CITY OF RENTON COMMUNITY SERVICES DEPARTMENT
CONTRACT AGREEMENT
THIS AGREEMENT is made as of the a� day of , 2004, between the
CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as"CITY"
and Decor Carpets Inc. , hereinafter referred to as"CONTRACTOR", to furnish and install new carpet,
including removal and disposal of existing carpet in the Renton Main Library, 100 Mill Avenue South, Renton,
Washington.
The City and Contractor agree as set forth below.
1. Scope of Services. The Contractor will provide all material and labor necessary to perform all work
described in the Project Specification book.
2. Changes in Scope of Services. The City, without invalidating the Contract, may order changes in the
Services consisting of additions, deletions or modifications, the Contract Sum being adjusted
accordingly. Such changes in the work shall be authorized by written Change Order signed by the City
and the Contractor.
3. Time of Performance. The Contractor shall commence performance of the Contract no later than ten
(10)calendar days after Contract's final execution, and shall complete the full performance of the
Contract not later than 30 calendar days from the date of commencement.
4. Term Of Contract.The Term of this Agreement shall end at completion of the enclosed scope of work.
This Agreement may be extended to accomplish change orders, if required, upon mutual written
agreement of the City and the Contractor.
5. Contract Sum. The total amount of this Contract is the sum of $69,692.67 which includes
Washington State Sales Tax.
6. Method of Payment. Payment by the City for the Services will only be made after the Services have
been performed and a voucher or invoice is submitted in the form specified by the City. Payment will
be made thirty(30)days after receipt of such voucher or invoice. The City shall have the right to
withhold payment to the Contractor for any work not completed in a satisfactory manner until such time
as the Contractor modifies such work so that the same is satisfactory.
7. Employment.The Contractor's employees are not employees of the City of Renton.
8. Assignment and Subcontract. The Contractor shall not assign or subcontract any portion of this
Contract without express written consent of the City of Renton.
Sol 'sod
9. Record Keeping and Reporting. The Contractor shall maintain accounts and records which properly
reflect all direct and indirect costs expended and services provided in the performance of this
Agreement. The Contractor agrees to provide access to any records required by the City.
10. Hold Harmless. The Contractor shall indemnify, defend and hold harmless the City, its officers,
agents, employees and volunteers, from and against any and all claims, including claims from third
parties, losses or liability, or any portion thereof, including attorneys fees and costs, arising from injury
or death to persons, including injuries, sickness, disease or death to Contractor's own employees, or
damage to property occasioned by a negligent act, omission or failure of the Contractor.
11. Insurance. The Contractor shall secure and maintain in force throughout the duration of the Contract
Commercial General Liability insurance in the amount of$2,000,000; Auto Liability insurance in the
amount of$1,000,000; Excess Liability insurance in the amount of$1,000,000; and Workers' Comp
coverage. The City of Renton shall be named as an additional insured on the policy. A certificate of
insurance evidencing the contractor's insurance coverage shall be delivered to the City before
executing the Work on this Agreement.
12. Compliance with Laws. The Contractor and all of the Contractor's employees shall perform the
services in accordance with all applicable federal,state, county and city laws, codes and ordinances.
13. Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the City
of Renton contract shall prevail.
14. Prevailing Wage Rates. By executing this Contact, the Contractor agrees to comply with the State
prevailing wage requirements as set forth in the Contract Documents.
This Agreement is entered into as of the day and year written above.
CONTRACTOR CITY OF RENTON
c=7c-/4 Are.kbfrA)kuie_‘_,
nature Signature
/11/ c / /hs/cv Y/° opria Tai s; Kathy Keolker-Wheeler, Mayor
Printed Name and Title Printed Name and Title
Decor Carpets Inc. 6d7.C.tA_t
Business Name Attest
1000 SW 7th St. Suite#C Bonnie I.Walton, City Clerk
Mailing Address Printed Name and Title
Renton WA 98055
City State Zip
•
(425) 226-7550
Telephone
is
Atigi
rr
CARPET REPLACEMENT
0,,, for the
RENTON MAIN LIBRARY
` - O
a cm,
N
rc Q
CITY OF RENTON
is COMMUNITY SERVICES DEPARTMENT
FACILITIES DIVISION
1055 SOUTH GRADY WAY
RENTON,WASHINGTON
September,2004
aro
to
or PROJECT SPECIFICATIONS
0.
las
.ir
CARPET REPLACEMENT
for the
RENTON MAIN LIBRARY
(cY
O
ti
0 ;,
Ak
N rc 0
WO
CITY OF RENTON
COMMUNITY SERVICES DEPARTMENT
FACILITIES DIVISION
1055 SOUTH GRADY WAY
RENTON,WASHINGTON
September,2004
o. PROJECT SPECIFICATIONS
CARPET REPLACEMENT - RENTON MAIN LIBRARY
TABLE OF CONTENTS
TITLE NUMBER OF PAGES
Table of Contents 1
DIVISION 0-BIDDING REQUIREMENTS, CONTRACT FORMS,AND CONDITIONS OF THE
CONTRACT
4" 00020 Synopsis of Bidding Information 2
00030 Invitation To Bid 1
00040 Bid Submittal Checklist 1
00100 Instructions to Bidders 3
00300 Bid Form-Form Of Proposal 4
00400 Non-Collusion,Anti-Trust, &Minimum Wage Form 1
00500 Contract 2
00800 Special Conditions 2
00900 Fair Practices Policy Affidavit of Compliance Form 1
00910 Bond To The City Of Renton Form 1
00920 Insurance Requirements 3
DIVISON 1 -GENERAL REQUIREMENTS
01010 Summary of Work and Sequences 1
01028 Change Orders 2
01500 Construction Facilities, Utilities, and Temporary Controls 2
01700 Project Closeout 2
DRAWINGS
Technical Specifications 3
Library Floor Plan/Installation Schedule 1
CARPET REPLACEMENT MUB TC-1 TABLE OF CONTENTS
BIDDING REQUIREMENTS,
CONTRACT FORMS, AND
CONDITIONS OF THE CONTRACT
DIVISION 0
SECTION 00020-SYNOPSIS OF BIDDING INFORMATION
A. PROJECT: CARPET REPLACEMENT
Renton Main Library
100 Mill Ave. South
Renton,WA 98055
�. B. OWNER: City of Renton
1055 South Grady Way
Renton,WA 98055
w
C. OWNERS REPRESENTATIVE:
wig Greg Stroh, Facilities Manager
Community Services Department
City of Renton
.. 1055 South Grady Way
Renton,WA 98055
•� Phone(425)430-6614
FAX (425)430-6603
D. BIDS DUE: Wednesday,June 23rd, 2004 3:00 P.M.
Renton City Hall- Seventh Floor-City Clerks Office
After Bids are received and time-stamped by the City Clerk, the bids
will be opened in the Conference Room
#521 on the Fifth Floor of City Hall
E. TENTATIVE SCHEDULE OF WORK:
The following dates represent the tentative schedule for the
Work to be performed under this contract:
Plans Available for Bidding Weds June 16, 2004
... Pre-Bid Site Walk-Thru 7:30 AM Weds June 16, 2004
Bids Due 3:00 PM Weds June 23, 2004
Commence Work Mon Aug 30, 2004
F. TIME OF CONSTRUCTION:
Thirty(30)calendar days. Liquidated damages thereafter at one-hundred
dollars($100) per day.
G. BID SECURITY:
None
- 00020.1
ROOF REPLACEMENT SENIOR CENTER SYNOPSIS OF BIDDING INFORMATION
,rr
Of
H. PERFORMANCE BOND&PAYMENT BOND:
100%of contract amount
WAGES:
Pay state prevailing wages rates.
J. TYPE OF CONTRACT:
Single lump-sum contract encompassing all work
END OF SECTION
.w
r
M.
..
U
U-
00020-2
ROOF REPLACEMENT LIBRARY&STADIUM SYNOPSIS OF BIDDING INFORMATION
•. SECTION 00030-INVITATION TO BID
CARPET REPLACEMENT
for the
INF
RENTON MAIN LIBRARY
too
You are invited to submit a sealed bid for the REPLACEMENT OF APPROXIMATELY 2,105 SQUARE YARDS OF CARPET at
the Renton Main Library,Renton,Washington.Bids will be accepted at the Office of the City Clerk,Seventh Floor,City Hall, 1055
.. South Grady Way,Renton,WA 98055 until 3:00 P.M.,Wednesday,June 23,2004 and then will be publicly opened and read
aloud in room 521,fifth floor.Bids received after the specified time and date will not be considered.
The project scope includes the following tasks:
rrr • Remove and dispose of existing carpet.
• Prepare flooring for new carpet.
• Provide new carpet in accordance with the technical specification to be provided at the pre-bid walk-through.
• Install carpet,approved by the City,in accordance with the installation schedule to be provided at the pre-bid walk-
through.
The single contract bid indudes the appropriate supervision,scheduling and job site management.The City reserves the right to
reject any and all bids and waive any informalities or irregularities in the bids received.No bid bond is required,a performance
bond is required.
.rr The City's fair practices/non-discrimination policies and State Prevailing Wage Rates apply to this project.
Questions shall be addressed to,Greg Stroh,Renton Community Services Department,1055 South Grady Way,Fifth Floor,
Renton,WA 98055,phone(425)430-6614,fax(425)430-6603.
A pre-bid walk-through will be held at 7:30 AM,Wednesday,June 16th,2004 at the Main Library.Attendance by bidders is
strongly suggested.The following documents will be handed out at the walk-through.
• A draft copy of the contract between the City and successful bidder
• A floor plan of the Renton main Library
• The carpet and walk-off mat technical specifications
• The installation schedule
• Bid submittal form
Published: June 9,2004
Seattle Daily Journal of Commerce
00030-1
ROOF REPLACEMENT MAIN LIBRAY&STADIUM INVITATION TO BID
irr
SW
SECTION 00040-BID SUBMITTAL CHECKLIST
The following items are required to be submitted for the Bid. Other forms not listed below but included in
these Specifications are for informational purposes and need only be executed by the successful
w, Contractor.
.. LIST OF REQUIRED SUBMITTALS
❑ Bid Proposal Form (Section 00300)
❑ Combined Affidavit and Certification (Section 00400)
❑ Contractor's Certificate of Insurance(Section 00920)
out
IMO
ROOF REPLACEMENT MUSEUM 00030-1 INVITATION TO BID
r
SECTION 00100 - INSTRUCTIONS TO BIDDERS
A. BIDDERS REPRESENTATIONS
The Bidder, by making a Bid represents that he has read and understands the Bidding
•„ Documents and the Bid is made in accordance therewith. He has also visited the site,
become familiar with local conditions under which the Work is to be performed and has
correlated the bidders personal observations with the requirements of the proposed
,�. Contract Documents.
Bid shall include Work in conformance with all applicable State Laws, Municipal
•• Ordinances, and the rules and regulations of all authorities having jurisdiction over the
construction of the Project.
.. B. BIDDING DOCUMENT INTERPRETATIONS
Bidders requiring clarification or interpretation of the Bidding Documents shall contact the
"' City's Representative at least four days prior to the date of bids due. Interpretations,
corrections, and changes to the Bidding Documents will be made by Addendum issued no
later than three days before bids due.
C. SUBSTITUTIONS
Substitutions not accepted.
D. BID FORMS
• Bids shall be submitted on forms identical to the form included with the Bidding
Documents. All blanks on the bid form shall be filled in by typewriter or manually in
ink.
• Bid shall be accompanied by a signed Non-Collusion,Anti-Trust, and Minimum Wage
Form (Specifications Section 00400).
• Bid shall be accompanied by Contractor's Certificate of Insurance per
Specifications Section 00920. Bids lacking these insurance documents will be
•. considered non-responsive.
E. SUBMISSION OF BIDS
Bids shall be submitted in a sealed envelope and marked with the words"Sealed Bid
Enclosed". The envelope shall also identify the project name, bidders name, and the
name of the person designated to receive the bid.
ROOF REPLACEMENT MUSEUM 00100-1 INSTRUCTIONS TO BIDDERS
wrr
Bids shall be deposited at the designated location up to the time and date for receipt of
Bids. Bids received after the time and date for receipt of Bids will be returned unopened.
F. OPENING OF BIDS
Bids shall be publicly opened and an abstract of the Bids made available to the Bidders.
The City reserves the right to reject any and all bids and waive any informalities or
irregularities in the bids received. The City further reserves the right to Award a Contract
in whatever manner is in the City's best interest.
G. AWARD OF BID
It is the intent of the Owner to award a Contract to the lowest responsible Bidder provided
the Bid has been submitted in accordance with the requirements of the Bidding
Documents and does not exceed the funds available.
