HomeMy WebLinkAboutT-372901J
5 �-
C � 2
Z
r
Z
� O
C Q
Z_
J
J
`o
n«
d o
oy
0 -o
z
nw
W as
c E
a
�E
m
�N
C
C
O p�j
a�
N 1001
=a o
o
z
0
0
z
SEC. 29, TWP. 23N., RGE. 5 E., W.M.
4. INSTALL ALL CONDUIT AND WIRING PER WIRING SCHEDULE AND CITY STANDARD
DETAILS ON SHEETS I1-2, IL3 AND IL4.
CONSTRUCTION NOTES
OINSTALL FOUNDATION AND ELECTRICAL SERVICE CABINET AT S 28TH ST, STA.
11 +04.5, 18.0' LT. CABINET SHALL HAVE TWO ILLUMINATION CIRCUITS MINIMUM.
USE CITY STANDARD DETAILS 122.1 AND 126.1. LABEL CABINET AS # - - -_
2O COORDINATE WITH PUGET SOUND ENERGY (PSE) FOR NEAREST ELECTRICAL
POINT OF SERVICE. ROUTE SERVICE ENTRANCE CONDUIT AND CONDUCTORS TO
POINT OF SERVICE PER PSE REQUIREMENTS. COORDINATE WITH PSE FOR
SERVICE CONNECTION.
OCONSTRUCT FOUNDATION AND RELOCATE EXISTING FLASHING BEACON ASSEMBLY
TO NEW FOUNDATION. RELOCATE EXISTING JUNCTION BOX WITHIN FIVE FEET OF
NEW FOUNDATION. INTERCEPT EXISTING CONDUIT AND ROUTE TO RELOCATED
JUNCTION BOX. INSTALL 2" SCHEDULE 40 PVC CONDUIT FROM JUNCTION BOX
TO NEW FOUNDATION. INSTALL AND TERMINATE EXISTING ^CONDUCTORS. USE
WSDOT STANDARD PLAN J- 21.10 -03.
PEDESTRIAN POLE, LUMINAIRE, FOUNDATION AND TYPE 1
JUNCTION BOX WITH CONCRETE PAD
ARTERIAL POLE, LUMINAIRES, FOUNDATION AND TYPE 1
JUNCTION BOX WITH CONCRETE PAD
ARTERIAL POLE, LUMINAIRES, FOUNDATION AND TYPE
2 JUNCTION BOX WITH CONCRETE PAD
FLASHING BEACON ASSEMBLY
TYPE 1 JUNCTION BOX WITH CONCRETE PAD
TYPE 2 JUNCTION BOX WITH CONCRETE PAD
ELECTRICAL SERVICE CABINET
PVC CONDUIT (SEE WIRING SCHEDULE)
WIRE NOTE
CONSTRUCTION NOTE
T- 312901
RECORD DOCUMENT
BY DATE
RECOMMENDED FOR APPROVAL
BY DATE fig is<
BY DATE
BY DATE
H I C HERMAN TRAFFIC ENGINEERING
15324 Southeast 133rd Court, Renton, Washington 98059
y 425- 277 -1740 tel. 425- 277 -5718 fax hte @comcast.net
O
�O
4,
a F�
V
N
a
0
m
z
0
0
z
SEC. 29, TWP. 23N., RGE. 5 E., W.M.
4. INSTALL ALL CONDUIT AND WIRING PER WIRING SCHEDULE AND CITY STANDARD
DETAILS ON SHEETS I1-2, IL3 AND IL4.
CONSTRUCTION NOTES
OINSTALL FOUNDATION AND ELECTRICAL SERVICE CABINET AT S 28TH ST, STA.
11 +04.5, 18.0' LT. CABINET SHALL HAVE TWO ILLUMINATION CIRCUITS MINIMUM.
USE CITY STANDARD DETAILS 122.1 AND 126.1. LABEL CABINET AS # - - -_
2O COORDINATE WITH PUGET SOUND ENERGY (PSE) FOR NEAREST ELECTRICAL
POINT OF SERVICE. ROUTE SERVICE ENTRANCE CONDUIT AND CONDUCTORS TO
POINT OF SERVICE PER PSE REQUIREMENTS. COORDINATE WITH PSE FOR
SERVICE CONNECTION.
OCONSTRUCT FOUNDATION AND RELOCATE EXISTING FLASHING BEACON ASSEMBLY
TO NEW FOUNDATION. RELOCATE EXISTING JUNCTION BOX WITHIN FIVE FEET OF
NEW FOUNDATION. INTERCEPT EXISTING CONDUIT AND ROUTE TO RELOCATED
JUNCTION BOX. INSTALL 2" SCHEDULE 40 PVC CONDUIT FROM JUNCTION BOX
TO NEW FOUNDATION. INSTALL AND TERMINATE EXISTING ^CONDUCTORS. USE
WSDOT STANDARD PLAN J- 21.10 -03.
PEDESTRIAN POLE, LUMINAIRE, FOUNDATION AND TYPE 1
JUNCTION BOX WITH CONCRETE PAD
ARTERIAL POLE, LUMINAIRES, FOUNDATION AND TYPE 1
JUNCTION BOX WITH CONCRETE PAD
ARTERIAL POLE, LUMINAIRES, FOUNDATION AND TYPE
2 JUNCTION BOX WITH CONCRETE PAD
FLASHING BEACON ASSEMBLY
TYPE 1 JUNCTION BOX WITH CONCRETE PAD
TYPE 2 JUNCTION BOX WITH CONCRETE PAD
ELECTRICAL SERVICE CABINET
PVC CONDUIT (SEE WIRING SCHEDULE)
WIRE NOTE
CONSTRUCTION NOTE
T- 312901
RECORD DOCUMENT
BY DATE
RECOMMENDED FOR APPROVAL
BY DATE fig is<
BY DATE
BY DATE
H I C HERMAN TRAFFIC ENGINEERING
15324 Southeast 133rd Court, Renton, Washington 98059
y 425- 277 -1740 tel. 425- 277 -5718 fax hte @comcast.net
O
�O
4,
a F�
V
N