Loading...
HomeMy WebLinkAboutR-37370629 30 FL _ \ \ \ \ \ \ \ \ \ 29.32 \ \ \ \ \ \ LINE OF \\CANOPY ABOVE \ 0 ❑[]7 CONCRETE GUTTER SWALE zmll 29.88 4 - CONCRtTE GUTTER ° ° 29.87 v v TPI SWAL@ -255 8 TF 258 25 8 25.8M O't:A:1L :I E�11111 L - SCREW 1 4 TF ° Y' A.C. M TF I �I DESCRIPTION � ° , ISLAND N N N (PRODUCT) 1. ELEVATION AT TOP OF ISLAND (PER PLAN) Ys" x 2" 30.12 2. PIPING FALL = [(L) x 1/8" PER FT.)] a Oi A 12 ° I d e ° 6" CONCRETE O c a n 2,29 FT. 3. PUMP ISLAND (6 IN.) 0 II 0 TPI I- ° a 8.94 PI PIPE DIAMETER (3 IN.) 28.74 a 11 25.8 TPI. r -- TF I ° II °< v ° O a J\ Ij (b1 - 44) = #5 24.83 6. TOP OF SLAB ELEV. ABOVE TANKS 0 SLOPE o SLOPE SLOPE W Z ° !v 7. DEPTH OF BURY (j)6 - 45) = ((7 3.74' ° ° Q° I � A W ° �\ CD� 1 29.57 29.79 \\ d 4 ° TPI 8 25.8 TPI d l= t 1 1 TF TF � - I t VI M Z - r- Q I 0,a�Q ,,�� `0 0 01' Wa o a ° m m a a 0 Ix DID 4 I Ln Of \ ° p M \ I i \ I v FLOWLINE OF CONCRETE SWALE NOTE: \ Project N: 13245 Store 4'00459 1. INSTALL EXPANSION JOINTS 0 6" MIN. AGGREGATE BASE AND SUBGRADE 20' -0" O.C. MAX. PREPARE AND CONSTRUCT SAME AS BASE 2. SEE SHEET Al FOR MATCHING Designed By: CMT AND SUBGRADE PER PAVEMENT SECTION OF CONTROL JOINTS Drawn By: RDC INTEGRAL CONCRETE SWALE DETAIL w Checked By. JH �p Dote: 9.7.2012 NOT TO SCALE (AT CANOPY) 25 8 25.8M O't:A:1L :I E�11111 L 1 :L Ja 2FL RIDGEI,II 4 CANOPY AND 0 1TANK SLAB GRADING SCALE: 1 " =10' II 29:44 TPI 4 ° PJ ° C; I, 29.09 I - SCREW 1 25.6 TPI Y' A.C. M TF I �I DESCRIPTION r 4 ISLAND N N N (PRODUCT) 1. ELEVATION AT TOP OF ISLAND (PER PLAN) Ys" x 2" 30.12 2. PIPING FALL = [(L) x 1/8" PER FT.)] a Oi A 12 ° I d e ° 6" CONCRETE O c a n 2,29 FT. 3. PUMP ISLAND (6 IN.) 0 II 0 I PIPE COVER (12 IN.) a 8.94 PI PIPE DIAMETER (3 IN.) 28.74 a 11 25.8 TPI. r -- TF I III �r ❑ ° O v GRADE DIFFERENTIAL (42 + 43) = #4 O 5.29 FT. 5. TOP OF TANKS AT LOWEST POINTS (b1 - 44) = #5 24.83 6. TOP OF SLAB ELEV. ABOVE TANKS 0 SLOPE o SLOPE SLOPE 28.57 LOWEST ELEVATION (PER PLANS) 7. DEPTH OF BURY (j)6 - 45) = ((7 3.74' NOTE: MINIMUM BURY DEPTH = 4.0' � I 0 46 (28.57) - 4.00' = 24M 1 v 4JI o e d l= t W t VI M Z rc Q I 0,a�Q ,,�� `0 0 01' Wa o a ° m m a a 0 Ix DID 4 Ln Of /\ � \/� M \ i 1 :L Ja 2FL RIDGEI,II 4 CANOPY AND 0 1TANK SLAB GRADING SCALE: 1 " =10' II 29:44 TPI 4 ° PJ ° C; I, 29.09 I - SCREW 1 25.6 TPI Y' A.C. M TF I I DESCRIPTION r 4 ISLAND N N N (PRODUCT) 1. ELEVATION AT TOP OF ISLAND (PER PLAN) Ys" x 2" 30.12 2. PIPING FALL = [(L) x 1/8" PER FT.)] a Oi 12 ° v = [(L) x 0.0104] 6" CONCRETE O 1 a n 2,29 FT. 3. PUMP ISLAND (6 IN.) 0 0 0 I PIPE COVER (12 IN.) aG PIPE