Loading...
HomeMy WebLinkAboutR-370619zz 0 W 00 o: a F c � 2 ti c o 8" PERVIOUS CONCRETE 6' PER PLANS PORTION OF: SE 1/4 & NE 1/4 OF THE SW 1/4, SECTION 04, T. 23 N., R. 05 E., W.M. 6" AGGREGATE DISCHARGE SUBBASE 1 R (TYP) SEE NOTE 4. FINISHED GRADE VARIES (3' MIN.) 2' #4 VERTICAL ® ogo�O O �OODaOoOO�DaOo 18"± O.C. 3„ UTILITY LOCATE TAPE 1/4° SLOPED TO DRAIN SLOPED TO DRAIN FINISH GRADE METAL CAP #10 WIRE, (6) WRAPS MIN., REQUIRED FOR MAGNETIC —� LOCATION FINDER PC GEOTEXTILE 1/4" MINUS - PER SPECS (BOTTOM AND SIDES) 45' BEND CITY OF RENTON PROTECT AND PREPARE #4 HORIZ 12" t O.C. CAP AT WYE 4" BASE COURSE - PER SPECS Approved by: Date: 0 Z0 A7 SUBGRADE PER SPECIFICATIONS PORTLAND CEMENT TERMINAL CONCRETE BARRIER CLEANOUTS NOTE: CURB ONLY SD 1. DOCUMENT LOCATION OF COMPACTED SUBGRADE Approved by: Date: CLEANOUT AND INVERT NOTES: ELEVATION AT CLEANOUT Approved by: Date: 1. DEPTHS SHOWN FOR PAVEMENT SECTION ARE COMPACTED DEPTHS. ON AS- BUILTS. NOTES: Approved by: Date: 2. OWNERS GEOTECHNICAL ENGINEER TO REVIEW SUBGRADE PREPARATION PRIOR FLOW TO PLACEMENT OF PC GEOTEXTILE. 3. LOCATE CHECK DAMS PARALLEL TO CONTOURS AT EVERY ONE FOOT DROP IN �i� Cleanout 2 1. DEPTHS NOTED ARE COMPACTED DEPTHS. r� Crushed Rods Paving 3 ELEVATION. SEE DETAIL 7/D1.2 FOR CHECK DAM DETAIL. 1 MAN GRANITE BOULDERS. SEE NOTE 2 NOTES: 4. DETAIL SHOULD BE USED FOR EDGE TRANSITIONS BETWEEN PERVIOUS VEHICULAR CONCRETE PAVEMENT AND EXISTING AND PROPOSED SURFACES, BOULDERS SHALL BE OF A INCLUDING BUT NOT LIMITED TO ASPHALT PAVING. B SIMILAR COLOR AND TYPE 1. STAKE PROPOSED LOCATION 18" 1 SOWNEER'S EN Pervious Concrete Vehicular Pavement with Curb Barrier REVIEW WITH PAVEMENT PIPE PER PLAN `4 LANDSCAPE CONSULTANT. �F AL w A 3: °z 2. WHEN OUTLET CULVERT IS \ \\ AGE PC CHECK DAM w PARALLEL TO CENTERLINE OF x/\ //\ II 6„ PC GEOTEXTILE N SWALE: D D =3' COBBLES BETWEEN 2" AND W =MATCH BOTTOM WIDTH SECTION 10" SIZE B —I III —I ii —i WHEN OUTLET CULVERT IS PLAN PERPENDICULAR TO 1' CENTERLINE OF SWALE: - a D =MATCH BOTTOM WIDTH II PIPE W =3' NOTES: 00 ro TOP OF CHECK DAM TO BE LEVEL ACROSS -' %' %- PAVEMENT LENGTH OF CHECK DAM. 2 " -10" " : -;, -, ✓.: REBAR /ANCHOR PER WHEEL STOP PER COBBLES - MANUFACTURER SPECIFICATIONS 2. LOCATE CHECK DAMS PARALLEL TO CONTOUR AT EVERY ONE FOOT DROP IN ELEVATION. COMPACTED SUBGRADE SECTION A -A GEOTEXTILE SECTION B -B 4 5 6 Check Dam INet /outlet Protection Wheel Stops PER PLANS PER PLANS 5" PERVIOUS CONCRETE COVER SPOILS MOUND WITH ANCHOR EDGES OF PLASTIC CROSS SLOPE SIDEWALK (PC) BLACK 6 MIL PLASTIC SHEETING SHEETING WITH STRAW 1 " -2" COBBLES PERRPPLAN 6" AGGREGATE DISCHARGE PLACE EXCAVATION SPOILS ON BALES