GENERAL CONSTRUCTION CHANNELIZATION NOTES
(APPLIES TO SHEETS 37 -49)
1. THE CONSTRUCTION CHANNEUZATION SHOWN AND THE CONSTRUCTION SEQUENCING
LISTED IN STAGE 1, 2, & 3 GENERAL NOTES ON THIS SHEET IS INTENDED TO
DEMONSTRATE A POSSIBLE GENERAL COURSE OF ACTION. THE CONTRACTOR SHALL
DEVELOP PHASING SUITABLE TO THEIR OPERATION AND SUBMIT FOR REVIEW VIA
THE SCHEDULE AND THEIR TRAFFIC CONTROL PLAN.
2. THE CONSTRUCTION CHANNELIZATION SHOWN IS INTENDED TO MEET THE MINIMUM
LANE REQUIREMENTS DURING DAYTIME HOURS. THE NUMBER OF LANES AND TURN
POCKET LENGTHS SHOWN MAY NOT BE REDUCED DURING THESE HOURS. WORK TO
BE PERFORMED OUTSIDE THE THREE WORKZONES SHOWN SHALL BE COMPLETED
AT NIGHT. DURING NIGHT WORK, LANE REQUIREMENTS MAY BE TEMPORARILY
REDUCED TO 1 LANE IN EACH DIRECTION. DRIVING SURFACES AND DAYTIME
CHANNELIZATION ARRANGEMENTS MUST BE REESTABLISHED PRIOR TO DAYTIME
HOURS. TRAFFIC CONTROL CONFIGURATIONS FOR NIGHT WORK ARE NOT SHOWN
ON THESE PLANS. TRAFFIC CONTROL PLANS FOR NIGHTWORK MUST BE
SUBMITTED TO THE ENGINEER FOR APPROVAL.
3. ALL EXISTING AND FUTURE IMPROVEMENTS, INCLUDING UTILITIES, ARE NOT SHOWN
ON THIS DRAWING. FOR ADDITIONAL INFORMATION, SEE APPLICABLE CONTRACT
DRAWINGS. THIS PLAN DEPICTS GENERAL CONSTRUCTION CHANNELIZATION ONLY.
4. CONSTRUCTION ACTIVITIES NOT SPECIFICALLY SEQUENCED SHALL BE CONDUCTED
IN A MANNER TO MINIMIZE PUBLIC IMPACT. FULL PROGRESS SCHEDULES IN
ACCORDANCE WITH SECTION 1 -08.3 OF THE SPECIFICATIONS ARE NECESSARY FOR
ITEMS INCLUDING, BUT NOT LIMITED TO, STORM DRAINS, UTILITY TRENCHING AND
OTHER ITEMS AFFECTING TRAFFIC OR AGENCY COORDINATION.
5. ALL CHANNEUZA110N SHOWN IS SCHEMATIC ONLY. DETAILED TRAFFIC CONTROL
PLANS CONFORMING TO THE MUTCD AND WSDOT STANDARD PLANS SHALL BE
SUBMITTED BY THE CONTRACTOR FOR APPROVAL BY THE ENGINEER AT LEAST
(14) DAYS PRIOR TO THE START OF ANY CONSTRUCTION STAGE (71 -10).
6. CONTRACTOR SHALL MAINTAIN EXISTING DRAINAGE, WATER, AND UTILITY SYSTEMS
OR CONSTRUCT TEMPORARY SYSTEMS UNTIL FINAL SYSTEMS ARE FULLY
OPERATIONAL
7. PROJECT SIGNS SHALL BE PLACED AT BOTH THE NORTH AND SOUTH
CONSTRUCTION LIMITS (COORDINATE EXACT LOCATION WITH THE ENGINEER).
"BUSINESS OPEN DURING CONSTRUCTION" SIGNS SHALL BE PLACED AT BUSINESS
ACCESSES AS SHOWN ON THE PLANS. THE SIGNS SHALL BE USED DURING ALL
CONSTRUCTION PHASES. SEE SPECIFICATIONS FOR DETAILS OF 'BUSINESSES OPEN
DURING CONSTRUCTION" AND PROJECT SIGNS (SP1 -10).
8. TRAFFIC SAFETY DRUMS SHALL BE SPACED AT 35 FT. MAXIMUM INTERVALS ON
CENTERS. FLASHERS SHALL BE MOUNTED ON ALTERNATING DRUMS. ADDITIONAL
DRUMS AT CLOSER SPACING WILL BE REQUIRED AT INTERSECTIONS AND
DRIVEWAYS TO SAFELY CHANNELIZE THE TRAFFIC.
