HomeMy WebLinkAboutContract J
CAG-06-097
ADDENDUM #26
GENERAL TERMS and CONDITIONS
For Sharing of Fiber Optic Installation Projects
`le)`fv9 0�7 t&-362. SsG��y- cam
&5 1781717
WHEREAS, the City of Bellevue, the City of Kirkland, the Lake Washington
School District, the University of Washington, the Bellevue School District and
Evergreen Hospital (the Participating Agencies) have entered into the General Terms
and Conditions for Sharing of Fiber Optic Installation Projects, and;
WHEREAS, the Participating Agencies desire to enter into a Fiber Optic Project
Agreement for a planned Fiber Optic Project, and;
WHEREAS, the City of Renton desires to participate in the planned Fiber Optic
Project and future Fiber Optic Projects but cannot because it is not a Participating
Agency subject to the General Terms and Conditions for Sharing of Fiber Optic
Installation Projects, and;
WHEREAS, Renton School District desires to participate in the planned Fiber
Optic Project and future Fiber Optic Projects but cannot because it is not a Participating
Agency subject to the General Terms and Conditions for Sharing of Fiber Optic
Installation Projects, and;
WHEREAS, the current Participating Agencies desire to amend the General
Terms and Conditions for Sharing of Fiber Optic Installation Projects to add the City of
Renton and Renton School District each separately and individually, as a Participating
Agency for participation in the planned Fiber Optic Project and future Fiber Optic
Projects;
NOW THEREFORE, the parties hereby agree as follows:
1) All terms in this Addendum shall have the same meaning as the defined
terms in the General Terms and Conditions for Sharing of Fiber Optic Installation
Projects.
2) The City of Renton hereby acknowledges that it has read, understands
and accepts the General Terms and Conditions for Sharing of Fiber Optic Installation
Projects, hereby incorporated by reference as if fully set forth, and agrees to be bound
by them.
3) Renton School District hereby acknowledges that it has read, understands
and accepts the General Terms and Conditions for Sharing of Fiber Optic Installation
Projects, hereby incorporated by reference as if fully set forth, and agrees to be bound
by them.
1
"``� �.r► CAG-06-097
4) As provided in Section IX, paragraph N, the current Participating Agencies
hereby amend the General Terms and Conditions for Sharing of Fiber Optic Installation
Projects to add the City of Renton and Renton School District each separately and
individually, as a Participating Agency, and the City of Renton and Renton School
District each separately and individually, by executing this agreement, consents to
becoming a Participating Agency.
IN WITNESS WHEREOF, the parties hereto have executed this Addendum to
the General Terms and Conditions For Sharing of Fiber Optic Installation Projects on
the respective dates indicated below.
Approved as to Form:
David ams Date City Attorney
City Manager, City of Kirkland
Approved as to Fo
Steve Sarkozy Date X4oVLWfy Attorne
City Manager, City of Bellevue
1�1& /-'Y'I)o to
Weldon Ihrig Date
Executive Vice President
University of Washingt
Barbara Posthumus Date
Coordinator Business Services
Lake Washington School District
C111 40
'T`erry-Hst�iah.I4.�r�� Date
Chief Information Officer
Evergreen Hospital
2
CAG-06-097
P O�
McLeod E 5 ate
erector, Facilities 7nd f orm tion Services
Bellevue School District
Ap d as t or
Kathy K Iker Date City Attorney awrence J. warren
Mayor
City of Renton -- At/test:
4 W-azt :-
Bonnie I. alton, City Clerk
7:Bt t_- j U�-�- J 5-25- 0 6
Bill Hulten Date
Chief Technology Officer
Renton School District
3
*4000 `""'r CAG-06-097
Jack McLeod Date
Director, Facilities and Information Services
Bellevue School District
Appr as to F rm:
Kathy Ke6lker Date ity Attorney - ence J. Warren
Mayor
City of Renton -- Attest:
�• LIJGLQ�r-
Bonnie I. Walton, City Clerk
ic- 1- VLtate° 5 -Zs' 06
Bill Hulten Date
Chief Technology Officer
Renton School District
3
1658-RES N OR ! G I N
11/15/2006
CITY OF BELLEVUE, WASHINGTON
RESOLUTION NO. 7477
A RESOLUTION authorizing the City Manager or his
designee to sign an addendum to that existing Interlocal
Agreement between cities for sharing of fiber optic
installation projects adding the City of Renton and the
Renton School District as participating agencies.
THE CITY COUNCIL OF THE CITY OF BELLEVUE, WASHINGTON, DOES
RESOLVE AS FOLLOWS:
Section 1. The City Manager or his designee is hereby authorized to sign an
addendum to that existing Interlocal Agreement between cities for sharing of fiber
optic installation projects (Clerk's Receiving No. 3q&07 ) adding the City of
Renton and the Renton School District as participating agencies, a copy of which
addendum has been given Clerk's Receiving No.
Passed by the City Council this //VA' day of �r� 1i , 2006,
and signed in authentication of its passage this 11YA day of
2006.
(SEAL)
Grant S. be'gAer, Mayor
Attest:
Myrna C. Basich, City Clerk
i
GENE RALTERMS and C0NDITIONS
Interlocal Agreement
For Sharing of Fiber Optic Installation Projects
"11w t
TABLE OF CONTENTS
L RECITALS I
If PURPOSE OFAGREEMENT 2
III. DEFINITIONS 2
IV. RELATIONSHIPSAMONGPARTICIPATINGAGENCIES 6
A. PRINCIPLES 6
B. TERM 7
C. FIBER OPTIC PROJECT 7
D. GENERAL PLANNING, ENGINEERING AND DESIGN CONSIDERATIONS 9
E. CHANGES 12
F. ALLOCATION AND OWNERSHIP OF FIBER OPTIC CABLE 12
G. USE OF FIBERS 13
H. SALE OF FIBERS 13
I. PARTICIPATING AGENCIES RIGHT OF FIRST REFUSAL 13
J. FUTURE USE OF FIBER OPTIC CABLE ALREADY OWNED BY INDIVIDUAL PUBLIC
AGENCIES 15
K. TAXES 15
L. PAYMENTS 16
V. LEAD AGENCYRESPONSIBILITIES 16
A. GENERAL RESPONSIBILITY OF LEAD AGENCY 16
B. AGREEMENTS,APPROVALS,PERMISSIONS AND PERMITS 17
C. NOTICE OF INSTALLATION AND TESTING 17
D. MAINTENANCE AND REPAIR RESPONSIBILITIES 18
E. FINANCIAL REIMBURSEMENTS AND OTHER PAYMENTS TO BE PROVIDED TO THE
LEAD AGENCY 19
F. LEAD AGENCY'S NONCOMPLIANCE 20
G. AUDIT 20
VI FACILITY OWNER RIGHTS AND RESPONSIBILITIES 20
A. PRINCIPLES FOR USE OF PARTICIPATING AGENCY FACILITIES 21
B. APPROVALS 21
C. ACKNOWLEDGMENT AND ACCEPTANCE OF RISKS 22
D. ACCESS TO AND USE OF FACILITIES 22
E. BUILDING ENTRANCES 23
i
Terms and Conditions for Sharing of Fiber Optic Installation Projects April 24,2006
F. MODIFICATIONS TO FACILITIES 24
G. RELOCATION OF FIBER OPTIC CABLE 25
H. RIGHTS OF PROPERTY 26
I. DEFAULT AND DISPUTE RESOLUTION 26
VII RELATIONSHIP BETWEEN LEAD AGENCYAND CONTRACTORS 28
A. RESPONSIBILITY 28
B. APPROVALS 28
C. INSURANCE 28
VIII. IADEMNIFICATIONAAID LIMITATION OFLUBILITY 29
A. LIMITATION OF LIABILITY AND INDEMNITY—LEAD AGENCY 29
B. LIMITATION OF LIABILITY AND INDEMNITY—FACILITY OWNERS 30
C. LIMITATION OF LIABILITY AND INDEMNITY—PARTICIPATING AGENCIES 31
LK ADDITIONAL TERMS A"CONDITIONS 32
A. LAWS,LICENSES,AND PERMITS 32
B. PERFORMANCE 32
C. SUBJECT TO LAWS 33
D. FORCE MAJEURE 34
E. NO WAIVER 34
F. SEVERABILrFY 35
G. RIGHTS CUMULATIVE 35
H. CONTRACTUAL RELATIONSHIP 36
I. HEADINGS 36
J. APPLICABLE LAW AND VENUE 36
K. BINDING EFFECTS 36
L. ASSIGNMENT 37
M. NOTICES 37
N. MODIFICATION OR AMENDMENT 37