H. POST-BID INFORMATION AND DOCUMENT SUBMITTAL
ite
After Bids are opened, the Bidder to whom award of a Contract is under consideration
shall submit to the City's Representative, additional documents requested in the
specifications including:
Standard Form of Agreement(AIA Form A101 )
City of Renton Business License
Performance Bond and Payment Bond (Section 00910)
City of Renton Affidavit of Compliance(Section 00900)
The following document must be submitted prior to commencement of the Work and no
later than 10 days after receipt of Notification of Intent To Award Contract:
Statement of Intent to Pay Prevailing Wages
.r I. NOTICE TO PROCEED
A Notice To Proceed shall be given after the building permit is approved,the City Council,
City Attorney, Risk Manager approves the Contract, and the Contract is signed by the
Mayor.
J. TIME OF CONSTRUCTION
After the designated date of Start of Work, Contractor shall proceed with promptness and
dispatch and shall be substantially complete within thirty(30)calendar days.
ROOF REPLACEMENT MUSEUM 00100-3 INSTRUCTIONS TO BIDDERS
K. LIQUIDATED DAMAGES
,w
For each calendar day after date established by the above allowed time that any portion of
the work remains incomplete(in the City's sole judgment)the sum of One Hundred
Dollars($ 100.00) ,not to be construed in any sense a penalty, but as fixed, agreed
liquidated damages incurred by the City for failure of the Contractor to meet the scheduled
completion dates.
L. CHANGE ORDER
When extra work is performed under an approved Change Order and paid for by
acceptable lump sum or mutually agreed prices,the contractor will be limited to a markup
OW of 10%overhead and profit.
When extra work is performed as above by a subcontractor to the general contractor,the
general contractor shall be limited to a 10% markup on the subcontractors work. No
further markup shall be permitted to cover any other miscellaneous costs.
go
ROOF REPLACEMENT MUSEUM 00100-3 INSTRUCTIONS TO BIDDERS
SECTION 00300- BID FORM
FORM OF PROPOSAL ( BID )
for the
CARPET REPLACEMENT of the RENTON MAIN LIBRARY
100 Mill Ave South
Renton, Washington
at
Bids Due: 3:00 P.M. Wednesday, June 23, 2004
To: City Clerk, Room#728
Seventh Floor of City Hall
1055 South Grady Way
Renton, WA 98055
W O
The undersigned hereby certifies that they have carefully examined the Contract Documents as defined in
ei• the General Conditions entitled "Carpet Replacement for the City of Renton Main Library, 100 Mill Ave
South, Renton, WA and have examined the site of the work and the location where said work is to be
done, and fully understands the manner in which payment is proposed to be made for the cost thereof,
hereby proposes to furnish all materials and to perform all labor which may be required to complete said
work within the time fixed, and upon the terms and conditions provided in said Contract Documents for
consideration of the following amount:
A. BASE BID
W S
For all work shown in the Contract Documents,the sum of: $
SW Washington State Sales Tax: $
Grand Total Base Bid: $
00300-1
ROOF REPLACEMENT MUSEUM BID FORM
way
B. CONDITIONS OF PROPOSAL
1. Determination of Low Bidder:
The owner reserves the right to'Award a Contract' based on the Contractor's Proposal
Amounts for Base Bid and/or Breakdown , in whatever manner is in the Owner's best
interest.
2. Overhead and Profit:
All of the above Bid Prices shall include overhead and profit.
.,r 3. Sales Tax:
All of the above Bid Prices shall include Washington State Sales Tax.
• C. PERIOD OF BID VALIDITY I ACCEPTANCE OF BID
1. BASE BID
ow
The undersigned hereby agrees that this BID as described in paragraph "A"shall be a
valid and firm offering for the period of sixty(60)days from closing time for the"Receipt Of
""' Bids."
Acceptance of Bid: Within sixty(60)days after the opening of Form Of Proposal,the City
will act either to accept the Proposal from the lowest responsive, responsible Bidder, or to
reject all Bids. The City reserves the right to request extensions of such Bid acceptance
period.
The acceptance of a Bid will be evidenced by a written Notice of Intent to Award Contract
to the Bidder whose Bid is under consideration for acceptance,together with a request to
taw
furnish a bond (if required),evidence of insurance to execute the agreement set forth in
the Contract Documents, and other designated documents.
iim
D. EXECUTION OF CONTRACT
If written"Notice of Intent to Award Contract"is mailed,telegraphed,facsimile,or delivered
to the undersigned within the"period of Bid Validity" noted above,or any time thereafter
before this Bid is withdrawn,the undersigned will,within ten (10)days after the date of
". such notification,execute a Contract in the form of the AIA Document A101 "STANDARD
FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR-STIPULATED
SUM", 1997 edition
E. TIME FOR COMPLETION
The undersigned hereby agrees to"FINAL COMPLETION"of all Work outlined in the
Contract Documents within thirty(30)calendar days after receipt of Notice to Proceed with
established Start Date.
00300-2
ROOF REPLACEMENT MUSEUM BID FORM
"" F. LIQUIDATED DAMAGES
If the Contractor fails to complete the Work by the FINAL COMPLETION DATE (or such
extension of that date which might be granted by the Owner), he agrees to abide by all
provisions of the Contract. In addition, Liquidated Damages in the amount of One
Hundred Dollars($ 100.00)will be assessed for each calendar day that the Contractor
exceeds the"FINAL COMPLETION DATE."
.. G. ADDENDUM RECEIPT
Receipt of the following "ADDENDA"to the CONTRACT DOCUMENTS is acknowledged:
Addendum No. Date
•• Addendum No. Date
.r
IMP
NW
IMO
"' 00300-3
ROOF REPLACEMENT MUSEUM BID FORM
.n
H. EXECUTION OF PROPOSAL
Name of Firm
State License Registration No.
Address
City State Zip Code
top
Telephone ( ) FAX ( )
.. The undersigned designates the above as the firm and address to which "NOTICE OF CONTRACT
AWARD" may be mailed, hand delivered or delivered via facsimile.
NOTE: If a Bidder is a corporation,write state of incorporation; and if a partnership,give full names and
addresses of all partners below:
VW
The undersigned certifies that the above is a firm and valid BID to accomplish all Work and comply with all
requirements of the Contract Documents.
Date
Signature
Signed Printed
Title
I. ENCLOSURES PROVIDED BY CONTRACTOR
The Contractor shall provide the following enclosure with this Form of Proposal:
1. Non-Collusion Affidavit,Assignment of Antitrust Claims To Purchaser, Minimum Wage
""' Affidavit Form, which is located in this Specification Section 00400.
2. Certificate of Insurance as specified in Section 00920.
END OF BID FORM
00300.4
ROOF REPLACEMENT MUSEUM BID FORM
SECTION 00400 - NON-COLLUSION, ANTI-TRUST, AND MINIMUM WAGE FORM
NON-COLLUSION AFFIDAVIT
Being duly sworn,deposes and says,that he is the identical person who submitted the forgoing proposal or bid,and
that such bid is genuine and not sham or collusive or made in the interest or on behalf of any person not therein
named,and further,that the deponent has not directly induced or solicited any other Bidder on the foregoing work or
equipment to put in a sham bid,or any other person or corporation to refrain from bidding,and that deponent has not
in any manner sought by collusion to secure to himself or to any other person any advantage over the other Bidder
or Bidders.
AND
vim CERTIFICATION RE:ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER
Vendor and purchaser recognize that in actual economic practice overcharges resulting from anti-trust violations are
in fact usually borne by the purchaser. Therefor,vendor hereby assigns to purchaser any and all claims for such
.. overcharges as to goods and materials purchased in connection with this order or contract,except as to overcharges
resulting from anti-trust violations commencing after the date of the bid,quotation,or other event establishing the
price under this order or contract. In addition,vendor warrants and represents that such of his suppliers and
subcontractors shall assign any and all such claims to purchaser,subject to the aforementioned exception.
AND
MINIMUM WAGE AFFIDAVIT FORM
I,the undersigned,having been duly sworn,deposed,say and certify that in connection with the performance of the
— work of this project,I will pay each classification of laborer,workman,or mechanic employed in the performance of
such work;not less than the prevailing rate of wage or not less than the minimum rate of wages as specified in the
principal contract:that I have read the above and foregoing statement and certificate,know the contents thereof and
the substance as set forth therein is true to my knowledge and belief.
FOR: NON-COLLUSION AFFIDAVIT,ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND
MINIMUM WAGE AFFIDAVIT
CARPET REPLACEMENT–RENTON MAIN LIBRARY
Name of Bidder's Firm
Signature of Authorized Representative of Bidder
ow
Subscribed and sworn to before me on this day of ,20
two
Notary Public in and for the State of Washington
Residing at
00400-1
'aw ROOF REPLACEMENT MUSEUM NON-COLLUSION,ANTI-TRUST,
MINIMUM WAGE FORM
`rr
SECTION 00500-CONTRACT
ar 1(SY 0
CITY OF RENTON COMMUNITY SERVICES DEPARTMENT
CONTRACT AGREEMENT
THIS AGREEMENT is made as of the day of , 2004, between the
"., CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as"CITY"
and , hereinafter referred to as"CONTRACTOR", to furnish and install new carpet, including removal
and disposal of existing carpet in the Renton Main Library, 100 Mill Avenue South, Renton,Washington.
The City and Contractor agree as set forth below.
1. Scope of Services. The Contractor will provide all material and labor necessary to perform all work
described in the Project Specification book.
2. Changes in Scope of Services. The City,without invalidating the Contract, may order changes in the
Services consisting of additions,deletions or modifications, the Contract Sum being adjusted
accordingly. Such changes in the work shall be authorized by written Change Order signed by the City
and the Contractor.
3. Time of Performance. The Contractor shall commence performance of the Contract no later than ten
(10)calendar days after Contract's final execution, and shall complete the full performance of the
Contract not later than 30 calendar days from the date of commencement.
4. Term Of Contract.The Term of this Agreement shall end at completion of the enclosed scope of work.
This Agreement may be extended to accomplish change orders, if required, upon mutual written
agreement of the City and the Contractor.
5. Contract Sum. The total amount of this Contract is the sum of $00,000.00 which includes
Washington State Sales Tax.
6. Method of Payment. Payment by the City for the Services will only be made after the Services have
been performed and a voucher or invoice is submitted in the form specified by the City. Payment will
be made thirty(30)days after receipt of such voucher or invoice. The City shall have the right to
withhold payment to the Contractor for any work not completed in a satisfactory manner until such time
as the Contractor modifies such work so that the same is satisfactory.
7. Employment.The Contractor's employees are not employees of the City of Renton.
8. Assignment and Subcontract. The Contractor shall not assign or subcontract any portion of this
Contract without express written consent of the City of Renton.
00500-1
ROOF REPLACEMENT MUSEUM GENERAL CONDITIONS
<"r
SECTION 00500-CONTRACT
9. Record Keeping and Reporting. The Contractor shall maintain accounts and records which properly
reflect all direct and indirect costs expended and services provided in the performance of this
Agreement. The Contractor agrees to provide access to any records required by the City.
10. Hold Harmless. The Contractor shall indemnify, defend and hold harmless the City, its officers,
agents, employees and volunteers,from and against any and all claims, including claims from third
parties, losses or liability,or any portion thereof, including attorneys fees and costs, arising from injury
or death to persons, including injuries,sickness,disease or death to Contractor's own employees, or
damage to property occasioned by a negligent act, omission or failure of the Contractor.
11. Insurance. The Contractor shall secure and maintain in force throughout the duration of the Contract
Commercial General Liability insurance in the amount of$2,000,000;Auto Liability insurance in the
amount of$1,000,000; Excess Liability insurance in the amount of$1,000,000; and Workers' Comp
coverage. The City of Renton shall be named as an additional insured on the policy. A certificate of
insurance evidencing the contractor's insurance coverage shall be delivered to the City before
executing the Work on this Agreement.
12. Compliance with Laws. The Contractor and all of the Contractor's employees shall perform the
services in accordance with all applicable federal, state,county and city laws, codes and ordinances.
13. Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the City
of Renton contract shall prevail.
14. Prevailing Wage Rates. By executing this Contact, the Contractor agrees to comply with the State
prevailing wage requirements as set forth in the Contract Documents.
This Agreement is entered into as of the day and year written above.
CONTRACTOR CITY OF RENTON
Signature Signature
Kathy Keolker-Wheeler,Mayor
Printed Name and Title Printed Name and Title
srr
Business Name Attest
Bonnie I.Walton,City Clerk
Mailing Address Printed Name and Title
Iry
City State Zip
est
Telephone
00500.2
ROOF REPLACEMENT MUSEUM GENERAL CONDmONs
tr.•
SECTION 00800-SPECIAL CONDITIONS
ARTICLE 1 -COMPLIANCE WITH WAGE RATES AND FILING OF"INTENT TO PAY
PREVAILING WAGES" HEREINAFTER CALLED"INTENT"AND
"AFFIDAVIT OF WAGES PAID"
2.1 "Prevailing Wages on Public Works"-The Contractor and Subcontractors shall comply
with 39.12 RCW and amendments"Prevailing Wages on Public Works."The prevailing rate wages
to be paid to all workers, laborers,or mechanics employed in the performance of any part of this
Contract shall be in accordance therewith.
