HomeMy WebLinkAboutT-34302334
e e
e
e�
e e
�e
FINISH SURFACE OF PAVEMENT
OR CURB
IIII IIII IIII C)
IIIL- W
3" MIN IIII
3" MAX I I
SPRINKLER FLUSH WITH GRADE
FINISH GRADE
PVC TEE OR ELBOW
PVC LATERAL LINE
BARBED POLYETHYLENE
ELBOW
-1/2" DIA. x 12" MIN POLYETHYLENE
FLEX PIPE
BARBED POLYETHYLENE
ELBOW
TYPICAL FLEXIBLE RISER
NTS
VALVE BOX FLUSH IN LAWN
AREAS, 1/2" ABOVE FINISH
GRADE IN SHRUB AND 11-�7
GROUNDCOVER AREAS.
AUTOMATIC CONTROL VALVE
SCHEDULE 80 REDUCER (SxTH)
SCHEDULE 80 UNION - TYP.
PVC CONDUIT SWEEP -
TO ELECTRICAL CONNECTION, SEE
SIGNAL PLAN. SIZE AS REQUIRED.
TREE ROOTBALL
PVC LATERAL LINE
4" MIN. PEA GRAVEL
BRICK SUPPORTS; TYP.
EACH CORNER
PVC 90' ELBOW
PVC PIPE - THREADED SCH 80 NIPPLE
LENGTH AS REQ.
PVC PRESSURE MAIN
PVC THREADED ELBOW OR TEE LATERAL LINE
LOCATE PER CONTROLLER ENCLOSURE
ENCLOSURE
4 ANCHOR BOLTS WITH
WASHERS & 2 NUTS (TYP)
CONCRETE FOUNDATION
a
d: <
FINISH GRADE
PVC CONDUIT SWEEP
FOR VALVE WIRES
TO CONTROL VALVES.
IRRIGATION CONTROLLER ENCLOSURE SECTION
NTS
1 M;a01
°n
cli
0
of
CL
a
a
TREE GRATE TYP
FINISHED GRADE
PEA GRAVEL
PLASTIC CAP
FLOOD BUBBLER WITH Y2"
FEMALE THREADED INLET
SHRUB ADAPTOR
PEA GRAVEL
4" ADS CPP PERFORATED BLACK
PLASTIC PIPE, 1" LENGTH
%2" NIPPLE
BARBED POLYETHYLENE ELBOW
& MARLEX STREET 90'
1/2" DIA. POLYETHYLENE FLEX PIPE
LENGTH AS NECESSARY
BARBED POLYETHYLENE ELBOW
PVC TEE OR ELBOW
CONNECTION TO SPRINKLER
HEAD. SEE FLOOD BUBBLER
ASSEMBLY THIS SHEET
TOP OF CURB
IRRIGATION LATERAL SUPPLY
LINE
PVC CONDUIT PRECAST INTO
CENTER OF BOX WALL, FOR
IRRIGATION SUPPLY LINE
CONNECTION TO SPRINKLER
HEAD. SEE FLOOD BUBBLER
ASSEMBLY THIS SHEET
IRRIGATION LATERAL SUPPLY
LINE
NOTE:
INSTALL WIRE BUNDLE
BELOW PIPE �
COPPER TRACE WIRE
/ NYLON TY -WRAP AT 10' OC
IRRIGATION MAINLINE, SIZE
AS INDICATED ON PLAN
i /- WIRE BUNDLE
CONTROL WIRE BUNDLE INSTALLATION
NTS
ELEVATION
------------- - - - - -�
I I
I / �
FACE OF CURB
_AB
LAYER BY
,AST
4DUIT
TREE GRATE
PVC CONDUIT PRECAST
INTO CENTER OF BOX
WALL, FOR IRRIGATION
SUPPLY
-I
FILTERRA THROAT OPENING
AUTOMATIC CONTROL VALVE PLAN
NTS FLOOD BUBBLER ASSEMBLY AT FILTERRA UNIT LOCATIONS FILTERRA UNIT IRRIGATION LAYOUT
NTS NTS
T= 3430233
1 + + - +a - ++ SURVEYED; KPG S� RAINIER AVENUES SR 167 DRAWING NO. 293
5 °G DRAWN BY: EM Kp� CITY OF 1�E O ( )
96! BID S GRADY WAY TO S 2ND ST PROJECT NO. TED40343DESIGN BY: EM PUbIiC Works Department
=NW 15398AvenueN 2502JeBersooAuenue
a CHECK BY: EG Seattle,WA98109 Tamma,WA9W2 DOCUMENTS FED AID NO. - CM0167(0;.r a F APPROV D FOR CONSTRUCTION DATE: NOV 2011
w PROJMGR: JF (2061286.1640 (253)62700 IRRIGATION DETAILS
NUMBER REVISION DESCRIPTION BY APP. DATE J o FILE: 0655DIRR01.dwg www.kpg.com BY: DATE: . /2 SHEET NO. 293 OF 3134
a
a
z
�y
m �1/
a O
4�
N� N
w 9
ZE
o
-c
o w
0
z