HomeMy WebLinkAboutT-3430108a
0
3
0
0
0
i
U
0
0
U
i
3
0
0
i
z
c�
i
a
�o
0
0
0
z
w
i
U
w
O
1IM111111
N
_(0
ti
W
�l-
N
a o
ti
2
25
8
- P9
El
LITHIA DODGE CHRYSLER
1=
CONSTRUCTION NOTES
1 / Q3 4" DIAMETER CONDUIT — CENTURYLINK (2 CONDUIT)
2" DIAMETER CONDUIT - COMCAST (1 CONDUIT)
4" DIAMETER CONDUIT -PSE POWER (1 CONDUIT)
21 END INSTALLATION OF 4" DIAMETER CONDUIT -PSE GAS
APPROXIMATE STA 27 +40, LT
El_ CID
JOINT UTILITY TRENCH LEGEND
UGP =`.( tiGP_ -_i UGP— UGP G1 -- - -- — ` �, O
- - - _ \ 6 FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164.
- - - --
� 6
- -- ` UcP a, RAINIER AVE S
~ T - -- - -- - -- — —
I�.
"'�.:�:�..,,,„c�e.
IJ
I&VSroV �If,
GENERAL JOINT UTILITY TRENCH PLAN NOTES
= - --
4
-- - - - - - - - -
� -- - - -��� IHOP I
VAULT SCHEDULE
1.
EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
8.
CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
PROVIDED BY
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
CONDUIT
IN /FROM LEFT
AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND
P7
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL
V08
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PSE
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
is
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
—_
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
#919
_: y
CENTURYLINK
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
12q,13q
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
C6
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
i
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
ICOMCAST
GAS, COMCAST, AND CENTURYLINK.
7c,8c,9c,50c
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
- -- ` UcP a, RAINIER AVE S
~ T - -- - -- - -- — —
I�.
"'�.:�:�..,,,„c�e.
IJ
I&VSroV �If,
GENERAL JOINT UTILITY TRENCH PLAN NOTES
= - --
4
-- - - - - - - - -
� -- - - -��� IHOP I
VAULT SCHEDULE
1.
EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND
8.
CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS
PROVIDED BY
ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY
CONDUIT
IN /FROM LEFT
AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND
P7
COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL
V08
VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND
PSE
AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE
12p
PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM
Q8
THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF
#919
COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER
CENTURYLINK
THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE
12q,13q
UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE
C6
FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE
-
TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE
ICOMCAST
GAS, COMCAST, AND CENTURYLINK.
7c,8c,9c,50c
UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO
P8
THREE PHASE J -BOX
J13
AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192.
2.
THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE
9p,10p,3 -4"
13p,14p
Q9
APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE U1ILITY
9.
CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL
CENTURYLINK
REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL
-
EXISTING U1ILITIES UN11L NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS
C7
CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE
-
COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL,
COMCAST
CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE
1001c
CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY
P9
FRANCHISE UTILITIES.
J14
STRUCTURES NO LONGER IN USE.
3.
PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL
10
INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE.
C8
CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS
-
SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER
COMCAST
CONVERSION.
-
DESIGN.
4.
THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR
11.
CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS.
-
THE CITY OF RENTON.
15p
-
5.
COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED
12.
CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN.
COMCAST
FOR THEIR CONVERSION.
12c
-
6.
UNDERGROUND SERVICE CONNECTIONS FOR CENTURYUNK AND COMCAST SHALL BE
IP07
PSE
-
MADE BY THE FRANCHISE UTILITIES.
-
20p
7.
UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE
IP05
PSE
-
PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS.