O. EXECUTED IN COUNTERPARTS 37
P. SUPERCEDES CITY OF KIRKLAND FRANCHISE 37
Exhibit A I
ii
Terms and Conditions for Sharing of Fiber Optic Installation Projects April 24,2006
Vow
I. RECITALS
WHEREAS,the Lake Washington School District plans to construct a fiber optic
network among its schools for the purpose of improving overall learning and
achievement by increasing the availability and diversity of training and
educational material; and
WHEREAS,the City of Kirkland requires a fiber optic network amongst its'
facilities to provide services to its constituents, for traffic including but not limited
to: traffic, SCADA systems,economic development, business support, and
WHEREAS,the City of Kirkland and the City of Bellevue desire a direct fiber
connection,to enhance internal governmental cooperation and extend
communications to other local governments,achieve efficiencies through shared
resources, and
WHEREAS,the University of Washington desires a path North to South through
the City of Kirkland, and
WHEREAS,each of the Parties have a portion of what is required to build a fiber
network but do not want to duplicate efforts,and
WHEREAS,the Parties and their respective `citizens' have a vested interest in
supporting and improving educational opportunities, community communications;
and infrastructure, and
WHEREAS,the City of Kirkland, City of Bellevue,and the University of
Washington have conduit plant available that can serve all the Parties; and
WHEREAS,the Lake Washington School District has signed the City of
Kirkland's Franchise Agreement allowing the Lake Washington School District
use of the City of Kirkland's Right of Way.
Therefore the parties agree as below.
H. PURPOSE OF AGREEMENT
This interlocal agreement outlines how the parties will work together on fiber
optic projects for the benefit of all the Parties. This document also outlines the
roles and responsibilities of all the Parties and use of the fiber cables today and
into the future.
1
Terms and Conditions for Sharing of Fiber Optic Installation Projects
III. DEFIMTIONS
Whenever used in this Agreement with initial letters capitalized,the following terms shall have the
following specified meanings,unless the context clearly requires a different meaning:
A. Agreement
Refers to this document, General Terms and Conditions for sharing fiber optic projects
B. Building Entrance
Conduit or Conduits usually connecting a Vault,Handhole,or Maintenance Hole in the
public right-of-way to a building.
C. Common Fiber Spares
Fiber strands installed as part of a Fiber Optic Project held in reserve solely for replacement
of disabled fibers.
D. Conduit or Duct
Enclosed runway or tube designed to house cables for their protection.
E. Dark Fiber
An optical fiber strand not coupled to an optical light source.
F. Demarcation Point
A point agreed to between the facility owner and lead agency that documents where one
party's responsibilities end and the other begin and is required to be documented,agreed to
and approved in the Fiber Optic Project Agreement.
G. Indirect Costs
Indirect costs are costs determined in accordance with a Participating Agency's standard
methodology for computing indirect costs. Indirect costs shall include costs of labor,
benefits,equipment usage,miscellaneous materials,material handling,and administrative
and general charges. This definition also applies to Facility Owner indirect costs.
H. Facility or Facilities
A structure including but not limited to: Buildings,Vaults,Maintenance Holes, Handholes,
Conduit, Building Entrances.
I. Facility Manager
The person designated by the Facility Owner to manage the Facility,including granting
access,determining and approving its use and terms and conditions for such use.
2
Terms and Conditions for Sharing of Fiber Optic Installation Projects
`111I�
J. Facility Owner
The Participating Agency that is the legal owner of a Facility or Facilities or the
Participating Agency holding the legal right to grant permission to occupy,use or modify
Facilities.
K. Fiber Optic Cable
A cable installed by the Participating Agencies pursuant to this Agreement that is composed
of strands of glass fiber,each strand which is designed to conduct signals of modulated light
(optical signals)from one end to the other.
L. Fiber Optic Project
The Work associated with the installation of fiber optic transmission materials,pursuant to
a Fiber Optic Project Agreement.
M. Fiber Optic Project Agreement
An agreement for a specific Fiber Optic Project with Participating Agencies that specifies
the contractual relationships between and among the participants.
N. Fiber Strand or Strand of Fiber
A single thin transparent fiber of glass enclosed by a material of a lower index of refraction
that reflects light throughout its length by internal reflections.
O. Handhole
An underground structure(usually concrete)providing an opening in a Conduit in which
workers may reach into but usually do not enter for the purposes of installation and
maintenance of cable.
P. Lead Agency
The Participating Agency designated by mutual consent in a Fiber Optic Project Agreement
that is responsible for managing Fiber Optic Project related Work, including entering into
construction contracts and overseeing the construction work for the Participating Agencies
and ongoing maintenance of the Fiber Optic Project(s).
Q. Make-Ready Work
Any and all planning,analysis,design,review, adjustment to equipment,construction,
and/or other activities(such as tree trimming)necessary to prepare existing Facilities for use
by the Lead Agency as determined by the Facility Owner.
R. Participating Agency
A public agency that is a signatory to this Agreement for the purpose of engaging in the
shared Fiber Optic Project(s).
S. Participating Agency Facilities
Those Facilities owned,managed,occupied,by a Participating Agency Department or
Division.
T. Pathway
Aerial or underground Facilities used for the purpose of placing fiber optic cables, splice
cases,trace wire,etc.
U. Project Budget(s)
3
Terms and Conditions for Sharing of Fiber Optic Installation Projects
A required section of all Fiber Optic Project Agreements which identifies the total
anticipated costs for Work performed as part of that agreement,including contingency,and
allocates responsibility for those costs,including ongoing maintenance,to all parties to that
Fiber Optic Project Agreement.
V. Splice
The point where two separate optical fiber strands are joined together either mechanically or
by fusion to make one continuous optical fiber strand.
W. Telecommunications Services)
Telecommunications service(s)is the transmission of information over Fiber Strands from
one location to another(not including services provided between two areas within the same
building)meeting industry accepted transmission standards,their equivalent or replacement
service. Such information includes but is not limited to voice,video,data,pictures,and
facsimile. Telecommunication service(s)does not include Dark Fiber or services other than
transmission services.
