HomeMy WebLinkAboutR-370005w z U w a TEMPORARY EROSION CONTROL NOTES: 1. APPROVAL OF THIS TEMPORARY EROSION /SEDIMENTATION CONTROL PLAN ( TESCP) DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.). 2. THE IMPLEMENTATION OF THESE TESCP PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESCP FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS APPROVED. 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THESE PLANS SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE CONTRACTOR FOR THE DURATION OF CONSTRUCTION. 4. THE TESCP FACILITIES SHOWN ON THIS PLAN, IF NECESSARY FOR SEDIMENT CONTROL, MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER STANDARDS. 5. THE TESCP FACILITIES REFERENCED ON THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TESCP FACILITIES SHALL BE MAINTAINED AND UPGRADED (E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS. REFER TO SPECIFICATION SECTION 02475. 6. THE TESCP FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. 7. ANY AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY EMBANKMENTS, WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF FIFTEEN (15) DAYS, SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED TESCP METHODS APPLICABLE FOR THE SUBJECT SEASON OF THE YEAR (E.G. SEEDING, MULCHING, NETTING, EROSION BLANKETS, ETC.) 8. ANY AREA NEEDING TESCP MEASURE, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS. 9. THE TESCP FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 48 HOURS FOLLOWING A STORM EVENT. 10. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEARED PRIOR TO PAVING. THE CLEARING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO DOWNSTREAM SYSTEM. 11. STABILIZED CONSTRUCTION ENTRANCES AND WASH PADS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 12. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED AREAS GREATER THAN 5,000 SQUARE FEET THAT ARE TO BE LEFT UNWORKED FOR MORE THAN TWELVE (12) HOURS SHALL BE COVERED BY ONE OF THE FOLLOWING COVER MEASURES: MULCH, SOD OR PLASTIC COVERING. 13. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION OR DISPERSION SYSTEM, THE FACILITY SHALL NOT BE USED AS A TEMPORARY SETTLING BASIN. NO UNDERGROUND DETENTION TANKS OR VAULTS SHALL BE USED AS A TEMPORARY SETTLING BASIN. 14. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMINATING GRASSES SHALL BE APPLIED AT AN APPROPRIATE RATE (E.G. ANNUAL OR PERENNIAL RYE APPLIED AT APPROXIMATELY 80 POUNDS PER ACRE). 15. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO (2) INCHES. 16. IF NECESSARY FOR SEDIMENT CONTROL, THE CONTRACTOR SHALL DESIGN AND CONSTRUCT SEDIMENT TRAPS AS REQUIRED BY AND IN ACCORDANCE WITH SECTION 5.4.4 OF THE KCSWDM. 