Loading...
HomeMy WebLinkAboutD-349707r- \ 1 ' 11 "..,.Madsen INSTALL TEMPORARY YPASS DAM ��ETRO SS \\ _ ` '-_, (� O \� "= _C�eek FOR SON SEE SEE DETAIL ` =k N ACCESS O SCALE 1 20 Feet = '/�` U) ' - -- _ - \ THIS S DE S PROVIDE SECOND ` `_- -- F NEEDED ro - -- DAM AND PUMP, _ - -- - -- AND COLLECT ` - - - -' X CONSTRUCTION NOTES _ \� � `'� `�.. FLOW -� ` '` - - -- - -------------- A _ 1 . PIPE INVERT ELEVATIONS TAKEN FROM PRELIMINARY SITE ._ LOG DROPS ` _ --------- PLAN, NEW LIFE CHURCH, WEST SIDE IMPROVEMENTS. �..` ` q- - ------ -- - - -- �.` 1 20 -' 2. SEDIMENT LIMITS AND BASIN BOTTOM ELEVATIONS ARE 2H:1V APPROX. THE CITY MAY ADJUST THE SEDIMENT REMOVAL LIMITS AND DEPTHS AS NEEDED. BYPASS PIPE INLEL 24 "CMP IE =121.1 est ��� 1 1 6 / `— / REMOVE SEDIMENT TO BASE GRADES SHOWN 3. TEMPORARY BYPASS DAM SHALL BE WATER TIGHT SO BASIN OR TO TOP OF RIP -RAP ON SIDE SLOPES. CAN BE DRAINED AND SEDIMENT CAN BE DRIED OUT. / HAND DIG IF NEEDED TO IDENTIFY RIP -RAP. \ BOTTOM OF BASIN \\ I i ` APPX. EL 113 \ \ i DO NOT OVEREXCAVATE SIDESLOPES. USE SMOOTH BUCKET, NO TEETH. 4. FISH RESCUE IN THE SEDIMENT BASIN SHALL OCCUR IMMEDIATELY AFTER THE BYPASS DAM IS INSTALLED. \ / UTILITY EASEMENT \ \ `� \\_1 \ SEDIMENT LIMITS APPROXIMATE. SEDIMENT DEPTH APPROX 4 TO 6 FEET. See Note ACCESS BASIN DOWN THIS SIDE ONLY _ \ \2 24 "CMP BYPASS PIPE �` LOCATION NOT VERIFIED 2 _ \� -p i \c�9 �a O / �� �' 12U ' G ,6 0)� / �0 n B��_ \ EED AND STRAW MULCH \ DISTURBED \ DISTURBED SLOPE AND ACCESS ROAD \ \ AFTER BASIN CLEANING \ \ x3' CONS. BOX CULVERT J OVERFLOW SPILLWAY IE = 117.86 \ Y\ \ % NO UTILITY EASEMENT See Note ACCESS F ROM r o IS SIDE j o \�` I � _ - 24 "CMP BY ASS PIPE ' \ �� -- LOCATION OT VERIFIED 1 36" CMP INLET �\I IF = 115.81 O c9._.._.. BYPASS PIPE OUTLET 24' CMP ;— \�� _. ._.._.._.._. — GRA — `- O� IE = 116.12 \ ._..- ,.._.._.._.. ' - -_ �EL ACCESS_R�A OVERFLOW CH (� CMP LEf Ne< _.. .._.. _. /dry._.._ `� N �� OVERFLOW ` E6= 114.47U SPILLWAY -'� -SR_ =116.8 ` est - ti0 N m� cFSS - `\�� X090 ` UTILITY EASEMENT FROM NEW LIFE CHURCH 8/10/09 SEDIMENT BASIN CLEANING DRAWING AS —BUILT NOTES 1. 2009 - POND BOTTOM WAS WET AND MUCKY. KING CO. RECORDING # 20091007000046 EXCAVATOR STAYED ON PAD OF SEDIMENT AND REMOVED MATERIAL TO APPX. EL 113 BY JUDGING THE DEPTH SHOVEL WENT DOWN. APPROX 1000 CY REMOVED. BOTTOM WAS Too MUCKY TO WALK ON AND SURVEY AFTER WORK WAS FINISHED. 2. 2010 - POND CLEANED TO APPX EL 113. BOTTOM WET, MUCKY DUE TO WATER GETTING PAST DAM OR GROUNDWATER. 3. 2011 - POND CLEANED TO APPX EL 113. BOTTOM WET, MUCKY DUE TO GROUNDWATER. J. Q° 0 D= 349107 2013 Cleaning o RECOMMENDED FOR APPROVAL �\�4� sum o: KRPCA3L NAVJ 1980 xoR¢oxrw xm HCC /i9si s T ocs�cxeo� AS NOTED �p r— CITY OF DC "'R 6/10/13 nE�nmoro MADSEN CREEK SEDIMENT BASIN aY Daniel Carey 6/10/13 Y�Fs(_• _ '/0 — �l �3 O., DC "" °oc RENTON oxE xex DATUM CLEANING PROJECT o� / Rs�� Punning /Dui ding /Public Works Dept. SEDIMENT BASIN BY - NO. REVISION BY DATE APPR w°emm: �F NOT ONE INCH wac ucoxoixcr . or: 2 RS X D -347