SCALE IN FEET
0 40 80
PHASE
INSTALL DEWATERING
SYSTEM FOR
RECEIVING PIT AND CASING.
1A:
DEWATERING
INSTALLED TO ALLOW
FOR TRAFFIC
CROSSING OVER DEWATERING SYSTEM.
3.
REMOVE TEMPORARY
SYSTEM & RECEIVING
AND SIGNS FROM
VEHICULAR ACCESS DRIVE
-OPEN RECEIVING PIT 1
PIT
SYSTEM.
1. INSTALL TEMPORARY
CONSTRUCTION FENCING,
BARRICADES AND SIGNS, LEAVING ROOM AROUND
WORK AREA
FOR CUSTOMER
ACCESS.
2.
INSTALL DEWATERING
SYSTEM FOR
RECEIVING PIT AND CASING.
DEWATERING SYSTEM TO BE
INSTALLED TO ALLOW
FOR TRAFFIC
CROSSING OVER DEWATERING SYSTEM.
3.
REMOVE TEMPORARY
FENCING, BARRICADES
AND SIGNS FROM
VEHICULAR ACCESS DRIVE
-OPEN RECEIVING PIT 1
ACROSS DEWATERING
SYSTEM.
4.
EXCAVATE RECEIVING
PIT 1, BORE
CASING FROM JACKING PIT
1 TO RECEIVING PIT 1, REMOVE
CASING DEWATERING
SYSTEM WHEN
NO LONGER NEEDED.
5.
ON WEEKENDS, MOVE
CONTRACTOR
VEHICLES AND MATERIALS
TO STORAGE /PARKING AREA ON
EAST SIDE OF WALKER
PROPERTY.
RELOCATE FENCING TO ALLOW
FOR CAR DISPLAY ALONG
FRONTAGE. RE- ESTABLISH WORK AREA FENCING AT START OF
WORK WEEK.
6.
FILL OR PLATE OVER
RECEIVING PIT
1 AND MINIMIZE FENCING
AS REQUIRED FOR ACCESS.
WALKER PROPERTY
TEMPORARY FENCING
PLAN
SCALE IN FEET
0 40 80
PHASE
1
B:
START
OF
OPEN
CUT
1. ADJUST WORK
AREA
FENCING TO
NEW LOCATION. RE
-OPEN RECEIVING PIT 1
AS REQUIRED.
2. START OPEN CUT AT WEST END OF PROJECT, EXCAVATE AND INSTALL NEW
STORM SYSTEM WITHIN LIMITS INDICATED.
3. AS NEW SYSTEM IS INSTALLED, BACKFILL EXCAVATION TO SURFACE AND MOVE
FENCING TO EAST TO ALLOW FOR CAR DISPLAY ALONG WEST FRONTAGE.
4. ON WEEKENDS, MOVE CONTRACTOR VEHICLES AND MATERIALS TO
STORAGE /PARKING AREA ON EAST SIDE OF WALKER PROPERTY. RELOCATE
FENCING TO ALLOW FOR CAR DISPLAY ALONG FRONTAGE, AS POSSIBLE.
RE- ESTABLISH WORK AREA FENCING AT START OF WORK WEEK.
5. INSTALL TEMPORARY PYPASS PUMPING SYSTEM IN VICINITY OF CB -2 UNTIL
TEMPORARY CONNECTION IS MADE IN ACCORDANCE WITH SHEET Cl,
CONSTRUCTION NOTE 3.
FOR ALL PHASES:
1. MAINTAIN CUSTOMER ACCESS FROM /TO SOUTH 3RD STREET AT ALL TIMES.
2. PROVIDE TRAFFIC CONTROL FLAGGERS AS REQUIRED FOR CONSTRUCTION AND
CUSTOMER VEHICLE INGRESS AND EGRESS TO SOUTH 3RD STREET.
3. PROVIDE TEMPORARY BYPASS AND /OR PUMPING OF EXISTING STORM SYSTEM
AROUND WORK AREA. BYPASS MUST BE CAPABLE OF HANDLING ALL STORM
FLOWS WITHOUT CAUSING FLOODING.
4. SEE SHEET G4 FOR OVERALL DESCRIPTION OF GENERAL CONSTRUCTION
SEQUENCING.
WALKER PROPERTY
TEMPORARY FENCING
PLAN
SCALE IN FEET
0 40 80
PHASE 1 C: END OF OPEN CUT
1. ADJUST WORK AREA FENCING TO NEW LOCATION.
2. START OPEN CUT AT EAST END OF PROJECT, EXCAVATE AND INSTALL NEW
STORM SYSTEM WITHIN LIMITS INDICATED.
3. PREPARE AREA FOR ASPHALT RESTORATION. MATCH EXISTING SLOPES AND
GRADE TO DRAIN TO CATCH BASINS. PLACE ASPHALT RESTORATION.
4. DEMOBILIZE ALL EQUIPMENT AND FENCING FROM WALKER PROPERTY.
5. CONTRACTOR MAY RETURN LATER TO PLUG AND ABANDON EXISTING 24"
STORM PIPE. FENCING SHALL BE SIMILAR TO THIS PHASE. WORK SHALL BE
ACCOMPLISHED QUICKLY AND ALL EQUIPMENT AND FENCING SHALL BE
REMOVED WHEN WORK IS COMPLETED.
6. ON WEEKENDS, MOVE CONTRACTOR VEHICLES AND MATERIALS TO
STORAGE /PARKING AREA ON EAST SIDE OF WALKER PROPERTY. RELOCATE
FENCING TO ALLOW FOR CAR DISPLAY ALONG FRONTAGE. RE- ESTABLISH
WORK AREA FENCING AT START OF WORK WEEK.
I FnGNIn
TEMPORARY FENCING AS DEWATERING
SYSTEM IS INSTALLED
TEMPORARY FENCING DURING
CONSTRUCTION PHASE
® TYPE 3 BARRICADE WITH R11 -2
'ROAD CLOSED' (42•x30 ") SIGN
I
D=352909
vmna: euw ,see
RECOMMENDED FOR APPROVAL e6�m, 1 ••_40• LAKE AVE S /RAINIER AVE S JUNE 2011
ByI---------- - - - - -- Date( -------- J. COOP CITY 0 F
Byj_______ - Dnte-- - - -_ -- "u REN TON STORM SYSTEM
vu�
9IUwN:
K. TAYLOR oeanxc �,
_- - -- - -- DATUM r
vP WMHNGTON 9U74 Bv�________________ ➢ate.________ �_ .. NLL� Planning /Building /Public Works Dept. WALKER PROPERTY TEMPORARY PHASING, 1.
F. 253.6N.6]99 IF NOT diE I..
o,„e.9,,,m,m,.mm BY?__ ____ ____ _ _____ ➢at ----------
NO. REVISION BY DATE APPR �� = ^�OPDWeL� FENCING, AND TRAFFIC CONTROL PLAN
SNFGT: 9 11