X. Work
All activities related to the planning,right-of-way acquisition,scheduling,analysis,design,
engineering,preparation,construction,installation,evaluation,maintenance,repair and
operation of a Fiber Optic Project as provided for in this Agreement or a Fiber Optic Project
Agreement including Make-Ready Work but not including work done prior to the execution
of a Fiber Optic Project Agreement.
4
Terms and Conditions for Sharing of Fiber Optic Installation Projects
IV. RELATIONSHIPS AMONG PARTICIPA'T'ING AGENCIES
A. PRINCIPLES
Agreements among the Participating Agencies for sharing of Fiber Optic
Projects shall conform to the following principles:
1. Participation in Fiber Optic Projects is voluntary and can depend on
specific cable routes.
2. Arrangements for cooperation should be fair and equitable among
Participating Agencies. Any special configuration, such as a routing
change to accommodate a particular Participating Agency, should be
paid for in whole by that Participating Agency.
3. If a Facility Owner requires a route change due to the requirements for
optimal Facility access,the costs of such a change shall be considered
general project costs of the affected Participating Agencies and not the
sole responsibility of the Facility Owner as a Participating Agency.
4. Participating Agencies may have varying amounts of financial and other
responsibilities on different projects. One or more Fiber Optic Project
Agreement(s)will define and document those responsibilities. As a
general principle Participating Agencies should share maintenance
proportionately based on each Participating Agency's share of the Fiber
Strands deployed or as described in the Fiber Project Agreement(s).
5. Participating Agencies may,from time to time,act variously and
simultaneously as Lead Agencies and/or Facility Owners.
6. The Lead Agency for a specific Fiber Optic Project may be changed with
the mutual consent of all Participating Agencies that are party to that
specific Fiber Optic Project.
B. TERM
This Agreement shall become effective upon the execution of all
Participating Agencies,and unless terminated sooner in accordance with the
provisions of this Agreement, shall continue for a period of ten(10)years,
and automatically renew for an additional ten(10)years upon the agreement
of the parties.
5
Terms and Conditions for Sharing of Fiber Optic Installation Projects
,%✓
As a starting point for negotiations of a renewal Agreement,the
Participating Agencies will use this Agreement as the fiamework for further
negotiations. Under the terms of any renewal agreement,the Participating
Agencies shall continue to make payments as specified in any applicable
Fiber Optic Project Agreement(s).
C. FIBER OPTIC PROJECT
All Fiber Optic Projects among Participating Agencies shall have a Fiber
Optic Project Agreement specifying the following; including contact names
and addresses where appropriate.
- Participating Agencies
- Lead Agency and Project Manager
- Route
- Facilities to be Used; Facility Owners; and the Facility Manager(s)
- Project Budget, including Contingency and Terms of Cost Sharing
- Apportionment of Liability
- Project Schedule
- Changes or Addenda to General Terms and Conditions
- Bond and Insurance Requirements for Contracting and Participating
Agencies
- Fiber Allocation including Spares.
- Maintenance Responsibilities and Costs,including Ongoing
Maintenance and Responsibilities for Moves.
- Points of Demarcation
Each Fiber Optic Project Agreement shall be an attachment to and run
concurrent with this Agreement,General Terms and Conditions For Sharing
of Fiber Optic Installation Projects Interlocal Agreement.
D. GENERAL PLANNING, ENGINEERING AND DESIGN
CONSIDERATIONS
Upon execution of a Fiber Optic Project Agreement,the Participating
Agencies shall develop,review and/or revise the planning,engineering,
design,installation,and maintenance procedures for the Fiber Optic Project.
The procedures will be subject to the approval of the Participating Agencies
and of the Facility Owners as specified in Section IV and in related Exhibits
and Addenda. The procedures will be substantially similar to the following:
1. Perform Feasibility Review
A Participating Agency with an interest in a shared Fiber Optic
6
Terms and conditions for sharing of Fiber Optic Installation Projects
Project will undertake a feasibility review to determine which of the
Participating Agencies has an interest in participating in the Fiber
Optic Project,the possible routes,the availability of Facilities,the
approximate cost and the time frame required for installation.
Prospective Facility Owners shall be included in the feasibility
review process.
2. Execute Fiber Optic Project Agreement
The Fiber Optic Project Agreement must ensure that approval by the
appropriate authority is granted for Facilities to be used and shall
specify the information listed in Section W.C.
3. Perform Detailed Engineering Design
The Lead Agency shall work with Facility Owners to complete
routing,obtain permission for use of Facilities,etc. Any changes
exceeding the approved Project Budget(see definitions above) shall
require approval by the Participating Agencies;such approval shall
not be unreasonably withheld.
4. Install Project
The Lead Agency shall be responsible to ensure compliance with all
reasonable requirements of the Facility Owner.
Facility Owner staff shall be authorized to stop Work on an
installation that is being conducted by the Lead Agency and its
contractors on the Fiber Optic Project if Facility Owner or
Participating Agency reasonably determines that the Work in
question is inadequate,unsafe or would or could potentially cause a
problem.
5. Complete Acceptance of Fiber Optic Project
The Lead Agency shall formally accept installation of the Fiber
Optic Project by issuing a formal letter to the contractor(s)and the
Participating Agencies stating that the Work has been completed in
accordance with contract specifications,final test documentation has
been received,and all punch-list items have been resolved to the
satisfaction of the Lead Agency and Facility Owner(s). Such
acceptance shall authorize final payment(s)to contractor(s). The
Lead Agency shall also document and identify ownership of Fiber
Strands,providing a copy of such documentation to all Participating
7
Terms and Conditions for Sharing of Fiber Optic tnstanation Projects
Agencies.
6. Establish Maintenance Plan
The Lead Agency shall develop a maintenance plan for the Fiber
Optic Project,and upon acceptance of the maintenance plan by the
Participating Agencies,the Participating Agencies will, by mutual
consent,appoint a maintenance manager,usually the Lead Agency.
7. Keep Records
The Lead Agency shall provide Participating Agencies and/or
Facility Owners with whatever documents are required by the
Facility Manager(s)so Facility Owner(s)can maintain accurate
records of where and how the Participating Agencies installed
equipment within or on Facilities,and where and how the
Participating Agencies modified any Facility. Among the materials
that must be provided to Facility Owner are computerized records
and archival quality drawings that document installation or
modification Work performed by the Lead Agency or its contractors.
The Lead Agency shall not charge the Facility Owner for providing
any necessary documentation required by the Facility Manager.
Such costs,however,shall be included as part of the Project Budget
(see definitions above).
8. Provide Access to Records
All Participating Agencies shall provide access to relevant records
with respect to design,installation and maintenance of components
of the Fiber Optic System located within or on Facilities to Facility
Owner(s)when requested by the Facility Manager(s). The
Participating Agencies shall not charge the Facility Owner for either
access to,such information or for obtaining copies of any portion of
the information. Such costs,however,shall be included as part of
the Project Budget. The records to which the Participating Agengies
shall provide the Facility Owner access include,but are not limited
to computerized records and design drawings,equipment and fiber
specifications,route maps,manufacturer's test reports on fibers and
on other equipment,documentation of the installation of Fiber Optic
Cable and other equipment,and documentation of maintenance done
on fibers and other equipment.
