Loading...
HomeMy WebLinkAboutT-3430111(V w O i 3 Y II - 7 QDOBA BLOCKBUSTER _1 7 - 7 Q2 FRED MEYER _. -- -- H2 -- H1--=----- -_ - - -- - - - -- - - - -- - - -- }� �^ G � JT -- ,_ - -- 3 - - - -- -H1 -... __ - GP UGP— UGP UGP -UGP- -UGP I �3 GP 1iUGP1-�— Ph-- �JGP� O -H2� -� _.. �, e _<_ _ 1 - - - - - - -- r--- - - - - -- - - -- -- C C rT . r v 1 N \ 01 \ 1 1 \1 1 n Q3 1' w - - -- -- - - - - -J \\ 1 \ 1 1 w LLJ � - -- V \\ v 1 o � o v li �1 1 M � _ ! 1 \ 411 `. ICI 1 1\ \ 1 1 P 1 h1 1 i 39 40 11 v 1 1 en w C3 az �!r RAINIER AVE S _r. --------- - - - - -- \1 I 11 < ¢ \\ c \\ F r - -..... - - -. - - - _ - P UGP - - - - - -- 11 U L T - UGP t�i G UGP - -- q T UGP UGP - �; UGP— UGP —� UGP�,� \I\ - -P - -, UGP -UGP- Gr UGP- -UGP— UGP UGP—y' OGP 0G'P, - UGP— UGP UGP— UGP— UGPi - - -- v UGP— UGP— I i I I -r- - -i I Lf/ � 1 1 MCLENDON HARDWARE VAULT SCHEDULE ID VAULT FRANCHISE OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM CONDUIT OUT /TO U1ILIIY ID LEFT RIGHT P18 3 -PHASE TRANSFORMER V17 PSE PSE CONTRACTOR 1 -4" - Q21 CONNECT TO EX. SERVICE WIRE BOX - CENTURYLINK CENTURYLINK CONTRACTOR - 26q P19 ONE PHASE TRANSFORMER V20 PSE PSE CONTRACTOR 1 -2" - C18 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 30c,31c 32c,33c P73 REMOVE VAULT V18 PSE - CONTRACTOR - - P74 REMOVE VAULT V19 PSE - CONTRACTOR - - Q30 REMOVE VAULT - CENTURYLNK - CONTRACTOR - - 031 REMOVE VAULT - CENTURYLINK - CONTRACTOR - - P85 THREE PHASE J -BOX - PSE PSE CONTRACTOR 34p,35p 44p,45p 7 / I / SUB SHOP \ \ \ CONSTRUCTION NOTES 3Q 4" DIAMETER CONDUIT- CENTURYLINK (2 CONDUIT) A8 3" DIAMETER CONDUIT- COMCAST (2 CONDUIT) A4" DIAMETER CONDUIT -PSE POWER (2 CONDUIT) A6" DIAMETER CONDUIT -PSE GAS (1 CONDUIT) JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. GENERAL JOINT UTILITY TRENCH PLAN NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. PLAN 0 5 10 20 40 60 SCALE IN FEET CALL 2 DAYS BEFORE YOU DIG 1- 800 - 424 -5555 T- 3430111 CORRESPONDING SHEETS CATEGORY SHEET EXISTING CONDITIONS 14 RIGHT OF WAY PLANS 62 SITE PREPARATION & TESC PLAN 76 ALIGNMENT PLAN 88 ALIGNMENT PROFILE 100 DRAINAGE PLANS 111 DRAINAGE PROFILE 122 WATER PLAN 139 WATER PROFILE 153 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 187 PROPERTY RESTORATION PLANS 202 CHANNELIZA11ON & SIGNING PLAN 224 ILLUMINATION PLANS 3 IRRIGATION PLAN 89 LANDSCAPE PLAN r3;010 11 -14-17 SURVEYED: KPG oSwyfl wIn y °By DRAWN BY: SOD Kp� A CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 71 DESIGN BY: SOD 753MAvenueN 2502 Jefferson Avenue BID Public Works Department S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 h FED AID NO. - CM0167(048) CHECK BY: JLF SeaPoe,WA98109 Taooma,WA98402 DOCUMENTS JOINT UTILITY TRENCH PLAN '? 