GENERAL CONSTRUCTION NOTES
1. ALL WORK MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON PLANNING /BUILDING /PUBLIC
WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT /APWA
STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY
OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. A SET OF
APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING
CONSTRUCTION.
2. A COPY OF THE APPROVED PLANS MUST BE ON SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
w 3. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR WORK WITHIN
a THE PUBLIC RIGHT -OF -WAY.
z
4. PAVED SURFACES INCLUDING ROADWAYS, SIDEWALKS, AND CURBS THAT ARE
DAMAGED BY NEW CONSTRUCTION IN PUBLIC RIGHT -OF -WAY SHALL BE
REPAIRED AS REQUIRED BY THE CITY OF RENTON INSPECTOR.
a
5. THE CONTRACTOR SHALL NOTIFY THE FIRE DEPARTMENT DISPATCHER
TWENTY -FOUR (24) HOURS IN ADVANCE OF ALL WATER SERVICE
INTERRUPTIONS, HYDRANT SHUTOFFS, AND STREET CLOSURES OR OTHER
ACCESS BLOCKAGE. THE CONTRACTOR SHALL ALSO NOTIFY THE DISPATCHER
OF ALL NEW, RELOCATED, OR ELIMINATED HYDRANTS RESULTING FROM THIS
WORK.
6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN HEREON HAVE BEEN
ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS
AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT
NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY
LOCATIONS SHOWN AND TO FURTHER DISCOVER AND AVOID ANY OTHER
UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE
IMPLEMENTATION OF THIS PLAN.
7. THE CONTRACTOR SHALL LOCATE AND PROTECT ALL CASTINGS AND UTILITIES
DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES
LOCATOR SERVICE (1- 800 - 424 -5555) AT LEAST 72 HOURS PRIOR TO
CONSTRUCTION.
8. THE CONTRACTOR SHALL ADJUST ALL EXISTING MAINTENANCE HOLE RIMS,
DRAINAGE STRUCTURE LIDS, VALVE BOXES, AND UTILITY ACCESS STRUCTURES
TO FINISH GRADE WITHIN AREAS AFFECTED BY THE IMPROVEMENTS.
9. UTILITY SERVICE CONNECTIONS ARE TO BE PRIVATELY MAINTAINED.
10. THE CONTRACTOR SHALL PROVIDE FOR ALL COMPACTION TESTS REQUIRED
BY THE CITY OF RENTON INSPECTOR FOR WORK WITHIN THE PUBLIC
RIGHT -OF -WAY.
11. BACKFILL MATERIAL USED IN PUBLIC RIGHT -OF -WAY SHALL MEET CITY OF
RENTON STANDARD SPECIFICATIONS AND SHALL BE APPROVED BY THE CITY
OF RENTON.
12. INSPECTION AND ACCEPTANCE OF ALL WORK IN PUBLIC STREET
RIGHT -OF -WAY WILL BE ACCOMPLISHED BY REPRESENTATIVES OF THE CITY
OF RENTON. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE AND SCHEDULE APPROPRIATE INSPECTIONS, ALLOWING PROPER
ADVANCE NOTICE. THE INSPECTOR MAY REQUIRE RECONSTRUCTION OF ITEMS
THAT DO NOT MEET AUTHORITIES HAVING JURISDICTION (AHJ) STANDARDS OR
THAT WERE CONSTRUCTED WITHOUT INSPECTION. ANY RECONSTRUCTION
SHALL BE AT CONTRACTOR'S EXPENSE.
13. ALL TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE TRAFFIC
CONTROL MANUAL. A CITY OF RENTON APPROVED TRAFFIC CONTROL PLAN
WILL BE REQUIRED PRIOR TO ISSUANCE OF PERMIT.
14. CARE SHALL BE EXERCISED WHEN EXCAVATING NEAR ANY EXISTING UTILITY
LINES AND /OR WITHIN TREE CRITICAL ROOT ZONES.