DIAMETER (3 IN.) 28.74 I 25.8 TPI. TF I III �r ❑ ° O v GRADE DIFFERENTIAL (42 + 43) = #4 O 5.29 FT. 5. TOP OF TANKS AT LOWEST POINTS \ \ \ CONCRETE GUTTER SWALE OF CANOPY ASPHALT PAVEMENT CONSTRUCTION DETAILS 2 TANK BURY CHART NOT TO SCALE 1/2" RADIUS AT EDGE OF SLAB (TYP.) TACK COAT 10" THICKEyj EDGE (TYP.) I I I I I I I I I I I I I I I I STRUCTURAL MATERIAL COMPACTED TO 959. OR 6' OVER EXCAVATED, SEE THIS SHEET SCARIFIED AND RECOMPACTED FOR PAVEMENT SUBGRADE (TYPICAL) REFER TO SECTION DETAILS SOIL. ENGINEER'S RECOMMENDATIONS FOR SITE PREPARATION. TYPICAL JOINT SECTION AT 3 CONCRETE AND ASPHALT NOT TO SCALE CONSTRUCTION JOINTS MUST BE APPROVED BY OWNER'S ENGINEER. PLACE WHEN CONTINUOUS POUR OPERATIONS ARE SUSPENDED FOR MORE THAN 30 MINUTES. 4 COLD JOINT NOT TO SCALE 4- (MIN.) COMPACTED DEPTH 1. 1 - WSDOT HOT MIX ASPHALT A 1/2 -INCH CLASS 0 o g 00 0 8" (MIN.) COMPACTED o °00000 0 00 0 00 °•8°00000 0 °00 �00 DEPTH CRUSHED ROCK BASE (CRB) 12" MINIMUM STRUCTURAL FILL.-G G ° SEE SOILS REPORT FOR OVEREXCAVATION REQUIREMENTS. 5 TYPICAL PAVEMENT SECTION NOT TO SCALE CONCRETE SLAB CONCRETE CURB SLOPE v �_F I I CONCRETE POST FOOTING, SEE TANK PLANS Profile View . 6 4" THICK CEMENT CONCRETE. SET TOP ELEVATION TO MATCH TOP OF ADJACENT CURB C�j, CONCRETE CURB Plan View 6 VENT RISER PAD DETAIL NOT TO SCALE .ry EXPANSION JOINT WHERE EDGE ABUTS 6" WIDE STEEL PUMP ISLAND OR TANK SLAB (TYP) TROWEL FINISH 4 U o al SLOPE � SLOPE 7 CONCRETE GUTTER W /6 "x6 "x10" W.W.M. - 8" MINIMUM AGGREGATE BASE SUBGRADE. PREPARATION OF SUBGRADE SHALL BE PI PROCEDURES OUTLINED IN SOILS REPORT LIFT POCKET 12 Y." - I4 TANK BURY CALCULATIONS SCREW 1 N.C. SOCKET HD Yo-" LONG Y' A.C. M FURTHEST (BRONZE DESCRIPTION 18" 18" ISLAND N N N (PRODUCT) 1. ELEVATION AT TOP OF ISLAND (PER PLAN) Ys" x 2" 30.12 2. PIPING FALL = [(L) x 1/8" PER FT.)] IU Oi 12 O = [(L) x 0.0104] 6" CONCRETE O WHERE L (VAP.) = = (PER PLAN) a n 2,29 FT. 3. PUMP ISLAND (6 IN.) 0 0 0 CONC. DRIVE SLAB (6 IN.) PIPE COVER (12 IN.) ARCHITECTURAL PLANS. PIPE DIAMETER (3 IN.) U TANK CONNECTIONS (9 IN.) J i= TOTAL 36 IN., OR 3.00• 3.00 FT. 4. GRADE DIFFERENTIAL (42 + 43) = #4 O 5.29 FT. 5. TOP OF TANKS AT LOWEST POINTS (b1 - 44) = #5 24.83 6. TOP OF SLAB ELEV. ABOVE TANKS 0 SLOPE o SLOPE SLOPE 28.57 LOWEST ELEVATION (PER PLANS) 7. DEPTH OF BURY (j)6 - 45) = ((7 3.74' NOTE: MINIMUM BURY DEPTH = 4.0' SINCE ( #7) < 4.0', SET TOP OF TANKS N 0 46 (28.57) - 4.00' = 24M 2 TANK BURY CHART NOT TO SCALE 1/2" RADIUS AT EDGE OF SLAB (TYP.) TACK COAT 10" THICKEyj EDGE (TYP.) I I I I I I I I I I I I I I I I STRUCTURAL