Loading...
HomeMy WebLinkAboutT-372901J 5 �- C � 2 Z r Z � O C Q Z_ J J `o n« d o oy 0 -o z nw W as c E a �E m �N C C O p�j a� N 1001 =a o o z 0 0 z SEC. 29, TWP. 23N., RGE. 5 E., W.M. 4. INSTALL ALL CONDUIT AND WIRING PER WIRING SCHEDULE AND CITY STANDARD DETAILS ON SHEETS I1-2, IL3 AND IL4. CONSTRUCTION NOTES OINSTALL FOUNDATION AND ELECTRICAL SERVICE CABINET AT S 28TH ST, STA. 11 +04.5, 18.0' LT. CABINET SHALL HAVE TWO ILLUMINATION CIRCUITS MINIMUM. USE CITY STANDARD DETAILS 122.1 AND 126.1. LABEL CABINET AS # - - -_ 2O COORDINATE WITH PUGET SOUND ENERGY (PSE) FOR NEAREST ELECTRICAL POINT OF SERVICE. ROUTE SERVICE ENTRANCE CONDUIT AND CONDUCTORS TO POINT OF SERVICE PER PSE REQUIREMENTS. COORDINATE WITH PSE FOR SERVICE CONNECTION. OCONSTRUCT FOUNDATION AND RELOCATE EXISTING FLASHING BEACON ASSEMBLY TO NEW FOUNDATION. RELOCATE EXISTING JUNCTION BOX WITHIN FIVE FEET OF NEW FOUNDATION. INTERCEPT EXISTING CONDUIT AND ROUTE TO RELOCATED JUNCTION BOX. INSTALL 2" SCHEDULE 40 PVC CONDUIT FROM JUNCTION BOX TO NEW FOUNDATION. INSTALL AND TERMINATE EXISTING ^CONDUCTORS. USE WSDOT STANDARD PLAN J- 21.10 -03. PEDESTRIAN POLE, LUMINAIRE, FOUNDATION AND TYPE 1 JUNCTION BOX WITH CONCRETE PAD ARTERIAL POLE, LUMINAIRES, FOUNDATION AND TYPE 1 JUNCTION BOX WITH CONCRETE PAD ARTERIAL POLE, LUMINAIRES, FOUNDATION AND TYPE 2 JUNCTION BOX WITH CONCRETE PAD FLASHING BEACON ASSEMBLY TYPE 1 JUNCTION BOX WITH CONCRETE PAD TYPE 2 JUNCTION BOX WITH CONCRETE PAD ELECTRICAL SERVICE CABINET PVC CONDUIT (SEE WIRING SCHEDULE) WIRE NOTE CONSTRUCTION NOTE T- 312901 RECORD DOCUMENT BY DATE RECOMMENDED FOR APPROVAL BY DATE fig is< BY DATE BY DATE H I C HERMAN TRAFFIC ENGINEERING 15324 Southeast 133rd Court, Renton, Washington 98059 y 425- 277 -1740 tel. 425- 277 -5718 fax hte @comcast.net O �O 4, a F� V N a 0 m z 0 0 z SEC. 29, TWP. 23N., RGE. 5 E., W.M. 4. INSTALL ALL CONDUIT AND WIRING PER WIRING SCHEDULE AND CITY STANDARD DETAILS ON SHEETS I1-2, IL3 AND IL4. CONSTRUCTION NOTES OINSTALL FOUNDATION AND ELECTRICAL SERVICE CABINET AT S 28TH ST, STA. 11 +04.5, 18.0' LT. CABINET SHALL HAVE TWO ILLUMINATION CIRCUITS MINIMUM. USE CITY STANDARD DETAILS 122.1 AND 126.1. LABEL CABINET AS # - - -_ 2O COORDINATE WITH PUGET SOUND ENERGY (PSE) FOR NEAREST ELECTRICAL POINT OF SERVICE. ROUTE SERVICE ENTRANCE CONDUIT AND CONDUCTORS TO POINT OF SERVICE PER PSE REQUIREMENTS. COORDINATE WITH PSE FOR SERVICE CONNECTION. OCONSTRUCT FOUNDATION AND RELOCATE EXISTING FLASHING BEACON ASSEMBLY TO NEW FOUNDATION. RELOCATE EXISTING JUNCTION BOX WITHIN FIVE FEET OF NEW FOUNDATION. INTERCEPT EXISTING CONDUIT AND ROUTE TO RELOCATED JUNCTION BOX. INSTALL 2" SCHEDULE 40 PVC CONDUIT FROM JUNCTION BOX TO NEW FOUNDATION. INSTALL AND TERMINATE EXISTING ^CONDUCTORS. USE WSDOT STANDARD PLAN J- 21.10 -03. PEDESTRIAN POLE, LUMINAIRE, FOUNDATION AND TYPE 1 JUNCTION BOX WITH CONCRETE PAD ARTERIAL POLE, LUMINAIRES, FOUNDATION AND TYPE 1 JUNCTION BOX WITH CONCRETE PAD ARTERIAL POLE, LUMINAIRES, FOUNDATION AND TYPE 2 JUNCTION BOX WITH CONCRETE PAD FLASHING BEACON ASSEMBLY TYPE 1 JUNCTION BOX WITH CONCRETE PAD TYPE 2 JUNCTION BOX WITH CONCRETE PAD ELECTRICAL SERVICE CABINET PVC CONDUIT (SEE WIRING SCHEDULE) WIRE NOTE CONSTRUCTION NOTE T- 312901 RECORD DOCUMENT BY DATE RECOMMENDED FOR APPROVAL BY DATE fig is< BY DATE BY DATE H I C HERMAN TRAFFIC ENGINEERING 15324 Southeast 133rd Court, Renton, Washington 98059 y 425- 277 -1740 tel. 425- 277 -5718 fax hte @comcast.net O �O 4, a F� V N