8
Terms and Conditions for Sharing of Fiber Optic Installation Projects
E. CHANGES
Participating Agencies shall have the right to propose changes to the Fiber
Optic Project Agreement which must first be approved by all Participating
Agencies,including replacing the;Lead Agency and adjusting Project
Budgets. Changes that impact Facility Owners shall be subject to approval
by the Facility Owners.
The costs of any changes proposed by and beneficial to an individual
Participating Agency made after the signing of a Fiber Optic Project
Agreement shall be borne by that Participating Agency. However,if a
Facility Owner requires a route relocation due to the requirements for
optimal Facility access,the costs of such a relocation shall be considered
general project costs and not the sole responsibility of the Facility Owner as
a Participating Agency. The costs of other changes that are approved by the
Participating Agencies because they are deemed necessary to complete the
Fiber Optic Project shall become part of the total project cost.
F. ALLOCATION AND OWNERSHIP OF FIBER OPTIC CABLE
All Fiber Optic Cable and Fiber Strands installed as part of a Fiber Optic
Project shall be allocated to the individual Participating Agencies as
specified in the Fiber Optic Project Agreement. The Participating Agencies
shall own all right and title to these allocated Fiber Strands.
G. USE OF FIBERS
A Participating Agency shall have complete free and unrestricted use of the
Fiber Strands installed and allocated to it under a Fiber Optic Project
Agreement for any lawful purpose subject to applicable agreements,
approvals,permission and permits.
Common Fiber Spares,if provided for in a Fiber Optic Project Agreement,
shall be shared in common among the Participating Agencies only.
Identified Common Fiber Spares shall be used only as replacements for
disabled Fibers Strands unless documented and agreed to in a Fiber Optic
Project Document. Use of spare fibers shall be implemented by the Lead
Agency,with notification to all Participating Agencies.
H. SALE OF FIBERS
Participating Agencies who wish to sell or otherwise transfer their allocated
fibers to any other party must obtain written and unanimous approval from
9
Terms and Conditions for Sharing of Fiber Optic Installation Projects
"\rr two
all Participating Agencies,whom are also granted right of fast refusal
regardless of circumstances of the sale.
1. PARTICIPATING AGENCIES RIGHT OF FIRST REFUSAL
Before any allocated fibers held by a Participating Agency may be sold or
otherwise transferred(including transfer by gift or operation of law),the
other Participating Agencies,either individually or collectively, shall have a
right of first refusal to purchase the Shares on the terms and conditions set
forth in this section.
(a) Notice of Proposed Transfer. The selling Participating Agency shall
deliver to all Participating Agencies a written notice Notice stating: (i)the
bona fide intention to sell or otherwise transfer such allocated fibers; (ii)the
name of each proposed purchaser or other transferee; (iii)the number of
fibers to be transferred to each proposed transferee; (iv)the bona fide cash
price or other consideration for which the selling Participating Agency
proposes to transfer the allocated fibers and the material terms and
conditions of the proposed transfer(the "Offered Terms")and(b)offer the
allocated fibers at the Offered Terms to the other Participating Agencies.
(b) Exercise of Right of First Refusal. At any time within 60 days after
receipt of the notice,the other Participating Agencies,either individually or
collectively,may,by giving written notice to the selling Participating
Agency,elect to purchase all,but not less than all,of the allocated fibers
proposed to be transferred to any one or more of the proposed transferees,at
the purchase price and on the terms determined in accordance with
subsection(c)below.
(c) Purchase Price. The purchase of the allocated fibers by the other
Participating Agencies,either individually or collectively,under this section
shall be identical in all material respects to the Offered Terms.
(d) Payment. Payment of the purchase price shall be made in accordance
with the Offered Terms,within ninety(90)days after delivery of the written
notice by the other Participating Agencies, either individually or collectively,
as set forth in(b)above.
(e) Right to Transfer. If all allocated fibers proposed in the notice to be
transferred to a given proposed transferee are not purchased by the other
Participating Agencies,either individually or collectively,the Participating
Agency may sell or otherwise transfer such allocated fibers to that proposed
transferee,provided that such sale or other transfer is consummated within
10
Tennis and Conditions for Sharing of Fiber Optic Installation Projects
sixty(60)days after the date of the notice and provided further that any such
sale or other transfer is affected in accordance with Offered Terms as
presented to the other Participating Agencies. If the allocated fibers
described in the notice are not transferred to the proposed transferee within
such period,a new notice shall be required and the other Participating
Agencies,either individually or collectively, shall again be offered the Right
of First Refusal before any allocated fibers held by the may be sold or
otherwise transferred.
(f) Any entity purchasing the right to use fibers installed under a Fiber
Optic Project Agreement must agree to all the terms and conditions of this
Agreement,including the General Terms and Conditions,Exhibits and
Addenda as specified in this document and shall notify the Facility Owner(s)
of any such purchase.
Participating Agencies may grant the right to use their fiber allocation to any
other party provided the sale or lease is approved by a majority of the other
Participating Agencies. Such approval shall not be reasonably withheld.
J. FUTURE USE OF FIBER OPTIC CABLE ALREADY OWNED BY
INDIVIDUAL PUBLIC AGENCIES
Nothing in this document precludes Participating Agencies from entering
into separate agreements with other Participating Agencies to utilize fiber
optic cable other than the Fiber Optic Cable installed pursuant to a Fiber
Optic Project Agreement.
K. TAXES
The Participating Agencies shall pay,before delinquency,all applicable
taxes,levies, and assessments arising from their joint installations and
undertakings under a Fiber Optic Project Agreement
L. PAYMENTS
Participating Agencies shall pay all amounts owed to the Lead Agency
within forty-five(45)days of receipt of the billing. If a Participating Agency
cannot or does not make payment for charges owed or if there is a dispute as
to amounts owed the such dispute shall be resolved through the process
identified in this Agreement.
If the Participating Agency fails to make payment as required,then its
11
Terms and Conditions for Sharing of Fiber Optic Installation Projects
allocated Fiber Strands shall become the property of the other Participating
Agencies and those Participating Agencies may either reallocate the Fiber
Strands amongst themselves or sell the Fiber Strands pursuant to the
provision of Section III.H and Section III. I above.
V. LEAD AGENCY RESPONSIBILITIES
A. GENERAL RESPONSIBILITY OF LEAD AGENCY
The Lead Agency shall be responsible for the overall management of the
Work necessary for the successful completion of the Fiber Optic Project, as
the agent of the Participating Agencies in the Fiber Optic Project,pursuant
to the terms and condition of the applicable Fiber Optic Project Agreement.
The Lead Agency shall have the authority and be responsible for negotiating
and entering into such separate contract agreements as are necessary with
Facility Owners for the specific use of their Facilities in furtherance of the
Fiber Optic Project.The Lead Agency will also have the authority to enter
into and manage such separate contract agreements with contractors as are
necessary to perform all or part of the Work associated with the Fiber Optic
Project.
The Lead Agency is responsible for ensuring that all applicable terms and
conditions of the Fiber Optic Project Agreement(s), General Terms and
Conditions,exhibits and addenda are included in the contract agreements
with Facility Owners and contractors.