MATERIAL COMPACTED TO 959. OR 6' OVER EXCAVATED, SEE THIS SHEET SCARIFIED AND RECOMPACTED FOR PAVEMENT SUBGRADE (TYPICAL) REFER TO SECTION DETAILS SOIL. ENGINEER'S RECOMMENDATIONS FOR SITE PREPARATION. TYPICAL JOINT SECTION AT 3 CONCRETE AND ASPHALT NOT TO SCALE CONSTRUCTION JOINTS MUST BE APPROVED BY OWNER'S ENGINEER. PLACE WHEN CONTINUOUS POUR OPERATIONS ARE SUSPENDED FOR MORE THAN 30 MINUTES. 4 COLD JOINT NOT TO SCALE 4- (MIN.) COMPACTED DEPTH 1. 1 - WSDOT HOT MIX ASPHALT A 1/2 -INCH CLASS 0 o g 00 0 8" (MIN.) COMPACTED o °00000 0 00 0 00 °•8°00000 0 °00 �00 DEPTH CRUSHED ROCK BASE (CRB) 12" MINIMUM STRUCTURAL FILL.-G G ° SEE SOILS REPORT FOR OVEREXCAVATION REQUIREMENTS. 5 TYPICAL PAVEMENT SECTION NOT TO SCALE CONCRETE SLAB CONCRETE CURB SLOPE v �_F I I CONCRETE POST FOOTING, SEE TANK PLANS Profile View . 6 4" THICK CEMENT CONCRETE. SET TOP ELEVATION TO MATCH TOP OF ADJACENT CURB C�j, CONCRETE CURB Plan View 6 VENT RISER PAD DETAIL NOT TO SCALE .ry EXPANSION JOINT WHERE EDGE ABUTS 6" WIDE STEEL PUMP ISLAND OR TANK SLAB (TYP) TROWEL FINISH 4 U o al SLOPE � SLOPE 7 CONCRETE GUTTER W /6 "x6 "x10" W.W.M. - 8" MINIMUM AGGREGATE BASE SUBGRADE. PREPARATION OF SUBGRADE SHALL BE PI PROCEDURES OUTLINED IN SOILS REPORT LIFT POCKET 12 Y." - I4 1 r. -i 12 Y4" 14" CAST IRON RING AND COVER L B 2" 45' (1 /6) BEND 1 Pe �P �o^ 5 45' (1 /8) BEND 2' -0" SAND OR EXPANDABLE FOAM WATER TIGHT PLUG PIPE MATERIAL AS SPECIFIED BY THE ENGINEER NOTES. 1. 8' AND 6` CLEANOUTS ON SEWER MAINS SHALL BE EAST JORDAN IRON WORKS. INC. No. 3698 OR EQUAL. CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY. 2. IN UNIMPROVED AREAS, POUR A 1' -0" THICK, 2' -0" SQUARE CONCRETE. CLASS 3000, PAD AROUND THE RING AND COVER. CIS PUBUC WORKS 8 OR 8 INCH CLEAN-OUT �' PLAN -'1 C_- DEPARTMENT FOR SANITARY SEWER MAINS SEPTEMBER 2011 8 CLEAN -OUT DETAIL NOT TO SCALE 7/2 RFINISHED GRADE NEW PAVEMENT - -- EXPANSION JOINT AT 20' INTERVALS 73 4" 9 CEMENT CONCRETE BARRIER CURB NOT TO SCALE 14AV��2 r- 0 U 0 _ Zs � Qy, 4<r7A'G EN G\NE0 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251 -6222 (425)251 -8782 FAX CIVIL ENGINEERING. LAND PLANNING, SURVEYING. ENVIRONMENTAL SERVICES U N6 T ca U � a= 0 Ci O> U O) nn� jt p\nonn 0 Y WLlnn 111 0 'A LION 'co: IiEL� I- -ISM 28527 -30 r� << y SCREW 1 N.C. SOCKET HD Yo-" LONG Y' A.C. M M (BRONZE OR S5.) 18" 18" W N N N L N F t Ys" x 2" RA ISED D PADS N N IU Oi O m O 6" CONCRETE O a n CLASS 3000 1 r. -i 12 Y4" 14" CAST IRON RING AND COVER L B 2" 45' (1 /6) BEND 1 Pe �P �o^ 5 45' (1 /8) BEND 2' -0" SAND OR EXPANDABLE FOAM WATER TIGHT PLUG PIPE MATERIAL AS SPECIFIED BY THE ENGINEER NOTES. 