Location
Well PW-9
Maplewood treatment plant
Maplewood BPS
Mount Olivet Site
Highlands Site
Hazen Reservoir Site
North Talbot BPS
Rolling Hills Site
West Hill BPS
West Hill Reservoir Site
South Talbot BPS
South Talbot Reservoir
Springbrook Springs Site
Houser Way BPS
Monroe Ave BPS
Tiffany Park BPS
Fred Nelson BPS
Bow Lake Intertie
Dimmit BPS
Skyway Intertie
Coal Creek Intertie
Net Site ID
?
24
?
74
71
73
??
70
48
72
??
75
??
??
??
??
??
??
??
??
??
Current Network Conneciton
Fiber connected
Fiber connected
Fiber installed
Fiber on-site
Fiber connected
Fiber installed
Fiber Connected
Planned Network Connection
Upgrade Transition SMAC-F to 1 Gbps xcvrs.
Terminate in BPS and treatment plant
Install fiber to Well PW-9
Install conduit & fiber between BPS and pad
Patch to PLC
Fiber to N Talbot reservoir & nearby aerial fiber. Aerial approx. 200 feet
Install fiber in telemetry conduit. Connect to Wi-Fi cabinet. Upgrade radio link to Shops
Terminate in BPS and Airport Tower
Install transcievers. Patch to PLC
Install fiber to E. Valley Hwy & SW 43td TSC & terminate. Approx. 700 feet.
Install fiber to Carr Rd. & terminate – approx.. 800 feet.
P to P IMS Wireless bridge to Oakesdale & SW 43rd TSC. Cost $500.
P to P IMS Wireless bridge to Mt. Olivet Reservoir. Cost $1,000.
Fiber to NE 4th & Monroe TSC approx. 400 feet.
Fiber splice to adjacent cable – 50 feet + vault + upstream splice
P to P IMS Wireless bridge to N. Talbot Reservoir. Cost $1,000.
Fiber splice to adjacent cable – 50 feet + vault + upstream splice
Conduit to West Hill AMR
P to P IMS Wireless bridge to West Hill Reservoir. Cost $1,000 + Water Dept. staff labor to install Ethernet cables form pad to N side rail & mount radio. Possible labor to install pole
near intertie & mount radio & cable.
P to P IMS Wireless bridge to Highlands Reservoir. Cost $1,000. 4,300 feet 4 houses on a hill. P to P IMS Wireless bridge to Long lift station – 3,250 feet, lots of trees.
Sub-Total
Contingency 10%
Tax (10 %)
Project Total
Estimated Cost
400
0.0000
5350
6350
5450
10
12750
5950
5350
400
5725
4650
30850
23500
5950
9950
12550
10200
5450
1000
1000
152835
15283.5
15283.5
183402
Address
4030 Maple Valley Highway
250 Bronson Way NE
3410 NE 12th Street
4900 NE 12th Street
730 S 19th Street
2401 Puget Drive SE
615 West Perimeter Road
12603 82nd Ave S
50 S 43rd Street
4300 Main Ave S
5750 Talbot Road S
325 Houser Way N
401 Monroe Ave NE
2000 Kirkland Ave SE
2300 Benson Road S
1901 Oakesdale Ave SW (1,250 feet south)
12603 82nd Ave S (adjacent to West Hill reservoir)
8016 S 116th Street
2610 Lynnwood Ave NE
Site comments
The Well PW-9 RTU communicates with the Corrosion Control Treatment Facility RTU via a spread spectrum radio link (unlicensed frequency). The Wells 1-2-3 RTU, Well EW-3 RTU and Well
PW-8 / Fluoride Building RTU communicate with the CCTF RTU via hard wire links.
The Maplewood BPS RTU communicates with the MTU. The Maplewood Water Treatment Plant (WTP) RTU communicates with the Maplewood BPS RTU via a spread spectrum radio link (unlicensed frequency)
The Maplewood BPS RTU communicates with the MTU. The Maplewood Water Treatment Plant (WTP) RTU communicates with the Maplewood BPS RTU via a spread spectrum radio link (unlicensed frequency).
RTU is located in BPS. Hardwire connections to Mt Olivet Reservoir and Mt Olivet emergency power building.
RTU is located in the BPS. Hardwire connections to the three Highlands reservoirs and emergency power building.
RTU is located in electrical / telecomm building. Hardwire connection to Hazen Reservoir.
RTU is in BPS. Hardwire connections to North Talbot Reservoir and North Talbot emergency power building.
RTU is in BPS. Hardware connections to the two Rolling Hills reservoirs.
RTU is in the BPS.
RTU is in cabinet at base of reservoir.
RTU is in BPS.
RTU is in cabinet at base of reservoir.
RTU is in treatment building.
RTU is in BPS.
RTU is in BPS.
RTU is in BPS.
RTU is in BPS.
RTU is in cabinet next to vault.
RTU is in BPS.
RTU is in vault.