-
1 -4"
E4 P a
—� E4 "
0 5 10 20 40 60
KFC i�' \\ A� SCALE IN FEET
T=3430108
ID
VAULT
FRANCHISE
UTILITY ID
OWNED BY
PROVIDED BY
INSTALLED BY
CONDUIT
IN /FROM LEFT
CONDUIT
OUT /TO RIGHT
P7
1 -PH MP TRANSFORMER
V08
PSE
PSE
CONTRACTOR
12p
2 -4"
Q8
264 TA
#919
CENTURYLINK
CENTURYLINK
CONTRACTOR
12q,13q
14q,15q,16q,17q
C6
2436 MEDIUM DUTY VAULT
-
COMCAST
ICOMCAST
CONTRACTOR
7c,8c,9c,50c
1001c
P8
THREE PHASE J -BOX
J13
PSE
PSE
CONTRACTOR
9p,10p,3 -4"
13p,14p
Q9
264 TA
#920
CENTURYLINK
CENTURYLINK
CONTRACTOR
-
19q,20q
C7
2436 MEDIUM DUTY VAULT
-
COMCAST
COMCAST
CONTRACTOR
1001c
120304c
P9
THREE PHASE J -BOX
J14
PSE
PSE
CONTRACTOR
13p,1 4p
15p,16p,17p
C8
17 "x30"
-
COMCAST
COMCAST
CONTRACTOR
-
19c
P35
INTERCEPT POINT
IP06
PSE
-
CONTRACTOR
15p
-
C37
17 "x30"
-
COMCAST
COMCAST
CONTRACTOR
12c
-
P36
INTERCEPT POINT
IP07
PSE
-
CONTRACTOR
-
20p
P46
INTERCEPT POINT
IP05
PSE
-
CONTRACTOR
-
1 -4"
P47
INTERCEPT POINT
IP05
PSE
-
CONTRACTOR
-
1 -4"
P51
INTERCEPT POINT
IP05A
PSE
-
CONTRACTOR
-
1 -4"
P63
REMOVE VAULT
A 3
PSE
-
CONTRACTOR
-
-
P64
REMOVE VAULT
J15
PSE
-
CONTRACTOR
-
-
P65
REMOVE VAULT
J17A
PSE
-
CONTRACTOR
-
-
CALL 2 DAYS
BEFORE YOU DIG
1- 800 -424 -5555
CORRESPONDING SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
11
EXISTING CONDITIONS
59
SITE PREPARATION & TESC PLAN
73
ALIGNMENT PLAN
85
ALIGNMENT PROFILE
97
DRAINAGE PLANS
108
DRAINAGE PROFILE
116 -119
WATER PLAN
136
WATER PROFILE
150
JOINT UTILITY TRENCH PLAN
-
JOINT UTILITY TRENCH PROFILES
184
PROPERTY RESTORATION PLANS
199
CHANNELIZATION & SIGNING PLAN
221
ILLUMINATION PLANS
232
IRRIGATION PLAN
286
LANDSCAPE PLAN
298
a
z
n
a
h
11 -1x11
Os4'4�GwA y° 11
"? 2.
n _ $ "
SOT 20320 W`e
msrea ¢,
'�oNAL tiT$
SURVEYED: KPG
DRAWN BY: SOD
DESIGN BY: SOD
CHECKBY: JLF
PROJ MGR: JF
FILE: 0655DJUT01.dwg
KpC
753901AvenueN 2502 Jefferson Avenue BID
SeaMe,WA98109 Taconna,WA98402 DOCUMENTS
(206)2861640 (2531627 -0720
wwwkpgcam
�� CITY OF RENTON
"L
Public Works Department
APPROVED FOR CONSTRUCTION
BY: DATE: ��
/�"Z
RAINIER AVENUES (SR 167)
S GRADY WAY TO S 2ND ST
JOINT UTILITY TRENCH PLAN
STA 24 +50 TO STA 29 +00
8
DRAWING NO. 6V
PROJECTNO. TED403430
FEDAIDNO. - CM0167(048)
DATE: NOV 2011
SHEET NO. 166 OF 304
a
d
K
�
W
a
.p,
o
W
N
O
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE
a
z
n
a
h
v
O
4&
a
d
K
�
W
a
.p,
o
W
N
O