15. THE CONTRACTOR SHALL SUBMIT CONSTRUCTION HAUL ROUTES TO CITY OF
RENTON PRIOR TO CONSTRUCTION.
16. IN THE EVENT NOTES CONFLICT, THE CITY OF RENTON STANDARD NOTES
SHALL RULE.
c�?t VON ,
F� aQ 8hi `9
y= O
m
•d3
QA / QC REVIEWER•
I,� 23
PORTION OF: SE 1/4 & NE 1/4 OF THE SW 1/4, SECTION 04, T. 23 N., R. 05 E., W.M.
TESC NOTES
1. CONSTRUCTION EROSION CONTROL MEASURES MUST BE IN PLACE AND
APPROVED BY THE CITY OF RENTON INSPECTOR PRIOR TO ANY EARTH
DISTURBANCE.
2. CONTRACTOR SHALL PREPARE AND SUBMIT FOR PERMITTING AGENCY'S
APPROVAL A STORMWATER POLLUTION PREVENTION PLAN (SWPPP). THE SWPPP
SHALL BE PREPARED IN ACCORDANCE WITH WASHINGTON STATE'S DEPARTMENT
OF ECOLOGY WATER POLLUTION CONTROL LAW. THE REQUIREMENTS FOR THE
SWPPP ARE AS OUTLINED IN ECOLOGY'S NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM AND STATE WASTE DISCHARGE GENERAL PERMIT FOR
STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES.
3. THE IMPLEMENTATION OF THE TEMPORARY EROSION AND SEDIMENT CONTROL
(TESC) PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND
UPGRADING OF THE TESC FACILITIES IN COORDINATION WITH THE CONTRACTOR
PREPARED AND AHJ APPROVED SWPPP IS THE RESPONSIBILITY OF THE
CONTRACTOR UNTIL ALL CONSTRUCTION IS APPROVED AND SITE IS
PERMANENTLY STABILIZED.
4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION
COLLECTION FACILITIES TO ENSURE THAT SEDIMENT -LADEN WATER DOES NOT
ENTER THE PUBLIC DRAINAGE SYSTEM. AS CONSTRUCTION PROGRESSES AND
UNEXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION CONTROL
FACILITIES MAY BE REQUIRED TO ENSURE COMPLETE SILTATION CONTROL OF
THE PROJECT. THEREFORE, DURING THE COURSE OF CONSTRUCTION IT SHALL
BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS /HER ACTIVITIES AND TO
PROVIDE ADDITIONAL FACILITIES THAT MAY BE NEEDED TO PROTECT ADJACENT
PROPERTIES.
5. THE TESC FACILITIES SHOWN ON THE PLANS AND AHJ APPROVED SWPPP MUST
BE CONSTRUCTED IN CONJUNCTION WITH ALL DEMOLITION, CLEARING, AND
GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT
LADEN WATER DOES NOT LEAVE THE SITE, ENTER THE DRAINAGE SYSTEM, OR
VIOLATE APPLICABLE WATER STANDARDS.
6. DURING THE CONSTRUCTION PERIOD, THE TESC FACILITIES SHALL BE MAINTAINED
AND UPGRADED (E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES, PORTABLE
TANKS AND SILT FENCES, ETC.) IN COORDINATION WITH THE CONTRACTOR
PREPARED SWPPP AS NEEDED SO AS NOT TO VIOLATE APPLICABLE WATER
STANDARDS.
15. THE TESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED
DAILY AND WITHIN 24 HOURS FOLLOWING A STORM EVENT.
16. THE TESC FACILITIES SHALL BE MAINTAINED UNTIL PERMANENT EROSION
CONTROL (REVEGETATION WITH TREES, SHRUBS, GROUND COVER, ETC.) IS IN
PLACE. STREET IMPROVEMENT PLANS, INCLUDING PERMANENT EROSION CONTROL
IN THE PUBLIC RIGHT OF WAY, WILL BE PERMITTED SEPARATELY. CONTRACTOR
SHALL COORDINATE RIGHT OF WAY AND PRIVATE CONSTRUCTION AND MAKE
SURE TEMPORARY EROSION CONTROL FACILITIES ARE MAINTAINED.