20320 y`e APPR V FOR CONSTRUCTION 1wis rsTF �`° PROJ MGR: JF (20512561640 (2531627 -0720 / /�� DATE: NOV 2011 NUMBER REVISION DESCRIPTION BY APP. DATE L E FILE: 0655DJUT01.dwg wevkpgcem BY: DATE STA 38 +00 TO STA 42 +00 SHEET NO. 171 OF 304 a z n a m a O I," ZE d � { w o W y O i -r- - -i I Lf/ � 1 1 MCLENDON HARDWARE VAULT SCHEDULE ID VAULT FRANCHISE OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM CONDUIT OUT /TO U1ILIIY ID LEFT RIGHT P18 3 -PHASE TRANSFORMER V17 PSE PSE CONTRACTOR 1 -4" - Q21 CONNECT TO EX. SERVICE WIRE BOX - CENTURYLINK CENTURYLINK CONTRACTOR - 26q P19 ONE PHASE TRANSFORMER V20 PSE PSE CONTRACTOR 1 -2" - C18 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 30c,31c 32c,33c P73 REMOVE VAULT V18 PSE - CONTRACTOR - - P74 REMOVE VAULT V19 PSE - CONTRACTOR - - Q30 REMOVE VAULT - CENTURYLNK - CONTRACTOR - - 031 REMOVE VAULT - CENTURYLINK - CONTRACTOR - - P85 THREE PHASE J -BOX - PSE PSE CONTRACTOR 34p,35p 44p,45p 7 / I / SUB SHOP \ \ \ CONSTRUCTION NOTES 3Q 4" DIAMETER CONDUIT- CENTURYLINK (2 CONDUIT) A8 3" DIAMETER CONDUIT- COMCAST (2 CONDUIT) A4" DIAMETER CONDUIT -PSE POWER (2 CONDUIT) A6" DIAMETER CONDUIT -PSE GAS (1 CONDUIT) JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. GENERAL JOINT UTILITY TRENCH PLAN NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. PLAN 0 5 10 20 40 60 SCALE IN FEET CALL 2 DAYS BEFORE YOU DIG 1- 800 - 424 -5555 T- 3430111 CORRESPONDING SHEETS CATEGORY SHEET EXISTING CONDITIONS 14 RIGHT OF WAY PLANS 62 SITE PREPARATION & TESC PLAN 76 ALIGNMENT PLAN 88 ALIGNMENT PROFILE 100 DRAINAGE PLANS 111 DRAINAGE PROFILE 122 WATER PLAN 139 WATER PROFILE 153 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 187 PROPERTY RESTORATION PLANS 202 CHANNELIZA11ON & SIGNING PLAN 224 ILLUMINATION PLANS 3 IRRIGATION PLAN 89 LANDSCAPE PLAN r3;010 11 -14-17 SURVEYED: KPG oSwyfl wIn y °By DRAWN BY: SOD Kp� A CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 71 DESIGN BY: SOD 753MAvenueN 2502 Jefferson Avenue BID Public Works Department S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 h FED AID NO. - CM0167(048) CHECK BY: JLF SeaPoe,WA98109 Taooma,WA98402 DOCUMENTS JOINT UTILITY TRENCH PLAN '? 20320 y`e APPR V FOR CONSTRUCTION 1wis rsTF �`° PROJ MGR: JF (20512561640 (2531627 -0720 / /�� DATE: NOV 2011 NUMBER REVISION DESCRIPTION BY APP. DATE L E FILE: 0655DJUT01.dwg wevkpgcem BY: DATE STA 38 +00 TO STA 42 +00 SHEET NO. 171 OF 304 a z n a m a O I," ZE d � { w o W y O i � 1 1 MCLENDON HARDWARE VAULT SCHEDULE ID VAULT FRANCHISE OWNED BY PROVIDED BY INSTALLED BY CONDUIT IN /FROM CONDUIT OUT /TO U1ILIIY ID LEFT RIGHT P18 3 -PHASE TRANSFORMER V17 PSE PSE CONTRACTOR 1 -4" - Q21 CONNECT TO EX. SERVICE WIRE BOX - CENTURYLINK CENTURYLINK CONTRACTOR - 26q P19 ONE PHASE TRANSFORMER V20 PSE PSE CONTRACTOR 1 -2" - C18 2436 MEDIUM DUTY VAULT - COMCAST COMCAST CONTRACTOR 30c,31c 32c,33c P73 REMOVE VAULT V18 PSE - CONTRACTOR - - P74 REMOVE VAULT V19 PSE - CONTRACTOR - - Q30 REMOVE VAULT - CENTURYLNK - CONTRACTOR - - 031 REMOVE VAULT - CENTURYLINK - CONTRACTOR - - P85 THREE PHASE J -BOX - PSE PSE CONTRACTOR 34p,35p 44p,45p 7 / I / SUB SHOP \ \ \ CONSTRUCTION NOTES 3Q 4" DIAMETER CONDUIT- CENTURYLINK (2 