Loading...
HomeMy WebLinkAboutR-361484COMBINED SERVICE /BBS CABINET TYPE P CONTROLLER CABINET SHIN SEE #4 HO ( EQUAI r D A m M � � r + n N m CO NOTE 5 ELEVATION VIEW IV 111 L L VU VVI \I \LCTED TO NE CORNER SIGNAL POLE DIAMETER PLASTIC DRAIN (ONE PER CABINET) ASEE NOTE 7 ASEE NOTE 7 NOTE 5 CONTROLLER CABINET 10" WIDTH + 1" 10" NTS COMBINATION \,-#4 HOOPS SERVICE I I WIDTH 10" WIDTH CABINET 1 10" PLAN VIEW R:: A I 1 ` -2" HORIZONTAL 0 COMBINED FOUNDATION REINF. BAR DIAGRAM 6 PIECES \-3 - #4 REINFORCING BAR (EQUAL SPACES) 0 COMBINED CONTROLLER / BBS / RAPID RIDE CABINET FOUNDATION m D A z M m 31" 24" SERVICE TSC r 1 r 25 -TA 7.0" —7 6' 7.0" 4-2" CONDUITS, CONDUIT MEASUREMENTS ARE TO CENTER OF CONDUIT 10.5" 10.5" TYPE 2 JB L — — — — SIGNAL NW CORNER �J SIGNAL POLE 1" TYP N U SIDEWALK PLAN VIEW 0 RAPIDRIDE CABINET FOUNDATION LAYOUT NTS 10 NOTES 1. WHERE FOUNDATION PAD IS LOCATED WITHIN A SIDEWALK, CONSTRUCT PAD TOP FLUSH WITH SIDEWALK GRADE, OMITTING CHAMFER WHERE TOP AND SIDEWALK ABUT. MOUNT TOP SHALL BE FINISHED BY A CONCRETE CONTRACTOR AND SHALL MEET THE REQUIREMENTS OF SECTION 8 -14.3 IN THE WSDOT STANDARD SPECIFICATIONS. 2. PAD MOUNT DESIGN IS TYPICAL. SEE PLANS FOR TOTAL NUMBER OF CABINETS TO BE INSTALLED AT EACH LOCATION. 3. PLACE SILICONE SEAL BETWEEN THE FOUNDATION AND CABINET. 4. ANCHOR BOLTS AND THEIR SPACING TO BE SUPPLIED BY CABINET MANUFACTURER AND SUBMITTED TO THE ENGINEER FOR APPROVAL. 5. CONDUIT SIZES /QUANTITIES FOR THE CONTROLLER AND ITS CABINETS SHALL BE INSTALLED PER THE CONTRACT PLANS, PLUS ONE 2" SPARE CAPPED OUT PAST THE FOUNDATION. 6. CONCRETE SHALL BE CLASS 3000. 7. 2" CONDUIT SHALL BE PLACED FROM THE BBS TO THE CONTROLLER CABINET, AND FROM THE BBS TO THE ITS CABINET. 8. EACH CABINET SHALL HAVE A V DIAMETER PLASTIC DRAIN PIPE. 9. LOCATE CONDUITS CENTRALLY WITHIN THE CABINETS. 10. WHERE CABINETS ARE TO BE INSTALLED AND SPACE ALLOWS, A COMBINED FOUNDATION SHALL BE USED. 11. SEE PLANS FOR LOCATION AND ORIENTATION IN RELATION TO TRAFFIC SIGNAL, ELECTRICAL SERVICE AND IRRIGATION CABINETS. 12. INSTALL THE KING COUNTY METRO FURNISHED 336A CABINET ON THE NEW FOUNDATION. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN ON THE PLANS. SEE PLAN SHEETS FOR RAPIDRIDE (RRIDE) CABINET LOCATION. 13. THE CABINET FOUNDATION SHALL BE CLASS 3000 CONCRETE. 14. INSTALL #4 REBAR AT THE CORNERS OF THE CABINET FOUNDATION. THE REBAR SHALL EXTEND 12" INTO THE CABINET PAD IF ONE IS INCLUDED. THE REBAR IS NOT REQUIRED FOR CABINETS INSTALLED INTO EXISTING SIDEWALK OR ASPHALT PAVEMENT. 