SPACED 8' OC — SUBBASE BLACK 6 MIL PLASTIC SHEETING 1 " -2" COBBLES METAL EDGING =_ o _ SEE NOTE 5. WITH SANDBAGS AND ROPE AS NOTES: 1 =1 1 =1 —III i- NECESSARY ADJACENT 1. WHERE PERVIOUS CONCRETE SIDEWALK IS WITHIN PC SIDEWALK GEOTEXTILE BOTTOM MOUND SPOILS TO ENSURE �� PARKING THE CRITICAL ROOT ZONE OF TREES TO SAVE, AND SIDES POSITIVE RUNOFF \. REDUCE AGGREGATE DISCHARGE SUBBASE TO 2 ". COMPACT SUBGRADE TO 1 90 % -92 %. SCARIFY TOP ii 1' MIN Z 2. DEPTHS SHOWN FOR PAVEMENT SECTION ARE SURFACE PRIOR TO PLACEMENT \i COMPACTED DEPTHS. OF GEOTEXTILE PER SPECS. NOTES: 3. AT DRIVEWAYS THICKENED EDGE OF SIDEWALK ON PERVIOUS CONCRETE (PC) SIDEWALK SECTION (� EACH SIDE OF DRIVEWAY PER TRANSITION ABOVE. 1. THE COVER SHALL BE MAINTAINED TIGHTLY IN PLACE BY USING SANDBAGS OR TIRES ON ROPES IN A UJI SIDEWALK SECTION PER ABOVE 10 -FOOT, MAXIMUM GRID. ALL SEAMS SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH. FILTER FABRIC FILTER FABRIC 4. OWNERS GEOTECHNICAL ENGINEER TO REVIEW `3'7 M SUBGRADE PREPARATION PRIOR TO PLACEMENT 9I SIDEWALK DEPTH AT DRIVEWAY 2. AT BASE OF STOCKPILE MOUND INSTALL INTERCEPTOR SWALES, WATTLES, PIPING AND/OR OTHER FLOW / BUILDING FOOTING. BUILDING FOOTING. IIr OF PC GEOTEXTILE. TO MATCH DRIVEWAY DIVERSION AND ENERGY DISSIPATION MEASURES TO SAFELY REDIRECT RUNOFF FROM MOUND TO SEE STRUCTURAL. SEE STRUCTURAL. O M PAVEMENT DEPTH SEDIMENT POND. RUNOFF FROM STOCKPILES SHALL UNDER NO CIRCUMSTANCES SHEET FLOW OR V 5. EXTEND PC SIDEWALK GEOTEXTILE ABOVE �' _— — III DIRECT FLOW TO ECA, TO EXISTING TREES TO REMAIN, TO ADJACENT OFF -SITE PROPERTIES AND TO ADJACENT TO PAVING AREAS ADJACENT TO LANDSCAPE AREAS PAVEMENT. AFTER PAVEMENT IS CURED AND 2 DRIVEWAY DEPTH PER PLAN NEW AND EXISTING FACILITIES TO REMAIN. ADJACENT FINISHED GRADE IS STABILIZED, CUT THICKENED GEOTEXTILE AT FINISHED GRADE. (TYP.) EDGE SEE NOTE 5. 3. MAINTAIN CONTINUOUS PROTECTION OF STOCKPILES DURING RAIN EVENTS. PLEASE CALL silil SIDEWALK DEPTH TRANSITION AT DRIVEWAYS R=37061 9 3 Working Days W a a� it / P VON SCy9 7 MS travel Drain Strip 9 BEFORE YOU DIG EL �P Pervious Concrete Walkway Excavation Spoils Erosion + Protection Barrier Quo oFW E,F yi i9> m DESIGN COMPANY PERMIT CORRECTIONS 7/11/1 BENCHMARK AS NOTED �E „„�,� „�, !� CITY OF RHA KIRKLAND AVENUE TOWNHOMES 10/23/2013 PERMIT CORRECTIONS 9/30/1 RM SEE gEarw Faaeus4 ��- ass 1205 SECOND AVE. SUITE 200 PERMIT CORRECTIONS 10/23/13 RENTON RENTON, WA 98056 °"”" FF '��9g4ALEa SEATTLE, WA 98101 dz MFG DATUM a .r „u I F � ME 23 / T 206.223.0326 Planning /Building /Public Works Dept. CML DFALS D 1.2 0 QA /QC REVIEW F 206.223.0125 wwwsvrdesigo.com NO. REVISION BY DATE APPR �'C01m"av �