17. DESIGN, PREPARE AND OBTAIN PERMITS FOR TEMPORARY DEWATERING. TREAT
AND DISPOSE OF WATER FOR TEMPORARY DEWATERING IN ACCORDANCE WITH
AHJ REQUIREMENTS.
18. PROTECT STOCKPILES FROM WET WEATHER AND CONTAMINATION FROM OTHER
SOURCES. PROVIDE DUST CONTROL MEASURES AND STOCKPILE PROTECTION IN
ACCORDANCE WITH AHJ APPROVED SWPPP. STOCKPILES THAT BECOME
UNSUITABLE DUE TO LACK OF PROTECTION MEASURES SHALL BE PROPERLY
DISPOSED OF AND REPLACED AT CONTRACTOR'S EXPENSE.
19. COORDINATE LOCATION OF SEDIMENT, TRAPS, PORTABLE FILTRATION TREATMENT
SYSTEMS, INTERCEPTOR SWALES, AND OTHER TESC MEASURES WITH
IMPROVEMENTS AND CONTRACTOR'S OPERATIONS AND SEQUENCING. COORDINATE
OUTLET DRAINS FROM SEDIMENT PONDS AND PORTABLE FILTRATION TREATMENT
SYSTEMS WITH EXISTING AND NEW IMPROVEMENTS.
20. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS USED, FAST
GERMINATING GRASSES SHALL BE APPLIED AT AN APPROPRIATE RATE. SEE
SPECIFICATIONS FOR SEED MIX AND RATE OF APPLICATION.
21. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS USED, IT SHALL
BE APPLIED AT A MINIMUM THICKNESS OF TWO INCHES.
22. INSTALL FLOW DIVERSION AND INTERCEPTOR SWALES AND /OR BERMS AND
TEMPORARY CULVERTS IN ORDER TO PREVENT SHEET FLOW ONTO POROUS
SIDEWALK AND BIORETENTION FACILITIES. IT IS ASSUMED THAT THE AREA SHEET
FLOWING TO INTERCEPTOR SWALE IS STABILIZED AND NOT TURBID. IF
STORMWATER IS TURBID, EXCEEDING WATER QUALITY REQUIREMENTS, WATER
SHALL BE DIRECTED TO SEDIMENT PONDS AND /OR PORTABLE FILTRATION
TREATMENT SYSTEM AND TREATED PER AHJ REQUIREMENTS.
7. STABILIZED CONSTRUCTION ENTRANCES AND WASH PADS AT ALL CONSTRUCTION 23. THE TESC MEASURES SHOWN ON THE PLANS ARE FOR AHJ PERMITTING
SITE EXITS SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND PURPOSES ONLY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL MEANS
MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES AT AND METHODS AND SEQUENCING OF TESC MEASURES AND ENSURING WATER
CONTRACTOR'S EXPENSE MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS QUALITY REQUIREMENTS ARE MET.
ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
8. NO SEDIMENT SHALL BE TRACKED INTO THE STREET OR ONTO PAVED
SURFACES. SEDIMENT SHALL BE REMOVED FROM TRUCKS AND EQUIPMENT
PRIOR TO LEAVING THE SITE. IN THE EVENT OF FAILURE OF THE EROSION
CONTROL SYSTEM RESULTING IN SEDIMENT BEING TRACKED ONTO PAVED
SURFACES, THE CONTRACTOR SHALL IMMEDIATELY IMPLEMENT MEASURES TO
CORRECT THE SITUATION, AND VACUUM STREET SWEEPING SHALL BE EMPLOYED
ON AN EMERGENCY BASIS. IF VACUUM STREET SWEEPING VEHICLES ARE
UTILIZED, THEY SHALL BE OF THE TYPE THAT ACTUALLY REMOVES THE
SEDIMENT FROM THE PAVEMENT. WASHING OF THE STREETS WILL NOT BE
ALLOWED WITHOUT PRIOR AHJ APPROVAL.