STAGE 1 GENERAL NOTES
THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 1. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVE MEDIANS AND ISLANDS AS NECESSARY TO ESTABLISH CONSTRUCTION CHANNELIZATION AND PROVIDE TEMPORARY PAVEMENT PRIOR TO SHIFTING TRAFFIC. MAINTAIN 2' OF
SHY DISTANCE BETWEEN LANE EDGE AND OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZA110N DEVICES AS NECESSARY TO WARN DRIVERS OF
OBSTRUCTIONS.
2. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES.
3. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER TEMPORARY SIGNAUZA110N PLANS, SHEETS 50 -54. SET UP TEMPORARY STRIPING AND TRAFFIC
CONTROL DEVICES TO SHIFT TRAFFIC TO THE EAST SIDE OF RAINIER AVE S.
4. INSTALL PROJECT SIGNS AND 'BUSINESSES OPEN DURING CONSTRUCTION" SIGNS.
5. INSTALL TEMPORARY EROSION CONTROL MEASURES, COMPLETE CLEARING AND GRUBBING, BEGIN DEMOLITION, CUT AND CAP EXISTING IRRIGATION SYSTEMS.
6. SAWCUT PAVEMENT AND REMOVE SURFACE FEATURES AS NECESSARY FOR INSTALLATION OF THE JOINT UTILITY TRENCH.
7. CONSTRUCT JOINT U11LITY TRENCH. CONSTRUCT RETAINING WALLS IF NECESSARY FOR INSTALLATION OF JOINT TRENCH CONDUIT. COORDINATE WITH PSE (POWER AND GAS),
CENTURY LINK, AND COMCAST AS THEY INSTALL THEIR NEW SYSTEMS AND DEACTIVATE THE OLD SYSTEMS.
8. AFTER NEW UTILITIES ARE FULLY OPERATIONAL, AND OLD UTILITY SYSTEMS ARE COMPLETELY DEACTIVATED, CONSTRUCTION OF NEW WATER AND STORM DRAINAGE IN CONFLICT
WITH EXISTING UTILITIES CAN PROCEED.
9. REMOVE EXISTING FEATURES AS NECESSARY AND INSTALL WATER AND STORM DRAINAGE SYSTEMS. CROSSINGS AND OTHER POR110NS OF THESE SYSTEMS THAT ARE OUTSIDE THE
STAGE 1 WORK ZONE SHALL BE CONSTRUCTED AT NIGHT.
10. INSTALL WALLS, ILLUMINATION SYSTEM, AND SIGNALIZATION SYSTEM.
11. INSTALL CURB, GUTTER, SIDEWALK, DRIVEWAYS AND PROPERTY RESTORATION ITEMS.
12. SAWCUT AND REMOVE EXISTING PAVEMENT AS NECESSARY AND INSTALL CONCRETE INTERSECTION APPROACHES IN THE SOUTHBOUND LANES. INSTALL CONCRETE CROSSWALKS IN
THE SOUTHBOUND LANES AND WEST LEGS OF INTERSECTIONS. PORTIONS OF THE CONCRETE ROADWAY AND CROSSWALKS THAT ARE OUTSIDE THE STAGE 1 WORK ZONE SHALL BE
CONSTRUCTED AT NIGHT. INSTALL HOT MIX ASPHALT PAVING TO MATCH EXISTING PAVEMENT.
13. THE CONTRACTOR MAY INSTALL LANDSCAPING, IRRIGATION, AND SIGNING AT THIS TIME. ANY WORK WITHIN THE STAGE 1 WORKZONE THAT IS NOT COMPLETED PRIOR TO
ESTABLISHING THE STAGE 2 WORK ZONE MUST BE COMPLETED AT NIGHT.
9. DIFFERENT STAGES WILL REQUIRE ADJUSTING TRAFFIC SIGNAL HEADS AND VIDEO CONSTRUCTION SIGNING NOTES:
DETECTION EQUIPMENT AT INTERSECTIONS. TEMPORARY RELOCATION OF EXISTING
POLES AND THE ADJUSTMENT OF THESE HEADS ON THE SPAN WIRE, SHALL BE "MOTORCYCLES USE EXTREME CAUTION" SIGNS
THE RESPONSIBILITY OF THE CONTRACTOR. SEE TEMPORARY SIGNALIZATION PLANS, (W21 -1701) SHALL BE INSTALLED WHEN THE FOLLOWING
SHEETS 50 -54. ROADWAY CONDITIONS EXIST:
10. LANE CLOSURES AS SPECIFIED IN SECTION 1 -10, TEMPORARY TRAFFIC CONTROL IN
THE SPECIAL PROVISIONS.