Prior to execution of any contract agreements with Facility Owners or
contractors,the Lead Agency shall provide an opportunity for the
Participating Agencies to review and comment on such agreements. In the
event there is a dispute regarding any of the provisions or lack of provisions
of any agreement, such dispute shall be resolved through the process
identified in this Agreement.
The Lead Agency shall keep the Participating Agencies informed as to the
status of the Fiber Optic Project.
B. AGREEMENTS,APPROVALS,PERMISSIONS AND PERMITS
The Lead Agency shall be responsible for obtaining all necessary
agreements,approvals,permissions and permits and any other documents
required or necessary for the successful completion of the Fiber Optic
12
Terms and conditions for Sharing of Fiber Optic Installation Projects
Project and to keep them in place and current.
C. NOTICE OF INSTALLATION AND TESTING
The Lead Agency shall notify the Participating Agencies when initial
installation of the Fiber Optic Cable and acceptance testing of all of the
Fiber Strands have been completed.
D. MAINTENANCE AND REPAIR RESPONSIBILITIES
1. Maintenance and Repair of Fiber Optic Cable,Fiber Strands,and
Pathway
Maintenance of the Fiber Optic Cable and Fiber Strands within Fiber
Optic Cable installed pursuant to a Fiber Optic Project Agreement
shall be the responsibility of the Lead Agency as agent for the
Participating Agencies up to the Demarcation Point.Lead Agency
maintenance responsibility shall continue for the term of the Fiber
Optic Project Agreement and for any extensions or renewals.
In instances where service to any of the Participating Agencies has
been interrupted on the Lead Agency side of the Demarcation Point,
the Lead Agency,at the Participating Agencies'request,will make a
reasonable effort to complete repairs of the Fiber Optic Cable as
soon as practicably possible provided that all necessary permissions
to effect the repairs has been obtained from the Facility Owner(s).
Restoration of telecommunications,traffic control,and public safety
services shall be given the highest priority in the event that any of
these services and the Participating Agencies'telecommunications
services are interrupted at the same time,unless otherwise agreed to
by the Participating Agencies at the time of restoration. In the event
of an outage,the Participating Agencies shall promptly work to
restore the functionality of the Fiber Optic Cable as soon as
reasonably possible and practical after restoration of any other
necessary services. The Participating Agencies shall not cut or
otherwise damage Fiber Optic Cable unless absolutely necessary for
the safe and prompt restoration of telecommunications,traffic
control and street lighting systems.
2. Maintenance and Repair Expenses
13
Terns and Conditions for Sharing of Fiber Optic Installation Projects
The Participating Agencies shall be responsible for the expense of
maintenance and repair of the Fiber Optic Cable and Fiber Strands
for the duration of the Fiber Optic Project Agreement and any
extensions or renewals thereof on a basis proportional to the
ownership of Fibers Strands allocated to each Participating Agency
or by such other method as may be specified in the applicable Fiber
Optic Project Agreement(s). The designated maintenance manager
shall review ongoing maintenance expenses with Participating
Agencies as reasonably requested,but at least on an annual basis.
The Lead Agency shall contract with a vendor capable of making
any necessary repairs. The contract shall provide for around the
clock service,defined response times and supply guarantees.
E. FINANCIAL REIMBURSEMENTS AND OTHER PAYMENTS TO BE
PROVIDED TO THE LEAD AGENCY
All reasonable and necessary costs and expenses incurred by the Lead
Agency in performance of any Work to successfully complete a Fiber Optic
Project shall be actual and verifiable. The Lead Agency shall provide
documentation of its methodology for computing any Indirect Costs,
including Indirect Costs for Facility Owners. The Participating Agencies
shall reimburse the Lead Agency within forty-five(45)days of receipt of the
Lead Agency's statement of charges.
F. LEAD AGENCY'S NONCOMPLIANCE
The Lead Agency shall make its best good faith effort to adhere to the terms,
condition and requirements of the Work as provided in the Fiber Optic
Project Agreement,and the required record keeping as provided in this
Agreement. Absent negligence or other misconduct on the part of the Lead
Agency, any additional Work necessary to conform the Work to
requirements of the Fiber Optic Project Agreement will be a general project
cost allocated to the Participating Agencies. Where there has been
negligence or other misconduct on the part of the Lead Agency, and
additional Work is necessary to conform the Work to requirements of the
Fiber Optic Project Agreement shall be at the expense of the Lead Agency.
G. AUDIT
14
Terms and Conditions for Sharing of Fiber Optic Installation Projects
The Lead Agency shall permit Participating Agencies or designated agent(s)
thereof from time to time(including up to five years after the expiration or
termination of a Fiber Optic Project Agreement),to inspect and audit all
pertinent books and records of the Lead Agency,the subcontractors or any
other person or entity in connection with or related to the Fiber Optic Project
with respect to the services provided,costs thereof,and the compensation
paid therefore. Such audit shall occur at such reasonable times and at such
reasonable location(s)as mutually agreed to by the Participating Agencies
and the Lead Agency.
VI. FACILITY OWNER RIGHTS AND RESPONSIBILITIES
A. PRINCIPLES FOR USE OF PARTICIPATING AGENCY FACILITIES
1. Use of and Facilities owned by a Participating Agency shall comply
with all requirements of the Participating Agency that owns them.
Use of a Facility shall be designed and constructed so as to
maximize the reasonable additional future use of such Facility. The
general project costs shall include all fees and charges for the use of
the Facility.
2. This Agreement shall not be construed to authorize any Participating
Agency to make use of any other Participating Agency's Facilities
unless such use is specifically authorized by the Participating
Agency in its capacity as a Facility Owner.
3. The Facility Owner has final approval of planning,engineering,
design,material,and maintenance for all portions of a Fiber Optic
Project on or within its Facilities.
B. APPROVALS
All contractors hired by the Lead Agency to Work within or on Facilities
shall be subject to approval by Facility Owner(s), such approval not to be
unreasonably withheld. In all agreements with contractors,the Facility
Owner(s)may require the Lead Agency to specify that the contractors attend
one or more pre-construction meetings with the appropriate Participating
Agencies and Facility Owners to review installation requirements for the
Work and any restrictions or other requirements that must be adhered to,
prior to any Work being performed in or on Facilities. The contractor
agreement shall state that the Facility Owner or the Participating Agency has
15
Terms and Conditions for Sharing of Fiber Optic Installation Projects
`..r
authority to stop inadequate or unsafe Work or require that inadequate or
unsafe Work be corrected,as provided by this Agreement.
C. ACKNOWLEDGMENT AND ACCEPTANCE OF RISKS
1. Risk of Co-location
In choosing to co-locate any components of a Fiber Optic Project in
any Facilities,the Participating Agencies acknowledge and accept all
risks that are associated with having components of the Fiber Optic
Project co-located with in any such Facility.
2. Easements
Participating Agencies acknowledge that existing easements may not
be sufficient and are not warranted to be available for the purpose of
this Agreement and/or any Fiber Optic Project Agreement.
Additional easements may be required.
D. ACCESS TO AND USE OF FACILITIES
The Lead Agency shall obtain access to and use of Facilities from Facility
Owners for the purpose of installing,maintaining and repairing components
of the Fiber Optic Project,including all agreements,approvals,permissions,
and permits required. Such Access shall be subject to Facility availability as
reasonably determined by the Facility Manager,and any and all reasonable
conditions specified by the Facility Owner.