RTU in cabinet next to vault.
3
3
Location
Maplewood BPS
19 inch rack enclosure - BPS end
Corning Patch Panel
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Net Site ID
?
Current Network Conneciton
Fiber installed
Planned Network Connection
Terminate in BPS and treatment plant
Estimated Cost
5350
750
350
1800
1200
500
300
200
250
5350
Address
Site comments
The Maplewood BPS RTU communicates with the MTU. The Maplewood Water Treatment Plant (WTP) RTU communicates with the Maplewood BPS RTU via a spread spectrum radio link (unlicensed frequency).
4
Location
Mount Olivet Site
19 inch rack enclosure - Mt. Olivet end
Corning Patch Panel
2,000 feet fiber cable
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside Mt. Olivet
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Assumption: Cable will be installed in conduit by water dept. staff with assistance of Transportation Manint. Staff.
Net Site ID
74
Current Network Conneciton
Planned Network Connection
Install fiber to Well PW-9
Estimated Cost
6350
750
350
1000
1800
1200
500
300
200
250
6350
Address
250 Bronson Way NE
Site comments
RTU is located in BPS. Hardwire connections to Mt Olivet Reservoir and Mt Olivet emergency power building.
Approximate fiber path 1,800 feet
5
Location
Highlands Site
19 inch rack enclosure - BPS end
Corning Patch Panel
200 feet fiber cable
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Assumption: Water Dept. Staff will install conduit and fiber between Wi-Fi pad and BPS building
Net Site ID
71
Current Network Conneciton
Fiber on-site
Planned Network Connection
Install conduit & fiber between BPS and pad
Estimated Cost
5450
750
350
100
1800
1200
500
300
200
250
5450
Address
3410 NE 12th Street
Site comments
RTU is located in the BPS. Hardwire connections to the three Highlands reservoirs and emergency power building.
7
Location
North Talbot BPS
19 inch rack enclosure * 2
2 Corning Patch Panel
2,000 feet fiber cable
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Aerial splice case
Move slack, overlash drop fiber, cut aerial conduit, instal horseshoe
Conduit installation inside BPS and reservoir buildings
Fiber transceiver and SFP 2 pair
Miscellaneous supplies
Pole attachment fees * 2
Consultant labor to program PLCs
Assumption: Water Dept. Staff will install conduit and fiber between PSE pole and reservoir building
Net Site ID
??
Current Network Conneciton
Planned Network Connection
Fiber to N Talbot reservoir & nearby aerial fiber. Aerial approx. 200 feet
Estimated Cost
12750
1500
700
1000
2700
1800
400
1500
1000
600
300
1000
250
12750
Address
730 S 19th Street
Site comments
RTU is in BPS. Hardwire connections to North Talbot Reservoir and North Talbot emergency power building.
8
Location
Rolling Hills Site
19 inch rack enclosure - BPS end
2 Corning Patch Panel
500 feet fiber cable
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Assumption: Water Dept. Staff will install conduit and fiber between Wi-Fi pad and BPS building
Note: When Edmonds Ave. SE / 116th Ave SE is widened, telemetry conduit should be extended to BPS building.
When conduit is installed, fiber to City Hall should be installed via fiber at SE 161st at an approximate cost of $10,000
Net Site ID
70
Current Network Conneciton
Planned Network Connection
Install fiber in telemetry conduit. Connect to Wi-Fi cabinet. Upgrade radio link to Shops
Estimated Cost
5950
750
700
250
1800
1200
500
300
200
250
5950
Address
2401 Puget Drive SE
Site comments
RTU is in BPS. Hardware connections to the two Rolling Hills reservoirs.
9
Location
West Hill BPS
19 inch rack enclosure - BPS end
Corning Patch Panel
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Assumption: Water Dept. Staff may install fiber between hand hole adjacent to Airport Tower and BPS building
Net Site ID
48
Current Network Conneciton
Fiber installed
Planned Network Connection
Terminate in BPS and Airport Tower
Estimated Cost
5350
750
350
1800
1200
500
300
200
250
5350
Address
615 West Perimeter Road
Site comments
RTU is in the BPS.
11
Location
South Talbot BPS
19 inch rack enclosure - BPS end
Corning Patch Panel
750 feet fiber cable
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Assumption: Water Dept. Staff will install fiber between TSC and BPS building
Net Site ID
??
Current Network Conneciton
Planned Network Connection
Install fiber to E. Valley Hwy & SW 43td TSC & terminate. Approx. 700 feet.
Estimated Cost
5725
750
350
375
1800
1200
500
300
200
250
5725
Address
50 S 43rd Street
Site comments
RTU is in BPS.
12
Location
South Talbot Reservoir
Corning Patch Panel
1,000 feet fiber cable
Splice enslosure
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Assumption: Water Dept. Staff will install fiber between TSC and Reservoir building
Net Site ID
75
Current Network Conneciton
Planned Network Connection
Install fiber to Carr Rd. & terminate – approx.. 800 feet.