11. ALL CONSTRUCTION SIGNING, STRIPING AND CHANNELIZATION DEVICES SHALL BE
PER MUTCD AND WSDOT STANDARD PLANS. EXISTING REGULATORY SIGNS SHALL
BE ADJUSTED AS NECESSARY TO MAINTAIN VISIBILITY TO DRIVER'S DURING
CONSTRUCTION.
12. MAINTAIN DRIVEWAY ACCESS TO BUSINESSES. (SP 1 -10)
13. ENCROACHMENT ON TRAVELED LANES IS NOT ALLOWED.
14. FLOODLIGHTS SHALL BE PROVIDED TO MARK FLAGGER STATIONS AT NIGHT.
15. STEADY BURNING WARNING LIGHTS (TYPE C MUTCD) SHALL BE USED TO MARK
CHANNELIZATION DEVICES AT NIGHT.
16. CHANNELIZATION DEVICES ARE TO BE EXTENDED TO A POINT WHERE THEY ARE
VISIBLE TO APPROACHING TRAFFIC.
17. ABRUPT PAVEMENT EDGES OF 0.20 FT (2.5 ") OR GREATER TRANSVERSE TO THE
ROADWAY SHALL BE WEDGED ACCORDING TO THE REQUIREMENTS OF SECTION
1 -07, LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC.
18. MAINTAIN MINIMUM TRAVEL LANE WIDTHS OF 11 FEET WHERE NOT SHOWN BY A
CROSS - SECTION.
19. PROTECT VALVE BOXES, MANHOLE LIDS, & CB LIDS WHEN EXPOSED PRIOR TO
FINAL GRADING AND PAVING.
1. GROOVED PAVEMENT
2. ABRUPT PAVEMENT EDGE
3. STEEL PLATES
4. LOOSE GRAVEL OR EARTH
SPECIFIC SIGNS FOR EACH OF THE CONDITIONS NOTED
SHALL BE INSTALLED ALONG WITH THE "MOTORCYCLES
USE EXTREME CAUTION" SIGNS.
CHANNELIZING DEVICE
SPACING (FEET)
MPH
TAPER
TANGENT
'%5
40
80
%
30
60
z%0
20
40
T- 343037
SIGN SPACING = X (FEET) (1)
FREEWAYS & EXPRESSWAYS
55/65 MPH
1500' +-
(OR AS PER MUTCD)
RURAL HIGHWAYS
60/65 MPH
800' +-
RURAL ROADS
45/65 MPH
500' +-
URBAN ARTERIALS & RURAL ROADS
35/40 MPH
350' +-
RURAL ROADS, URBAN ARTERIALS,
RESIDENTIAL AREAS & BUSINESS DISTRICTS
25/30 MPH
200' +- (2)
URBAN STREETS
25 MPH OR LESS
10
ALL SIGNS ARE 48" X 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMODATE INTERCHANGE RAMPS, AT -GRADE
INTERSECTIONS, AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
STAGE 2 GENERAL NOTES
THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 2. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVE ISLANDS AS NECESSARY TO ESTABLISH CONSTRUCTION CHANNELIZATION AND PROVIDE TEMPORARY
PAVEMENT PRIOR TO SHIFTING TRAFFIC. MAINTAIN 2' OF SHY DISTANCE BETWEEN LANE EDGE AND
OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZATION DEVICES AS NECESSARY TO WARN
DRIVERS OF OBSTRUCTIONS.
2. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES.
3. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER SIGNAL CONSTRUCTION STAGING
PLANS. SET UP TEMPORARY STRIPING AND TRAFFIC CONTROL DEVICES TO SHIFT TRAFFIC TO THE WEST SIDE
OF RAINIER AVE S.
4. INSTALL 'BUSINESSES OPEN DURING CONSTRUCTION" SIGNS.
5. INSTALL TEMPORARY EROSION CONTROL MEASURES, COMPLETE CLEARING AND GRUBBING, BEGIN DEMOLITION,
CUT AND CAP EXISTING IRRIGATION SYSTEMS.
6. SAWCUT PAVEMENT AND REMOVE SURFACE FEATURES AS NECESSARY AND INSTALL WATER AND STORM
DRAINAGE SYSTEMS. CROSSINGS AND OTHER PORTIONS OF THESE SYSTEMS OUTSIDE THE STAGE 2 WORK ZONE
SHALL BE CONSTRUCTED AT NIGHT.
