Loading...
HomeMy WebLinkAboutT-3430132a N Z W Q Y GENERAL JOINT TRENCH PROFILE NOTES 1. SEE JOINT UTILITY TRENCH PLANS AND SECTIONS FOR APPROXIMATE PLAN LAYOUT AND DETAILS, SHEETS 164 -179. SUNSET BLVD JOINT UTILITY TRENCH CROSSING PROFILE T- 3430132 11-14-11 pS4'4�Owa y04 SO zoszo ma @�0 1 NAL ti SURVEYED: KPG DRAWN BY: SOD DESIGN BY: SOD CHECK BV: NJD PROJ MGR: JF FILE: 0655DJUTPRF01.dwg Kp� 753901 AVaaaeN 2502 Jefferson Avenue BID Sea10e, WA 98109 Tamma, WA 98402 DOCUMENTS (206)2861640 (253)627 -0720 wwwkpgcam '� �-�- CITY OF RFNTON � Public Works Department APPR V FOR CONSTRUCTION BY: DATE:/ �L RAINIER AVENUES (SR 167) S GRADY WAY TO S 2ND ST JOINT UTILITY TRENCH PROFILE CROSSINGS SW SUNSET BLVD CROSSING DRAWING NO. 192 PROJECTNO. TED403430 FED AID NO. - CM0167(048) DATE: NOV 2011 SHEET NO. 192 OF 304 2. THE JOINT TRENCH PROFILE SHOWN IS APPROXIMATE. 60 60 ADJUST THE PROFILE AS NECESSARY TO AVOID CONFLICTS ............................................... ............................... NUMBER REVISION DESCRIPTION BY APP. DATE WITH EXISTING AND PROPOSED UTILITIES, WHILE Y MAINTAINING 6" M T ROVER CONDUITS AND 12" w ........ ............. _.. .. ... MINIMUM VERTICAL CLEARANCE BETWEEN OTHER w UNDERGROUND UTILITIES. THE CONTRACTOR SHALL ........... w b w VERTICALLY TRANSITION THE TRENCH DEPTH BY ........................... a .......o ...........................;. . .. -....- . z ....................... Y x DEFLECTING JOINTS OR INSTALLING BENDS PER THE _ .....Y .............:......... z o ... .. ° ..� .... �.................. z SW SUNSET BLVD. w C) �...... o ......... . FRANCHISE UTILITY REQUIREMENTS, AND TYPICAL JOINT Y �.... .. N ...:......... N............� .. ..1...... �. ....................... CL ..:... ..... ........ w a y UTILITY TRENCH TRANSITION DETAIL, SHEET 174. zw N w U o .... Z. .0 :N W. ... ..... EXISTING GROUND .... .. �.. .. �. .. ........ Q. ........... .. �... ..... 40 w. v — =. �. w z. a.... ¢ 40 3. LOCATION, DEPTH AND SIZE OF EXISTING UTILITIES ARE ............... ..........Q... .. m ' o ............ ..° . ........................a...... APPROXIMATE. CONTRACTOR TO VERIFY BY POTHOLING E �- x w C) x .. BEFORE EXCAVA TION. :......... ..... .....................:......... N............. w ............ n CO....s..w x .... ... w . .............. ........ ..... .................... ....... ;w :. .. ....................;.......... ................. w ............... cQ...:......... .. ............................... ....................... .....................:......... 4. CONTRACTOR SHALL SEQUENCE WORK TO ALLOW ... .... CONTINUED OPERATION OF ALL EXISTING UTILITIES UN TIL ......... .....................:......... ....................:.... ...........................:... ............. 0 5 10 20 40 60 NEW SYSTEM IS COMPLETE. ONCE NEW SYSTEM IS ................... .................. .....:......................... ................... ... .................... ........... ; ............................. .: COMPLETED, TESTED, APPROVED BY UTILITY OWNERS AN 0 .......... .......... ............... JOINT UTILITY TRENCH.... ............................... .............................. .............................. HORIZONTAL SCALE IN FEET FULLY OPERATIONAL, CONTRACTOR SHALL REMOVE OR 20 " "' . CONDUIT. BANK .............. ........... :........... :...............................: ..............................: VERT. SCALE =1 2 HORIZ. SCALE ABANDON EXISTING FACILITIES NO LONGER IN USE. .......... ...................................................................................................................................................:................................................:.................................................:............................ ....................:.......... 20 ....... ......... CONNECTION. TO AVE .... ...... 0 STA.47 CT10 AI I A S 189 5 COORDINATE JOINT UTILITY TRENCH PROFILE WITH WATER ±42.38, SEE WEST. PROFILE, SHT STA.45. +87.14, .RAINIER. .SEE. WEST. PROFILE, .S. .SHT.18.9 ....... .... ....... ..... ... .. ....................... ... .... ..... ..... LE S PROF( SHEETS 146 -159 AND STORM DRAINAGE PROFILE. ..................... ...:....... ............... .... . . . _ .. .. ............. .......:....... .......................[............................. .:............................. 6. FOR PROFILE REFERENCE POINT, SEE TYPICAL JOINT .. .................. ....... .......... .............:................. :.............................. ............................... _ ............. ... ............. ................................ ............................... _ ........... ... ............................... ............................... _ ......................:.............................. _ ....:. .............I................: ..............................: ............................ ..............................E : ........... ................... : UTILITY TRENCH PROFILE COORDINATION DETAIL, SHEET 174 AIL, S . 0 ............................................................:...................................................................................................:.................................................:.................................................:............................ :..............................:............................ a ..:...............................:..................... .... .................. ........ :.............................. .................... : ............... .. ............................... ................ .....................:......... O . SUNSET BLVD JOINT UTILITY TRENCH CROSSING PROFILE T- 3430132 1-1 a z my m 1zO1z m I N C) I� a 'C W 0 W M N_ O 11-14-11 pS4'4�Owa y04 SO zoszo ma @�0 1 NAL ti SURVEYED: KPG DRAWN BY: SOD DESIGN BY: SOD CHECK BV: NJD PROJ MGR: JF FILE: 0655DJUTPRF01.dwg Kp� 753901 AVaaaeN 2502 Jefferson Avenue BID Sea10e, WA 98109 Tamma, WA 98402 DOCUMENTS (206)2861640 (253)627 -0720 wwwkpgcam '� �-�- CITY OF RFNTON � Public Works Department APPR V FOR CONSTRUCTION BY: DATE:/ �L RAINIER AVENUES (SR 167) S GRADY WAY TO S 2ND ST JOINT UTILITY TRENCH PROFILE CROSSINGS SW SUNSET BLVD CROSSING DRAWING NO. 192 PROJECTNO. TED403430 FED AID NO. - CM0167(048) DATE: NOV 2011 SHEET NO. 192 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE 1-1 a z my m 1zO1z m I N C) I� a 'C W 0 W M N_ O