2.2 Current prevailing wage data will be furnished by the Industrial Statistician upon request.
Requests shall be made to the State of Washington Department of Labor and Industries. The
�. Contractor is responsible for paying the appropriate wage rates.
2.3 The Contractor, and all Subcontractors,on or before the date of commencement of work,
shall file a statement under oath with the City and with the Director of Labor and Industries
certifying the rate of hourly wages paid to each classification of laborers,workers,or mechanics
employed to perform work under this Contract shall not be less than the prevailing rate of wages
determined by the Washington State Labor and Industries. Such statement and any supplemental
statements which may be necessary shall be filed in accordance with the practices and procedures
required by the Department of Labor and Industries.
2.4 Copies of all"Intents"shall be on file with the Contractor,the Industrial Statistician, and
the City.
2.5 "Affidavits of Wages Paid"-upon completion of project, the Contractor shall fully execute
and file"Affidavit of Wages Paid"with the Washington State Department of Labor and Industries
and any other agencies required by law. Sample copy enclosed herein.
I., Copies shall be provided to the City prior to Final Completion, Final Payment and release of
Retainage. Each affidavit of wages paid must be certified by the Industrial Statistician of the
Department of Labor and Industries before it is submitted.
2.6 All costs and fees for and associated with the"Intent to Pay Prevailing Wages" and
"Affidavits of Wages Paid" are to be paid by the Contractor.
ARTICLE 2-STATE LICENSING LAW
The Contractor agrees to comply with all requirements of Chapter 18.27 RCW. The Contractor
agrees and covenants to furnish unto the Owner proper evidence that the Contractor has fully
complied with the State Licensing Law of the State of Washington, Chapter 18.27 RCW, and a
Contractor's Certificate of Registration shall be in full force and effect throughout the work project
herein above enumerated, prior to starting work.
'ter 00800-1
ROOF REPLACEMENT MUSEUM SPECIAL CONDITIONS
ARTICLE 3-NON-DISCRIMINATION
The Contractor shall offer equal opportunity to all qualified employees and applicants for
employment without regard to the race,creed,color,sex, national origin, age, or disability.
Successful designated bidder shall fill out and complete the AFFIDAVIT OF COMPLIANCE FORM
included herein and submit with the signed Contract.
ARTICLE 4-CITY OF RENTON BUSINESS LICENSE
Prior to signing a contract the contractor agrees to purchase a City of Renton Business License
and maintain the license in full force and effect throughout the work of the project. License may be
purchased from the City Finance Department located on the First Floor of the City Hall Building,
1055 South Grady Way, Renton, WA.
9.
Oa
END OF SECTION
tas
VW
tut 00800.2
ROOF REPLACEMENT MUSEUM SPECIAL CONDITIONS
dor
SECTION 00910-BOND TO THE CITY OF RENTON FORM
KNOW ALL MEN BY THESE PRESENTS:
That we,the undersigned
VIP
as principal,and
corporation organized and existing under the laws of the State of as a
surety corporation,and qualified under the laws of the State of Washington to become surety upon bonds of
contractors with municipal corporations,as surety are jointly and severally held and firmly bound to the City of
„g„ Renton in the penal sum$ for the payment of which sum on
demand we bind ourselves and our successors,heirs,administrators or person representatives,as the case may be.
This obligation is entered into in pursuance of the statutes of the State of Washington,the Ordinance of the City of
IMO
Renton.
Dated at ,Washington,this day of ,2004
Nevertheless,the conditions of the above obligation are such that:
ism WHEREAS, under and pursuant to Public Works Construction Contract CAG- providing for construction
of
rrr Project Name
the principal is required to furnish a bond for the faithful performance of the contract;and
WHEREAS,the principal has accepted,or is about to accept,the contract,the undertake to perform the work therein
provided for in the manner and within the time set forth;
NOW,THEREFORE,if the principal shall faithfully perform all of the provisions of said contract in the manner and
'within the time therein set forth,or within such extensions of time as may be granted under said contract,and shall
pay all laborers,mechanics,subcontractors and materialmen,and all persons who shall supply said principal or
subcontractors with provisions and supplies for the carrying on of said work,and shall hold said City of Renton
harmless from any damage or expense by reason of failure of performance as specified in the contract or from
defects appearing or developing in the material or workmanship provided or performed under the contract within a
period of one year after its acceptance thereof by the City of Renton,then and in that event this obligation shall be
void;but otherwise it shall be and remain in full force and effect.
Principal Surety
Signature Surety's Address
Name and Title Agent's Signature
Name and Title
+w 00910-1
ROOF REPLACEMENT MUSEUM BOND TO THE CITY OF RENTON FORM
,r.
SECTION 00920-CONTRACTORS INSURANCE AND RELATED REQUIREMENTS
MINIMUM INSURANCE COVERAGE AND REQUIREMENTS
The CONTRACTOR shall obtain and maintain the minimum insurance coverage set forth below. By
•' requiring such minimum insurance, CITY OF RENTON shall not be deemed or construed to have
assessed the risks that may be applicable to the CONTRACTOR under the Contract. The CONTRACTOR
shall assess its own risks and if it deems appropriate and/or prudent, maintain higher limits and/or broader
coverage.
(1) Commercial General Liability-Acord Form or equivalent,written on an occurrence basis,
including:
• Premises and Operations
( Including CG 2503 general aggregate to apply per project if applicable)
• Explosion, Collapse and Underground Hazards
• Products/Completed Operations
we • Contractual Liability(including Amendatory Endorsement CG 0043 or equivalent which
includes defense coverage assumed under contract)
• Broad Form Property Damage
• Independent Contractors
• Personal/Advertising Injury
• Stop Gap Liability
(2) Automobile Liability including all
•. Owned Vehicles
• Non-Owned Vehicles
• Hired Vehicles
(3) Workers'Compensation
Statutory Benefits -Show Washington Labor& Industries Number
(4) Umbrella Liability
• Excess of Commercial General Liability and Automobile Liability. Coverage should be as
broad as primary.
4• 00920-1
ROOF REPLACEMENT MUSEUM INSURANCE REQUIREMENTS
a
CONTRACTORS INSURANCE REQUIREMENTS
The CONTRACTOR shall carry the following limits of liability as required below:
Commercial General Liability
General Aggregate* $2,000,000
Products/Completed Operations Aggregate $2,000,000
Each Occurrence Limit $1,000,000
Personal/Advertising Injury $1,000,000
Fire Damage(Any One Fire) $ 50,000
Medical Payments(Any One Person) $ 5,000
MI
Stop Gap Liability $1,000,000
.. *General Aggregate to apply per project
Automobile Liability
Bodily Injury/Property Damage $1,000,000
(Each Accident)
Workers'Compensation
•• Statutory Benefits-Show Washington Labor&Industries Number
Umbrella Liability
Each Occurrence Limit $1,000,000
General Aggregate Limit $1,000,000
Products/Completed Operations Aggregate $1,000,000
Per Loss $ 1,000,000
Aggregate $ 1,000,000
tip 00920-2
ROOF REPLACEMENT MUSEUM INSURANCE REQUIREMENTS
ADDITIONAL REQUIREMENTS
CONTRACTOR shall Name CITY OF RENTON, and its officers, officials, agents,employees and
volunteers as Additional Insureds(ISO Form CG 2010 or equivalent). CONTRACTOR shall provide CITY
OF RENTON Certificates of Insurance and copies of policies, if at our sole discretion it is deemed
appropriate Further, all policies of insurance described above shall:
'o 1) Be on a primary basis nor contributory with any other insurance coverage and/or self-insurance
carried by CITY OF RENTON.
2) Include a Waiver of Subrogation Clause.
3) Severability of Interest Clause(Cross Liability)
4) Policy may not be non-renewed,canceled or materially changed or altered unless forty-five(45)
days prior written notice is provided to CITY OF RENTON. Notification shall be provided to CITY
OF RENTON by certified mail.
An example of an acceptable cancellation clause is as follows:
'Should any of the above described policies be canceled before the expiration date thereof,the
issuing company will-endeavor-to mail 45 days written notice to the certificate holder named to the
left.But-failure-to-mail . - -•- - - • -- - •- -- -- - - •-- .' - - - •""-
M
The CONTRACTOR shall promptly advise the CITY OF RENTON in the event any general aggregate or
as other aggregate limits are reduced below the required per occurrence limit. At his or her own expense the
CONTRACTOR will reinstate the aggregate limits to comply with the minimum requirements and shall
furnish to the CITY OF RENTON a new certificate of insurance showing such coverage is in force.
Required insurance coverage shall be maintained throughout the term of this contract,except Automobile
Liability and Workers'Compensation,for a period of two(2)years after the date of substantial completion
of the project.
ON On all Certificates of Insurance,the Certificate Holder shall be listed as"City of Renton, Washington,
Attention: Greg Stroh Facilities Manager
VW
•• 00920-3
ROOF REPLACEMENT MUSEUM INSURANCE REQUIREMENTS
NIB
OW
dlIP
ON GENERAL REQUIREMENTS
DIVISION 1
IMP
SECTION 01010-SUMMARY OF WORK
PART 1 -GENERAL
1.01 WORK COVERED BY CONTRACT DOCUMENTS
.w A. Work of this Contract includes Remove and dispose of existing carpet. Prepare
floor for new carpet. Provide new carpet in accordance with the technical specification to be
provided at the pre-bid walk-through. Install carpet approved by the City, in accordance with
„aa the installation schedule to be provided at the pre-bid walk-through and performing such
incidental or other work as may be necessitated by these operations. Work shall include a
manufacturer and contractors warranty for the work required by the contract documents
and includes all labor necessary to produce such work, and all materials and equipment
incorporated in such work. Contractor's work shall be performed as indicated, specified
herein and as necessary to provide a complete project.
B. Unless otherwise indicated,the work includes, but is not limited to the following:
1. Providing and payment for labor, materials, equipment, tools, machines,
facilities, and services necessary for proper execution and completion of
asa work.
2. Paying required taxes.
3. Maintaining required egress in accordance with governing Codes and
Ordinances throughout the work.
C. Do not employ on work:
1. Unfit persons or persons not skilled in assigned tasks.
1.02 CONTRACT
A. Construct work under a single fixed-price Contract. See Bid Form.
1.03 WORK SEQUENCE
A. All efforts shall be made to perform all work without abnormally disturbing,
inconveniencing,or interrupting the usage of the building, pedestrians, and
vehicular traffic.
1.04 OBJECTIONS TO APPLICATION OF PRODUCTS
Contractor and subcontractors submitting bids for this Project are required to thoroughly
familiarize themselves with specified products and installation procedures and submit to
Architect any objection in writing no later than seven (7)days prior to Bid Date. Submittal
of Bid constitutes acceptance of products and procedures specified.
END OF SECTION
01010.1
ROOF REPLACEMENT MUSEUM SUMMARY OF WORK
SECTION 01028-CHANGE ORDERS
PART 1 -GENERAL
1.01 SUBMITTALS
A. Change Order Forms: AIA G701 to be completed by City's Representative.
1.02 DOCUMENTATION OF CHANGE IN CONTRACT SUM I PRICE AND CONTRACT TIME
A. Submit detailed records of work to be done including time and materials. Provide
full information required for evaluation of proposed changes, and to substantiate
— costs of changes in the Work. Document each quotation for a change in cost or
time with sufficient data to allow evaluation of the quotation.
-• B. On request, provide additional data to support computations:
1. Quantities of products, labor, and equipment.
2. Taxes, insurance and bonds.
3. Overhead and profit.
4. Justification for any change in Contract Time.
5. Credit for deletions from Contract,similarly documented.
C. When extra work is performed under an approved Change Order and paid for by
acceptable lump sum or mutually agreed prices,the contractor will be limited to a
markup of 10%overhead and profit.
When extra work is performed as above by a subcontractor to the general
... contractor,the general contractor shall be limited to a 10%markup on the
subcontractors work. No further markup shall be permitted to cover any other
miscellaneous costs.
1.03 CHANGE PROCEDURES
A. The City's Representative may issue a Proposal Request which includes a
detailed description of a proposed change with supplementary or revised
Drawings and specifications, a change in Contract Time for executing the change
and the period of time during which the requested price will be considered valid.
Contractor will prepare and submit an estimate within 5 days.
4111 B. The Contractor may propose a change by submitting a request for change to the
City's Representative, describing the proposed change and its full effect on the
Work,with a statement describing the reason for the change, and the effect of the
Contract/Sum Price and contract .
dW
01028.1
ROOF REPLACEMENT MUSEUM CHANGE ORDERS
1.04 CORRELATION OF CONTRACTOR SUBMITTALS
A. Promptly revise Construction Schedule and Application for Payment forms to
record each authorized Change Order as a separate line item and adjust the
Contract Sum.