7. INSTALL WALLS, ILLUMINATION SYSTEM, AND SIGNALIZATION SYSTEM.
8. INSTALL CURB, GUTTER, SIDEWALK, DRIVEWAYS AND PROPERTY RESTORATION ITEMS.
9. SAWCUT AND REMOVE EXISTING PAVEMENT AS NECESSARY AND INSTALL CONCRETE INTERSECTION APPROACHES
IN THE NORTHBOUND LANES. INSTALL CONCRETE CROSSWALKS IN THE NORTHBOUND LANES AND EAST LEGS
OF INTERSECTIONS. PORTIONS OF THE CONCRETE ROADWAY AND CROSSWALKS OUTSIDE THE STAGE 1 WORK
ZONE SHALL BE CONSTRUCTED AT NIGHT. INSTALL HOT MIX ASPAHLT PAVING TO MATCH EXISTING PAVEMENT.
10. THE CONTRACTOR MAY INSTALL LANDSCAPING, IRRIGATION, AND SIGNING AT THIS TIME. ANY WORK WITHIN THE
STAGE 2 WORKZONE THAT IS NOT COMPLETED PRIOR TO ESTABLISHING THE STAGE 3 WORKZONE MUST BE
COMPLETED AT NIGHT.
STAGE 3 GENERAL NOTES
THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 3. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING:
1. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES. MAINTAIN 2' OF SHY DISTANCE
BETWEEN LANE EDGE AND OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZATION DEVICES
AS NECESARY TO WARN DRIVERS OF OBSTRUCTIONS.
2. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER SIGNAL CONSTRUCTION
STAGING PLANS. SET UP TEMPORARY STRIPING AND TRAFFIC CONTROL DEVICES TO SHIFT TRAFFIC TO THE
OUTSIDE LANES OF RAINIER AVE S.
3. SAWCUT AND REMOVE PAVEMENT FOR MEDIAN.
4. PERFORM ROADWAY PLANING, PRELEVEL AND FINAL LIFT OF HMA OVERLAY FOR THE ENTIRE PROJECT.
REESTABLISH PHASE 3 CONSTRUCTION CHANNELIZATION WITH TEMPORARY TAPE. ALL PLANING AND PAVING
OPERATIONS SHALL BE COMPLETED AT NIGHT.
5. INSTALL MEDIAN EXTRUDED CURBS.
6. COMPLETE THE MEDIAN IRRIGATION AND LANDSCAPING.
7. REMOVE PHASE 3 CONSTRUCTION CHANNELIZAT10% INSTALL FINAL CHANNELIZATION, COMPLETE THE FINAL
SIGNAL CONFIGURATIONS AND THE REMAINING PERMANENT SIGNING.
8. DURING DAYTIME HOURS USE TEMPORARY SINGLE LANE CLOSURES TO COMPLETE ALL OUTSTANDING WORK
ITEMS. MULTIPLE LANE CLOSURES WILL ONLY BE ALLOWED AT NIGHT.
BUFFER DATA
BUFFER SPACE = B
SPEED
(MPH)
MINIMUM
TAPER LENGTH =
L (FEET)
LANE WIDTH
(FEET)
45
50
55
POSTED SPEED
(MPH)
-
25
30
35
40 45
65
10
105
150
205
485
270
450
VEHICLE
TYPE
TYPICAL VEHICLE
LOADED WEIGHT
(LBS)
POSTED
SPEED
(MPH)
STATIONARY
OPERATION
(FEET)
11
115
165
225
50 - 55
295
495
50
2 TON
CARGO
TRUCK
15,000
60 - 65
150
12
125
180
245
1 TON
CARGO
TRUCK
320
540
200
600
660
720
780
STAGE 2 GENERAL NOTES
THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 2. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVE ISLANDS AS NECESSARY TO ESTABLISH CONSTRUCTION CHANNELIZATION AND PROVIDE TEMPORARY
PAVEMENT PRIOR TO SHIFTING TRAFFIC. MAINTAIN 2' OF SHY DISTANCE BETWEEN LANE EDGE AND
OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZATION DEVICES AS NECESSARY TO WARN
DRIVERS OF OBSTRUCTIONS.
2. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES.
3. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER SIGNAL CONSTRUCTION STAGING
PLANS. SET UP TEMPORARY STRIPING AND TRAFFIC CONTROL DEVICES TO SHIFT TRAFFIC TO THE WEST SIDE
OF RAINIER AVE S.