1. 8' AND 6` CLEANOUTS ON SEWER MAINS SHALL BE EAST JORDAN IRON WORKS. INC. No. 3698 OR EQUAL. CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY. 2. IN UNIMPROVED AREAS, POUR A 1' -0" THICK, 2' -0" SQUARE CONCRETE. CLASS 3000, PAD AROUND THE RING AND COVER. CIS PUBUC WORKS 8 OR 8 INCH CLEAN-OUT �' PLAN -'1 C_- DEPARTMENT FOR SANITARY SEWER MAINS SEPTEMBER 2011 8 CLEAN -OUT DETAIL NOT TO SCALE 7/2 RFINISHED GRADE NEW PAVEMENT - -- EXPANSION JOINT AT 20' INTERVALS 73 4" 9 CEMENT CONCRETE BARRIER CURB NOT TO SCALE 14AV��2 r- 0 U 0 _ Zs � Qy, 4<r7A'G EN G\NE0 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251 -6222 (425)251 -8782 FAX CIVIL ENGINEERING. LAND PLANNING, SURVEYING. ENVIRONMENTAL SERVICES U N6 T ca U � a= 0 Ci O> U O) nn� jt p\nonn 0 Y WLlnn 111 0 'A LION 'co: IiEL� I- -ISM 28527 -30 r� << y n M M M M M x 18" 18" W N N N N N F t N N IU Oi O m O N O a n o 0 0 0 0 ARCHITECTURAL PLANS. U J i= a C O O O O SLOPE o SLOPE SLOPE p M N (n O ASPHALT OR (n CONCRETE 6" WIDE STEEL PAVEMENT (TYP.) TROWEL FINISH W 3' � NOTE: SEE SHEET Al FOR MATCHING OF CONTROL JOINTS CONCRETE SWALE DETAIL NOT TO SCALE 3' -8" V_8" PAINT (2) COATS iO TRAFFIC LINE YELLOW ON -SITE n DIRECTIONAL ARROW 11 NOT TO SCALE Scole. Rm373706 Disk File: 13245 -07- 1 3.dw Model: ° 0 Address: v1 431 RAINIER AVENUE SOUTH N RENTON, WA 98057 '^ CTLY OF RENTON Approved by: Date: CONSTRUCTION DEEALS c FRED MEYER d Approved by: Date: FUELNG FACLITY Permit No. U13001730 r Approved by: Date: Drawing Na.: g 7 1T 1 0 Approved by: Date: C/ o 1 1 O d y n ` °J 17 w x 18" 18" n O r "> � w O N � CONCRETE SLAB AND x Y z REINFORCING PER ARCHITECTURAL PLANS. J i= a SLOPE SLOPE o SLOPE SLOPE p M N o e d l= t W t VI M rc Q ¢ 0,a�Q ,,�� `0 0 01' Wa o a a m m a a 0 Ix /\ � \/� M \ v FLOWLINE OF CONCRETE SWALE NOTE: Project N: 13245 Store 4'00459 1. INSTALL EXPANSION JOINTS 0 6" MIN. AGGREGATE BASE AND SUBGRADE 20' -0" O.C. MAX. PREPARE AND CONSTRUCT SAME AS BASE 2. SEE SHEET Al FOR MATCHING Designed By: CMT AND SUBGRADE PER PAVEMENT SECTION OF CONTROL JOINTS Drawn By: RDC INTEGRAL CONCRETE SWALE DETAIL w Checked By. JH �p Dote: 9.7.2012 NOT TO SCALE (AT CANOPY) Scole. Rm373706 Disk File: 13245 -07- 1 3.dw Model: ° 0 Address: v1 431 RAINIER AVENUE SOUTH N RENTON, WA 98057 '^ CTLY OF RENTON Approved by: Date: CONSTRUCTION DEEALS c FRED MEYER d Approved by: Date: FUELNG FACLITY Permit No. U13001730 r Approved by: Date: Drawing Na.: g 7 1T 1 0 Approved by: Date: C/ o 1 1 O d y n ` °J 17 w as = A n O r "> � w O