END OF SECTION
AO
MO
SW
01028-2
ROOF REPLACEMENT MUSEUM CHANGE ORDERS
.rr
SECTION 01500-CONSTRUCTION FACILITIES, UTILITIES,
AND TEMPORARY CONTROLS
PART 1 -GENERAL
1.01 ELECTRICAL SERVICE
A. Arrangements may be made to obtain electrical power from the existing building system.
City will pay for cost of electricity.
1.02 WATER
A. Arrangements may be made to obtain water from the existing building system. City will
pay for cost of water.
1.03 SANITARY FACILITIES
A. Usage of existing public facilities in the general area is acceptable.
1.04 BARRIERS&FENCE
A. Make provisions to prevent public entry to the portion of the site being used for staging of
construction equipment. Limit use of site within a fenced area furnished and installed by
the contractor. Protect existing sidewalks, plantings, building, and adjacent properties
from damage by operations.
B. Fenced area shall be located over hard-surfaced areas only.
1.05 CLEANING DURING DEMOLITION
A. Control accumulation of waste materials and rubbish dumping. Periodically dispose off-
.. site in authorized dump sites.
1.06 STAGING AREA
A. Contractor may utilize the parking lot South of the building for staging,.Alternate site
storage considerations and contractor employee parking will be addressed during site
,., setup.
B. Protect the existing building from any marring,scrapes, holes,or damage of any kind.
•• Any damaged area due to the contractors work shall be replaced by the contractor.
C. Provide for periodic removal of dumpster contents.
.. 01500-1
ROOF REPLACEMENT MUSEUM CONSTRUCTION FACILITIES,UTILITIES
AND TEMPORARY CONTROLS
o..
1.07 POLLUTION CONTROL
A. Provide methods, means, and facilities to prevent contamination of soil,water,and
m„ atmosphere from discharge of noxious,toxic substances,and pollutants produced by
any construction operations.
END OF SECTION
Or
Wer
as
eve
eW
01500.2
ROOF REPLACEMENT MUSEUM CONSTRUCTION FACILITIES,UTILITIES
AND TEMPORARY CONTROLS
�• SECTION 01700-PROJECT CLOSEOUT
PART 1 -GENERAL
1.01 SUBMISSIONS FOR FINAL COMPLETION
A. General: Submit the following documents:
1. In progress payment request coincident with or first following date claimed,
show either 100%completion for portion of Work claimed as"Final
du Completion",or list incomplete items,value of incompletion, and reasons for
being incomplete.
2. Include supporting documentation for completion as indicated in these
Contract Documents.
3. Submit statement showing accounting of changes to the Contract Sum.
4. Complete final cleaning up requirements, including touch-up of marred
'" surfaces.
5. Submit updated final statement,accounting for additional(final)changes to
Contract Sum.
"• 6. Submit final payment request with final releases and supporting
documentation not previously submitted and accepted.
7. Submit certified copy of City Representative's final punch list of itemized
law
work to be completed or corrected,stating that each item has been
completed or otherwise resolved for acceptance,endorsed and dated by
e• City's Representative.
8. Payment and Release of Liens
B. Inspection Procedures: Upon receipt of Contractor's request, City's Representative
will either proceed with inspection or advise Contractor of prerequisites not fulfilled.
Following initial inspection,City's Representative will either prepare certificate of
Final Completion,or advise Contractor of work which must be performed prior to
issuance of certificate;and repeat inspection when requested and assured that work
has been substantially completed. Results of completed inspection will form initial
.00 "punch list"for final acceptance.
1.02 FINAL ADJUSTMENT OF ACCOUNTS
A. Submit a final statement of accounting to City's Representative.
B. Reflect all adjustments to Contract Sum. Indicate following:
1. The original Contract Sum.
2. Additions and deductions resulting from:
a. Previous Change Orders.
„.• b. Deductions of uncorrected Work.
c. Other adjustments.
01700-1
ROOF REPLACEMENT MUSEUM PROJECT CLOSEOUT
3. Total Contract Sum, as adjusted.
4. Previous Payments.
5. Sum remaining due.
1.03 FINAL APPLICATION FOR PAYMENT
de A. Submit final Application for Payment in accordance with procedures and
requirements of Owner.
1. Submit"Affidavit of Wages Paid"from Contractor and all subcontractors.
2. Lien waiver from General Contractor for entire contract.
3. Proof of Payment of taxes from the State Dept of Revenue
SW
END OF SECTION
IMO
AO
tie
ON
AMP
01700-2
ROOF REPLACEMENT MUSEUM PROJECT CLOSEOUT
rrr
IMP
s
NIP
.r
i
ON
TECHNICAL
SPECIFICATIONS
- DRAWINGS
mill
CARPET SPECIFICATIONS—CITY OF RENTON MAIN LIBRARY
IMP Quality: Blueridge Touchstone with power lock plus backing system, or approved
equal. See specification sheet"A"attached.
Color: TBD, as approved by the City of Renton
Construction: Multi-level pattered loop graphics with tufted step-over stitch minimum 3/4"
step-over.
Pile Fiber: 100%Honeywell Solure Premium Solution Dyed Nylon. Nylon fiber
contains no
pre-metalized dyes or leads and is treated with stain protector and a soil
repellent.
Secondary Backing: Power Lock Plus system with no minimum yardage, or approved equal.
Tufted Yarn Weight: 20 ounces.
Gauge: 1/10"
es
Stitches Per Inch: 10
Density Factor: 6923
Weight Density Factor: 138,460
Run Resistance: 20 lbs on test method PT- 155.
MID
Pattern Repeat: 1-1/4"Wide x 1-1/4"Long.
Warranties: Published and non—prorated warranty covering the following:
Tuft Bind 20 lbs for useful life
Edge Ravel Life of the Carpet
Delamination Life of the Carpet
Run Resistance Life of the Carpet
Wear Life of carpet
Stain Removal (including mustard stains) Life of carpet
Static Life of carpet
Colorfastness to light 10 Years
Colorfastness to atmospheric contaminants 5 Years
•. Carpet Padding: Powerlock plus, or approved equal.
Walk-off Insets: See specification sheet`B"attached, or approved equal.
Ile
SPECIFICATION"A"
QUALITY: TOUCHSTONE—POWERLOCK PLUS. Backing System—Moisture Barrier
COLORS: Dakota Toffee Moonstone Brass Tack
Brazilla Meteorite Oakledge Fired Clay
Oxford Tourmaline Winter Cloud Limerick
Tanglewood Capri Vineyard Far Away
CONSTRUCTION: Multi-Level Textured Loop
10 YARN: 100%BASF Zeftron 2000 Nylon containing post industrial
and/or post consumer recycled content. Treated with a stain protector&
a soil repellent.
YARN PLY: 2 Ply
or
TUFTED YARN WEIGHT: 20 Ounces Per Sq.Yd.
MACHINE GAUGE: 1/10"
STITCHES PER INCH: 10
4* FINISHED PILE THICKNESS: .104 Inch Approx.
DENSITY FACTOR: 6,923
WIDTH: 12'
*.• PRIMARY BACKING: 100%Synthetic
SECONDARY BACKING: Powerlock Plus.
DYE LOT SIZE: 20,000 Square Yards
VETTERMAN DRUM-WEAR: 3-4 or better after 22,000 cycles—ASTM5417
- DELAMINATION: 2.70 Lbs./Inch or Greater—ASTM D3936
LIGHT FASTNESS: 4 or Better After 8 Cycles of Exposure—AATCC 16
OZONE: 4 or Better After 8 Cycles of Exposure—AATCC 129
OXIDES OF NITROGEN: 4 or Better After 8 Cycles of Exposure—AATCC 164
'r FLAMMABILITY: Floor Radiant Panel Test ASTME-648-Passes—Has an
Average Critical Radiant Flux of Greater than.45 watts per square
centimeter.
r Class I
NBS Smoke Chamber(SFDA 258). Has a Maximum Specific Optical
Density of 450 or less.
IMP
TUFT BIND GUARANTEE—20 POUNDS 15 Year -See Warranty Listing for Details
EDGE RAVEL GUARANTEE Useful Life " " "
DELAMINATION GUARANTEE Useful Life " " "
... WEAR WARRANTY 15 Year 46 CC "
STAIN REMOVAL GUARANTEE 10 Year " " "
STATIC WARRANTY Useful Life
COLORFASTNESS TO LIGHT 10 Year " " "
COLORFASNESS TO ATMOSPHERIC CONTAMINANTS: 5 Year tt 64 "
RYCLING PROGRAM: Qualifies for BASF 6ixTM Again Program
for CRI INDOOR AIR QUALITY TETING PROGRAM-PASSES—CERTIFICATION NO. 16654078
NOTES:
�.r 1. Chair pads are recommended under office chairs with roller casters to preserves appearance retention,act as a
detterent toward delamination and to avoid premature or accelerated wear out. Walk-off mats are recommended at
building entryways to reduce soiling.
2. Product specifications are derived from averages resulting from normal manufacturing tolerances in yard fiber,
fabrication or finish,and may vary within normal industry tolerances. Construction value quotes are"at point of
manufacture". Performance is not affected by these variables.
3. Carpet must be installed according to manufacturers carpet installation procedures.
IMP
ar
SPECIFICATION"B"
.rr QUALITY: C200T CLEAN STEP—STRIPE 24"x 24"Carpet Tile
C200V CLEAN STEP—STRIPE 6 Ft.EnviroFlex®Vinyl
C210V CLEAN STEP—TEXTURE 24"x 24"Carpet Tile
C210V CLEAN STEP—TEXTURE 6 Ft. EnviroFlex®Vinyl
COLORS: 2258 Charcoal
2259 Slate
2260 Brown
CONSTRUCTION: Needlebond Loop
YARN: Nylon/Polyester—High UV Resistance
VIP
DYE METHOD: Solution Dyed
TOTAL WEIGHT: 168 Ounces Per Sq.Yd.(5696 g/m2)
SIZE: 24"x 24"(60.96 cm x 60.96 cm)
+a' OPTIONS: 6 Ft.EnviroFlex®Vinyl Available. Not recommended for multi breadth installation
SECONDARY BACKING: EnviroFlex®(Fiberglass Reinforced Vinyl)Contains 20%Recycled Content
ADHESIVE: CAO2V Vinyl Carpet Adhesive
SSO2V Vinyl Seam Sealer
SCO2V Vinyl Seam Cleaner
Installation 'Vs Turn
Wear Warranty Useful Life
Delamination Guarantee Useful Life
Edge Ravel Guarantee Useful Life
Run Resistance Warranty Useful Life
FEATURES:
me Needlebond Construction Engineered for heavy foot traffic. No zippering or edge ravel.
High-Low Texture Traps dirt,dust and debris. Reduces slips and falls.
UV Stabilized Excellent for entryways with strong sunlight.
Heavy Denier Yarns Provides aggressive scraping action to remove soil from shoe.
Cost Savings Helps protect your flooring investment and control maintenance cost.
NOTES:
✓ Chair pads are recommended under office chairs with roller casters to preserves appearance retention,act as a detterent toward
delamination and to avoid premature or accelerated wear out. Walk-off mats are recommended at building entryways to reduce
soiling.
• Product specifications are derived from averages resulting from normal manufacturing tolerances in yard fiber,fabrication or
finish,and may vary within normal industry tolerances. Construction value quotes are"at point of manufacture". Performance
is not affected by these variables.
arr
Due to the nature of patterned textile products,an exact pattern match cannot be guaranteed. Some visual inconsistencies in
the surface appearance of all textile products should be expected,including visible seams.
• Carpet must be installed according to manufacturers carpet installation procedures
+rr
+r•
6 ' • ' - a ,_..A.... .. •
, \ ;7
1 .i.. ,. .
i*ss\--C\-** NA 'N \ NN, 11
1 \ \ k
1 1 [ r
\ \I ffit ,
1 \ \ \ \I\ L,_
1 \ 1
_1
$ 11
(2L
1
,,
. ,.
' a::::$
,- . .. J
,\_. .„_7:::.:titi <,,,,,...
a,
,\\\ ,.. _ ,. e
inu
416iii >
%•. IMMIN.M1==.111L. MMININ. 7 ''''''' 'N'
Ar-----, ,-----, 1
1 i IIII‘y N :, / , 0
1 1 § i 6 1. ---1!-----j i ift.N. Qk I- &-
MI? irii *l& -- -III
. \I. I 1 I c3
a q 1
I _ Li___
■
2 il liiii, . MI . I-
Illh
/ .11.1- i
r ,
Carpet Replacement
for the
Renton Main Library
Sealed Bids due Wednesday June 23, 2004 — 3:00 pm
Addendum 1
SPECIFICATION"A"
QUALITY: TOUCHSTONE—POWERLOCK PLUS. Backing System—Moisture Barrier
COLORS: Dakota Toffee Mo., vie Brass Tack
Brazilla Meteorite Jr " •aided le Fired Clay
Oxford Tourmaline Winter loud Limerick
Tanglewood Capri Vineyard Far Away
CONSTRUCTION: Multi-Level Textured Loop
YARN: 100%BASF Zeftron 2000 Nylon containing post industrial
and/or post consumer recycled content. Treated with a stain protector&
a soil repellent.
