HomeMy WebLinkAboutT-343037Fj iR 0 M m 3 0 0 i z 0 i a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z%0 20 40 T- 343037 SIGN SPACING = X (FEET) (1) FREEWAYS & EXPRESSWAYS 55/65 MPH 1500' +- (OR AS PER MUTCD) RURAL HIGHWAYS 60/65 MPH 800' +- RURAL ROADS 45/65 MPH 500' +- URBAN ARTERIALS & RURAL ROADS 35/40 MPH 350' +- RURAL ROADS, URBAN ARTERIALS, RESIDENTIAL AREAS & BUSINESS DISTRICTS 25/30 MPH 200' +- (2) URBAN STREETS 25 MPH OR LESS 10 ALL SIGNS ARE 48" X 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED. (1) ALL SPACING MAY BE ADJUSTED TO ACCOMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS, AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. STAGE 2 GENERAL NOTES THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 2. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: 1. REMOVE ISLANDS AS NECESSARY TO ESTABLISH CONSTRUCTION CHANNELIZATION AND PROVIDE TEMPORARY PAVEMENT PRIOR TO SHIFTING TRAFFIC. MAINTAIN 2' OF SHY DISTANCE BETWEEN LANE EDGE AND OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZATION DEVICES AS NECESSARY TO WARN DRIVERS OF OBSTRUCTIONS. 2. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES. 3. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER SIGNAL CONSTRUCTION STAGING PLANS. SET UP TEMPORARY STRIPING AND TRAFFIC CONTROL DEVICES TO SHIFT TRAFFIC TO THE WEST SIDE OF RAINIER AVE S. 4. INSTALL 'BUSINESSES OPEN DURING CONSTRUCTION" SIGNS. 5. INSTALL TEMPORARY EROSION CONTROL MEASURES, COMPLETE CLEARING AND GRUBBING, BEGIN DEMOLITION, CUT AND CAP EXISTING IRRIGATION SYSTEMS. 6. SAWCUT PAVEMENT AND REMOVE SURFACE FEATURES AS NECESSARY AND INSTALL WATER AND STORM DRAINAGE SYSTEMS. CROSSINGS AND OTHER PORTIONS OF THESE SYSTEMS OUTSIDE THE STAGE 2 WORK ZONE SHALL BE CONSTRUCTED AT NIGHT. 7. INSTALL WALLS, ILLUMINATION SYSTEM, AND SIGNALIZATION SYSTEM. 8. INSTALL CURB, GUTTER, SIDEWALK, DRIVEWAYS AND PROPERTY RESTORATION ITEMS. 9. SAWCUT AND REMOVE EXISTING PAVEMENT AS NECESSARY AND INSTALL CONCRETE INTERSECTION APPROACHES IN THE NORTHBOUND LANES. INSTALL CONCRETE CROSSWALKS IN THE NORTHBOUND LANES AND EAST LEGS OF INTERSECTIONS. PORTIONS OF THE CONCRETE ROADWAY AND CROSSWALKS OUTSIDE THE STAGE 1 WORK ZONE SHALL BE CONSTRUCTED AT NIGHT. INSTALL HOT MIX ASPAHLT PAVING TO MATCH EXISTING PAVEMENT. 10. THE CONTRACTOR MAY INSTALL LANDSCAPING, IRRIGATION, AND SIGNING AT THIS TIME. ANY WORK WITHIN THE STAGE 2 WORKZONE THAT IS NOT COMPLETED PRIOR TO ESTABLISHING THE STAGE 3 WORKZONE MUST BE COMPLETED AT NIGHT. STAGE 3 GENERAL NOTES THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 3. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: 1. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES. MAINTAIN 2' OF SHY DISTANCE BETWEEN LANE EDGE AND OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZATION DEVICES AS NECESARY TO WARN DRIVERS OF OBSTRUCTIONS. 2. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER SIGNAL CONSTRUCTION STAGING PLANS. SET UP TEMPORARY STRIPING AND TRAFFIC CONTROL DEVICES TO SHIFT TRAFFIC TO THE OUTSIDE LANES OF RAINIER AVE S. 3. SAWCUT AND REMOVE PAVEMENT FOR MEDIAN. 4. PERFORM ROADWAY PLANING, PRELEVEL AND FINAL LIFT OF HMA OVERLAY FOR THE ENTIRE PROJECT. REESTABLISH PHASE 3 CONSTRUCTION CHANNELIZATION WITH TEMPORARY TAPE. ALL PLANING AND PAVING OPERATIONS SHALL BE COMPLETED AT NIGHT. 5. INSTALL MEDIAN EXTRUDED CURBS. 6. COMPLETE THE MEDIAN IRRIGATION AND LANDSCAPING. 7. REMOVE PHASE 3 CONSTRUCTION CHANNELIZAT10% INSTALL FINAL CHANNELIZATION, COMPLETE THE FINAL SIGNAL CONFIGURATIONS AND THE REMAINING PERMANENT SIGNING. 