Loading...
HomeMy WebLinkAboutT-3430209O 3 0 m 0 U O C 0 3 0 z c� N 0 ■� SW GRADY WAY NW CORNER AT SW GRADY WAY INTERSECTION PLAN 10} 9 Lz1 to W n Z W Q W_ - Z �1 SW CORNER AT SW GRADY WAY INTERSECTION PLAN NTS W a_ / Z 5", W Q .6 16 6 �\ SOUND FORD _W 3 Z_ 5: 4 \ CONSTRUCTION WALL B'\, LIMIT & ROW O 8 12 1 \ 7 WALL A 0 o :1:• (TYP) 2 ° 6 1 °° .• 3 £l u 10 T ti 9 SIDEWALK EXPANSION JOINT, TYP. SCORE JOINT, o TYP. w o° Ye a N man le! a �pY 10 WA 9 WG S NE CORNER AT SW GRADY WAY INTERSECTION PLAN a t 1 SW GRAY W A W Z } rz 14 W 9 15 a W 00 CONSRUC110N LIMIT Z ° 12 ,r gg 13 ma •• a Cy- Jfl no- ti �a e° u ,® YANKEE GRILL SE CORNER AT SW GRADY WAY INTERSECTION PLAN NTS T- 3430209 CONSTRUCTION NOTES O1 INSTALL GATEWAY SIGN WALL (A), SEE DETAILS, SHEETS 270 -271. O2 INSTALL DECORATIVE ART POLES, TYP. SEE DETAILS, SHEETS 273 -274. O INSTALL DECORATIVE CONCRETE FINISH (COLOR A). SEE DETAILS, SHEET 281, AND NOTE, THIS SHEET. ® INSTALL WALL (B & C) WITH SKATEBLOCKS. SEE DETAIL, SHEET 271. Q5 INSTALL TRASH RECEPTACLE. SEE SURFACE MOUNT DETAIL, SHEET 281, AND TRASH RECEPTACLE SCHEDULE, THIS SHEET. © INSTALL DECORATIVE CONCRETE FINISH (COLOR B). SEE DETAILS, SHEET 281 AND NOTE, THIS SHEET. O7 SCORED CEMENT CONCRETE SIDEWALK AND CONSTRUCTION JOINT LAYOUT. SEE DETAILS, SHEET 281. ® PLANTING AREA, TYP. O9 INSTALL DECORATIVE CROSSWALK TREATMENT. SEE DETAIL, SHEET 281. 10 DECORATIVE STAMPED CONCRETE FINISH. 11 DECORATIVE ROADWAY LUMINAIRE, SEE ILLUMINATION PLANS. 12 DECORATIVE SIGNAL POLE WITH MAST ARM AND LUMINAIRE, SEE SIGNALIZATION PLANS. 13 PEDESTRIAN PUSH BUTTON. SEE SIGNALIZATION PLANS. 14 CEMENT CONCRETE SIDEWALK, PER WSDOT STD PLAN F- 30.10 -01. 15 CEMENT CONCRETE SIDEWALK. SEE PROPERTY RESTORATION PLANS SHEETS 195 -207. 16 INSTALL JUNCTION BOX TYPE 1, SEE DETAILS, SHEETS 271 & 273. LAYOUT POINTS SCHEDULE ITEM : #: STATION OFFSET DESCRIPTION 1 SEE TABLE, SHEET 195 BEGIN CURVE FOR WALL A, PRC 2 SEE TABLE, SHEET 195 END CURVE FOR WALL A, PRC 3 10 +90.64 83.11 RT LAYOUT PT FOR SCORING* 4 SEE TABLE, SHEET 195 BEGIN CURVE FOR WALL B, PRC 5 SEE TABLE, SHEET 195 END CURVE FOR WALL B, PRC 6 10 +59.64 71.92 LT LAYOUT PT FOR SCORING* 7 SEE TABLE, SHEET 195 BEGIN CURVE FOR WALL C, PRC 8 SEE TABLE, SHEET 195 END CURVE FOR WALL C, PRC 9 11 +15.88 178.88 RT RING CONCRETE FINISH, CENTER 10 10 +72.28 F 67.99 LT RING CONCRETE FINISH, CENTER 11 SEE SHEET 81 LAYOUT POINT FOR EDGE OF SCORING 12 SEE SHEET 81 LAYOUT POINT FOR EDGE OF SCORING * SIDEWALK SCORING TO BE ALIGNED WITH BACK OF ADA RAMP. NOTE: ENGINEER TO FIELD LOCATE AND VERIFY DECORATIVE CONCRETE FINISH PRIOR TO INSTALLATION. TRASH RECEPTACLE SCHEDULE L STATION OFFSET 10 +57.72 89.04 [T- 11+4.00 79.61 RT 0 5 10 20 SCALE IN FEET 30 n -14 -11 SURVEYED: KPG �� KPG'r CITY OF PENTON RAINIER AVENUES (SR 167) DRAWING NO- 269 DRAWN BY: PN gip "a S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 DESIGN BY: KPG Public Works Department a 7539th Avenue N 2502 Jefferson Avenue as`"a a CHECKBY: PF Seak WA98109 Tacama,WA9M02 FED AID NO. - CM0167(048) y<w� DOCUMENTS APP DFORCONSTRUCTION URBAN DESIGN DETAILS aLL (206)286.1640 253627 -0720 DATE: NOV 2011 U PROJ MGR: JF w� ( ) �_ / S GRADY WAY INTERSECTION NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DURB01.dwg Yyg Wm BY: DATE: �iL SHEET NO- 269 OF 304 z ay a O N C a .p. o W v, 0 i