Loading...
HomeMy WebLinkAboutT-3430108a 0 3 0 0 0 i U 0 0 U i 3 0 0 i z c� i a �o 0 0 0 z w i U w O 1IM111111 N _(0 ti W �l- N a o ti 2 25 8 - P9 El LITHIA DODGE CHRYSLER 1= CONSTRUCTION NOTES 1 / Q3 4" DIAMETER CONDUIT — CENTURYLINK (2 CONDUIT) 2" DIAMETER CONDUIT - COMCAST (1 CONDUIT) 4" DIAMETER CONDUIT -PSE POWER (1 CONDUIT) 21 END INSTALLATION OF 4" DIAMETER CONDUIT -PSE GAS APPROXIMATE STA 27 +40, LT El_ CID JOINT UTILITY TRENCH LEGEND UGP =`.( tiGP_ -_i UGP— UGP G1 -- - -- — ` �, O - - - _ \ 6 FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. - - - -- � 6 - -- ` UcP a, RAINIER AVE S ~ T - -- - -- - -- — — I�. "'�.:�:�..,,,„c�e. IJ I&VSroV �If, GENERAL JOINT UTILITY TRENCH PLAN NOTES = - -- 4 -- - - - - - - - - � -- - - -��� IHOP I VAULT SCHEDULE 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS PROVIDED BY ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY CONDUIT IN /FROM LEFT AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND P7 COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL V08 VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PSE AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE is PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM —_ THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF #919 _: y CENTURYLINK THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE 12q,13q UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE C6 FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE i TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE ICOMCAST GAS, COMCAST, AND CENTURYLINK. 7c,8c,9c,50c UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO - -- ` UcP a, RAINIER AVE S ~ T - -- - -- - -- — — I�. "'�.:�:�..,,,„c�e. IJ I&VSroV �If, GENERAL JOINT UTILITY TRENCH PLAN NOTES = - -- 4 -- - - - - - - - - � -- - - -��� IHOP I VAULT SCHEDULE 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS PROVIDED BY ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY CONDUIT IN /FROM LEFT AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND P7 COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL V08 VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PSE AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE 12p PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM Q8 THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF #919 COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER CENTURYLINK THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE 12q,13q UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE C6 FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE - TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE ICOMCAST GAS, COMCAST, AND CENTURYLINK. 7c,8c,9c,50c UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO P8 THREE PHASE J -BOX J13 AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE 9p,10p,3 -4" 13p,14p Q9 APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE U1ILITY 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL CENTURYLINK REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL - EXISTING U1ILITIES UN11L NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS C7 CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE - COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, COMCAST CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE 1001c CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY P9 FRANCHISE UTILITIES. J14 STRUCTURES NO LONGER IN USE. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. C8 CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS - SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER COMCAST CONVERSION. - DESIGN. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. - THE CITY OF RENTON. 15p - 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. COMCAST FOR THEIR CONVERSION. 12c - 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYUNK AND COMCAST SHALL BE IP07 PSE - MADE BY THE FRANCHISE UTILITIES. - 20p 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE IP05 PSE - PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS. - 1 -4" E4 P a —� E4 " 0 5 10 20 40 60 KFC i�' \\ A� SCALE IN FEET T=3430108 ID VAULT FRANCHISE UTILITY ID OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM LEFT CONDUIT OUT /TO RIGHT P7 1 -PH MP TRANSFORMER V08 PSE PSE CONTRACTOR 12p 2 -4" Q8 264 TA #919 CENTURYLINK CENTURYLINK CONTRACTOR 12q,13q 14q,15q,16q,17q C6 2436 MEDIUM DUTY VAULT - COMCAST ICOMCAST CONTRACTOR 7c,8c,9c,50c 1001c P8 THREE PHASE J -BOX J13 PSE PSE CONTRACTOR 9p,10p,3 -4" 13p,14p Q9 264 TA #920 CENTURYLINK CENTURYLINK CONTRACTOR - 19q,20q C7 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 1001c 120304c P9 THREE PHASE J -BOX J14 PSE PSE CONTRACTOR 13p,1 4p 15p,16p,17p C8 17 "x30" - COMCAST COMCAST CONTRACTOR - 19c P35 INTERCEPT POINT IP06 PSE - CONTRACTOR 15p - C37 17 "x30" - COMCAST COMCAST CONTRACTOR 12c - P36 INTERCEPT POINT IP07 PSE - CONTRACTOR - 20p P46 INTERCEPT POINT IP05 PSE - CONTRACTOR - 1 -4" P47 INTERCEPT POINT IP05 PSE - CONTRACTOR - 1 -4" P51 INTERCEPT POINT IP05A PSE - CONTRACTOR - 1 -4" P63 REMOVE VAULT A 3 PSE - CONTRACTOR - - P64 REMOVE VAULT J15 PSE - CONTRACTOR - - P65 REMOVE VAULT J17A PSE - CONTRACTOR - - CALL 2 DAYS BEFORE YOU DIG 1- 800 -424 -5555 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 11 EXISTING CONDITIONS 59 SITE PREPARATION & TESC PLAN 73 ALIGNMENT PLAN 85 ALIGNMENT PROFILE 97 DRAINAGE PLANS 108 DRAINAGE PROFILE 116 -119 WATER PLAN 136 WATER PROFILE 150 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 184 PROPERTY RESTORATION PLANS 199 CHANNELIZATION & SIGNING PLAN 221 ILLUMINATION PLANS 232 IRRIGATION PLAN 286 LANDSCAPE PLAN 298 a z n a h 11 -1x11 Os4'4�GwA y° 11 "? 2. n _ $ " SOT 20320 W`e msrea ¢, '�oNAL tiT$ SURVEYED: KPG DRAWN BY: SOD DESIGN BY: SOD CHECKBY: JLF PROJ MGR: JF FILE: 0655DJUT01.dwg KpC 753901AvenueN 2502 Jefferson Avenue BID SeaMe,WA98109 Taconna,WA98402 DOCUMENTS (206)2861640 (2531627 -0720 wwwkpgcam �� CITY OF RENTON "L Public Works Department APPROVED FOR CONSTRUCTION BY: DATE: �� /�"Z RAINIER AVENUES (SR 167) S GRADY WAY TO S 2ND ST JOINT UTILITY TRENCH PLAN STA 24 +50 TO STA 29 +00 8 DRAWING NO. 6V PROJECTNO. TED403430 FEDAIDNO. - CM0167(048) DATE: NOV 2011 SHEET NO. 166 OF 304 a d K � W a .p, o W N O NUMBER REVISION DESCRIPTION BY APP. DATE a z n a h v O 4& a d K � W a .p, o W N O