Loading...
HomeMy WebLinkAboutProposed SCADA network.xlsx1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Location Well PW-9 Maplewood treatment plant Maplewood BPS Mount Olivet Site Highlands Site Hazen Reservoir Site North Talbot BPS Rolling Hills Site West Hill BPS West Hill Reservoir Site South Talbot BPS South Talbot Reservoir Springbrook Springs Site Houser Way BPS Monroe Ave BPS Tiffany Park BPS Fred Nelson BPS Bow Lake Intertie Dimmit BPS Skyway Intertie Coal Creek Intertie Net Site ID ? 24 ? 74 71 73 ?? 70 48 72 ?? 75 ?? ?? ?? ?? ?? ?? ?? ?? ?? Current Network Conneciton Fiber connected Fiber connected Fiber installed Fiber on-site Fiber connected Fiber installed Fiber Connected Planned Network Connection Upgrade Transition SMAC-F to 1 Gbps xcvrs. Terminate in BPS and treatment plant Install fiber to Well PW-9 Install conduit & fiber between BPS and pad Patch to PLC Fiber to N Talbot reservoir & nearby aerial fiber. Aerial approx. 200 feet Install fiber in telemetry conduit. Connect to Wi-Fi cabinet. Upgrade radio link to Shops Terminate in BPS and Airport Tower Install transcievers. Patch to PLC Install fiber to E. Valley Hwy & SW 43td TSC & terminate. Approx. 700 feet. Install fiber to Carr Rd. & terminate – approx.. 800 feet. P to P IMS Wireless bridge to Oakesdale & SW 43rd TSC. Cost $500. P to P IMS Wireless bridge to Mt. Olivet Reservoir. Cost $1,000. Fiber to NE 4th & Monroe TSC approx. 400 feet. Fiber splice to adjacent cable – 50 feet + vault + upstream splice P to P IMS Wireless bridge to N. Talbot Reservoir. Cost $1,000. Fiber splice to adjacent cable – 50 feet + vault + upstream splice Conduit to West Hill AMR P to P IMS Wireless bridge to West Hill Reservoir. Cost $1,000 + Water Dept. staff labor to install Ethernet cables form pad to N side rail & mount radio. Possible labor to install pole near intertie & mount radio & cable. P to P IMS Wireless bridge to Highlands Reservoir. Cost $1,000. 4,300 feet 4 houses on a hill. P to P IMS Wireless bridge to Long lift station – 3,250 feet, lots of trees. Sub-Total Contingency 10% Tax (10 %) Project Total Estimated Cost 400 0.0000 5350 6350 5450 10 12750 5950 5350 400 5725 4650 30850 23500 5950 9950 12550 10200 5450 1000 1000 152835 15283.5 15283.5 183402 Address 4030 Maple Valley Highway 250 Bronson Way NE 3410 NE 12th Street 4900 NE 12th Street 730 S 19th Street 2401 Puget Drive SE 615 West Perimeter Road 12603 82nd Ave S 50 S 43rd Street 4300 Main Ave S 5750 Talbot Road S 325 Houser Way N 401 Monroe Ave NE 2000 Kirkland Ave SE 2300 Benson Road S 1901 Oakesdale Ave SW (1,250 feet south)   12603 82nd Ave S (adjacent to West Hill reservoir) 8016 S 116th Street 2610 Lynnwood Ave NE Site comments The Well PW-9 RTU communicates with the Corrosion Control Treatment Facility RTU via a spread spectrum radio link (unlicensed frequency). The Wells 1-2-3 RTU, Well EW-3 RTU and Well PW-8 / Fluoride Building RTU communicate with the CCTF RTU via hard wire links. The Maplewood BPS RTU communicates with the MTU. The Maplewood Water Treatment Plant (WTP) RTU communicates with the Maplewood BPS RTU via a spread spectrum radio link (unlicensed frequency) The Maplewood BPS RTU communicates with the MTU.  The Maplewood Water Treatment Plant (WTP) RTU communicates with the Maplewood BPS RTU via a spread spectrum radio link (unlicensed frequency).  RTU is located in BPS. Hardwire connections to Mt Olivet Reservoir and Mt Olivet emergency power building. RTU is located in the BPS. Hardwire connections to the three Highlands reservoirs and emergency power building. RTU is located in electrical / telecomm building. Hardwire connection to Hazen Reservoir. RTU is in BPS. Hardwire connections to North Talbot Reservoir and North Talbot emergency power building. RTU is in BPS.  Hardware connections to the two Rolling Hills reservoirs. RTU is in the BPS. RTU is in cabinet at base of reservoir. RTU is in BPS. RTU is in cabinet at base of reservoir. RTU is in treatment building. RTU is in BPS. RTU is in BPS. RTU is in BPS. RTU is in BPS. RTU is in cabinet next to vault. RTU is in BPS. RTU is in vault. RTU in cabinet next to vault. 3 3 Location Maplewood BPS 19 inch rack enclosure - BPS end Corning Patch Panel Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Net Site ID ? Current Network Conneciton Fiber installed Planned Network Connection Terminate in BPS and treatment plant Estimated Cost 5350 750 350 1800 1200 500 300 200 250 5350 Address Site comments The Maplewood BPS RTU communicates with the MTU.  