YARN PLY: 2 Ply
TUFTED YARN WEIGHT: 20 Ounces Per Sq.Yd.
MACHINE GAUGE: 1/10"
STITCHES PER INCH: 10
FINISHED PILE THICKNESS: .104 Inch Approx.
DENSITY FACTOR: 6,923
WIDTH: 12'
PRIMARY BACKING: 100%Synthetic
SECONDARY BACKING: Powerlock Plus.
DYE LOT SIZE: 20,000 Square Yards
VETTERMAN DRUM-WEAR: 3-4 or better after 22,000 cycles—ASTM5417
DELAMINATION: 2.70 Lbs./Inch or Greater—ASTM D3936
LIGHT FASTNESS: 4 or Better After 8 Cycles of Exposure—AATCC 16
OZONE: 4 or Better After 8 Cycles of Exposure—AATCC 129
OXIDES OF NITROGEN: 4 or Better After 8 Cycles of Exposure—AATCC 164
FLAMMABILITY: Floor Radiant Panel Test ASTME-648-Passes—Has an
Average Critical Radiant Flux of Greater than.45 watts per square
centimeter.
Class I
NBS Smoke Chamber(SFDA 258). Has a Maximum Specific Optical
Density of 450 or less.
TUFT BIND GUARANTEE—20 POUNDS 15 Year -See Warranty Listing for Details
EDGE RAVEL GUARANTEE Useful Life
DELAMINATION GUARANTEE Useful Life 44 44 "
WEAR WARRANTY 15 Year 44 " "
STAIN REMOVAL GUARANTEE 10 Year 64 64 "
STATIC WARRANTY Useful Life "
COLORFASTNESS TO LIGHT 10 Year " " "
COLORFASNESS TO ATMOSPHERIC CONTAMINANTS: 5 Year 44 44 "
RYCLING PROGRAM: Qualifies for BASF 6bcni Again Program
CRI INDOOR AIR QUALITY TETING PROGRAM-PASSES—CERTIFICATION NO. 16654078
NOTES:
1. Chair pads are recommended under office chairs with roller casters to preserves appearance retention,act as a
detterent toward delamination and to avoid premature or accelerated wear out. Walk-off mats are recommended at
building entryways to reduce soiling.
2. Product specifications are derived from averages resulting from normal manufacturing tolerances in yard fiber,
fabrication or finish,and may vary within normal industry tolerances. Construction value quotes are"at point of
manufacture". Performance is not affected by these variables.
3. Carpet must be installed according to manufacturers carpet installation procedures.
SPECIFICATION"B"
•
QUALITY: - - -- -
C210V CLEAN STEP—TEXTURE 24"x 24"Carpet Tile
COLORS: V. 2258 Charcoal
•- 59-91ate
- 260-grawn.
CONSTRUCTION: Needlebond Loop
YARN: Nylon/Polyester—High UV Resistance
DYE METHOD: Solution Dyed
TOTAL WEIGHT: 168 Ounces Per Sq.Yd.(5696 g/m2)
SIZE: 24"x 24"(60.96 cm x 60.96 cm)
OPTIONS: _, . . . -.- - .,_._- :._..
SECONDARY BACKING: EnviroFlex®(Fiberglass Reinforced Vinyl)Contains 20%Recycled Content
ADHESIVE: CAO2V Vinyl Carpet Adhesive
Insallation V.Turn
Wear Warranty Useful Life
Delamination Guarantee Useful Life
Edge Ravel Guarantee Useful Life
Run Resistance Warranty Useful Life
FEATURES:
Needlebond Construction Engineered for heavy foot traffic. No zippering or edge ravel.
High-Low Texture Traps dirt,dust and debris. Reduces slips and falls.
IN Stabilized Excellent for entryways with strong sunlight.
Heavy Denier Yarns Provides aggressive scraping action to remove soil from shoe.
Cost Savings Helps protect your flooring investment and control maintenance cost.
NOTES:
Chair pads are recommended under office chairs with roller casters to preserves appearance retention,act as a detterent toward
delamination and to avoid premature or accelerated wear out. Walk-off mats are recommended at building entryways to reduce
soiling.
Product specifications are derived from averages resulting from normal manufacturing tolerances in yard fiber,fabrication or
finish,and may vary within normal industry tolerances. Construction value quotes are"at point of manufacture". Performance
is not affected by these variables.
Due to the nature of patterned textile products,an exact pattern match cannot be guaranteed. Some visual inconsistencies in
the surface appearance of all textile products should be expected,including visible seams.
Carpet must be installed according to manufacturers carpet installation procedures
go
2ailawf"
tar
KW CARPET REPLACEMENT
for the
am RENTON MAIN LIBRARY
CI) O
N
CITY OF RENTON
COMMUNITY SERVICES DEPARTMENT
FACILITIES DIVISION
1055 SOUTH GRADY WAY
RENTON,WASHINGTON
September,2004
PROJECT SPECIFICATIONS
.o.
CARPET REPLACEMENT
for the
RENTON MAIN LIBRARY
ti�Y
O4
•
Mu
_A mime
Nr.cO
air
CITY OF RENTON
COMMUNITY SERVICES DEPARTMENT
FACILITIES DIVISION
1055 SOUTH GRADY WAY
RENTON,WASHINGTON
September,2004
PROJECT SPECIFICATIONS
CARPET REPLACEMENT - RENTON MAIN LIBRARY
.• TABLE OF CONTENTS
TITLE NUMBER OF PAGES
Table of Contents 1
DIVISION 0-BIDDING REQUIREMENTS,CONTRACT FORMS,AND CONDITIONS OF THE
CONTRACT
00020 Synopsis of Bidding Information 2
00030 Invitation To Bid 1
,,. 00040 Bid Submittal Checklist 1
00100 Instructions to Bidders 3
00300 Bid Form-Form Of Proposal 4
00400 Non-Collusion,Anti-Trust, &Minimum Wage Form 1
00500 Contract 2
00800 Special Conditions 2
00900 Fair Practices Policy Affidavit of Compliance Form 1
00910 Bond To The City Of Renton Form. 1
00920 Insurance Requirements 3
DIVISON 1 -GENERAL REQUIREMENTS
01010 Summary of Work and Sequences 1
01028 Change Orders 2
01500 Construction Facilities, Utilities, and Temporary Controls 2
01700 Project Closeout 2
DRAWINGS
Technical Specifications 3
Library Floor Plan/Installation Schedule 1
CARPET REPLACEMENT MLIB TC-1 TABLE OF CONTENTS
u+r
■rr
ar
nr
rr
rrr
ar
w
BIDDING REQUIREMENTS,
CONTRACT FORMS, AND
CONDITIONS OF THE CONTRACT
DIVISION 0
SECTION 00020-SYNOPSIS OF BIDDING INFORMATION
A. PROJECT: CARPET REPLACEMENT
Renton Main Library
100 Mill Ave. South
Renton,WA 98055
B. OWNER: City of Renton
1055 South Grady Way
Renton,WA 98055
C. OWNERS REPRESENTATIVE:
�. Greg Stroh, Facilities Manager
Community Services Department
City of Renton
1055 South Grady Way
Renton,WA 98055
Phone (425)430-6614
FAX (425)430-6603
"' D. BIDS DUE: Wednesday,June 23rd, 2004 3:00 P.M.
Renton City Hall- Seventh Floor-City Clerks Office
After Bids are received and time-stamped by the City Clerk, the bids
will be opened in the Conference Room
#521 on the Fifth Floor of City Hall
E. TENTATIVE SCHEDULE OF WORK:
The following dates represent the tentative schedule for the
�• Work to be performed under this contract:
Plans Available for Bidding Weds June 16, 2004
.. Pre-Bid Site Walk-Thru 7:30 AM Weds June 16, 2004
Bids Due 3:00 PM Weds June 23, 2004
.+. Commence Work Mon Aug 30, 2004
F. TIME OF CONSTRUCTION:
SO
Thirty(30)calendar days. Liquidated damages thereafter at one-hundred
dollars ($100) per day.
G. BID SECURITY:
None
00020-1
ROOF REPLACEMENT SENIOR CENTER SYNOPSIS OF BIDDING INFORMATION
H. PERFORMANCE BOND&PAYMENT BOND:
wor
100%of contract amount
WAGES:
Pay state prevailing wages rates.
J. TYPE OF CONTRACT:
Single lump-sum contract encompassing all work
END OF SECTION
OW
00020.2
ROOF REPLACEMENT LIBRARY&STADIUM SYNOPSIS OF BIDDING INFORMATION
.10 SECTION 00030-INVITATION TO BID
CARPET REPLACEMENT
for the
RENTON MAIN LIBRARY
You are invited to submit a sealed bid for the REPLACEMENT OF APPROXIMATELY 2,105 SQUARE YARDS OF CARPET at
the Renton Main Library,Renton,Washington.Bids will be accepted at the Office of the City Clerk,Seventh Floor,City Hall, 1055
South Grady Way,Renton,WA 98055 until 3:00 P.M.,Wednesday,June 23,2004 and then will be publicly opened and read
aloud in room 521,fifth floor.Bids received after the specified time and date will not be considered.
The project scope includes the following tasks:
• Remove and dispose of existing carpet
• Prepare flooring for new carpet.
• Provide new carpet in accordance with the technical specification to be provided at the pre-bid walk-through.
• Install carpet,approved by the City,in accordance with the installation schedule to be provided at the pre-bid walk-
through.
The single contract bid indudes the appropriate supervision,scheduling and job site management The City reserves the right to
reject any and all bids and waive any informalities or irregularities in the bids received.No bid bond is required,a performance
bond is required.
,. The City's fair practices/non-discrimination policies and State Prevailing Wage Rates apply to this project
Questions shall be addressed to,Greg Stroh,Renton Community Services Department, 1055 South Grady Way,Fifth Floor,
Renton,WA 98055,phone(425)430-6614,fax(425)430-6603.
A pre-bid walk-through will be held at 7:30 AM,Wednesday,June 16th,2004 at the Main Library.Attendance by bidders is
strongly suggested.The following documents will be handed out at the walk-through.
•r • A draft copy of the contract between the City and successful bidder
• A floor plan of the Renton main Library
• The carpet and walk-off mat technical specifications
• The installation schedule
• Bid submittal form
4111 Published: June 9,2004
Seattle Daily Journal of Commerce
00030-1
ow
ROOF REPLACEMENT MAIN LIBRAY&STADIUM INVITATION TO BID
arr
SECTION 00040 -BID SUBMITTAL CHECKLIST
The following items are required to be submitted for the Bid. Other forms not listed below but included in
these Specifications are for informational purposes and need only be executed by the successful
Contractor.
LIST OF REQUIRED SUBMITTALS
❑ Bid Proposal Form (Section 00300)
❑ Combined Affidavit and Certification (Section 00400)
❑ Contractor's Certificate of Insurance(Section 00920)
OW
aor
wry
ROOF REPLACEMENT MUSEUM 00030-1 INVITATION TO BID
SECTION 00100 - INSTRUCTIONS TO BIDDERS
A. BIDDERS REPRESENTATIONS
The Bidder, by making a Bid represents that he has read and understands the Bidding
• Documents and the Bid is made in accordance therewith. He has also visited the site,
become familiar with local conditions under which the Work is to be performed and has
correlated the bidders personal observations with the requirements of the proposed
Contract Documents.
Bid shall include Work in conformance with all applicable State Laws, Municipal
Ordinances, and the rules and regulations of all authorities having jurisdiction over the
construction of the Project.
r. B. BIDDING DOCUMENT INTERPRETATIONS
Bidders requiring clarification or interpretation of the Bidding Documents shall contact the
"r City's Representative at least four days prior to the date of bids due. Interpretations,
corrections, and changes to the Bidding Documents will be made by Addendum issued no
later than three days before bids due.
C. SUBSTITUTIONS
Substitutions not accepted.
D. BID FORMS
• Bids shall be submitted on forms identical to the form included with the Bidding
Documents. All blanks on the bid form shall be filled in by typewriter or manually in
ink.
• Bid shall be accompanied by a signed Non-Collusion,Anti-Trust, and Minimum Wage
�• Form (Specifications Section 00400).
• Bid shall be accompanied by Contractor's Certificate of Insurance per
Specifications Section 00920. Bids lacking these insurance documents will be
•• considered non-responsive.
E. SUBMISSION OF BIDS
ail
Bids shall be submitted in a sealed envelope and marked with the words'Sealed Bid
Enclosed". The envelope shall also identify the project name, bidders name, and the
name of the person designated to receive the bid.
ROOF REPLACEMENT MUSEUM 00100-1 INSTRUCTIONS TO BIDDERS
Bids shall be deposited at the designated location up to the time and date for receipt of
Bids. Bids received after the time and date for receipt of Bids will be returned unopened.
"p F. OPENING OF BIDS
Bids shall be publicly opened and an abstract of the Bids made available to the Bidders.
