Loading...
HomeMy WebLinkAboutT-3430145a 0 N 3 a O w a i U O 0 i C �3 0 0 i z c� w 0 i Q Y I� 'I F- i era oG? SUBWAY GP P _ I - - I - c N I — ��,..— -v`i- ,. b- F-- r- I ° 50 RAINIER AVE S Z +.p J O Q ��N. -Vl-j— n}-.- �n, _... -u.� _ �r— I�•` -_— -.6:_- W _ - 4� t, J 1 _ �. -y -.r � .i A i L -- I 53 I I <n I i I I I I — -- -- - - -- \,,b' �-- — —, — I/� r QI: I ii I TACO.TIME I I CO) I > Z J CD �� - - -- '_ .I DENNY'S 1d I 4- I CI I\1 III � Y7 i W ti I I i T z Ell 0 5 10 20 40 60 Y J, SCALE IN FEET I I r I I'Il T1I PROPERTY RESTORATION LEGEND COMMERCIAL HMA PAVEMENT AREA CEMENT CONCRETE SIDEWALK AND /OR PAVEMENT PROPERTY LINES -- - - - - -- SAWCUT LINES — — — RIGHT OF WAY LINES — - - — EASEMENT LINES - - - - - - - - APPROXIMATE CONSTRUCTION LIMITS GENERAL CONSTRUCTION NOTES 1. CONTRACTOR SHALL MAINTAIN CONTINUOUS ACCESS TO ALL PARCELS. 2. ADJUST ALL SURFACE UTILITIES TO FINAL GRADE. 3. CONTRACTOR SHALL NOTIFY BUSINESS OWNERS AT LEAST THREE DAYS PRIOR TO PERFORMING WORK WITHIN THE TEMPORARY CONSTRUCTION EASEMENT. 4. CONTRACTOR SHALL COORDINATE WITH BUSINESS OWNER AND SCHEDULE WORK WITHIN THE TEMPORARY CONSTRUCTION EASEMENT AROUND SPECIAL BUSINESS HOURS. 5. FOR REMOVAL LIMITS, CONSTRUCTION LIMITS, AND TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES, SEE SITE PREPARATION & TESC PLANS, SHEETS 69 -79. 6. FOR CONSTRUCTION PHASING, SEE CONSTRUCTION PHASING PLANS, SHEETS 37 -54. 7. THESE SHEETS CONTAIN BACK OF SIDEWALK LAYOUT POINTS AND WORK TO BE COMPLETED BEHIND THE SIDEWALK. FOR TREATMENT OF ROADWAY FEATURES SEE ALIGNMENT PLANS, SHEETS 81 -91. 8. FOR WATER SERVICE CONNECTIONS, SEE WATER PLANS, SHEETS 132 -141. 9. FOR STORM DRAINAGE CONNECTIONS AND ADJUSTMENTS, SEE STORM DRAINAGE PLANS. 10. FOR TREATMENT OF DRIVEWAYS SEE DRIVEWAY PLANS AND PROFILES SHEETS 208 -216. 11. FOR FRANCHISE UTILITY CONNECTIONS, SEE JOINT UTILITY TRENCH PLANS, SHEETS 164 -173. 12. FOR DECORATIVE SIDEWALK PAVEMENT TREATMENTS AND FOR LOCATION OF OTHER URBAN DESIGN FEATURES, SEE URBAN DESIGN DETAILS, SHEETS 269 -281. 13. FOR ALL LOCATIONS WHERE THE BACK OF SIDEWALK IS NOT DEFINED IN THE POINT LAYOUT TABLES, THE TOP BACK OF SIDEWALK SHALL BE CONSTRUCTED AS DEFINED BY THE ALIGNMENT PROFILES (SHEETS 93 -103), TYPICAL SECTIONS (SHEETS 19-23), INTERSECTION CURVE DATA TABLES (SHEETS 81 -92), AND PLAN DIMENSIONS SHOWN. 14. CONTRACTOR SHALL ENSURE FINAL GRADE OF COMMERCIAL HMA MAINTAINS POSITIVE DRAINAGE TO DOWNSTREAM DRAINAGE STRUCTURES, T- 3430145 CORRESPONDING SHEETS CATEGORY SHEET RIGHT OF WAY PLANS 17 EXISTING CONDITIONS 65 SITE PREPARATION & TESC PLAN 79 ALIGNMENT PLAN 91 ALIGNMENT PROFILE - DRAINAGE PLANS - DRAINAGE PROFILE - WATER PLAN - WATER PROFILE - JOINT UTILITY TRENCH PLAN - JOINT U11UTY TRENCH PROFILES - PROPERTY RESTORATION PLANS - CHANNELIZATION & SIGNING PLAN 227 ILLUMINATION PLANS - IRRIGATION PLAN - LANDSCAPE PLAN - KAMY At JL UUKNLK UP KAINIGK ANU ZNU. GIA 11 -14.11 OS�43, WA HO '69 ti - °02l _ 207ER O qq� r0untl� SURVEYED: KPG DRAWN BY: SOD DESIGN BY: JLF CHECK BY: NM PROJ MGR: JF FILE: 0655dREST01.dwg KPGr 7539thAvenueN 2502JeBersonAvenue BID SeaMe,WA98109 Tamela,WA98402 DOCUMENTS (206)286-1640 (253) 627 -0720 wxwkpgcom °' - CITY OF RENTON Public Works Department APP V D FOR CONSTRUCTION BY: DATE:�L RAINIER AVENUE S (SR 167) S GRADY WAY TO S 2ND ST PROPERTY RESTORATION PLANS STA 49 +00 TO STA 53 +25 DRAWINGNO. 205 PROJECT NO. TED403(0 FED AID NO. -C NOV 011 DATE: OV 2011 SHEET NO. 205 OF 304 REVISION DESCRIPTION BY APP. DATE z My Kl y rn O G 1 NC U� o w N O z c