TEMPORARY EROSION CONTROL NOTES:
1. APPROVAL OF THIS TEMPORARY EROSION /SEDIMENTATION CONTROL PLAN ( TESCP) DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE
DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.).
2. THE IMPLEMENTATION OF THESE TESCP PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESCP FACILITIES IS THE
RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS APPROVED.
3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THESE PLANS SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE
CONTRACTOR FOR THE DURATION OF CONSTRUCTION.
4. THE TESCP FACILITIES SHOWN ON THIS PLAN, IF NECESSARY FOR SEDIMENT CONTROL, MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND
GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE
WATER STANDARDS.
5. THE TESCP FACILITIES REFERENCED ON THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION
PERIOD, THESE TESCP FACILITIES SHALL BE MAINTAINED AND UPGRADED (E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.) AS
NEEDED FOR UNEXPECTED STORM EVENTS. REFER TO SPECIFICATION SECTION 02475.
6. THE TESCP FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
7. ANY AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY EMBANKMENTS, WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF FIFTEEN (15) DAYS,
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED TESCP METHODS APPLICABLE FOR THE SUBJECT SEASON OF THE YEAR (E.G. SEEDING, MULCHING,
NETTING, EROSION BLANKETS, ETC.)
8. ANY AREA NEEDING TESCP MEASURE, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.
9. THE TESCP FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 48 HOURS FOLLOWING A STORM
EVENT.
10. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES
SHALL BE CLEARED PRIOR TO PAVING. THE CLEARING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO DOWNSTREAM SYSTEM.
11. STABILIZED CONSTRUCTION ENTRANCES AND WASH PADS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF
THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
12. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED AREAS GREATER THAN 5,000 SQUARE FEET THAT ARE TO BE LEFT
UNWORKED FOR MORE THAN TWELVE (12) HOURS SHALL BE COVERED BY ONE OF THE FOLLOWING COVER MEASURES: MULCH, SOD OR PLASTIC COVERING.
13. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL
MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION OR DISPERSION
SYSTEM, THE FACILITY SHALL NOT BE USED AS A TEMPORARY SETTLING BASIN. NO UNDERGROUND DETENTION TANKS OR VAULTS SHALL BE USED AS A
TEMPORARY SETTLING BASIN.
14. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMINATING GRASSES SHALL BE APPLIED AT AN APPROPRIATE RATE (E.G. ANNUAL
OR PERENNIAL RYE APPLIED AT APPROXIMATELY 80 POUNDS PER ACRE).
15. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO (2) INCHES.
16. IF NECESSARY FOR SEDIMENT CONTROL, THE CONTRACTOR SHALL DESIGN AND CONSTRUCT SEDIMENT TRAPS AS REQUIRED BY AND IN ACCORDANCE WITH
SECTION 5.4.4 OF THE KCSWDM.
17. THE STREET SURFACE SHALL BE CLEANED AT THE END OF EACH DAY'S OPERATION WITH A POWER BROOM OR OTHER APPROVED MEANS,
3.5' -5'
SURFACE AREA
DETERMINED AT
TOP OF WEIR 4' MIN.
r 1' MIN.
1.5' MIN.
NOTE: TRAP MAY BE FORMED BY BERM OR BY
PARTIAL OR COMPLETE EXCAVATION
NATIVE SOIL OR
COMPACTED BACKFILL
3/4" — 1.5 "J
WASHED GRAVEL
2 " -4" ROCK
CROSS SECTION OF SEDIMENT TRAP
6' MIN.
1' MIN. DEPTH OVERFLOW SPILLWAY
SEDIMENT TRAP
OUTLET
SEDIMENT TRAP
DETAIL %1
SCALE: N.T.S.
' MIN. OVERFLOW
1' MIN.