1. Permission to Enter
Access to Facilities shall be allowed only after the Facility Owner
has been notified per item 2.,below,and permission has been
granted by the Facility Owner.
2. Requests for Access
All requests for access to Facilities must be made through the
appropriate Facility Manager or designee in writing(facsimile or
email acceptable),and shall be subject to the restrictions and
conditions in this Agreement.
16
Terms and Conditions for Sharing of Fiber Optic Installation Projects
In the event of an emergency,requests for access may be made in
person or by telephone.,In such cases,prompt written
documentation of the request will follow.
3. Buildings
If the Lead Agency desires to utilize space in any building,the Lead
Agency shall comply with the restrictions and conditions specified
by the designated building manager.
4. Conformance to Regulations
Access to and use of any Facility shall be in conformance with all
codes, regulations and requirements.
E. BUILDING ENTRANCES
In the event that an existing Building Entrance that is owned or controlled
by one of the Participating Agencies is not usable or is inadequate,unsafe or
would or could potentially cause a problem for either entering a building or
for providing access to the location in a building where the Participating
Agencies have installed Fiber Optic Project components,then the Lead
Agency will have the responsibility for making alternative arrangements for
Building Entrance with the Facility Owner.
The expense associated with any required alternative Building Entrance
because the Existing Building Entrance is not usable or is inadequate,unsafe
or would or could potentially cause a problem for either entering a building
or for providing access to the location in a building where the Participating
Agencies have installed Fiber Optic Project components shall be borne by
the Participating Agencies utilizing the building as a general project cost.
F. MODIFICATIONS TO FACILITIES
At the Lead Agency's request,the Facility Owner shall make reasonable and
necessary modifications to any existing Facilities or the Building Entrance to
facilitate building access for the Fiber Optic Project. Any requests by the
Lead Agency for such modifications shall be made to the Facility Owner
and/or Manager. Costs for such modifications shall be paid as allocated in
the Fiber Optic Project Agreement.
The design and construction of any required modifications to any Facility or
17
Terms and Conditions for Sharing of Fiber Optic Installation Projects
Building Entrance shall be subject to the review and approval by the Facility
Owner and Participating Agencies. Any unauthorized modifications must
be corrected at the expense of the Lead Agency.
G. RELOCATION OF FIBER OPTIC CABLE
The Lead Agency will work with the Facility Owner to make a good faith
effort to ensure that the Fiber Optic Cable within or on Facilities is designed
and constructed so as to minimize the likelihood of future relocation.
However,upon notice from the Facility Owner that relocation is required,
the Lead Agency shall work with the Facility Owner to ensure timely
relocation of such Fiber Optic Cable. The Facility Owner has the right of
pre-approval and post-construction acceptance of any work required either to
remove cable from within or on Facilities or to place cable within or on
alternative Facilities.
1. All relocations of Fiber Optic Cable,regardless of reason,will be
managed by the Lead Agency. All relocations will be managed as a
part of and under the terms and conditions of existing Fiber Optic
Project Agreement that controlled the original construction and
installation.
2. Notice
Except for emergency situations,the Facility Owner will give the
Lead Agency at least ninety(90)days notice of the need to relocate
any components of the Fiber Optic Project located within or on
Facilities.
2. Relocation
When relocation is required,the Facility Owner shall,when possible,
provide substitute Facilities within or on which the Participating
Agencies may relocate the components of the Fiber Optic Project.
H. RIGHTS OF PROPERTY
Nothing in the General Terms and Conditions,Exhibits and/or Addenda
shall be construed to convey to the Participating Agencies any property
rights in existing Facilities of a Facility Owner. Nothing in the General
Terms and Conditions,Exhibits and/or Addenda shall be construed to
18
Terms and Conditions for Sharing of Fiber Optic Installation Projects
compel a Facility Owner to maintain any of its Facilities for a period longer
than is necessary for its own service requirements. In the event that
Facilities are abandoned by the Facility Owner,the Participating Agencies
may remain in such Facilities at their own risk,subject to the approval of the
Facility Owner. Any property rights in Facilities created or constructed as
part of a Fiber Optic Project Agreement will be allocated per the Fiber Optic
Project Agreement.
I. DEFAULT AND DISPUTE RESOLUTION
The Participating Agencies desire,if possible,to resolve disputes,
controversies and claims("Disputes")arising out of this Agreement or any
Fiber Optic Project Agreement without litigation.
To that end,if any Participating Agency believes that another Participating
Agency,whether as a Participating Agency,Facility Owner,or Lead
Agency, has failed to perform any obligation under this Agreement or any
Fiber Optic Project Agreement or has performed such obligation in a manner
inconsistent with this Agreement or any Fiber Optic Project Agreement,
then the Participating Agency shall provide written notice to all Participating
Agencies, stating with reasonable specificity the nature of the Dispute.
Thereafter, each Participating Agency shall appoint a knowledgeable,
responsible management representative to meet within thirty(30)days of the
date of the written notice and negotiate in good faith to resolve any
Dispute.The Participating Agencies intend that these negotiations be
conducted by non-lawyer,business representatives. The discussions shall be
left to the discretion of the representatives.
The Participating Agencies agree that the discussions and correspondence
among the representatives for purposes of these negotiations shall be treated
as confidential information developed for purposes of settlement,shall be
exempt from discovery and production,and shall not be admissible in any
action or proceeding arising under or concerning this Agreement or any
Fiber Optic Project Agreement,without the concurrence of all parties.
Documents identified in or provided with such communications,which are
not prepared for purposes of the negotiations,are not so exempted and may,
if otherwise admissible,be admitted in evidence in any such action or
proceeding.
If the negotiations between the Participating Agencies do not resolve the
Dispute within sixty(60)days of the initial written request,the Dispute shall
be submitted to non-binding mediation with a mediator chosen by mutual
19
Terms and Conditions for Sharing of Fiber Optic Installation Projects
agreement of the parties or,in the absence of such agreement,with Judicial
Dispute Resolution,LLC.
Each Participating Agency shall bear its own cost of these Dispute resolution
procedures. The Participating Agencies that are party to the mediation shall
equally share the fees of the mediation and the mediator.
Nothing in this paragraph precludes any Participating Agency from seeking
relief from King County Superior Court should mediation efforts be
unsuccessful.
VII. RELATIONSHIP BETWEEN LEAD AGENCY AND CONTRACTORS
A. RESPONSIBILITY
The Lead Agency is responsible for ensuring that the applicable terms and
conditions of the Project Agreement,General Terns and Conditions,
exhibits and addenda are included in Agreements with Facility Owners and
contractors. However,each contractor shall be held liable for any
negligence caused by its performance or failure to perform the work under
the Project Agreement or any contracts with the Lead Agency.
B. APPROVALS
All contractors hired by the Lead Agency to work within or on Facilities
shall be subject to approval by Facility Owner(s). In all agreements with
contractors,the Facility Owner(s)may require the Lead Agency to require
such contractors to attend a pre-construction meeting with the appropriate
authority to review installation requirements and Work restrictions prior to
any Work being performed in or on Facilities. The contractor's agreement
shall state that the Facility Owner or the jurisdiction having rights-of-way
has authority to stop Work or require that inadequate Work be corrected.
