Loading...
HomeMy WebLinkAboutD-352905rn N L0 Ck•) n N d. JO w � Z w U vJ �ll^^ w O a W 2 IY 0 U) w Q w_ Z cc w Q w Y Q J Q � n/ z CB -1A STA 10 +11, 9'LT N 178135.41 E 1298300.88 NEW TYPE 1 CB N 178125.72 \� E 1298300.67 CONNECT TO EX BOX CULVERT STRUCTURE PLUG AND ABANDON EX 8�D CB -3A STA 10+ N 178111.10 E 1298343.11 NEW TYPE 1 CB CB -1 STA 10 +18 N 17813,0'35 E 1298310.49 ANEW 72" TYPE 2 CB W 36" FRAME & COVER CB -2 STA 10 +51 REMOVE EX CB o I N 178144.41 E 1298340.33 NEW 84" TYPE 2 CB REINSTALL EX 24" DIA' FRAME & GRATE a SEE CONSTRUCTI NOTE \\ •:, WALKER ' SUBARU�iY� / J �iJ� lQ APPROX lOCAT v - SOF- RECEIVING PIT 1 3 ti S _ 4 \ ° 2 RELOCATE EX POWER o \ I AS REQUIRED POTHOLE CB -3 STA 10 +75 LOCATION, TYP N 178128.59 RT ��\ E 1298358.38 �\ NEW G72 - TYP- E -2 -CB A Ro ST \r \ 9 0� PLAN SCALE IN FEET i J-- \. PLUG .__ &\ABANDON EX SW 24 \D, SEE CONSTRUCTION / NOTE 3 FOR\ TIMING -\__ i (i 1W / - z 5 STA /12 +88 22 LT N 129853.43 E 1298532.39 X TYPE 2 FB p �' APPROX -:9 CA ° JACKING PIT 1 TEMP BYPASS F - LAKE AVE S STREET VACATION (EX 60' WIDE CITY UTILITY EASEMENT) C, / 6 �1 so T � N' 178249.27 E 128583.72 INSTy LL NEW 60" TYRE 2 CB ION OF \f?ROVIDE OR PROTECT 1019 39TH AVENUE $E, SUITE WO T. 263. . W F. 253 ON 989 T. 293.fiO4.fi898 F.233.60C.9T99 xvw.PUemeOhmm ,I _ CONSTRUCTION NOTES: 0 20 40 1. ALL TYPE I CATCH BASINS SHALL BE FRAME & GRATE UNLESS NOTED OTHERWISE. SEE CITY STD PLAN 200.00. RIM ELEVATIONS SHALL MATCH EX GRADE. 2. ALL TYPE 2 CATCH BASINS SHALL BE FRAME CB -1 STA 10 +18 CB -2 STA 10 +51 & GRATE UNLESS NOTED OTHERWISE. RIM NEW 72 TYPE 2 CB NEW 84 TYPE 2 CB ELEVATIONS SHALL MATCH EX GRADE. 60 ..... ................. 60 RIM EL 36 :8 . .. .. ._.... ..... - -_.. .. ... .. .. RIM EL 30.6 26:72::::::: STA 10 +75 ...... CB -4 STA 13 +30 0 6 , 3. REMOVE APPROX 5' OF EXIST 24 "D NE OF 12 (W)::IE ..26;28 .. . E:X: 6 . (NW) IE- CB -3 NEW, 60" TYPE 2 CB . 10 +51) AS NECESSARY TO CB 1:0 +18 CB- 3:STA'10 +75 36 ":. NE) JE= 18;20 :::36' (SE' & SW :IE= 18.23:::: NEW: 72' TYPE 2 CB RIM: EL .30;9:: NXSTALL N NEW CB -2. CONTRACTOR TO 42''::�SW) IE -18;20 TEMP 24" ; (NE) IE= ;18.47 RIM EL 31 3 34.. ": (NE &; :SW) JE 1:8.50 50' 50 .. ... MATCH EXISTING ... : EX 12.: SE .iE_22,0 .. _ ....... PROVIDE BYPASS STORMWATER PUMPING AND .....:: .... .::::.. .:::. ... : ....::. ..... ......... ...: 3 4 (NE) IE 18:.25 .. .. ..... .. ... .. .. 0 PIPING TO BOX CULVERT AT STA 10 +07 GB .1.q C$ -3A STA +;39, 3VRT ... ... ... 3 6' :(:NW) IE- 1:8.25 ... . 15 CB-1 G H NAND STA 10+ 1 1, : 91T .. ... ;1:0 N7 W: TYPE 1 CB:: .... 12' :(SW) IE . 26.14..... . .. . CB-3 ASSOCIATED PIPING. NEW TYPE:.1..Cg.... RIM EL :37,3 .:: .... .... .....:...... JACKING: :PIT PPROVIDE EQUIPMENT PIPING BONNECTION 40 RIM -EL 30.6:.:.