The Maplewood Water Treatment Plant (WTP) RTU communicates with the Maplewood BPS RTU via a spread spectrum radio link (unlicensed frequency).  4 Location Mount Olivet Site 19 inch rack enclosure - Mt. Olivet end Corning Patch Panel 2,000 feet fiber cable Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside Mt. Olivet Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Assumption: Cable will be installed in conduit by water dept. staff with assistance of Transportation Manint. Staff. Net Site ID 74 Current Network Conneciton Planned Network Connection Install fiber to Well PW-9 Estimated Cost 6350 750 350 1000 1800 1200 500 300 200 250 6350 Address 250 Bronson Way NE Site comments RTU is located in BPS. Hardwire connections to Mt Olivet Reservoir and Mt Olivet emergency power building. Approximate fiber path 1,800 feet 5 Location Highlands Site 19 inch rack enclosure - BPS end Corning Patch Panel 200 feet fiber cable Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Assumption: Water Dept. Staff will install conduit and fiber between Wi-Fi pad and BPS building Net Site ID 71 Current Network Conneciton Fiber on-site Planned Network Connection Install conduit & fiber between BPS and pad Estimated Cost 5450 750 350 100 1800 1200 500 300 200 250 5450 Address 3410 NE 12th Street Site comments RTU is located in the BPS. Hardwire connections to the three Highlands reservoirs and emergency power building. 7 Location North Talbot BPS 19 inch rack enclosure * 2 2 Corning Patch Panel 2,000 feet fiber cable Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Aerial splice case Move slack, overlash drop fiber, cut aerial conduit, instal horseshoe Conduit installation inside BPS and reservoir buildings Fiber transceiver and SFP 2 pair Miscellaneous supplies Pole attachment fees * 2 Consultant labor to program PLCs Assumption: Water Dept. Staff will install conduit and fiber between PSE pole and reservoir building Net Site ID ?? Current Network Conneciton Planned Network Connection Fiber to N Talbot reservoir & nearby aerial fiber. Aerial approx. 200 feet Estimated Cost 12750 1500 700 1000 2700 1800 400 1500 1000 600 300 1000 250 12750 Address 730 S 19th Street Site comments RTU is in BPS. Hardwire connections to North Talbot Reservoir and North Talbot emergency power building. 8 Location Rolling Hills Site 19 inch rack enclosure - BPS end 2 Corning Patch Panel 500 feet fiber cable Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Assumption: Water Dept. Staff will install conduit and fiber between Wi-Fi pad and BPS building Note: When Edmonds Ave. SE / 116th Ave SE is widened, telemetry conduit should be extended to BPS building. When conduit is installed, fiber to City Hall should be installed via fiber at SE 161st at an approximate cost of $10,000 Net Site ID 70 Current Network Conneciton Planned Network Connection Install fiber in telemetry conduit. Connect to Wi-Fi cabinet. Upgrade radio link to Shops Estimated Cost 5950 750 700 250 1800 1200 500 300 200 250 5950 Address 2401 Puget Drive SE Site comments RTU is in BPS.  Hardware connections to the two Rolling Hills reservoirs. 9 Location West Hill BPS 19 inch rack enclosure - BPS end Corning Patch Panel Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Assumption: Water Dept. Staff may install fiber between hand hole adjacent to Airport Tower and BPS building Net Site ID 48 Current Network Conneciton Fiber installed Planned Network Connection Terminate in BPS and Airport Tower Estimated Cost 5350 750 350 1800 1200 500 300 200 250 5350 Address 615 West Perimeter Road Site comments RTU is in the BPS. 11 Location South Talbot BPS 19 inch rack enclosure - BPS end Corning Patch Panel 750 feet fiber cable Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Assumption: Water Dept. Staff will install fiber between TSC and BPS building Net Site ID ?? Current Network Conneciton Planned Network Connection Install fiber to E. Valley Hwy & SW 43td TSC & terminate. Approx. 700 feet. Estimated Cost 5725 750 350 375 1800 1200 500 300 200 250 5725 Address 50 S 43rd Street Site comments RTU is in BPS. 12 Location South Talbot Reservoir Corning Patch Panel 1,000 feet fiber cable Splice enslosure Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Assumption: Water Dept. Staff will install fiber between TSC and Reservoir building Net Site ID 75 Current Network Conneciton Planned Network Connection Install fiber to Carr Rd. & terminate – approx.. 