17. THE STREET SURFACE SHALL BE CLEANED AT THE END OF EACH DAY'S OPERATION WITH A POWER BROOM OR OTHER APPROVED MEANS, 3.5' -5' SURFACE AREA DETERMINED AT TOP OF WEIR 4' MIN. r 1' MIN. 1.5' MIN. NOTE: TRAP MAY BE FORMED BY BERM OR BY PARTIAL OR COMPLETE EXCAVATION NATIVE SOIL OR COMPACTED BACKFILL 3/4" — 1.5 "J WASHED GRAVEL 2 " -4" ROCK CROSS SECTION OF SEDIMENT TRAP 6' MIN. 1' MIN. DEPTH OVERFLOW SPILLWAY SEDIMENT TRAP OUTLET SEDIMENT TRAP DETAIL %1 SCALE: N.T.S. ' MIN. OVERFLOW 1' MIN. DISCHARGE TO STABILIZED CONVEYANCE, OUTLET, OR LEVEL SPREADER —MIN. 1' DEPTH 2 " -4" ROCK MIN. 1' DEPTH 3/4 " -1.5" WASHED GRAVEL `y IN COMPLIANCE WITH CITY OF RENTON STA DARDS B Date: /j BY Date: B Date: BY: Date: JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POST, USE STABLES, WIRE RINGS OR EQUIVALENT TO ATTACH SILT FENCE GEOTEXTILE ANCHOR POST, FABRIC TO POST BACKFILL NP• WIRE MESH SUPPORT EXCAVATED SOIL AND SILT FENCE GEOTEXTILE EXISTING GROUND —, - RUNOFF FLOW N BOTTOM OF GEOTEXTILE AND WIRE MESH SUPPORT 2 "X 4" WOOD POST, STEEL N EXISTING GROUND SECT. FENCE POST, REBAR, OR GEOTEXTILE EQUIVALENT 6' MAX GEOTEXTILE FABRIC ELEVATION FRAME PLAN RUNOFF WATER GRATE WITH SEDIMENT 5 MIN. GEOTEXTILE FABRIC FOR SEDIMENT REMOVAL TRAPPED tiI SEDIMENT FILTERED WATER yf DRAINAGE " STRUCTURE SECTION A TYPICAL SILT FENCE INSTALLATION DETAIL —8 SCALE: N.T.S. EXIST. SIDEWALK TO REMAIN (AS REQ'D) SECTION WIRE MESH SUPPORT FOR SILT FENCE GEOTEXTILE ANCHOR POST 8" MIN. z N qS RFQ���Fo 100, y/N A R =25' MIN 12" MIN 4 " -8" QUARRY SPALLS NOTE: CONTRACTOR SHALL INSTALL AND PROVIDE FULL MAINTAIN STABILIZED CONSTRUCTION WIDTH OF INGRESS/ ENTRANCES AT ALL LOCATIONS WHERE EGRESS AREA — GRATE VEHICLES TRAVERSE DIRT SURFACES PRIOR TO ENTERING PAVED PLANT ROADS. STABILIZED CONSTRUCTION ENTRANCE DETAIL SCALE: N.T.S. 5" MIN. CATCH BASIN SILT INSERT DETAIL 8 SCALE: N.T.S. NOIR IY to Ian DATUM BYPASS SILT FENCE GEOTEXTILE BACKFILL EXCAVATED SOIL EXISTING GROUND RUNOFF FLOW GEOTEXTILE R- 310005 KEITH OCONNELL 1501 41h Ave, SO. 1400 Sao".. WA 98101 -3655 (206) 438 -2700 WIRE MESH SUPPORT FOR SILT FENCE GEOTEXTILE ANCHOR POST COMPOST OR COIR LOG I Z N � N 8" MIN. DOUBLE SILT FENCE D ETA I L� SCALE: N.T.S. VELMEIR RETAIL PHARMACY TESC NOTES & DETAILS C Ll i R- 3 /o1 o_5 03/28/13 lRlisi -- SOTS AND HILL N/A �JEV CITY OF RENTON CONSTRUCTION PLAN REVIEW RESUBMIITAL JEV 08/05/13 CITY OF RENTON CONSTRUCTION PLAN REVIEW RESUBMtITAL JEV 06/20/131 JEV oK ro1 CITY OF RENTON CONSTRUCTION PLAN REVIEW SUBMITTAL ET 04/29/13 oeo� KO +%$3 Q r Km aKC Err NO. REVISION BY DATE I APPR NOIR IY to Ian DATUM BYPASS SILT FENCE GEOTEXTILE BACKFILL EXCAVATED SOIL EXISTING GROUND RUNOFF FLOW GEOTEXTILE R- 310005 KEITH OCONNELL 1501 41h Ave, SO. 1400 Sao".. WA 98101 -3655 (206) 438 -2700 WIRE MESH SUPPORT FOR SILT FENCE GEOTEXTILE ANCHOR POST COMPOST OR COIR LOG I Z N � N 8" MIN. DOUBLE SILT FENCE D ETA I L� SCALE: N.T.S. VELMEIR RETAIL PHARMACY TESC NOTES & DETAILS C Ll i R- 3 /o1 o_5 03/28/13 lRlisi