The City reserves the right to reject any and all bids and waive any informalities or
irregularities in the bids received. The City further reserves the right to Award a Contract
in whatever manner is in the City's best interest.
G. AWARD OF BID
It is the intent of the Owner to award a Contract to the lowest responsible Bidder provided
the Bid has been submitted in accordance with the requirements of the Bidding
Documents and does not exceed the funds available.
H. POST-BID INFORMATION AND DOCUMENT SUBMITTAL
lay
After Bids are opened,the Bidder to whom award of a Contract is under consideration
shall submit to the City's Representative, additional documents requested in the
specifications including:
Standard Form of Agreement(AIA Form A101 )
City of Renton Business License
Performance Bond and Payment Bond (Section 00910)
City of Renton Affidavit of Compliance(Section 00900)
The following document must be submitted prior to commencement of the Work and no
later than 10 days after receipt of Notification of Intent To Award Contract:
Statement of Intent to Pay Prevailing Wages
SW
I. NOTICE TO PROCEED
A Notice To Proceed shall be given after the building permit is approved, the City Council,
City Attorney, Risk Manager approves the Contract, and the Contract is signed by the
Mayor.
J. TIME OF CONSTRUCTION
•• After the designated date of Start of Work, Contractor shall proceed with promptness and
dispatch and shall be substantially complete within thirty(30)calendar days.
ROOF REPLACEMENT MUSEUM 00100-3 INSTRUCTIONS TO BIDDERS
ow
.wr
K. LIQUIDATED DAMAGES
For each calendar day after date established by the above allowed time that any portion of
the work remains incomplete(in the City's sole judgment)the sum of One Hundred
Dollars($ 100.00) ,not to be construed in any sense a penalty, but as fixed, agreed
liquidated damages incurred by the City for failure of the Contractor to meet the scheduled
completion dates.
emo
L. CHANGE ORDER
ow
When extra work is performed under an approved Change Order and paid for by
acceptable lump sum or mutually agreed prices,the contractor will be limited to a markup
ear of 10%overhead and profit.
When extra work is performed as above by a subcontractor to the general contractor, the
general contractor shall be limited to a 10% markup on the subcontractors work. No
.. further markup shall be permitted to cover any other miscellaneous costs.
SW
Wee
ROOF REPLACEMENT MUSEUM 00100-3 INSTRUCTIONS TO BIDDERS
tug
SECTION 00300-BID FORM
FORM OF PROPOSAL ( BID )
for the
.. CARPET REPLACEMENT of the RENTON MAIN LIBRARY
100 Mill Ave South
Renton, Washington
Bids Due: 3:00 P.M. Wednesday, June 23, 2004
To: City Clerk, Room#728
Seventh Floor of City Hall
1055 South Grady Way
Renton, WA 98055
The undersigned hereby certifies that they have carefully examined the Contract Documents as defined in
the General Conditions entitled "Carpet Replacement for the City of Renton Main Library, 100 Mill Ave
South, Renton, WA and have examined the site of the work and the location where said work is to be
done, and fully understands the manner in which payment is proposed to be made for the cost thereof,
hereby proposes to furnish all materials and to perform all labor which may be required to complete said
work within the time fixed, and upon the terms and conditions provided in said Contract Documents for
consideration of the following amount:
A. BASE BID
For all work shown in the Contract Documents, the sum of: $
Washington State Sales Tax: $
Grand Total Base Bid: $
VIP
OW• 00300-1
IMO
ROOF REPLACEMENT MUSEUM BID FORM
rr
"' B. CONDITIONS OF PROPOSAL
1. Determination of Low Bidder:
"~ The owner reserves the right to'Award a Contract' based on the Contractor's Proposal
Amounts for Base Bid and/or Breakdown , in whatever manner is in the Owner's best
interest.
2. Overhead and Profit:
All of the above Bid Prices shall include overhead and profit.
3. Sales Tax:
All of the above Bid Prices shall include Washington State Sales Tax.
C. PERIOD OF BID VALIDITY I ACCEPTANCE OF BID
1. BASE BID
The undersigned hereby agrees that this BID as described in paragraph "A"shall be a
valid and firm offering for the period of sixty(60)days from closing time for the"Receipt Of
Bids."
Acceptance of Bid: Within sixty(60)days after the opening of Form Of Proposal, the City
will act either to accept the Proposal from the lowest responsive, responsible Bidder, or to
reject all Bids. The City reserves the right to request extensions of such Bid acceptance
period.
ON
The acceptance of a Bid will be evidenced by a written Notice of Intent to Award Contract
to the Bidder whose Bid is under consideration for acceptance,together with a request to
alp
furnish a bond (if required),evidence of insurance to execute the agreement set forth in
the Contract Documents, and other designated documents.
IMP D. EXECUTION OF CONTRACT
If written "Notice of Intent to Award Contract"is mailed,telegraphed,facsimile,or delivered
to the undersigned within the"period of Bid Validity" noted above,or any time thereafter
before this Bid is withdrawn,the undersigned will,within ten (10)days after the date of
such notification, execute a Contract in the form of the AIA Document A101 "STANDARD
FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR-STIPULATED
SUM", 1997 edition
gip
E. TIME FOR COMPLETION
The undersigned hereby agrees to"FINAL COMPLETION"of all Work outlined in the
Contract Documents within thirty(30)calendar days after receipt of Notice to Proceed with
established Start Date.
00300-2
ROOF REPLACEMENT MUSEUM BID FORM
OW
F. LIQUIDATED DAMAGES
If the Contractor fails to complete the Work by the FINAL COMPLETION DATE (or such
extension of that date which might be granted by the Owner), he agrees to abide by all
provisions of the Contract. In addition, Liquidated Damages in the amount of One
Hundred Dollars($ 100.00)will be assessed for each calendar day that the Contractor
exceeds the"FINAL COMPLETION DATE."
G. ADDENDUM RECEIPT
Receipt of the following "ADDENDA"to the CONTRACT DOCUMENTS is acknowledged:
Addendum No. Date
Addendum No. Date
10
00300-3
ROOF REPLACEMENT MUSEUM BID FORM
"r
H. EXECUTION OF PROPOSAL
Name of Firm
"' State License Registration No.
Address
OOP
City State Zip Code
rw Telephone ( ) FAX ( )
The undersigned designates the above as the firm and address to which "NOTICE OF CONTRACT
AWARD" may be mailed, hand delivered or delivered via facsimile.
NOTE: If a Bidder is a corporation,write state of incorporation; and if a partnership,give full names and
addresses of all partners below:
ow
gip
The undersigned certifies that the above is a firm and valid BID to accomplish all Work and comply with all
°" requirements of the Contract Documents.
10
Date
Signature
Signed Printed
frr
Title
I. ENCLOSURES PROVIDED BY CONTRACTOR
The Contractor shall provide the following enclosure with this Form of Proposal:
1. Non-Collusion Affidavit,Assignment of Antitrust Claims To Purchaser, Minimum Wage
r" Affidavit Form,which is located in this Specification Section 00400.
2. Certificate of Insurance as specified in Section 00920.
owl
END OF BID FORM
"+• 00300.4
ROOF REPLACEMENT MUSEUM BID FORM
ti"r
SECTION 00400 - NON-COLLUSION, ANTI-TRUST, AND MINIMUM WAGE FORM
ely NON-COLLUSION AFFIDAVIT
Being duly sworn,deposes and says,that he is the identical person who submitted the forgoing proposal or bid,and
that such bid is genuine and not sham or collusive or made in the interest or on behalf of any person not therein
named,and further,that the deponent has not directly induced or solicited any other Bidder on the foregoing work or
equipment to put in a sham bid,or any other person or corporation to refrain from bidding,and that deponent has not
in any manner sought by collusion to secure to himself or to any other person any advantage over the other Bidder
sw or Bidders.
AND
mo CERTIFICATION RE:ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER
Vendor and purchaser recognize that in actual economic practice overcharges resulting from anti-trust violations are
,., in fact usually borne by the purchaser. Therefor,vendor hereby assigns to purchaser any and all claims for such
overcharges as to goods and materials purchased in connection with this order or contract,except as to overcharges
resulting from anti-trust violations commencing after the date of the bid,quotation,or other event establishing the
price under this order or contract. In addition,vendor warrants and represents that such of his suppliers and
subcontractors shall assign any and all such claims to purchaser,subject to the aforementioned exception.
AND
`al MINIMUM WAGE AFFIDAVIT FORM
I,the undersigned,having been duly sworn,deposed,say and certify that in connection with the performance of the
work of this project, I will pay each classification of laborer,workman,or mechanic employed in the performance of
such work;not less than the prevailing rate of wage or not less than the minimum rate of wages as specified in the
principal contract:that I have read the above and foregoing statement and certificate,know the contents thereof and
the substance as set forth therein is true to my knowledge and belief.
FOR: NON-COLLUSION AFFIDAVIT,ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND
MINIMUM WAGE AFFIDAVIT
CARPET REPLACEMENT—RENTON MAIN LIBRARY
ar
Name of Bidders Firm
Signature of Authorized Representative of Bidder
ar
Subscribed and sworn to before me on this day of ,20
r
Notary Public in and for the State of Washington
Residing at:
,� 00400-1
ROOF REPLACEMENT MUSEUM NON-COLLUSION,ANTI-TRUST,
MINIMUM WAGE FORM
wr
SECTION 00500-CONTRACT
rr 4
2,4
CITY OF RENTON COMMUNITY SERVICES DEPARTMENT
CONTRACT AGREEMENT
THIS AGREEMENT is made as of the day of , 2004, between the
,,,, CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as"CITY"
and , hereinafter referred to as"CONTRACTOR", to furnish and install new carpet, including removal
and disposal of existing carpet in the Renton Main Library, 100 Mill Avenue South, Renton,Washington.
The City and Contractor agree as set forth below.
1. Scope of Services. The Contractor will provide all material and labor necessary to perform all work
IMO described in the Project Specification book.
2. Changes in Scope of Services. The City,without invalidating the Contract, may order changes in the
Services consisting of additions, deletions or modifications, the Contract Sum being adjusted
accordingly. Such changes in the work shall be authorized by written Change Order signed by the City
and the Contractor.
3. Time of Performance. The Contractor shall commence performance of the Contract no later than ten
(10)calendar days after Contract's final execution, and shall complete the full performance of the
Contract not later than 30 calendar days from the date of commencement.
4. Term Of Contract.The Term of this Agreement shall end at completion of the enclosed scope of work.
This Agreement may be extended to accomplish change orders, if required, upon mutual written
agreement of the City and the Contractor.
5. Contract Sum. The total amount of this Contract is the sum of $00,000.00 which includes
Washington State Sales Tax.
6. Method of Payment. Payment by the City for the Services will only be made after the Services have
been performed and a voucher or invoice is submitted in the form specified by the City. Payment will
be made thirty(30)days after receipt of such voucher or invoice. The City shall have the right to
withhold payment to the Contractor for any work not completed in a satisfactory manner until such time
as the Contractor modifies such work so that the same is satisfactory.
7. Employment.The Contractor's employees are not employees of the City of Renton.
8. Assignment and Subcontract. The Contractor shall not assign or subcontract any portion of this
Contract without express written consent of the City of Renton.
00500.1
ROOF REPLACEMENT MUSEUM GENERAL CONDITIONS
rr
SECTION 00500-CONTRACT
die
9. Record Keeping and Reporting. The Contractor shall maintain accounts and records which properly
avi
reflect all direct and indirect costs expended and services provided in the performance of this
Agreement. The Contractor agrees to provide access to any records required by the City.
10. Hold Harmless. The Contractor shall indemnify, defend and hold harmless the City, its officers,
agents, employees and volunteers,from and against any and all claims, including claims from third
parties, losses or liability,or any portion thereof, including attorneys fees and costs, arising from injury
ap
or death to persons, including injuries, sickness,disease or death to Contractor's own employees,or
damage to property occasioned by a negligent act, omission or failure of the Contractor.
11. Insurance. The Contractor shall secure and maintain in force throughout the duration of the Contract
Commercial General Liability insurance in the amount of$2,000,000;Auto Liability insurance in the
40 amount of$1,000,000; Excess Liability insurance in the amount of$1,000,000; and Workers'Comp
coverage. The City of Renton shall be named as an additional insured on the policy. A certificate of
insurance evidencing the contractor's insurance coverage shall be delivered to the City before
dip executing the Work on this Agreement.
12. Compliance with Laws. The Contractor and all of the Contractor's employees shall perform the
services in accordance with all applicable federal, state, county and city laws, codes and ordinances.
13. Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the City
of Renton contract shall prevail.
14. Prevailing Wage Rates. By executing this Contact, the Contractor agrees to comply with the State
prevailing wage requirements as set forth in the Contract Documents.
rr
This Agreement is entered into as of the day and year written above.
CONTRACTOR CITY OF RENTON
4.