C. INSURANCE
Prior to undertaking any work under any Fiber Optic Project Agreement,the
Lead Agency shall ensure that all contractors,at no expense to the Lead
Agency,Participating Agencies and Facility Owner(s),have obtained and
20
Terms and Conditions for Sharing of Fiber Optic Installation Projects
filed with the Lead Agency,acceptable evidence of a policy or policies of
insurance as enumerated in the applicable Fiber Optic Project Agreement.
VIII. MENE'4MCATION AND LDGTATION OF LIABILITY
A. LIMITATION OF LIABILITY AND INDEMNITY—LEAD AGENCY
The Lead Agency,when acting in that capacity, shall not be liable, in law or
in equity,to the Facility Owner,Participating Agencies,or any subsequent
user for any damages relating to the interruption of service or interference
with the operation of the Fiber Optic Project,except to the extent caused by
the gross negligence or willful misconduct of the Lead Agency. The Facility
Owners and Participating Agencies shall indemnify and save harmless the
Lead Agency, its officers,employees,and agents from all claims,actions,
liability,and damages of any nature arising out of any act or omission,
except in the event of gross negligence or willful misconduct by the Lead
Agency in connection with this Agreement.
If any claim arises to which this indemnification provision may be
applicable,the Facility Owner shall immediately upon learning of such
claim,notify the Lead Agency, and upon such notice,the Lead Agency shall
promptly notify the Participating Agencies. The Participating Agencies
may,at their option,settle or compromise such claim. In no event shall the
Facility Owner or Lead Agency have the right to pay,settle or otherwise
compromise such claim without the prior written consent of the Participating
Agencies who shall not unreasonably withhold such consent.
THE LEAD AGENCY SHALL NOT BE LIABLE TO THE FACILITY
OWNER,PARTICIPATING AGENCIES OR THEIR USERS OR ANY
SUBSEQUENT USER UNDER ANY CIRCUMSTANCES FOR
INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES OR
DAMAGES ALLEGED TO HAVE ARISEN DUE TO AN
INTERRUPTION OF SERVICE OR DAMAGE TO ANY FIBER OPTIC
CABLE OR ASSOCIATED EQUIPMENT.
B. LIMITATION OF LIABILITY AND INDEMNITY—FACILITY OWNERS
Facility Owners,when acting in that capacity,shall not be liable, in law or in
equity,to the Lead Agency,Participating Agencies,or any subsequent user
for any damages relating to the interruption of service or interference with
the operation of the Fiber Optic Project,except to the extent caused by the
21
Terms and Conditions for Sharing of Fiber Optic Installation Projects
gross negligence or willful misconduct of the Facility Owner. The Lead
Agency and Participating Agencies shall indemnify and save harmless
Facility Owners,their officers, employees,and agents from all claims,
actions,liability,and damages of any nature arising out of any act or
omission,except in the event of gross negligence or willful misconduct by
the Facility Owner in connection with this Agreement.
If any claim arises to which this indemnification provision may be
applicable,the Facility Owner shall immediately upon learning of such
claim,notify the Lead Agency,and upon such notice,the Lead Agency shall
promptly notify the Participating Agencies. The Participating Agencies
may,at their option,settle or compromise such claim. In no event shall the
Facility Owner or Lead Agency have the right to pay, settle or otherwise
compromise such claim without the prior written consent of the Participating
Agencies who shall not unreasonably withhold such consent.
THE FACILITY OWNER SHALL NOT BE LIABLE TO THE
PARTICIPATING AGENCIES OR THEIR USERS OR ANY
SUBSEQUENT USER UNDER ANY CIRCUMSTANCES FOR
INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES OR
DAMAGES ALLEGED TO HAVE ARISEN DUE TO AN INTER-
RUPTION OF SERVICE OR DAMAGE TO ANY FIBER OPTIC CABLE
OR ASSOCIATED EQUIPMENT.
C. LIMITATION OF LIABILITY AND INDEMNITY—PARTICIPATING AGENCIES
A Participating Agency,when acting in that capacity, shall not be liable,in
law or in equity,to the Lead Agency,the Facility Owners or any other
Participating Agency,or any subsequent user for any damages relating to the
interruption of service or interference with the operation of the Fiber Optic
Project,except to the extent caused by the gross negligence or willful
misconduct of that Participating Agency. The Lead Agency,the Facility
Owner and the other Participating Agencies shall indemnify and save
harmless a Participating Agency and its officers,employees,and agents from
all claims,actions,liability,and damages of any nature arising out of any act
or omission, except in the event of gross negligence or willful misconduct
by that Participating Agency in connection with this Agreement.
If any claim arises to which this indemnification provision may be
applicable,the Facility Owner shall immediately upon learning of such
claim,notify the Lead Agency,and upon such notice,the Lead Agency shall
promptly notify the Participating Agencies. The Participating Agencies
may,at their option,settle or compromise such claim. In no event shall the
Facility Owner or Lead Agency have the right to pay, settle or otherwise
22
Terms and Conditions for Sharing of Fiber Optic Installation Projects
compromise such claim without the prior written consent of the Participating
Agencies who shall not unreasonably withhold such consent.
A PARTICIPATING AGENCY SHALL NOT BE LIABLE TO THE LEAD
AGENCY,THE FACILITY OWNER,OR OTHER PARTICIPATING
AGENCIES OR THEIR USERS OR ANY SUBSEQUENT USER UNDER
ANY CIRCUMSTANCES FOR INCIDENTAL, SPECIAL OR
CONSEQUENTIAL DAMAGES OR DAMAGES ALLEGED TO HAVE
ARISEN DUE TO AN INTERRUPTION OF SERVICE OR DAMAGE TO
ANY FIBER OPTIC CABLE OR ASSOCIATED EQUIPMENT.
IX. ADDITIONAL TERMS AND CONDITIONS
A. LAWS,LICENSES,AND PERMITS
1. General Requirement
All Work done under this Agreement or any Fiber Optic Project
Agreement shall comply with all applicable federal, state, and local
laws, and all rules,regulations,orders,and directives of the
administrative agencies and officers thereof.
2. Licenses,Permits and Similar Authorizations
The Participating Agencies shall have and maintain in effect at all
times all necessary franchises,licenses,permits,consents and
easements from federal, state and local authorities and the owners of
rights-of-way and private property. The Participating Agencies will
comply with all requirements thereof to install,construct,maintain,
operate and remove any fiber optic installation(s).
B. PERFORMANCE
Each Participating Agency will perform all of its obligations under this
Agreement or any Fiber Optic Project Agreement in a reasonable and timely
manner. The standard for such performance will be the normal industry
standard in the relevant market. Where any Participating Agency's approval,
satisfaction,authorization,or similar approbation is required, such approval,
satisfaction,authorization,or similar approbation will be forthcoming in a
timely manner and will not be unreasonably withheld.
23
Terms and Conditions for Sharing of Fiber Optic Installation Projects
*ftw
C. SUBJECT TO LAWS
This Agreement and any Fiber Optic Project Agreements are subject to all
applicable federal, state,and local laws,and regulations,rulings and orders
of governmental agencies. Any Participating Agency may terminate its
obligations under this Agreement or any Fiber Optic Project Agreement if
ordered to do so by the final order or filing of a court or other governmental
agency or if such order or ruling would make it impossible for any
Participating Agency to carry out its obligations.. In addition, if at any time
during the term of this Agreement or any Fiber Optic Project Agreement,the
action of a governmental agency requires modification of any terms and
conditions in order to meet legal requirements,or renders performance by
any Participating Agency unreasonable,the Participating Agencies will enter
into negotiations to achieve an equitable adjustment and accounting of any
increased costs or liabilities incurred by any Participating Agency as a result
of such required modification. The preceding section shall not apply to a
court order determining that the Participating Agencies'use violates a
private easement.