CONDUIT) A8 3" DIAMETER CONDUIT- COMCAST (2 CONDUIT) A4" DIAMETER CONDUIT -PSE POWER (2 CONDUIT) A6" DIAMETER CONDUIT -PSE GAS (1 CONDUIT) JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. GENERAL JOINT UTILITY TRENCH PLAN NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. PLAN 0 5 10 20 40 60 SCALE IN FEET CALL 2 DAYS BEFORE YOU DIG 1- 800 - 424 -5555 T- 3430111 CORRESPONDING SHEETS CATEGORY SHEET EXISTING CONDITIONS 14 RIGHT OF WAY PLANS 62 SITE PREPARATION & TESC PLAN 76 ALIGNMENT PLAN 88 ALIGNMENT PROFILE 100 DRAINAGE PLANS 111 DRAINAGE PROFILE 122 WATER PLAN 139 WATER PROFILE 153 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 187 PROPERTY RESTORATION PLANS 202 CHANNELIZA11ON & SIGNING PLAN 224 ILLUMINATION PLANS 3 IRRIGATION PLAN 89 LANDSCAPE PLAN r3;010 11 -14-17 SURVEYED: KPG oSwyfl wIn y °By DRAWN BY: SOD Kp� A CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 71 DESIGN BY: SOD 753MAvenueN 2502 Jefferson Avenue BID Public Works Department S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 h FED AID NO. - CM0167(048) CHECK BY: JLF SeaPoe,WA98109 Taooma,WA98402 DOCUMENTS JOINT UTILITY TRENCH PLAN '? 20320 y`e APPR V FOR CONSTRUCTION 1wis rsTF �`° PROJ MGR: JF (20512561640 (2531627 -0720 / /�� DATE: NOV 2011 NUMBER REVISION DESCRIPTION BY APP. DATE L E FILE: 0655DJUT01.dwg wevkpgcem BY: DATE STA 38 +00 TO STA 42 +00 SHEET NO. 171 OF 304 a z n a m a O I," ZE d � { w o W y O i 7 / I / SUB SHOP \ \ \ CONSTRUCTION NOTES 3Q 4" DIAMETER CONDUIT- CENTURYLINK (2 CONDUIT) A8 3" DIAMETER CONDUIT- COMCAST (2 CONDUIT) A4" DIAMETER CONDUIT -PSE POWER (2 CONDUIT) A6" DIAMETER CONDUIT -PSE GAS (1 CONDUIT) JOINT UTILITY TRENCH LEGEND FOR JOINT UTILITY TRENCH LEGEND, SEE SHT 164. GENERAL JOINT UTILITY TRENCH PLAN NOTES 1. EXISTING UNDERGROUND UTILITIES TO BE CONVERTED TO NEW UNDERGROUND ALIGNMENT TO THE LIMITS SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY COORDINATION, LAYOUT, SURVEYING, TRENCHING, EXCAVATION, BEDDING, BACKFILL AND RESTORATION FOR THE FRANCHISE UTILITIES TO SUCCESSFULLY COMPLETE THE CONVERSION. THE LAYOUT SHOWN IS APPROXIMATE AND A COMPILATION OF THE DESIGNS BY PSE, COMCAST, CENTURYLINK, AND CITY OF RENTON. SEE FRANCHISE UTILITY PLANS (VOLUME 4 OF 4) FOR DESIGNS BY PSE POWER, PSE GAS, COMCAST, AND CENTURYLINK. 2. THE JOINT TRENCH LAYOUT, SWEEPS, VAULTS AND OTHER FEATURES SHOWN ARE APPROXIMATE. ADJUST AS NECESSARY TO MEET FRANCHISE UTILITY REQUIREMENTS AND TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM. ALL CONDUIT MATERIALS, BENDS, VAULTS, AND OTHER MATERIALS INSTALLED BY THE CONTRACTOR SHALL BE PER THE REQUIREMENTS AND SPECIFICATIONS OF THE FRANCHISE UTILITIES. 3. PSE WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR ELECTRICAL CONVERSION. PSE WILL FURNISH ALL CASING CONDUIT REQUIRED FOR THEIR GAS CONVERSION. 4. THE CONTRACTOR WILL FURNISH AND INSTALL ALL VAULTS AND CONDUITS FOR THE CITY OF RENTON. 