Signature Signature
err
Kathy Keolker-Wheeler, Mayor
Printed Name and Title Printed Name and Title
err
Business Name Attest
a" Bonnie I.Walton,City Clerk
Mailing Address Printed Name and Title
Orr
City State Zip
+rr
Telephone
00500-2
ROOF REPLACEMENT MUSEUM GENERAL CONDITIONS
,rr
SECTION 00800-SPECIAL CONDITIONS
IMP
ARTICLE 1 -COMPLIANCE WITH WAGE RATES AND FILING OF"INTENT TO PAY
PREVAILING WAGES" HEREINAFTER CALLED"INTENT"AND
to. "AFFIDAVIT OF WAGES PAID"
2.1 "Prevailing Wages on Public Works"-The Contractor and Subcontractors shall comply
with 39.12 RCW and amendments"Prevailing Wages on Public Works."The prevailing rate wages
to be paid to all workers, laborers,or mechanics employed in the performance of any part of this
Contract shall be in accordance therewith.
2.2 Current prevailing wage data will be furnished by the Industrial Statistician upon request.
Requests shall be made to the State of Washington Department of Labor and Industries. The
Contractor is responsible for paying the appropriate wage rates.
2.3 The Contractor, and all Subcontractors, on or before the date of commencement of work,
shall file a statement under oath with the City and with the Director of Labor and Industries
certifying the rate of hourly wages paid to each classification of laborers,workers,or mechanics
employed to perform work under this Contract shall not be less than the prevailing rate of wages
determined by the Washington State Labor and Industries. Such statement and any supplemental
statements which may be necessary shall be filed in accordance with the practices and procedures
required by the Department of Labor and Industries.
2.4 Copies of all"Intents"shall be on file with the Contractor,the Industrial Statistician, and
the City.
2.5 'Affidavits of Wages Paid"-upon completion of project, the Contractor shall fully execute
®,r and file"Affidavit of Wages Paid"with the Washington State Department of Labor and Industries
and any other agencies required by law. Sample copy enclosed herein.
Copies shall be provided to the City prior to Final Completion, Final Payment and release of
Retainage. Each affidavit of wages paid must be certified by the Industrial Statistician of the
Department of Labor and Industries before it is submitted.
2.6 All costs and fees for and associated with the"Intent to Pay Prevailing Wages" and
"Affidavits of Wages Paid"are to be paid by the Contractor.
ARTICLE 2-STATE LICENSING LAW
The Contractor agrees to comply with all requirements of Chapter 18.27 RCW. The Contractor
agrees and covenants to furnish unto the Owner proper evidence that the Contractor has fully
complied with the State Licensing Law of the State of Washington, Chapter 18.27 RCW,and a
Contractor's Certificate of Registration shall be in full force and effect throughout the work project
herein above enumerated, prior to starting work.
00800-1
ROOF REPLACEMENT MUSEUM SPECIAL CONDITIONS
rri
ARTICLE 3-NON-DISCRIMINATION
The Contractor shall offer equal opportunity to all qualified employees and applicants for
employment without regard to the race,creed, color,sex, national origin, age,or disability.
Successful designated bidder shall fill out and complete the AFFIDAVIT OF COMPLIANCE FORM
included herein and submit with the signed Contract.
`l• ARTICLE 4-CITY OF RENTON BUSINESS LICENSE
Prior to signing a contract the contractor agrees to purchase a City of Renton Business License
and maintain the license in full force and effect throughout the work of the project. License may be
purchased from the City Finance Department located on the First Floor of the City Hall Building,
1055 South Grady Way, Renton, WA.
O
END OF SECTION
VIM
dig
dIP
00800-2
ROOF REPLACEMENT MUSEUM SPECIAL CONDITIONS
SECTION 00910-BOND TO THE CITY OF RENTON FORM
KNOW ALL MEN BY THESE PRESENTS:
That we,the undersigned
as principal,and
corporation organized and existing under the laws of the State of as a
surety corporation,and qualified under the laws of the State of Washington to become surety upon bonds of
contractors with municipal corporations,as surety are jointly and severally held and firmly bound to the City of
Renton in the penal sum$ for the payment of which sum on
demand we bind ourselves and our successors,heirs,administrators or person representatives,as the case may be.
,N,• This obligation is entered into in pursuance of the statutes of the State of Washington,the Ordinance of the City of
Renton.
Dated at ,Washington,this day of ,2004
Nevertheless,the conditions of the above obligation are such that
o• WHEREAS,under and pursuant to Public Works Construction Contract CAG- providing for construction
of
ors Project Name
the principal is required to furnish a bond for the faithful performance of the contract;and
WHEREAS,the principal has accepted,or is about to accept,the contract,the undertake to perform the work therein
provided for in the manner and within the time set forth;
NOW,THEREFORE,if the principal shall faithfully perform all of the provisions of said contract in the manner and
within the time therein set forth,or within such extensions of time as may be granted under said contract,and shall
pay all laborers,mechanics,subcontractors and materialmen,and all persons who shall supply said principal or
subcontractors with provisions and supplies for the carrying on of said work,and shall hold said City of Renton
harmless from any damage or expense by reason of failure of performance as specified in the contract or from
defects appearing or developing in the material or workmanship provided or performed under the contract within a
°' period of one year after its acceptance thereof by the City of Renton,then and in that event this obligation shall be
void; but otherwise it shall be and remain in full force and effect.
w
Principal Surety
NIP
Signature Surety's Address
Name and Title Agent's Signature
w
Name and Title
— 00910-1
ROOF REPLACEMENT MUSEUM BOND TO THE CITY OF RENTON FORM
SECTION 00920-CONTRACTORS INSURANCE AND RELATED REQUIREMENTS
r
MINIMUM INSURANCE COVERAGE AND REQUIREMENTS
The CONTRACTOR shall obtain and maintain the minimum insurance coverage set forth below. By
requiring such minimum insurance, CITY OF RENTON shall not be deemed or construed to have
assessed the risks that may be applicable to the CONTRACTOR under the Contract. The CONTRACTOR
shall assess its own risks and if it deems appropriate and/or prudent, maintain higher limits and/or broader
coverage.
(1) Commercial General Liability-Acord Form or equivalent,written on an occurrence basis,
including:
• Premises and Operations
( Including CG 2503 general aggregate to apply per project if applicable)
• Explosion, Collapse and Underground Hazards
• Products/Completed Operations
�. • Contractual Liability(including Amendatory Endorsement CG 0043 or equivalent which
includes defense coverage assumed under contract)
• Broad Form Property Damage
• Independent Contractors
• Personal/Advertising Injury
• Stop Gap Liability
(2) Automobile Liability including all
�• • Owned Vehicles
• Non-Owned Vehicles
• Hired Vehicles
(3) Workers'Compensation
• Statutory Benefits -Show Washington Labor& Industries Number
(4) Umbrella Liability
• Excess of Commercial General Liability and Automobile Liability. Coverage should be as
broad as primary.
++� 00920-1
ROOF REPLACEMENT MUSEUM INSURANCE REQUIREMENTS
r
arr
e• CONTRACTORS INSURANCE REQUIREMENTS
The CONTRACTOR shall carry the following limits of liability as required below:
Commercial General Liability
General Aggregate* $2,000,000
Products/Completed Operations Aggregate $2,000,000
Each Occurrence Limit $1,000,000
Personal/Advertising Injury $1,000,000
Fire Damage(Any One Fire) $ 50,000
Medical Payments(Any One Person) $ 5,000
Stop Gap Liability $1,000,000
*General Aggregate to apply per project
Automobile Liability
Bodily Injury/Property Damage $1,000,000
(Each Accident)
.r
Workers'Compensation
Statutory Benefits-Show Washington Labor&Industries Number
Umbrella Liability
Each Occurrence Limit $1,000,000
General Aggregate Limit $1,000,000
Products/Completed Operations Aggregate $1,000,000
Per Loss $ 1,000,000
Aggregatc $ 1,000,000
00920-2
ROOF REPLACEMENT MUSEUM INSURANCE REQUIREMENTS
ADDITIONAL REQUIREMENTS
CONTRACTOR shall Name CITY OF RENTON, and its officers, officials, agents,employees and
volunteers as Additional Insureds(ISO Form CG 2010 or equivalent). CONTRACTOR shall provide CITY
m" OF RENTON Certificates of Insurance and copies of policies, if at our sole discretion it is deemed
appropriate Further, all policies of insurance described above shall:
1) Be on a primary basis nor contributory with any other insurance coverage and/or self-insurance
carried by CITY OF RENTON.
2) Include a Waiver of Subrogation Clause.
3) Severability of Interest Clause(Cross Liability)
4) Policy may not be non-renewed,canceled or materially changed or altered unless forty-five(45)
,,. days prior written notice is provided to CITY OF RENTON. Notification shall be provided to CITY
OF RENTON by certified mail.
An example of an acceptable cancellation clause is as follows:
"Should any of the above described policies be canceled before the expiration date thereof, the
issuing company will-endeavor is mail 45 days written notice to the certificate holder named to the
left. failure-to-mait-.-• - '. - ••e: - •- -- -- -• - •-- ' - - - --• •
• "
The CONTRACTOR shall promptly advise the CITY OF RENTON in the event any general aggregate or
'"" other aggregate limits are reduced below the required per occurrence limit. At his or her own expense the
CONTRACTOR will reinstate the aggregate limits to comply with the minimum requirements and shall
furnish to the CITY OF RENTON a new certificate of insurance showing such coverage is in force.
Required insurance coverage shall be maintained throughout the term of this contract, except Automobile
Liability and Workers'Compensation,for a period of two(2)years after the date of substantial completion
of the project.
On all Certificates of Insurance,the Certificate Holder shall be listed as"City of Renton,Washington,
Attention: Greg Stroh Facilities Manager"
MIN
00920-3
ROOF REPLACEMENT MUSEUM INSURANCE REQUIREMENTS
UM
ND
MO
IMP
IMP
MN
NM
IMP r ,
GENERAL REQUIREMENTS
DIVISION 1
WV
WI
., SECTION 01010-SUMMARY OF WORK
PART 1 -GENERAL
NIP
1.01 WORK COVERED BY CONTRACT DOCUMENTS
MIN A. Work of this Contract includes Remove and dispose of existing carpet. Prepare
floor for new carpet. Provide new carpet in accordance with the technical specification to be
provided at the pre-bid walk-through. Install carpet approved by the City, in accordance with
the installation schedule to be provided at the pre-bid walk-through and performing such
incidental or other work as may be necessitated by these operations. Work shall include a
manufacturer and contractors warranty for the work required by the contract documents
and includes all labor necessary to produce such work, and all materials and equipment
incorporated in such work. Contractor's work shall be performed as indicated, specified
herein and as necessary to provide a complete project.
B. Unless otherwise indicated, the work includes, but is not limited to the following:
1. Providing and payment for labor, materials,equipment, tools, machines,
facilities, and services necessary for proper execution and completion of
work.
2. Paying required taxes.
3. Maintaining required egress in accordance with governing Codes and
Ordinances throughout the work.
C. Do not employ on work:
1. Unfit persons or persons not skilled in assigned tasks.
al
1.02 CONTRACT
A. Construct work under a single fixed-price Contract. See Bid Form.
1.03 WORK SEQUENCE
A. All efforts shall be made to perform all work without abnormally disturbing,
inconveniencing,or interrupting the usage of the building, pedestrians, and
vehicular traffic.
1.04 OBJECTIONS TO APPLICATION OF PRODUCTS
Contractor and subcontractors submitting bids for this Project are required to thoroughly
familiarize themselves with specified products and installation procedures and submit to
Architect any objection in writing no later than seven (7)days prior to Bid Date. Submittal
of Bid constitutes acceptance of products and procedures specified.
END OF SECTION
01010-1
ROOF REPLACEMENT MUSEUM SUMMARY OF WORK
•
SECTION 01028-CHANGE ORDERS
PART 1 -GENERAL
1.01 SUBMITTALS
A. Change Order Forms: AIA G701 to be completed by City's Representative.
1.02 DOCUMENTATION OF CHANGE IN CONTRACT SUM/PRICE AND CONTRACT TIME
A. Submit detailed records of work to be done including time and materials. Provide
full information required for evaluation of proposed changes, and to substantiate
�• costs of changes in the Work. Document each quotation for a change in cost or
time with sufficient data to allow evaluation of the quotation.
B. On request, provide additional data to support computations:
1. Quantifies of products, labor, and equipment.
2. Taxes, insurance and bonds.
IWO 3. Overhead and profit.
4. Justification for any change in Contract Time.
5. Credit for deletions from Contract,similarly documented.
C. When extra work is performed under an approved Change Order and paid for by
acceptable lump sum or mutually agreed prices,the contractor will be limited to a
markup of 10%overhead and profit.
When extra work is performed as above by a subcontractor to the general
contractor,the general contractor shall be limited to a 10%markup on the
subcontractors work. No further markup shall be permitted to cover any other
miscellaneous costs.