The Participating Agencies, in their capacity as Facility Owners, have no
actual knowledge of any restriction in their agreements with third parties
which would prohibit the Participating Agencies'use of Facilities as
contemplated herein. The Participating Agencies recognize that the Facility
Owners have done no special searches or investigations with respect to
restrictions in their agreements with third parties that may affect the use of
Facilities as contemplated this Agreement or by any Fiber Optic Project
Agreement.
D. FORCE MAJEURE
Any Participating Agency may suspend performance under this Agreement
or any Fiber Optic Project Agreement and such non-performance will be
excused where performance is rendered impossible or impracticable for
reasons beyond such Participating Agency's reasonable control, such as,but
not limited to,acts of nature,war or warlike operations,civil commotion,
riot,labor dispute including strike,walkout,or lockout,sabotage,or superior
governmental regulation or control. Upon removal or termination of the
force majeure event,the Participating Agency claiming force majeure shall
promptly perform the affected obligations in an orderly and expedited
manner or procure a substitute for such obligation. The Participating
Agencies shall use all reasonable efforts to eliminate or minimize any delay
caused by a force majeure event.
24
Terms and conditions for Sharing of Fiber Optic Installation Projects
E. NO WAIVER
No term or provision hereof shall be deemed waived or consented to,and no
breach excused unless such waiver or consent shall be in writing and signed
by the Participating Agency claimed to have waived or consented.
Failure of any one more Participating Agencies to insist upon strict
performance of,or that Participating Agency's waiver of,any of the terms,
conditions,or obligations of either the General Terms and Conditions or a
specific Fiber Optic Project Agreement, shall not be a waiver of any other
term,condition,covenant or obligation,or of any subsequent default by
breach of the same or other term,condition,covenant or obligation
contained herein by any one or more particular Participating Agencies, nor
shall such action or inaction by any one or more Participating Agencies be
constructed as to bind or prejudice any other Participating Agency.
F. SEVERABILITY
In the event any section,sentence,clause,or phrase of the General Terms
and Conditions or a specific Fiber Optic Project Agreement is adjudicated to
be invalid or illegal by a court of last resort and of competent jurisdiction,
the remainder of the General Terms and Conditions or of a specific Fiber
Optic Project Agreement shall be unaffected by such adjudication and all
other provisions shall remain in full force and effect as though the section,
clause,or phrase so adjudicated to be invalid had not been included herein.
The Participating Agencies agree to then negotiate,in good faith,a
replacement section, sentence,clause,or phrase which is legal and most
closely represents the original intent of the Participating Agencies.
G. RIGHTS CUMULATIVE
The rights and remedies of the Participating Agencies provided for under the
General Terms and Conditions or under a specific Fiber Optic Project
Agreement are in addition to any other rights and remedies provided by law.
The failure to exercise on any occasion any right shall not operate to forfeit
such right on another occasion. The use of one remedy shall not exclude or
waive the right to use another.
25
Terms and Conditions for Sharing of Fiber Optic Installation Projects
*"01
H. CONTRACTUAL RELATIONSHIP
The General Terms and Conditions do not constitute the Participating
Agencies as the agent or legal representative of a Facility Owner for any
purpose whatsoever. The Participating Agencies are not granted any express
or implied right or authority to assume or create any obligation or
responsibility on behalf of or in the name of the Facility Owner or to bind
the Facility Owner in any manner or thing whatsoever.
I. HEADINGS
The titles of sections are for convenience only and do not define or limit the
contents.
J. APPLICABLE LAW AND VENUE
This Agreement and any Fiber Optic Project Agreements among the
Participating Agencies shall be construed and interpreted in accordance with
the laws of the State of Washington,and venue of any action brought
hereunder shall be in the Superior Court for King County.
K. BINDING EFFECTS
The provisions,covenants and conditions in the General Terms and
Conditions and in any specific Fiber Optic Project Agreement apply to bind
the Participating Agencies,their legal heirs,representatives, successors,and
assigns.
L. ASSIGNMENT
No Participating Agency or Lead Agency shall assign its rights or assign its
duties under this Agreement or any Fiber Optic Project Agreement without
the prior written consent of the other Participating Agencies,which consent
shall not be unreasonably withheld.
M. NOTICES
All notices and other materials to be delivered hereunder,shall be in writing
and shall be delivered or mailed to addresses as identified in Exhibit A to
this Agreement and in any Fiber Optic Project Agreement.
26
Terms and Conditions for Sharing of Fiber Optic Installation Projects
N. MODIFICATION OR AMENDMENT
No modification to or amendment of the provisions of the General Terms
and Conditions or of any specific Fiber Optic Project Agreement shall be
effective unless in writing and signed by authorized representatives of the
Participating Agencies to this Agreement and the Fiber Optic Project
Agreement. The Participating Agencies expressly reserve the right to
modify any agreement,from time to time,by mutual agreement.
O. EXECUTED IN COUNTERPARTS
This Agreement may be executed in any number of counterparts,each of
which shall be an original,but all of which together shall constitute but
one instrument.
P. SUPERCEDES CITY OF KIRKLAND FRANCHISE
This Agreement and any Fiber Optic Project Agreements supersedes the
Franchise granted to the Lake Washington School District for purposes of its
fiber optic cable to the extent it contains terms and conditions which change,
modify,delete,add to,supplement or otherwise amend the terms and
conditions of the Franchise.
27
Terms and Conditions for Sharing of Fiber Optic Installation Projects
IN WITNESS WHEREOF,the parties hereto have executed these General Terms and Conditions
For Sharing of Fiber Optic Installation Projects on the respective dates indicated below.
Approved as to Form:
David Ramsay Date City Attorney
City Manager,City of Kirkland
Approved as to Form:
Steve Sarkozy Date City Attorney
City Manager, City of Bellevue
Weldon I frig Date
Executive Vice President
University of Washington
Robert Collard Date
Assistant Superintendent Business Services
Lake Washington School District
28
Terms and Conditions for Sharing of Fiber Optic Installation Projects
vie
Exhibit A
Participating Agencies,Approvals, and Contacts
Notices under the Agreement shall be as follows:
To the City of Kirkland:
Donna Gaw
Network and Operations Division Manager
City of Kirkland
123 5th Avenue
Kirkland,WA
98033
dgaw(d ci.kirkland.,,va.us
425 828 2227
To the Lake Washington School District:
MIS MANAGER
PO Box 97039
Redmond,WA
98073-9739
To the City of Bellevue:
Gary Clesson
City of Bellevue
Senior Technology Architect
301 116th Ave SE
Suite 450
Bellevue,WA 98004
To the University of Washington:
Weldon Ihrig
Executive Vice President
Office of the Executive Vice President
University of Washington
306 Gerberding Hall
Box 351235
Seattle,WA 98195
4
Any Party may change the person(s)to be notified or the address for the notification by giving
written notice of the change, in writing,to the persons then designated to receive routine notices.