4. INSTALL 'BUSINESSES OPEN DURING CONSTRUCTION" SIGNS.
5. INSTALL TEMPORARY EROSION CONTROL MEASURES, COMPLETE CLEARING AND GRUBBING, BEGIN DEMOLITION,
CUT AND CAP EXISTING IRRIGATION SYSTEMS.
6. SAWCUT PAVEMENT AND REMOVE SURFACE FEATURES AS NECESSARY AND INSTALL WATER AND STORM
DRAINAGE SYSTEMS. CROSSINGS AND OTHER PORTIONS OF THESE SYSTEMS OUTSIDE THE STAGE 2 WORK ZONE
SHALL BE CONSTRUCTED AT NIGHT.
7. INSTALL WALLS, ILLUMINATION SYSTEM, AND SIGNALIZATION SYSTEM.
8. INSTALL CURB, GUTTER, SIDEWALK, DRIVEWAYS AND PROPERTY RESTORATION ITEMS.
9. SAWCUT AND REMOVE EXISTING PAVEMENT AS NECESSARY AND INSTALL CONCRETE INTERSECTION APPROACHES
IN THE NORTHBOUND LANES. INSTALL CONCRETE CROSSWALKS IN THE NORTHBOUND LANES AND EAST LEGS
OF INTERSECTIONS. PORTIONS OF THE CONCRETE ROADWAY AND CROSSWALKS OUTSIDE THE STAGE 1 WORK
ZONE SHALL BE CONSTRUCTED AT NIGHT. INSTALL HOT MIX ASPAHLT PAVING TO MATCH EXISTING PAVEMENT.
10. THE CONTRACTOR MAY INSTALL LANDSCAPING, IRRIGATION, AND SIGNING AT THIS TIME. ANY WORK WITHIN THE
STAGE 2 WORKZONE THAT IS NOT COMPLETED PRIOR TO ESTABLISHING THE STAGE 3 WORKZONE MUST BE
COMPLETED AT NIGHT.
STAGE 3 GENERAL NOTES
THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 3. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING:
1. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES. MAINTAIN 2' OF SHY DISTANCE
BETWEEN LANE EDGE AND OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZATION DEVICES
AS NECESARY TO WARN DRIVERS OF OBSTRUCTIONS.
2. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER SIGNAL CONSTRUCTION
STAGING PLANS. SET UP TEMPORARY STRIPING AND TRAFFIC CONTROL DEVICES TO SHIFT TRAFFIC TO THE
OUTSIDE LANES OF RAINIER AVE S.
3. SAWCUT AND REMOVE PAVEMENT FOR MEDIAN.
4. PERFORM ROADWAY PLANING, PRELEVEL AND FINAL LIFT OF HMA OVERLAY FOR THE ENTIRE PROJECT.
REESTABLISH PHASE 3 CONSTRUCTION CHANNELIZATION WITH TEMPORARY TAPE. ALL PLANING AND PAVING
OPERATIONS SHALL BE COMPLETED AT NIGHT.
5. INSTALL MEDIAN EXTRUDED CURBS.
6. COMPLETE THE MEDIAN IRRIGATION AND LANDSCAPING.
7. REMOVE PHASE 3 CONSTRUCTION CHANNELIZAT10% INSTALL FINAL CHANNELIZATION, COMPLETE THE FINAL
SIGNAL CONFIGURATIONS AND THE REMAINING PERMANENT SIGNING.
8. DURING DAYTIME HOURS USE TEMPORARY SINGLE LANE CLOSURES TO COMPLETE ALL OUTSTANDING WORK
ITEMS. MULTIPLE LANE CLOSURES WILL ONLY BE ALLOWED AT NIGHT.
BUFFER DATA
BUFFER SPACE = B
SPEED
(MPH)
25
30
35
40
45
50
55
60
65
-
LENGTH
(FEET)
(FEET)
85
120
170
220
280
335
415
485
-
PROTECTIVE VEHICLE ROLL AHEAD DISTANCE = R
VEHICLE
TYPE
TYPICAL VEHICLE
LOADED WEIGHT
(LBS)
POSTED
SPEED
(MPH)
STATIONARY
OPERATION
(FEET)
4 YARD
DUMP
TRUCK
24,000
60 - 65
100
50 - 55
75
45
50
2 TON
CARGO
TRUCK
15,000
60 - 65
150
50 - 55
100
45
75
1 TON
CARGO
TRUCK
10,000
60 - 65
200
50 - 55
150
45
100
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.
a
a
z
�y
?o
wn N
a .p
o w
N O
0
-N7