1.03 CHANGE PROCEDURES
A. The City's Representative may issue a Proposal Request which includes a
detailed description of a proposed change with supplementary or revised
Drawings and specifications, a change in Contract Time for executing the change
and the period of time during which the requested price will be considered valid.
Contractor will prepare and submit an estimate within 5 days.
B. The Contractor may propose a change by submitting a request for change to the
City's Representative, describing the proposed change and its full effect on the
Work,with a statement describing the reason for the change, and the effect of the
Contract/Sum Price and contract.
01028-1
ROOF REPLACEMENT MUSEUM CHANGE ORDERS
1.04 CORRELATION OF CONTRACTOR SUBMITTALS
A. Promptly revise Construction Schedule and Application for Payment forms to
record each authorized Change Order as a separate line item and adjust the
Contract Sum.
END OF SECTION
WO
.r
01028-2
ROOF REPLACEMENT MUSEUM CHANGE ORDERS
air
SECTION 01500-CONSTRUCTION FACILITIES, UTILITIES,
AND TEMPORARY CONTROLS
PART 1 -GENERAL
1.01 ELECTRICAL SERVICE
wo
A. Arrangements may be made to obtain electrical power from the existing building system.
City will pay for cost of electricity.
1.02 WATER
A. Arrangements may be made to obtain water from the existing building system. City will
pay for cost of water.
1.03 SANITARY FACILITIES
A. Usage of existing public facilities in the general area is acceptable.
1.04 BARRIERS&FENCE
ow
A. Make provisions to prevent public entry to the portion of the site being used for staging of
construction equipment. Limit use of site within a fenced area furnished and installed by
ow the contractor. Protect existing sidewalks, plantings,building, and adjacent properties
from damage by operations.
B. Fenced area shall be located over hard-surfaced areas only.
1.05 CLEANING DURING DEMOLITION
A. Control accumulation of waste materials and rubbish dumping. Periodically dispose off-
.. site in authorized dump sites.
1.06 STAGING AREA
A. Contractor may utilize the parking lot South of the building for staging,.Alternate site
storage considerations and contractor employee parking will be addressed during site
setup.
B. Protect the existing building from any marring, scrapes, holes,or damage of any kind.
�.» Any damaged area due to the contractors work shall be replaced by the contractor.
C. Provide for periodic removal of dumpster contents.
r 01500-1
ROOF REPLACEMENT MUSEUM CONSTRUCTION FACILITIES,UTILITIES
AND TEMPORARY CONTROLS
_ 1.07 POLLUTION CONTROL
A. Provide methods, means,and facilities to prevent contamination of soil,water,and
�., atmosphere from discharge of noxious,toxic substances, and pollutants produced by
any construction operations.
END OF SECTION
4•
OW
rr+ 01500-2
ROOF REPLACEMENT MUSEUM CONSTRUCTION FACILITIES,UTILITIES
AND TEMPORARY CONTROLS
•� SECTION 01700-PROJECT CLOSEOUT
PART 1 -GENERAL
,., 1.01 SUBMISSIONS FOR FINAL COMPLETION
A. General: Submit the following documents:
mio
1. In progress payment request coincident with or first following date claimed,
show either 100%completion for portion of Work claimed as"Final
.. Completion",or list incomplete items,.value of incompletion, and reasons for
being incomplete.
2. Include supporting documentation for completion as indicated in these
elm Contract Documents.
3. Submit statement showing accounting of changes to the Contract Sum.
4. Complete final cleaning up requirements, including touch-up of marred
surfaces.
5. Submit updated final statement,accounting for additional(final)changes to
Contract Sum.
NO" 6. Submit final payment request with final releases and supporting
documentation not previously submitted and accepted.
7. Submit certified copy of City Representative's final punch list of itemized
work to be completed or corrected,stating that each item has been
completed or otherwise resolved for acceptance,endorsed and dated by
City's Representative.
8. Payment and Release of liens
B. Inspection Procedures: Upon receipt of Contractor's request,City's Representative
will either proceed with inspection or advise Contractor of prerequisites not fulfilled.
Following initial inspection,City's Representative will either prepare certificate of
or Final Completion,or advise Contractor of work which must be performed prior to
issuance of certificate;and repeat inspection when requested and assured that work
has been substantially completed. Results of completed inspection will form initial
"punch list"for final acceptance.
1.02 FINAL ADJUSTMENT OF ACCOUNTS
A. Submit a final statement of accounting to City's Representative.
B. Reflect all adjustments to Contract Sum. Indicate following:
1. The original Contract Sum.
2. Additions and deductions resulting from:
a. Previous Change Orders.
b. Deductions of uncorrected Work.
c. Other adjustments.
tmir
01700-1
ROOF REPLACEMENT MUSEUM PROJECT CLOSEOUT
++r
3. Total Contract Sum, as adjusted.
4. Previous Payments.
5. Sum remaining due.
1.03 FINAL APPLICATION FOR PAYMENT
A. Submit final Application for Payment in accordance with procedures and
requirements of Owner.
1. Submit"Affidavit of Wages Paid"from Contractor and all subcontractors.
2. Lien waiver from General Contractor for entire contract.
3. Proof of Payment of taxes from the State Dept of Revenue
END OF SECTION
WO
WO
01700.2
ROOF REPLACEMENT MUSEUM PROJECT CLOSEOUT
`r
IMP
WO
M
TECHNICAL
SPECIFICATIONS
DRAWINGS
IMP
CARPET SPECIFICATIONS—CITY OF RENTON MAIN LIBRARY
Quality: Blueridge Touchstone with power lock plus backing system, or approved
equal. See specification sheet"A"attached.
"" Color: TBD, as approved by the City of Renton
Construction: Multi-level pattered loop graphics with tufted step-over stitch minimum 1/4"
"' step-over.
Pile Fiber: 100%Honeywell Solure Premium Solution Dyed Nylon. Nylon fiber
l" contains no
pre-metalized dyes or leads and is treated with stain protector and a soil
t•
repellent.
Secondary Backing: Power Lock Plus system with no minimum yardage, or approved equal.
Tufted Yarn Weight: 20 ounces.
w Gauge: 1/10"
Stitches Per Inch: 10
Density Factor: 6923
Weight Density Factor: 138,460
Run Resistance: 20 lbs on test method PT- 155.
wr
Pattern Repeat: 1-1/4" Wide x 1-1/4"Long.
Warranties: Published and non—prorated warranty covering the following:
Tuft Bind 20 lbs for useful life
,,. Edge Ravel Life of the Carpet
Delamination Life of the Carpet
Run Resistance Life of the Carpet
aim Wear Life of carpet
Stain Removal (including mustard stains) Life of carpet
Static Life of carpet
r•. Colorfastness to light 10 Years
Colorfastness to atmospheric contaminants 5 Years
Carpet Padding: Powerlock plus, or approved equal.
Walk-off Insets: See specification sheet`B"attached, or approved equal.
IMP
SPECIFICATION"A"
QUALITY: TOUCHSTONE—POWERLOCK PLUS. Backing System—Moisture Barrier
,r.
COLORS: Dakota Toffee Moonstone Brass Tack
Brazilla Meteorite Oakledge Fired Clay
Oxford Tourmaline Winter Cloud Limerick
Tanglewood Capri Vineyard Far Away
CONSTRUCTION: Multi-Level Textured Loop
YARN: 100%BASF Zeftron 2000 Nylon containing post industrial
and/or post consumer recycled content. Treated with a stain protector&
a soil repellent.
YARN PLY: 2 Ply
TUFTED YARN WEIGHT: 20 Ounces Per Sq.Yd.
MACHINE GAUGE: 1/10"
STITCHES PER INCH: 10
FINISHED PILE THICKNESS: .104 Inch Approx.
DENSITY FACTOR: 6,923
WIDTH: 12'
PRIMARY BACKING: 100%Synthetic
SECONDARY BACKING: Powerlock Plus.
DYE LOT SIZE: 20,000 Square Yards
VETTERMAN DRUM-WEAR: 3-4 or better after 22,000 cycles—ASTM5417
DELAMINATION: 2.70 Lbs./Inch or Greater—ASTM D3936
LIGHT FASTNESS: 4 or Better After 8 Cycles of Exposure—AATCC 16
OZONE: 4 or Better After 8 Cycles of Exposure—AATCC 129
OXIDES OF NITROGEN: 4 or Better After 8 Cycles of Exposure—AATCC 164
FLAMMABILITY: Floor Radiant Panel Test ASTME-648-Passes—Has an
Average Critical Radiant Flux of Greater than.45 watts per square
centimeter.
■rr Class I
NBS Smoke Chamber(SFDA 258). Has a Maximum Specific Optical
Density of 450 or less.
TUFT BIND GUARANTEE—20 POUNDS 15 Year -See Warranty Listing for Details
EDGE RAVEL GUARANTEE Useful Life " " "
DELAMINATION GUARANTEE Useful Life " " "
WEAR WARRANTY 15 Year 44 44 "
STAIN REMOVAL GUARANTEE 10 Year " " "
STATIC WARRANTY Useful Life " " "
COLORFASTNESS TO LIGHT 10 Year " " "
.r COLORFASNESS TO ATMOSPHERIC CONTAMINANTS: 5 Year "
RYCLING PROGRAM: Qualifies for BASF 6ixTM Again Program
MO
CRI INDOOR AIR QUALITY TETING PROGRAM-PASSES—CERTIFICATION NO. 16654078
NOTES:
■• 1. Chair pads are recommended under office chairs with roller casters to preserves appearance retention,act as a
detterent toward delamination and to avoid premature or accelerated wear out. Walk-off mats are recommended at
building entryways to reduce soiling.
2. Product specifications are derived from averages resulting from normal manufacturing tolerances in yard fiber,
MI r fabrication or finish,and may vary within normal industry tolerances. Construction value quotes are"at point of
manufacture". Performance is not affected by these variables.
3. Carpet must be installed according to manufacturers carpet installation procedures.
OP
r•
�+r
SPECIFICATION`B"
QUALITY: C200T CLEAN STEP—STRIPE 24"x 24"Carpet Tile
C200V CLEAN STEP—STRIPE 6 Ft.EnviroFlex®Vinyl
C210V CLEAN STEP—TEXTURE 24"x 24"Carpet Tile
dig C210V CLEAN STEP—TEXTURE 6 Ft.EnviroFlex®Vinyl
COLORS: 2258 Charcoal
22 Slate.
• 268-Brown--
CONSTRUCTION: Needlebond Loop
so
YARN: Nylon/Polyester—High UV Resistance
DYE METHOD: Solution Dyed
TOTAL WEIGHT: 168 Ounces Per Sq.Yd.(5696 g/m2)
SIZE: 24"x 24"(60.96 cm x 60.96 cm)
or OPTIONS: . • , .• .. Not recommended for multi breadth installation
SECONDARY BACKING: EnviroFlex®(Fiberglass Reinforced Vinyl)Contains 20%Recycled Content
ADHESIVE: CAO2V Vinyl Carpet Adhesive
r
Vinyl-Seam-cleaner
• Installation '/.Turn
Wear Warranty Useful Life
Delamination Guarantee Useful Life
ow
Edge Ravel Guarantee Useful Life
Run Resistance Warranty Useful Life
FEATURES:
▪ Needlebond Construction Engineered for heavy foot traffic. No zippering or edge ravel.
High-Low Texture Traps dirt,dust and debris. Reduces slips and falls.
UV Stabilized Excellent for entryways with strong sunlight.
rr Heavy Denier Yarns Provides aggressive scraping action to remove soil from shoe.
Cost Savings Helps protect your flooring investment and control maintenance cost.
NOTES:
+r Chair pads are recommended under office chairs with roller casters to preserves appearance retention,act as a detterent toward
delamination and to avoid premature or accelerated wear out. Walk-off mats are recommended at building entryways to reduce
soiling.
+rr
Product specifications are derived from averages resulting from normal manufacturing tolerances in yard fiber,fabrication or
finish,and may vary within normal industry tolerances. Construction value quotes are"at point of manufacture". Performance
is not affected by these variables.
or
Due to the nature of patterned textile products,an exact pattern match cannot be guaranteed. Some visual inconsistencies in
the surface appearance of all textile products should be expected,including visible seams.
as
C arp et must be installed according to manufacturers carpet installation procedures
rr
rrr
NMI
CO‘N 1
\ \ I 1 1111 Irl ' i•--`
\ ', D__--1 L`d,-
5
\ I __,
- ,
1
›_ t•:4
I ii \\\\ < Li.i.!
I k- (2
I\ _
/1\\\V - ''
the,\ \Mt*, 7‹-c
kg:Ai
\_____litagi
/ N .
. .., . . :
•1
, vs, r I\ i A
6 1 '--4-- i i*.....„„....„........ ■■■■_* '4
- 1•••••■•••; :7 iF
I jri i______--Li.- __ I• „ilk .\.,
1,.,..
1 ___J qi L__
f
e. :i § OIL
1 \
I [Uri'
•
- - - - - - - - - - - - - - - - - - -