9. ALL TESC FACILITIES SHALL CONFORM TO THE BEST MANAGEMENT PRACTICES
LISTED IN THE CITY OF RENTON EROSION CONTROL NOTES.
10. NO EXPOSED EARTH SHALL REMAIN UNSTABILIZED FOR MORE THAN 7 DAYS
FROM MAY 1ST TO SEPTEMBER 30TH. FROM OCTOBER 1ST TO APRIL 30TH NO
EXPOSED EARTH SHALL REMAIN UNSTABILIZED FOR MORE THAN 12 HOURS.
STABILIZATION OF EXPOSED EARTH SHALL BE WITH APPROVED TESC METHODS
(I.E. SEEDING, MULCHING, NETTING, EROSION BLANKETS, COVERING, ETC.) IN
COORDINATION WITH THE CONTRACTOR PREPARED SWPPP.
11. NO SEDIMENT SHALL BE ALLOWED TO ENTER ANY CATCH BASIN WITHIN THE
SITE, OR ADJACENT PROPERTIES. IN THE EVENT OF A FAILURE OF THE TESC
PLAN THAT RESULTS IN SEDIMENT ENTERING A CATCH BASIN, THE CONTRACTOR
SHALL REMOVE ALL SUCH SEDIMENT IMMEDIATELY.
12. DISTURBED SOILS THAT ARE EXPOSED TO SURFACE RUNOFF SHALL BE
STABILIZED WITH TESC MEASURES AS DIRECTED BY THE CITY OF RENTON AND
PER THE APPROVED CONTRACTOR SWPPP.
13. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND
MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
14. CATCH BASINS IN THE STREET OR ON -SITE SHALL BE INSPECTED BY THE
CONTRACTOR DAILY. WATER LEAVING THE SITE DURING CONSTRUCTION,
INCLUDING WATER CARRIED BY TRUCKS, SHALL BE CLEAN. THE CONTRACTOR
SHALL CLEAN CITY CATCH BASINS AND IMPLEMENT EXTRA SEDIMENTATION
CONTROL MEASURES IF NECESSARY AND AS DIRECTED BY THE AHJ INSPECTOR
AT NO ADDITIONAL EXPENSE TO OWNER.
60 DESIGN COMPANY
1205 SECOND AVE. SUITE 200
SEATTLE, WA 98101
T 206.223.0326
F 206.223.0125
www.evcdeeigu:com
EARTHWORK AND GRADING NOTES
1. NONCOMPLIANCE WITH EROSION CONTROL REQUIREMENTS, WATER QUALITY
REQUIREMENTS, AND CLEARING LIMITS MAY RESULT IN REVOCATION OF
PROJECT PERMITS, PLAN APPROVAL, AND BOND FORECLOSURES.
2. PRIOR TO ANY WORK INCLUDING GROUND DISTURBANCE, THE CONTRACTOR
SHALL CONTACT THE CITY OF RENTON TO SCHEDULE A PRE - CONSTRUCTION
MEETING.
3. PRIOR TO ANY SITE CONSTRUCTION (WHICH INCLUDES CLEARING /LOGGING,
DEMOLITION, OR GRADING THE SITE), CLEARING LIMITS SHALL BE LOCATED
AND FIELD IDENTIFIED BY THE CONTRACTOR'S SURVEYOR.
4. ALL EARTHWORK SHALL BE PERFORMED IN ACCORDANCE WITH AHJ
STANDARDS.
5. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM OF 95% OF
MAXIMUM DENSITY BY MODIFIED PROCTOR TEST UNLESS SPECIFICALLY
INDICATED OTHERWISE IN THE SPECIFICATIONS.