15. ANCHOR BOLTS AND DATA FOR SPACING SHALL BE SUPPLIED BY THE CABINET MANUFACTURER. 16. IF CABINET IS INSTALLED IN EXISTING SIDEWALK OR ASPHALT PAVEMENT, THE CABINET FOUNDATION SHALL EXTEND 18" BELOW FINISHED GRADE AND THE FULL CABINET PAD IS NOT REQUIRED. 17. SEAL CABINET TO FOUNDATION WITH GRAY OR CLEAR SILICON TO PREVENT MOISTURE FROM ENTERING THE CABINET. R- 361484 CALL 3 WORKING DAYS BEFORE YOU DIG: 811 1 r —Unc nnrry nwL. — w o Lv 1 SURVEYED: KPG p P , 1GAN! �� �1 a�— DRAWING NO. 31 REVISED TO CONFORM TO CONSTRUCTION RECORDS VS HJT 07/2014 ' 0` ` " "'F %k DRAWN BY: JC RECORD CITY �F RENT�N SOUTH LAKE WASHINGTON �` PROJECT NO. 11156 DESIGN BY: JC 7539th Ave 2502 Jefferson Ave DRAWINGS Public Works Department ROADWAY IMPROVEMENTS CHECK BY: HJT Seaftle, WA 98109 Tacoma, WA 9 Ave FED AID NO. PREPARED BY KPG, JULY 2014 APPROVED FOR CONSTRUCTION 393 1 r �� p � PROJ MGR: NJD (20612661640 (25 31 627-0720 SIGNAL DETAILS DATE: FEB 2012 � G1 � BASED ON CONSTRUCTION RECORDS SHEET NO. 31 OF 53 SrOxnc E� BY: DATE: NUMBER REVISION DESCRIPTION BY APP. DATE O FILE: 08046SIG01.dwg D C �I � � 0 a > C I \ M w z ax 3 - #4 REINFORCI ^' z G BAR m 4 o a 1°a Z M E i Fo = o (EQUAL SPACES) 2 0 o C F m mm z � 3 I 03 z m M CONTROLLER CABINET 10" WIDTH + 1" 10" NTS COMBINATION \,-#4 HOOPS SERVICE I I WIDTH 10" WIDTH CABINET 1 10" PLAN VIEW R:: A I 1 ` -2" HORIZONTAL 0 COMBINED FOUNDATION REINF. BAR DIAGRAM 6 PIECES \-3 - #4 REINFORCING BAR (EQUAL SPACES) 0 COMBINED CONTROLLER / BBS / RAPID RIDE CABINET FOUNDATION m D A z M m 31" 24" SERVICE TSC r 1 r 25 -TA 7.0" —7 6' 7.0" 4-2" CONDUITS, CONDUIT MEASUREMENTS ARE TO CENTER OF CONDUIT 10.5" 10.5" TYPE 2 JB L — — — — SIGNAL NW CORNER �J SIGNAL POLE 1" TYP N U SIDEWALK PLAN VIEW 0 RAPIDRIDE CABINET FOUNDATION LAYOUT NTS 10 NOTES 1. WHERE FOUNDATION PAD IS LOCATED WITHIN A SIDEWALK, CONSTRUCT PAD TOP FLUSH WITH SIDEWALK GRADE, OMITTING CHAMFER WHERE TOP AND SIDEWALK ABUT. MOUNT TOP SHALL BE FINISHED BY A CONCRETE CONTRACTOR AND SHALL MEET THE REQUIREMENTS OF SECTION 8 -14.3 IN THE WSDOT STANDARD SPECIFICATIONS. 2. PAD MOUNT DESIGN IS TYPICAL. SEE PLANS FOR TOTAL NUMBER OF CABINETS TO BE INSTALLED AT EACH LOCATION. 3. PLACE SILICONE SEAL BETWEEN THE FOUNDATION AND CABINET. 4. ANCHOR BOLTS AND THEIR SPACING TO BE SUPPLIED BY CABINET MANUFACTURER AND SUBMITTED TO THE ENGINEER FOR APPROVAL. 