Loading...
HomeMy WebLinkAboutT-3430400 r7 rn 3 a 0 Y M W O L0 -4- O M FQ- (n LEI Z J U H Q 2' BUFFER 1' BUFFER 11.5' SOUTHBOUND LANE -.I 2' 1— TRAFFIC SAFETY DRUMS WITH LIGHT I I I I III I I II I I I I J I II a I � a All MAXIMUM EXTENTS OF WORK ZONE. ACTUAL EXTENTS ON FIELD SIDE SHALL VARY TO 14 C D MINIMIZE IMPACT TO ADJACENT BUSINESSES. (TYP) JACK IN THE BOX BLOCKBUSTER POWER SPORTS ODOBA 13 Al 13 _ C2 13 = �` VARIES PAINTED MEDIAN 11' 1 11' 11' SOUTHBOUND LEFT TURN NORTHBOUND LANE LANE LANE r - - -- MCLENDON HARD WARE C 0 20 40 80 SCALE IN FEET 11' NORTHBOUND LANE SECTION E -E 13 L I� 1 Miamian' 2 MR.! �A.� =is -------------------- - - -- -\ GENERAL CONSTRUCTION CHANNELIZATION NOTES R FOR GENERAL CONSTRUCTION CHANNELIZATION NOTES, SEE SHEET 37. 120 CONSTRUCTION CHANNELIZATION LEGEND TRAFFIC SAFETY DRUMS WITH LIGHT MAXIMUM EXTENTS OF WORK ZONE BUSINESS OPEN DURING CONSTRUCTION SIGN, SEE DETAIL SHEET 38. - - - - - - - CONSTRUCTION LIMITS DIRECTION OF TRAVEL TEMPORARY CHANNELIZATION NOTES W w N O N d' Q N w Z J 2 H Q WORKZONE BARRIER, SEE CONSTRUCTION CHANNELIZATION LEGEND, THIS SHEET 0 PAINTED DOUBLE YELLOW CENTER LINE PAINTED LANE LINE ® PAINTED EDGE LINE Q PAINTED WIDE LINE © PAINTED MEDIAN LINE 7D PAINTED TYPE 2L ARROW ® PAINTED TWO -WAY LEFT TURN LINE 10 PAINTED DOTTED EXTENSION LINE. 11 PAINTED STOP LINE. 12 PAINTED TYPE 2R ARROW 13 EXISTING CROSSWALK STRIPING TO REMAIN 14 MAINTAIN ADA COMPLIANT PEDESTRIAN ACCESS 15 FOR SIGNAL INSTALLATION, MODIFY RIGHT TURN LANE CONSTRUCTION CHANNELIZATION AND PROVIDE TRAFFIC SAFETY DRUMS WITH LIGHT TO ACCOMMODATE SIGNAL CONSTRUCTION AND AS NECESSARY TO PROTECT NEW SIGNAL EQUIPMENT ONCE CONSTRUCTED. 16 REMOVE EXISTING PAINTED CROSSWALK STRIPING 17 PAINTED TYPE 1 ARROW 18 TEMPORARY CROSSWALK STRIPING 19 PAINTED TYPE 3R ARROW T=343040 1 -Wl SURVEYED: KPG CITY OF RENTON SF'4�GWA COQ DRAWN BY: JLF /KAT KPG81 Al >� RAINIER AVENUE S (2N ST DRAWING NO- 4O ' " BAD � S GRADY WAY TO S 2ND ST PROJECT NO. TED403430 $ DESIGN BY: JLF Public Works Department 153961 Avenue N 2502 Jefferson Avenue FED AID NO. - CM0167(048) y a CHECK BY: JIG Seattle,WA96109 Tacoma,WA96402 DOCUMENTS CONSTRUCTION CHANNELIZATION PLAN - STAGE 1 +p.o 20320 yQ (206)286.1640 (253)627 -0729 APPROVED FOR CONSTRUCTION l DATE: NOV 2011 ISTS ��ONpL E \Q PROJ MGR: JF ��� BY DATE: ��1 -�i�� STA 30 +50 TO STA 42 +50 SHEET NO. 40 OF 304 NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 0655DCONST01A.dwg a a `z �y j.�..j m /v w O j ' ^y 1 T ON A L1 6" O �y a •p K . •, O W N O