6. APPROVAL BY AHJ OF THE DRAINAGE AND TEMPORARY EROSION CONTROL
PLANS DOES NOT INCLUDE APPROVAL OF THE GRADING ACTIVITIES SHOWN
HEREIN. GRADING ACTIVITIES WITHIN THE RIGHT -OF -WAY REQUIRES A
PERMIT FROM AHJ. GRADING ACTIVITIES ON ADJACENT PROPERTIES
REQUIRES WRITTEN APPROVAL BY THE ADJACENT PROPERTY OWNER.
7. GRADING AND EXPOSED SOILS MUST BE STABILIZED BY OCTOBER 15TH
AND NO EXCAVATION TO BE PERFORMED BETWEEN OCTOBER 31ST AND
APRIL 1ST UNLESS CONTRACTOR HAS OBTAINED WRITTEN APPROVAL BY
AHJ.
8. MATCH EXISTING GRADES AT EDGE CONDITIONS AND PROVIDE SMOOTH
TRANSITION.
9. SLOPE FINISHED SURFACE A MINIMUM OF 2% AWAY FROM THE BUILDING
FOR AT LEAST TWO FEET ON ALL SIDES OF THE BUILDING UNLESS NOTED
OTHERWISE.
10. CONTRACTOR SHALL PERFORM ALL WORK WITHIN THE TREE PROTECTION
ZONE /CRITICAL ROOT ZONE IN ACCORDANCE WITH PROJECT DOCUMENTS.
11. COORDINATE FINE GRADING FOR SURFACE DRAINAGE WITH LANDSCAPE
INSTALLATION. FINE GRADING FOR SURFACE DRAINAGE SHALL OCCUR PRIOR
TO PLANTING AND MULCHING. GRADE TO PROVIDE POSITIVE DRAINAGE AWAY
FROM BUILDINGS AT BOTH SUBGRADE AND FINISH GRADE.
12. UNLESS INDICATED OTHERWISE, THE EARTHWORK OPERATION SHALL AMEND
THE SOILS FOR NON -PAVED AREAS WITH THE FOLLOWING MINIMUM.
3- INCHES OF COMPOST TILLED INTO THE TOP 12 INCHES OF
NON- STRUCTURAL FILL AND NATIVE SOILS. ONCE AMENDED PROTECT SOILS
FROM OVERCOMPACTION. IF AMENDED SOILS BECOME OVERCOMPACTED
THEN RESTORE AT NO ADDITIONAL COST TO OWNER.
13. FINISHED GRADING. FINE GRADE BEDS TO CONTOUR LINES AND GRADES
SHOWN ON DRAWINGS, 1/4" BELOW THE LEVEL OF ADJACENT WALLS,
WALKS AND CURBS UNLESS NOTED OTHERWISE. ALLOW ROOM IN PLANT
BEDS, COORDINATE WITH LANDSCAPING PLANS. FINE FINISH TOPSOIL TO
MAKE SMOOTH AND EVEN AND REMOVING ALL EXTRANEOUS MATTER.
BENCHMARK �'"x H1VD 1B°8
PERMIT CORRECTIONS D9 30/1 AS NOTED 10P0t"""1D'°"' "°°' �s< ,} CITY OF
PERMIT CORRECTIONS 10/23/13 RM RENTON
JZ I oxE Ntl1 �J DATUM
N . .* Planning /Building /Public Works Dept.
F xOr a� ELSI
NO. REVISION BY DATE APPR �"' �""E"L`'01 y
CITY OF RENTON
Approved by: Ada
Approved by:
Approved by:
Approved by: GIy.
R- 310602
Date: A 3
Date:
Date:
Date: I q h/ 13
PLEASE CALL 811
3 Working Days
BEFORE YOU DIG
RHA KIRKLAND AVENUE
TOWNHOMES
RENTON, WA 98056
NOTES