HomeMy WebLinkAboutW-343018WEST GUTTER LINE
20 21 22 23 24
EAST GUTTER LINE
GENERAL WATER CONSTRUCTION NOTES
1. EXISTING WATER MAINS, HYDRANTS, AND SERVICES SHALL REMAIN OPERATIONAL THROUGHOUT
THE COURSE OF CONSTRUCTION EXCEPT WHERE WATER BYPASS SYSTEMS ARE REQUIRED. FOR
INSTALLATION OF WATER BYPASS SYSTEMS SEE TEMPORARY WATER BYPASS PLANS, SHTS
160 -163. ABANDONMENT AND /OR REMOVAL OF EXISTING MAINS SHALL TAKE PLACE ONLY
AFTER THE NEW MAIN OR WATER BYPASS SYSTEM HAS BEEN INSTALLED, TESTED, AND
APPROVED BY THE CITY OF RENTON.
2. MAIN SHUTDOWNS SHALL BE BY CITY MAINTENANCE STAFF ONLY. CUT —IN CONNECTIONS TO
EXISTING MAINS SHALL ALSO BE PERFORMED BY CITY STAFF. CONTRACTOR SHALL PROVIDE
TWO WEEK ADVANCED NONCE TO CITY FOR SCHEDULE OF CONNECTIONS AND SHUTDOWNS.
3. EXISTING SERVICE LINES, METER SETTERS, AND METER BOXES ARE TO BE REPLACED AS PART
OF THIS PROJECT. EXISTING METERS ARE TO BE RESET WITHIN THE NEW SETTERS COORDINATE
W /CITY OF RENTON.
4. DEFLECT JOINTS AS NECESSARY TO INSTALL WATER MAIN WITH MINIMUM COVER ALONG THE
APPROXIMATE LOCATION SHOWN. PIPE JOINTS NOT TO EXCEED 50 PERCENT OF THE MAXIMUM
JOINT DEFLECTION SPECIFIED BY THE PIPE MANUFACTURER.
5. ABANDONED DUSTING WATER MAINS SHALL BE CAPPED WITH (MJ) CAPS. PORTIONS OF THE
ABANDONED WATER MAIN MAY REQUIRE REMOVAL FOR THE CONSTRUCTION OF OTHER ROADWAY
IMPROVEMENTS.
6. EXISTING FIRE HYDRANTS SHALL BE REMOVED AND PROPERLY DISPOSED OF BY THE
CONTRACTOR AFTER INSTALLATION, TESTING, AND APPROVAL OF THE NEW HYDRANTS.
7. VERIFY LOCATION AND DEPTH OF EXISTING WATER MAINS AT ALL CONNECTION POINTS PRIOR
TO CONSTRUCTION. THE CONTRACTOR SHALL FIELD VERIFY THE OUTSIDE DIAMETER (O.D.) OF
ALL EXISTING CAST —IRON AND ASBESTOS — CEMENT PIPES, AND PROVIDE THE PROPER
LONG —BODY ADAPTERS AND TRANSITION COUPLINGS FOR THE FINAL CONNECTIONS BY CITY
FORCES. CONNECTIONS TO ALL DUCTILE IRON PIPES SHALL BE MADE NTH LONG SOLD SLEEVE
COUPLINGS (MJ).
B. ALL CONNECTIONS TO EXISTING WATER LINES SHALL BE MADE ONLY AFTER ALL THE NEW
WATER LINES AND APPURTENANCES HAVE SUCCESSFULLY PASSED ALL PRESSURE TESTS,
CLEANED WITH POLY —PIGS, DISINFECTED WITH CHLORINE SOLUTION, AND HAVE RECEIVED
SATISFACTORY BACTERIOLOGICAL TEST LAB REPORTS, AND ARE THOROUGHLY FLUSHED.
9. ELEVATIONS OF EXISTING CROSSING UTILITIES ARE PARTIALLY BASED ON RECORD DRAWING
INFORMATION. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL UNDERGROUND EQUIPMENT
PRIOR TO CONSTRUCTION AND INFORM THE ENGINEER IF CONFLICT IS FOUND.
10. ALL WATER MAINS, FITTINGS, AND APPURTENANCES SHALL BE INSTALLED PER CITY OF RENTON
STANDARD DETAILS INCLUDED WITH PROJECT SPECIFICATIONS.
11. WATER PIPE AND FITTINGS INDICATED ON PLANS SHALL HAVE RESTRAINED JOINTS PER
SPECIFICATIONS. SEE WATER PLANS, SHTS 132 -141 AND WATER PROFILES, SHTS 146 -159 FOR
THESE LOCATIONS.
12. PROVIDE 10' HORIZONTAL SEPARATION FROM PARALLEL SEWER LINES WATER SHALL CROSS
OVER EXISTING SEWER WITH 18" MINIMUM VERTICAL SEPARATION. WATER SHALL CROSS ALL
OTHER UTILITIES WHH 12" MINIMUM VERTICAL SEPARATION. CONCRETE ENCASEMENT MAY BE
NECESSARY WHERE THESE REQUIREMENTS CANNOT BE MET.
13. ALL WATER MAIN VERTICAL BENDS SHALL INCLUDE VERTICAL THRUST BLOCKING PER RENTON
PLAN 330.3. ALL WATER MAIN HORIZONTAL BENDS SHALL INCLUDE HORIZONTAL THRUST
BLOCKING PER RENTON PLAN 330.2.
0 5 10 20 40 60
HORIZONTAL SCALE IN FEET
VERT. SCALE =1 2 HORIZ. SCALE
SHEETS
CATEGORY
SHEET
RIGHT OF WAY PLANS
10
EXISTING CONDITIONS
58
SITE PREPARATION & TESC PLAN
72
ALIGNMENT PLAN
94
ALIGNMENT PROFILE
96
DRAINAGE PLAN
107
DRAINAGE PROFILE
116,117
WATER PLAN
135
WATER PROFILE
—
JOINT UTIUTY TRENCH PLAN
167
JOINT UTIUTY TRENCH PROFILES
183
PROPERTY RESTORATION PLANS
196
CHANNEUZATION & SIGNING PLAN
220
ILLUMINATION PLANS
231
IRRIGATION PLAN
265
LANDSCAPE PLAN
297
nw[nuum
RECORD DRAWINGS
wu
JLF
I
JAE
I t ,i
3/2014
SURVEYED'. HPG
DRAWN BY. SOD
DESIGN BY SOD
CHECK BY NJD
PFOJ MGR'. JF
FILE �UVATPNN1.M,p
KpG
79BWA'mueN 75PtJMetmAKnue RECORD
SoakwABBI4B TpYIq WA9BIfQ DRAWINGS
MN�iMO ��� DRAWINGS
kp;w
11 CITY OF RENTON
.0
PUeu�wo,9s 0a9aamam
APPROVED FOR CONSTRUCTION
BY DATE.
RAINIER AVENUE S (SR 167)
S GRADY WAY TO S 2ND ST
WATER PROFILE
STA 20 +00 TO STA 24 +50
DRAWING NO. 149
PROJECT NO TEDaoaao
FEDAID IJO. -0MD B)
DATE, MAR 2014
SHEET NO 149 OF soa
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE