Loading...
HomeMy WebLinkAboutT-3430131a 0 N 0 N 3 0 RM NUMBER STA 30 +00 JOINT UTILITY TRENCH CROSSING PROFILE 6.0 ...................................................................................................................................................................................................................................... ......... .........: ................. SURVEYED: KPG . ......... .. ..... ............................... ....... ..........I...............: 6.0. DRAWN BY: _ .............................. ........................... ..... ......... ........... _ :............................... .............. z ....Z' SOD . ........... ..................... .. 60 ... ......... ... .... ...... CHECK BY: ..... .............................. _._................. - .... .... .. .... W ..... JF .. ..... ... ... ... .... . FILE: 0655DJUTPRF01.dwg RAINIER AVE S ... ................................................................................ .. .. _ .. .......... GL v ° z Z J Y o : ....... Ycoo 3 ... : ... ..... ... ..... =.N:.... ... .... 4040 Z :..... .........................:..... Z W ., ... ....... W . w....... ... . L.i:.................... ........... ..... uj of g L — ad .... .. ............. ..........�.M 1..... ... ...� ... .. 1 ..;�. - EXISTING GROUND.. . ... .............................� ... .. ....... ...... ...... .. <D .. ... .. [ X N X N.. c� .�.. . ..t. .. ....... ........................:.....� ...... .... N . .... ... W .........:........ ........................ ....... .... ... ..... ... ...... .... .. ... ............................... 20 ' ....... .. .......t ... .... X 20 ........................... 40 .....:........ V .... J.U' _..... JOINT UTILITY TRENCH W ................................................. K o... Q . ................ �4 .... _ ....:.......... CONDUITBANK..... ... ................:... ............................E.. .... ....................:......... ......... ......... ......: r- CONNECTION TO RAINIER AVE S - �. p... PSE VAULT P17 C7.............................................. ....................:.......... w w w w STA 34 +29.83',' SEE WEST PROFILE; SHT 186 .. � . ........... :...... ..................X.X... 0 ............................................................. .......................... N.. . ................................................ . ..............................: .............................. . ..... .............................M p REVISION DESCRIPTION S 4TH PLACE JOINT UTILITY TRENCH CROSSING PROFILE BY I APP.I DATE T__ 753981 Avenue N 2502 Jefferson Avenue Seattle, WA 98109 Tacoma, WA 98402 (206) 286.1640 (253) 627 -0720 vrvry A g.omn GENERAL JOINT TRENCH PROFILE NOTES 1. SEE JOINT UTILITY TRENCH PLANS AND SEC11ONS FOR APPROXIMATE PLAN LAYOUT AND DETAILS, SHEETS 164 -179. 2. THE JOINT TRENCH PROFILE SHOWN IS APPROXIMATE. ADJUST THE PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES, WHILE MAINTAINING 36" MINIMUM COVER OVER CONDUITS AND 12" MINIMUM VERTICAL CLEARANCE BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS, AND TYPICAL JOINT U1LITY TRENCH TRANSITION DETAIL, SHEET 174. 3. LOCATION, DEPTH AND SIZE OF EXISTING UTILITIES ARE APPROXIMATE. CONTRACTOR TO VERIFY BY POTHOLING BEFORE EXCAVATION. 4. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE OR ABANDON EXISTING FACILITIES NO LONGER IN USE. 5. COORDINATE JOINT UTILITY TRENCH PROFILE WITH WATER PROFILE, SHEETS 146 -159 AND STORM DRAINAGE PROFILE. 6. FOR PROFILE REFERENCE POINT, SEE TYPICAL JOINT UTILITY TRENCH PROFILE COORDINATION DETAIL, SHEET 174. 80 ......................................................................................................................................................................................... 11 -14 -11 SURVEYED: KPG COQ ... ............ ........ .......... ......... ................................ 92 DRAWN BY: SOD .............................. ............... ........... _ :............................... .............. z DESIGN BY: SOD . ........... _.. . ............................... _.. ._.................: .. ...... ............................... 60 z CHECK BY: NJD �......... ...... W....................... _._................. - .... . PROJ MGR: JF Yl2w ..................... ............................... FILE: 0655DJUTPRF01.dwg T__ 753981 Avenue N 2502 Jefferson Avenue Seattle, WA 98109 Tacoma, WA 98402 (206) 286.1640 (253) 627 -0720 vrvry A g.omn GENERAL JOINT TRENCH PROFILE NOTES 1. SEE JOINT UTILITY TRENCH PLANS AND SEC11ONS FOR APPROXIMATE PLAN LAYOUT AND DETAILS, SHEETS 164 -179. 2. THE JOINT TRENCH PROFILE SHOWN IS APPROXIMATE. ADJUST THE PROFILE AS NECESSARY TO AVOID CONFLICTS WITH EXISTING AND PROPOSED UTILITIES, WHILE MAINTAINING 36" MINIMUM COVER OVER CONDUITS AND 12" MINIMUM VERTICAL CLEARANCE BETWEEN OTHER UNDERGROUND UTILITIES. THE CONTRACTOR SHALL VERTICALLY TRANSITION THE TRENCH DEPTH BY DEFLECTING JOINTS OR INSTALLING BENDS PER THE FRANCHISE UTILITY REQUIREMENTS, AND TYPICAL JOINT U1LITY TRENCH TRANSITION DETAIL, SHEET 174. 3. LOCATION, DEPTH AND SIZE OF EXISTING UTILITIES ARE APPROXIMATE. CONTRACTOR TO VERIFY BY POTHOLING BEFORE EXCAVATION. 4. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW CONTINUED OPERATION OF ALL EXISTING UTILITIES UNTIL NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AND FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE OR ABANDON EXISTING FACILITIES NO LONGER IN USE. 5. COORDINATE JOINT UTILITY TRENCH PROFILE WITH WATER PROFILE, SHEETS 146 -159 AND STORM DRAINAGE PROFILE. 6. FOR PROFILE REFERENCE POINT, SEE TYPICAL JOINT UTILITY TRENCH PROFILE COORDINATION DETAIL, SHEET 174. 80 ......................................................................................................................................................................................... ..... ....................:.......... _ .........:............. ... ............ ........ .......... ......... ................................ _ _ ............................... ........... ........: ........ ........ . ........... _._.............: 80 ....: .............................. ............... ........... _ :............................... .............. z ........... .................. ................. :............................... . ........... _.. . ............................... _.. ._.................: .. ...... ............................... 60 z ............... �......... ...... W....................... _._................. - .... . ........... ....................i 60 ................ ..................... ............................... ................................................................................ ............................... Ycoo 3 ... : ... ..... ... ..... =.N:.... ... .... W.... ' Z .... pj. � .... ............. ..... ... W ... . ..... uj of L — ad .... .. ............. ..........�.M 1..... ... ...� ... .. 1 ..;�. - �... . ... .............................� ... .. ....... ...... ...... .. <D .. ... .. ... Z �..... N....Z .......................................... ..... .... N.. c� 3F U. 0 ..'c w F-. ..... . RAINIER AVE S ..U... z N..—� W .... w .... .. ... W 3 X _ ........................... 40 V . .... �L. J.U' W Z K o... Q ... 40 ................ �4 .... �....... .... ....................:......... ..............................W r- N.:... - �. p... ..... ..... C7.............................................. ....................:.......... :... X... N. .. � . ........... :...... ..................X.X... N.. =. .... ............ ..............................: �... w.w' �N..m WOO w .... ...EXISTING GROUND ..... � . ...... .. ....... ..... X �..o :...... ' .. .... ....... .............. :...... ......... ........................�.. .... ..... .. ........................... .............. ............................... ........... ..............................: 20 ..... - .. .. ..... ....... .. ............... - ............................... .... 20 .. .. ......... .. ....... ..... JOINT UTILITY -TRENCH ........................ ..........:.................................................:.. ............................... CONDUIT' BANK............................................................. ............................... . : :..CONNECTION ....... ......... TO ...........:...... RAINIER AVE .S ... .... ................... .:........................ .......... .............................: STA 42 +40:97: SEE WEST PROFILE; SHT 188. 0 ..........:.................................................:.................................................:.................................................:............................ .: ........ .................................................. ............................... .... 0 . STA 42 +40 JOINT UTILITY TRENCH CROSSING PROFILE CITY OF RENTON BID Public Works Department DOCUMENTS APPROVE FOR CONSTRUCTION BY: DATE: / /LI/ 0 5 20 40 60 T=3430131 HORIZONTAL IZONTAL SCALE IN FEET VERT. SCALE =1 2 HORIZ. SCALE RAINIER AVENUE S (SR 167) DRAWINGNO. 191 S GRADY WAY TO S 2ND ST PROJECT NO. TED40M FED AID NO. -CM0167(048) JOINT UTILITY TRENCH PROFILE CROSSINGS DATE: NOV 30 STA 30 +00, S 4TH PL AND STA 42 +40 CROSSINGS 4 SHEET NO. 191 OF F 304 z n n � O G � n L7 yT w� ya U W { T O N O