800 feet. Estimated Cost 4650 350 500 350 900 1800 300 200 250 4650 Address 4300 Main Ave S Site comments RTU is in cabinet at base of reservoir. 13 Location Springbrook Springs Site 19 inch rack enclosure - BPS end Corning Patch Panel 6,000 feet fiber cable 750 feet new conduit to link existing street light segments at $30 per foot Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Interrim point to point Wi-Fi system linking Sprinbbrook treatment plant to Oakesdale and SW 43rd Net Site ID ?? Current Network Conneciton Planned Network Connection P to P IMS Wireless bridge to Oakesdale & SW 43rd TSC. Cost $500. Estimated Cost 30850 750 350 3000 22500 1800 1200 500 300 200 250 30850 500 Address 5750 Talbot Road S Site comments RTU is in treatment building. 14 Location Houser Way BPS 19 inch rack enclosure - BPS end Corning Patch Panel Splice enslosure 600 feet fiber cable 500 feet new conduit to link existing street light segments at $30 per foot 25-TA install on traffic island Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Interrim point to point Wi-Fi system linking Houser BPS to Mt. Oliver Reservoir Net Site ID ?? Current Network Conneciton Planned Network Connection P to P IMS Wireless bridge to Mt. Olivet Reservoir. Cost $1,000. Estimated Cost 23500 750 350 350 300 15000 2500 1800 1200 500 300 200 250 23500 500 Address 325 Houser Way N Site comments RTU is in BPS. 15 Location Monroe Ave BPS 19 inch rack enclosure - BPS end Corning Patch Panel Splice enslosure 500 feet fiber cable Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Net Site ID ?? Current Network Conneciton Planned Network Connection Fiber to NE 4th & Monroe TSC approx. 400 feet. Estimated Cost 5950 750 350 350 250 1800 1200 500 300 200 250 5950 Address 401 Monroe Ave NE Site comments RTU is in BPS. 16 Location Tiffany Park BPS 19 inch rack enclosure - BPS end Corning Patch Panel Splice enslosure 500 feet fiber cable 25-TA install on existing conduit Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Interrim point to point Wi-Fi system linking Houser BPS to Mt. Oliver Reservoir Net Site ID ?? Current Network Conneciton Planned Network Connection Fiber splice to adjacent cable – 50 feet + vault + upstream splice Estimated Cost 9950 750 350 350 250 2500 2700 1800 500 300 200 250 9950 500 Address 2000 Kirkland Ave SE Site comments RTU is in BPS. 17 Location Fred Nelson BPS 19 inch rack enclosure - BPS end Corning Patch Panel 600 feet fiber cable Aerial splice case Install new 35 foot telephone pole, attach existing aerial fiber cable Move slack, overlash drop fiber, cut aerial conduit, instal horseshoe 100 feet new conduit to link existing street light segments at $30 per foot Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Interrim point to point Wi-Fi system linking Nelson BPS to N Talbot Reservoir Net Site ID ?? Current Network Conneciton Planned Network Connection P to P IMS Wireless bridge to N. Talbot Reservoir. Cost $1,000. Estimated Cost 12550 750 350 300 400 2000 1500 3000 1800 1200 500 300 200 250 12550 1000 Address 2300 Benson Road S Site comments RTU is in BPS. 18 Location Bow Lake Intertie Corning Patch Panel Splice enslosure 500 feet fiber cable Install approximately 500 feet of new conduit 25-TA install on existing conduit Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Interrim point to point Wi-Fi system linking Bow Lake Intertie to Oakesdale & S 19th Assumption: Water Dept. Staff will install conduit and fiber betweenIntertie pad and street lightihg conduit on Oakesdale Net Site ID ?? Current Network Conneciton Planned Network Connection Fiber splice to adjacent cable – 50 feet + vault + upstream splice Estimated Cost 10200 350 350 250 2500 3600 2400 300 200 250 10200 2000 Address 1901 Oakesdale Ave SW (1,250 feet south)   Site comments RTU is in cabinet next to vault. 19 Location Dimmit BPS 19 inch rack enclosure - BPS end Corning Patch Panel 200 feet fiber cable Bulkheads, couplers, pigtails, splice trays, splice kits Fiter term prep and splicing Conduit installation inside BPS Fiber transceiver and SFP pair Miscellaneous supplies Consultant labor to program PLCs Assumption: Water Dept. Staff will install conduit and fiber between AMR pad and BPS building Net Site ID ?? Current Network Conneciton Planned Network Connection Conduit to West Hill AMR Estimated Cost 5450 750 350 100 1800 1200 500 300 200 250 5450 Address 12603 82nd Ave S (adjacent to West Hill reservoir) Site comments RTU is in BPS.