5. COMCAST AND CENTURYLINK WILL FURNISH ALL VAULTS AND CONDUITS REQUIRED FOR THEIR CONVERSION. 6. UNDERGROUND SERVICE CONNECTIONS FOR CENTURYLINK AND COMCAST SHALL BE MADE BY THE FRANCHISE UTILITIES. 7. UNDERGROUND SERVICE CONNECTIONS FOR POWER SHALL BE MADE BY THE PROPERTY OWNER FROM THE RIGHT -OF -WAY TO EXISTING PRIVATE METERS. 8. CONSTRUCT JOINT UTILITY TRENCH PER THE TYPICAL TRENCH DETAILS, SECTIONS AND PROFILE SHEETS 174 -192. ADJUST THE HORIZONTAL ALIGNMENT AND VERTICAL PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES AND ROADWAY FEATURES, WHILE MAINTAINING 3' MINIMUM COVER OVER CONDUITS AND VERTICAL 12" MINIMUM CLEAR BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS. SEE THE APPROXIMATE JOINT UTILITY TRENCH PROFILE TO AID IN THE LAYOUT OF THE TRENCH, SHEETS 180 -192. 9. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE EXISTING CONDUIT DUCT BANK AND EXISTING UTILITY STRUCTURES NO LONGER IN USE. 10 INCLUDE ILLUMINATION AND SIGNAL CONDUIT IN JOINT TRENCH WHERE POSSIBLE. SEE ILLUMINATION AND SIGNAL PLANS FOR CITY OF RENTON POWER AND FIBER DESIGN. 11. CONTRACTOR TO INSTALL CENTURYLINK OVERSET VAULTS. 12. CONTRACTOR SHALL PRESERVE AND PROTECT ALL FACILITIES TO REMAIN. PLAN 0 5 10 20 40 60 SCALE IN FEET CALL 2 DAYS BEFORE YOU DIG 1- 800 - 424 -5555 T- 3430111 CORRESPONDING SHEETS CATEGORY SHEET EXISTING CONDITIONS 14 RIGHT OF WAY PLANS 62 SITE PREPARATION & TESC PLAN 76 ALIGNMENT PLAN 88 ALIGNMENT PROFILE 100 DRAINAGE PLANS 111 DRAINAGE PROFILE 122 WATER PLAN 139 WATER PROFILE 153 JOINT UTILITY TRENCH PLAN - JOINT UTILITY TRENCH PROFILES 187 PROPERTY RESTORATION PLANS 202 CHANNELIZA11ON & SIGNING PLAN 224 ILLUMINATION PLANS 3 IRRIGATION PLAN 89 LANDSCAPE PLAN r3;010 11 -14-17 SURVEYED: KPG oSwyfl wIn y °By DRAWN BY: SOD Kp� A CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 71 DESIGN BY: SOD 753MAvenueN 2502 Jefferson Avenue BID Public Works Department S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 h FED AID NO. - CM0167(048) CHECK BY: JLF SeaPoe,WA98109 Taooma,WA98402 DOCUMENTS JOINT UTILITY TRENCH PLAN '? 20320 y`e APPR V FOR CONSTRUCTION 1wis rsTF �`° PROJ MGR: JF (20512561640 (2531627 -0720 / /�� DATE: NOV 2011 NUMBER REVISION DESCRIPTION BY APP. DATE L E FILE: 0655DJUT01.dwg wevkpgcem BY: DATE STA 38 +00 TO STA 42 +00 SHEET NO. 171 OF 304 a z n a m a O I," ZE d � { w o W y O i 11 -14-17 SURVEYED: KPG oSwyfl wIn y °By DRAWN BY: SOD Kp� A CITY OF RENTON RAINIER AVENUES (SR 167) DRAWING NO. 71 DESIGN BY: SOD 753MAvenueN 2502 Jefferson Avenue BID Public Works Department S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 h FED AID NO. - CM0167(048) CHECK BY: JLF SeaPoe,WA98109 Taooma,WA98402 DOCUMENTS JOINT UTILITY TRENCH PLAN '? 20320 y`e APPR V FOR CONSTRUCTION 1wis rsTF �`° PROJ MGR: JF (20512561640 (2531627 -0720 / /�� DATE: NOV 2011 NUMBER REVISION DESCRIPTION BY APP. DATE L E FILE: 0655DJUT01.dwg wevkpgcem BY: DATE STA 38 +00 TO STA 42 +00 SHEET NO. 171 OF 304 a z n a m a O I," ZE d � { w o W y O i