__ _. EX 8" (S) LE _ .. 40 .... .......L.._ .......... .:........ ......:. .. ACTUAL SIZE 40' AND EMPORARY "D ..... 12.::(SE) I;E 26.50 12' (NE) .2.6..6. 26:60' ........ ....... ..: RECEIVING. PIT:. CONTRACTOR ANDDSHA FINE BETWEEN EXIST 24 AND CB -2 AFTER :IE TO DETERMINE ACTUAL SIZE I SYSTEM HAS BEEN CONSTRUCTED AND .. ..: AN D SHAPE ..... I CULVERT ...- ... .: .. .. _ - . SHALL PLUG S 30 30 __ -.. - .... P : _ -: �T . -\t 3 0 AND WHEN NEW STORM 3S EXIST 24"D H .. . P::::: ::� P::. D:: p �12"D:: DRAIN SYSTEM COMPLETE P ..... 1Z'S: .. :: .. .... ....... ..... 65::.. o .:p... ... .. . I .. ... .. ... .. ... .. .... ...... ... ... .. .... ...: 208 42" STI• CASING AND 34 kDPE PIPE ;@ S-0+001:: - ....... .. FT /ET .... .... .. .. .. 20 ..... L 1 20, .... ... _ ...... ..... ..:.. ... 2 0 11' -::12' CPEP: PIPE @: .......:::::@] 23 .'1'2" CPER:PIPE. :::: S -0:020 .FT /FT: .... 33'. -; 36" CPEP PIPE:: STA: 1 1.0 :93 STA 13 +01 ": - - S:= 0.020::FT /FT:. ..::: �: S °0.00,1: ���' ::: 42 °: STL::CASING .117-17 94:... .... 42 STILL CASING .IE =18.14 _ _ 34" HD 7 PDPE:IPPE..782 _ 10 ..._. __..... :...... ..:..... ... . ....:.. ............. 10 11 42 CPEP PIPE 5 =0.001 FT ET: �.. ...... ..._. ...... .... ... .. 8' 34 H ..:::: 29 - 34 H 6PEDPIPEPI @ESE0:0047FT /FT 0 ... . .. ..: .... STA 10 + 07 ::::.::.:' @ FT /FT: S 0:001 ... 10 .:.. = FT /FT Hr PIPE S 0.001 .. .: 42 "::CPEP ...... PIPE: :::::: ..::..: ... 24' -::36" CPEP PIPE :: ..... . : STA 13+3942": STL:::: : IE -18 19 :: @ :5 =0 001 FT /FT CASING IE 18.17 0 :.: 0' : ..... ............. .. ...... ..:.:.: _..... ... .:.:.: 34 " -HDPE PIPE IE -18:51 0, CB -1A TO CB -1 CB -3A TO CB -3 10 +00 11 +00 12 +00 13 +00 13 +50 1019 39TH AVENUE $E, SUITE WO T. 263. . W F. 253 ON 989 T. 293.fiO4.fi898 F.233.60C.9T99 xvw.PUemeOhmm PROFILE HORIZ: 1 " =20' VERT: 1"=10' SUR+EIFD: EGLL£: 1 .71-7 -LD' R. HERMES o uwr: K. TAYLOR ONE WCN CHEd' Ai NLL SGLLE OW NO. REVISION BY DATE APPR v Nor OW ww A➢PROh➢: SVIE AGGOROWGLT ww19� CITY OF HORIZONGL NID 10&1/1991 ) RENTON DATUM Planning /Building /Public Works Dept. D- 352905 LAKE AVE S / RAINIER AVE S STORM SYSTEM PLAN AND PROFILE STA 10 +00 TO STA 13 +50 JUNE 20111 I.- PALE: C1 ,I _ D. PROFILE HORIZ: 1 " =20' VERT: 1"=10' SUR+EIFD: EGLL£: 1 .71-7 -LD' R. HERMES o uwr: K. TAYLOR ONE WCN CHEd' Ai NLL SGLLE OW NO. REVISION BY DATE APPR v Nor OW ww A➢PROh➢: SVIE AGGOROWGLT ww19� CITY OF HORIZONGL NID 10&1/1991 ) RENTON DATUM Planning /Building /Public Works Dept. D- 352905 LAKE AVE S / RAINIER AVE S STORM SYSTEM PLAN AND PROFILE STA 10 +00 TO STA 13 +50 JUNE 20111 I.- PALE: C1