Estimated Cost
4650
350
500
350
900
1800
300
200
250
4650
Address
4300 Main Ave S
Site comments
RTU is in cabinet at base of reservoir.
13
Location
Springbrook Springs Site
19 inch rack enclosure - BPS end
Corning Patch Panel
6,000 feet fiber cable
750 feet new conduit to link existing street light segments at $30 per foot
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Interrim point to point Wi-Fi system linking Sprinbbrook treatment plant to Oakesdale and SW 43rd
Net Site ID
??
Current Network Conneciton
Planned Network Connection
P to P IMS Wireless bridge to Oakesdale & SW 43rd TSC. Cost $500.
Estimated Cost
30850
750
350
3000
22500
1800
1200
500
300
200
250
30850
500
Address
5750 Talbot Road S
Site comments
RTU is in treatment building.
14
Location
Houser Way BPS
19 inch rack enclosure - BPS end
Corning Patch Panel
Splice enslosure
600 feet fiber cable
500 feet new conduit to link existing street light segments at $30 per foot
25-TA install on traffic island
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Interrim point to point Wi-Fi system linking Houser BPS to Mt. Oliver Reservoir
Net Site ID
??
Current Network Conneciton
Planned Network Connection
P to P IMS Wireless bridge to Mt. Olivet Reservoir. Cost $1,000.
Estimated Cost
23500
750
350
350
300
15000
2500
1800
1200
500
300
200
250
23500
500
Address
325 Houser Way N
Site comments
RTU is in BPS.
15
Location
Monroe Ave BPS
19 inch rack enclosure - BPS end
Corning Patch Panel
Splice enslosure
500 feet fiber cable
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Net Site ID
??
Current Network Conneciton
Planned Network Connection
Fiber to NE 4th & Monroe TSC approx. 400 feet.
Estimated Cost
5950
750
350
350
250
1800
1200
500
300
200
250
5950
Address
401 Monroe Ave NE
Site comments
RTU is in BPS.
16
Location
Tiffany Park BPS
19 inch rack enclosure - BPS end
Corning Patch Panel
Splice enslosure
500 feet fiber cable
25-TA install on existing conduit
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Interrim point to point Wi-Fi system linking Houser BPS to Mt. Oliver Reservoir
Net Site ID
??
Current Network Conneciton
Planned Network Connection
Fiber splice to adjacent cable – 50 feet + vault + upstream splice
Estimated Cost
9950
750
350
350
250
2500
2700
1800
500
300
200
250
9950
500
Address
2000 Kirkland Ave SE
Site comments
RTU is in BPS.
17
Location
Fred Nelson BPS
19 inch rack enclosure - BPS end
Corning Patch Panel
600 feet fiber cable
Aerial splice case
Install new 35 foot telephone pole, attach existing aerial fiber cable
Move slack, overlash drop fiber, cut aerial conduit, instal horseshoe
100 feet new conduit to link existing street light segments at $30 per foot
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Interrim point to point Wi-Fi system linking Nelson BPS to N Talbot Reservoir
Net Site ID
??
Current Network Conneciton
Planned Network Connection
P to P IMS Wireless bridge to N. Talbot Reservoir. Cost $1,000.
Estimated Cost
12550
750
350
300
400
2000
1500
3000
1800
1200
500
300
200
250
12550
1000
Address
2300 Benson Road S
Site comments
RTU is in BPS.
18
Location
Bow Lake Intertie
Corning Patch Panel
Splice enslosure
500 feet fiber cable
Install approximately 500 feet of new conduit
25-TA install on existing conduit
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Interrim point to point Wi-Fi system linking Bow Lake Intertie to Oakesdale & S 19th
Assumption: Water Dept. Staff will install conduit and fiber betweenIntertie pad and street lightihg conduit on Oakesdale
Net Site ID
??
Current Network Conneciton
Planned Network Connection
Fiber splice to adjacent cable – 50 feet + vault + upstream splice
Estimated Cost
10200
350
350
250
2500
3600
2400
300
200
250
10200
2000
Address
1901 Oakesdale Ave SW (1,250 feet south)
Site comments
RTU is in cabinet next to vault.
19
Location
Dimmit BPS
19 inch rack enclosure - BPS end
Corning Patch Panel
200 feet fiber cable
Bulkheads, couplers, pigtails, splice trays, splice kits
Fiter term prep and splicing
Conduit installation inside BPS
Fiber transceiver and SFP pair
Miscellaneous supplies
Consultant labor to program PLCs
Assumption: Water Dept. Staff will install conduit and fiber between AMR pad and BPS building
Net Site ID
??
Current Network Conneciton
Planned Network Connection
Conduit to West Hill AMR
Estimated Cost
5450
750
350
100
1800
1200
500
300
200
250
5450
Address
12603 82nd Ave S (adjacent to West Hill reservoir)
Site comments
RTU is in BPS.