5. CONDUIT SIZES /QUANTITIES FOR THE CONTROLLER AND ITS CABINETS SHALL BE INSTALLED PER THE CONTRACT PLANS, PLUS ONE 2" SPARE CAPPED OUT PAST THE FOUNDATION. 6. CONCRETE SHALL BE CLASS 3000. 7. 2" CONDUIT SHALL BE PLACED FROM THE BBS TO THE CONTROLLER CABINET, AND FROM THE BBS TO THE ITS CABINET. 8. EACH CABINET SHALL HAVE A V DIAMETER PLASTIC DRAIN PIPE. 9. LOCATE CONDUITS CENTRALLY WITHIN THE CABINETS. 10. WHERE CABINETS ARE TO BE INSTALLED AND SPACE ALLOWS, A COMBINED FOUNDATION SHALL BE USED. 11. SEE PLANS FOR LOCATION AND ORIENTATION IN RELATION TO TRAFFIC SIGNAL, ELECTRICAL SERVICE AND IRRIGATION CABINETS. 12. INSTALL THE KING COUNTY METRO FURNISHED 336A CABINET ON THE NEW FOUNDATION. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS SHOWN ON THE PLANS. SEE PLAN SHEETS FOR RAPIDRIDE (RRIDE) CABINET LOCATION. 13. THE CABINET FOUNDATION SHALL BE CLASS 3000 CONCRETE. 14. INSTALL #4 REBAR AT THE CORNERS OF THE CABINET FOUNDATION. THE REBAR SHALL EXTEND 12" INTO THE CABINET PAD IF ONE IS INCLUDED. THE REBAR IS NOT REQUIRED FOR CABINETS INSTALLED INTO EXISTING SIDEWALK OR ASPHALT PAVEMENT. 15. ANCHOR BOLTS AND DATA FOR SPACING SHALL BE SUPPLIED BY THE CABINET MANUFACTURER. 16. IF CABINET IS INSTALLED IN EXISTING SIDEWALK OR ASPHALT PAVEMENT, THE CABINET FOUNDATION SHALL EXTEND 18" BELOW FINISHED GRADE AND THE FULL CABINET PAD IS NOT REQUIRED. 17. SEAL CABINET TO FOUNDATION WITH GRAY OR CLEAR SILICON TO PREVENT MOISTURE FROM ENTERING THE CABINET. R- 361484 CALL 3 WORKING DAYS BEFORE YOU DIG: 811 1 r —Unc nnrry nwL. — w o Lv 1 SURVEYED: KPG p P , 1GAN! �� �1 a�— DRAWING NO. 31 REVISED TO CONFORM TO CONSTRUCTION RECORDS VS HJT 07/2014 ' 0` ` " "'F %k DRAWN BY: JC RECORD CITY �F RENT�N SOUTH LAKE WASHINGTON �` PROJECT NO. 11156 DESIGN BY: JC 7539th Ave 2502 Jefferson Ave DRAWINGS Public Works Department ROADWAY IMPROVEMENTS CHECK BY: HJT Seaftle, WA 98109 Tacoma, WA 9 Ave FED AID NO. PREPARED BY KPG, JULY 2014 APPROVED FOR CONSTRUCTION 393 1 r �� p � PROJ MGR: NJD (20612661640 (25 31 627-0720 SIGNAL DETAILS DATE: FEB 2012 � G1 � BASED ON CONSTRUCTION RECORDS SHEET NO. 31 OF 53 SrOxnc E� BY: DATE: NUMBER REVISION DESCRIPTION BY APP. DATE O FILE: 08046SIG01.dwg t D C � 0 a > C m M w z ax M ^' z n Dn ° m 4 o a 1°a Z M E i Fo = o Z t D C B a > 0 a °o M � ax D R I n Dn ° D I mN o a 1°a Z O E i Fo = o Z 2 g 3 o C F m mm z � 3 I 03 z m M n D C 8 a > � ax M R I n Dn ° D g I o a 1°a Z O E i Fo = o 1 L o � m z � I 8 M 00 ng D L