8. DURING DAYTIME HOURS USE TEMPORARY SINGLE LANE CLOSURES TO COMPLETE ALL OUTSTANDING WORK ITEMS. MULTIPLE LANE CLOSURES WILL ONLY BE ALLOWED AT NIGHT. BUFFER DATA BUFFER SPACE = B SPEED (MPH) MINIMUM TAPER LENGTH = L (FEET) LANE WIDTH (FEET) 45 50 55 POSTED SPEED (MPH) - 25 30 35 40 45 65 10 105 150 205 485 270 450 VEHICLE TYPE TYPICAL VEHICLE LOADED WEIGHT (LBS) POSTED SPEED (MPH) STATIONARY OPERATION (FEET) 11 115 165 225 50 - 55 295 495 50 2 TON CARGO TRUCK 15,000 60 - 65 150 12 125 180 245 1 TON CARGO TRUCK 320 540 200 600 660 720 780 STAGE 2 GENERAL NOTES THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 2. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: 1. REMOVE ISLANDS AS NECESSARY TO ESTABLISH CONSTRUCTION CHANNELIZATION AND PROVIDE TEMPORARY PAVEMENT PRIOR TO SHIFTING TRAFFIC. MAINTAIN 2' OF SHY DISTANCE BETWEEN LANE EDGE AND OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZATION DEVICES AS NECESSARY TO WARN DRIVERS OF OBSTRUCTIONS. 2. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES. 3. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER SIGNAL CONSTRUCTION STAGING PLANS. SET UP TEMPORARY STRIPING AND TRAFFIC CONTROL DEVICES TO SHIFT TRAFFIC TO THE WEST SIDE OF RAINIER AVE S. 4. INSTALL 'BUSINESSES OPEN DURING CONSTRUCTION" SIGNS. 5. INSTALL TEMPORARY EROSION CONTROL MEASURES, COMPLETE CLEARING AND GRUBBING, BEGIN DEMOLITION, CUT AND CAP EXISTING IRRIGATION SYSTEMS. 6. SAWCUT PAVEMENT AND REMOVE SURFACE FEATURES AS NECESSARY AND INSTALL WATER AND STORM DRAINAGE SYSTEMS. CROSSINGS AND OTHER PORTIONS OF THESE SYSTEMS OUTSIDE THE STAGE 2 WORK ZONE SHALL BE CONSTRUCTED AT NIGHT. 7. INSTALL WALLS, ILLUMINATION SYSTEM, AND SIGNALIZATION SYSTEM. 8. INSTALL CURB, GUTTER, SIDEWALK, DRIVEWAYS AND PROPERTY RESTORATION ITEMS. 9. SAWCUT AND REMOVE EXISTING PAVEMENT AS NECESSARY AND INSTALL CONCRETE INTERSECTION APPROACHES IN THE NORTHBOUND LANES. INSTALL CONCRETE CROSSWALKS IN THE NORTHBOUND LANES AND EAST LEGS OF INTERSECTIONS. PORTIONS OF THE CONCRETE ROADWAY AND CROSSWALKS OUTSIDE THE STAGE 1 WORK ZONE SHALL BE CONSTRUCTED AT NIGHT. INSTALL HOT MIX ASPAHLT PAVING TO MATCH EXISTING PAVEMENT. 10. THE CONTRACTOR MAY INSTALL LANDSCAPING, IRRIGATION, AND SIGNING AT THIS TIME. ANY WORK WITHIN THE STAGE 2 WORKZONE THAT IS NOT COMPLETED PRIOR TO ESTABLISHING THE STAGE 3 WORKZONE MUST BE COMPLETED AT NIGHT. STAGE 3 GENERAL NOTES THE FOLLOWING WORK IS ANTICIPATED FOR STAGE 3. IT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: 1. INSTALL GENERAL CONSTRUCTION SIGNS AND TRAFFIC CONTROL DEVICES. MAINTAIN 2' OF SHY DISTANCE BETWEEN LANE EDGE AND OBSTRUCTIONS. PROVIDE ADDITIONAL WARNING SIGNS OR CHANNELIZATION DEVICES AS NECESARY TO WARN DRIVERS OF OBSTRUCTIONS. 2. RELOCATE SIGNAL HEADS TO ALIGN WITH CONSTRUCTION CHANNELIZATION PER SIGNAL CONSTRUCTION STAGING PLANS. SET UP TEMPORARY STRIPING AND TRAFFIC CONTROL DEVICES TO SHIFT TRAFFIC TO THE OUTSIDE LANES OF RAINIER AVE S. 3. SAWCUT AND REMOVE PAVEMENT FOR MEDIAN. 4. PERFORM ROADWAY PLANING, PRELEVEL AND FINAL LIFT OF HMA OVERLAY FOR THE ENTIRE PROJECT. REESTABLISH PHASE 3 CONSTRUCTION CHANNELIZATION WITH TEMPORARY TAPE. ALL PLANING AND PAVING OPERATIONS SHALL BE COMPLETED AT NIGHT. 5. INSTALL MEDIAN EXTRUDED CURBS. 6. COMPLETE THE MEDIAN IRRIGATION AND LANDSCAPING. 7. REMOVE PHASE 3 CONSTRUCTION CHANNELIZAT10% INSTALL FINAL CHANNELIZATION, COMPLETE THE FINAL SIGNAL CONFIGURATIONS AND THE REMAINING PERMANENT SIGNING. 8. DURING DAYTIME HOURS USE TEMPORARY SINGLE LANE CLOSURES TO COMPLETE ALL OUTSTANDING WORK ITEMS. MULTIPLE LANE CLOSURES WILL ONLY BE ALLOWED AT NIGHT. BUFFER DATA BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 - LENGTH (FEET) (FEET) 85 120 170 220 280 335 415 485 - PROTECTIVE VEHICLE ROLL AHEAD DISTANCE = R VEHICLE TYPE TYPICAL VEHICLE LOADED WEIGHT (LBS) POSTED SPEED (MPH) STATIONARY OPERATION (FEET) 4 YARD DUMP TRUCK 24,000 60 - 65 100 50 - 55 75 45 50 2 TON CARGO TRUCK 15,000 60 - 65 150 50 - 55 100 45 75 1 TON CARGO TRUCK 10,000 60 - 65 200 50 - 55 150 45 100 ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT. a a z �y ?o wn N a .p o w N O 0 -N7