DISCHARGE TO
STABILIZED
CONVEYANCE, OUTLET,
OR LEVEL SPREADER
—MIN. 1' DEPTH 2 " -4" ROCK
MIN. 1' DEPTH 3/4 " -1.5" WASHED GRAVEL
`y
IN COMPLIANCE WITH CITY OF RENTON
STA DARDS
B Date: /j
BY Date:
B Date:
BY: Date:
JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POST,
USE STABLES, WIRE RINGS OR EQUIVALENT TO ATTACH SILT FENCE GEOTEXTILE
ANCHOR POST, FABRIC TO POST
BACKFILL
NP• WIRE MESH SUPPORT EXCAVATED SOIL
AND SILT FENCE GEOTEXTILE
EXISTING GROUND —,
- RUNOFF FLOW
N
BOTTOM OF GEOTEXTILE
AND WIRE MESH SUPPORT
2 "X 4" WOOD POST, STEEL N
EXISTING GROUND SECT. FENCE POST, REBAR, OR GEOTEXTILE
EQUIVALENT
6' MAX
GEOTEXTILE
FABRIC
ELEVATION
FRAME
PLAN
RUNOFF WATER GRATE
WITH SEDIMENT
5
MIN.
GEOTEXTILE FABRIC
FOR SEDIMENT
REMOVAL
TRAPPED tiI
SEDIMENT
FILTERED WATER yf
DRAINAGE "
STRUCTURE
SECTION A
TYPICAL SILT FENCE INSTALLATION
DETAIL —8
SCALE: N.T.S.
EXIST. SIDEWALK
TO REMAIN (AS
REQ'D)
SECTION
WIRE MESH SUPPORT
FOR SILT FENCE
GEOTEXTILE
ANCHOR POST
8" MIN.
z
N
qS
RFQ���Fo
100,
y/N
A
R =25' MIN
12" MIN
4 " -8" QUARRY SPALLS
NOTE:
CONTRACTOR SHALL INSTALL AND PROVIDE FULL
MAINTAIN STABILIZED CONSTRUCTION WIDTH OF INGRESS/
ENTRANCES AT ALL LOCATIONS WHERE EGRESS AREA —
GRATE VEHICLES TRAVERSE DIRT SURFACES
PRIOR TO ENTERING PAVED PLANT ROADS.
STABILIZED CONSTRUCTION ENTRANCE
DETAIL
SCALE: N.T.S.
5"
MIN.
CATCH BASIN SILT INSERT
DETAIL 8 SCALE: N.T.S.
NOIR IY to Ian
DATUM
BYPASS
SILT FENCE GEOTEXTILE
BACKFILL
EXCAVATED SOIL
EXISTING GROUND
RUNOFF FLOW
GEOTEXTILE
R- 310005
KEITH OCONNELL
1501 41h Ave, SO. 1400
Sao".. WA 98101 -3655
(206) 438 -2700
WIRE MESH SUPPORT
FOR SILT FENCE
GEOTEXTILE
ANCHOR POST
COMPOST OR COIR LOG
I Z
N �
N
8" MIN.
DOUBLE SILT FENCE
D ETA I L�
SCALE: N.T.S.
VELMEIR RETAIL PHARMACY
TESC NOTES & DETAILS
C Ll i R- 3 /o1 o_5
03/28/13
lRlisi
-- SOTS AND HILL
N/A
�JEV
CITY OF RENTON CONSTRUCTION PLAN REVIEW RESUBMIITAL
JEV
08/05/13
CITY OF RENTON CONSTRUCTION PLAN REVIEW RESUBMtITAL
JEV
06/20/131
JEV
oK ro1
CITY OF RENTON CONSTRUCTION PLAN REVIEW SUBMITTAL
ET
04/29/13
oeo�
KO +%$3
Q
r Km aKC Err
NO.
REVISION
BY
DATE
I APPR
NOIR IY to Ian
DATUM
BYPASS
SILT FENCE GEOTEXTILE
BACKFILL
EXCAVATED SOIL
EXISTING GROUND
RUNOFF FLOW
GEOTEXTILE
R- 310005
KEITH OCONNELL
1501 41h Ave, SO. 1400
Sao".. WA 98101 -3655
(206) 438 -2700
WIRE MESH SUPPORT
FOR SILT FENCE
GEOTEXTILE
ANCHOR POST
COMPOST OR COIR LOG
I Z
N �
N
8" MIN.
DOUBLE SILT FENCE
D ETA I L�
SCALE: N.T.S.
VELMEIR RETAIL PHARMACY
TESC NOTES & DETAILS
C Ll i R- 3 /o1 o_5
03/28/13