CONTRACTS OTHER THAN FEDERAL-AID FHWA
THIS AGREEMENT, made and entered into this le day of 144A ,_2010_. by and
between THE CITY OF RENTON, Washington, a municipal co oration of the State of
Washington, hereinafter referred to as "CITY" and Lakeridge Paving Company,
LLC hereinafter referred to as "CONTRACTOR."
WITNESSETH:
1) The Contractor shall within the time stipulated, (to-wit: within_thirty (30) working
days from date of commencement hereof as required by the Contract, of which this
agreement is a component part)perform all the work and services required to be performed,
and provide and furnish all of the labor, materials, appliances, machines, tools, equipment,
utility and transportation services necessary to perform the Contract, and shall complete the
construction and installation work in a workmanlike manner, in connection with the City's
Project (identified as East Side and Southeast Side Paving Projects) or improvement by
construction and installation of:
Work as described in "Scope of Work" dated August 30, 2010 ,
attached hereto and incorporated herein by this reference.
All the foregoing shall be timely performed, furnished,constructed, installed and completed
in strict conformity with the plans and specifications, including any and all addenda issued
by the City and all other documents hereinafter enumerated, and in full compliance with all
applicable codes, ordinances and regulations of the City of Renton and any other
governmental authority having jurisdiction thereover. It is further agreed and stipulated that
all of said labor, materials, appliances, machines, tools, equipment and services shall be
furnished and the construction installation performed and completed to the satisfaction and
the approval of the City's Public Works Director as being in such conformity with the plans,
specifications and all requirements of or arising under the Contract. The Contractor agrees
to use recycled materials whenever practicable.
2) The aforesaid Contract, entered into by the acceptance of the Contractor's bid and signing of
this agreement, consists of the following documents, all of which are component parts of
said Contract and as fully a part thereof as if herein set out in full, and if not attached, as if
hereto attached.
a) This Agreement
b) Instruction to Bidders
c) Bid Proposal
d) Specifications
e) Maps and Plans
f) Bid
g) Advertisement for Bids
h) Special Provisions, if any
i) Technical Specifications,if any
1 C 1-2009
'`✓ 1%0r
3) If the Contractor refuses or fails to prosecute the work or any part thereof, with such
diligence as will insure its completion within the time specified in this Contract, or any
extension in writing thereof, or fails to complete said work with such time, or if the
Contractor shall be adjudged a bankrupt, or if he should make a general assignment for the
benefit of his creditors, or if a receiver shall be appointed on account of the Contractor's
insolvency, or if he or any of his subcontractors should violate any of the provisions of this
Contract, the City may then serve written notice upon him and his surety of its intention to
terminate the Contract, and unless within ten(10) days after the serving of such notice, such
violation or non-compliance of any provision of the Contract shall cease and satisfactory
arrangement for the correction thereof be made, this Contract, shall, upon the expiration of
said ten (10) day period, cease and terminate in every respect. In the event of any such
termination, the City shall immediately serve written notice thereof upon the surety and the
Contractor and the surety shall have the right to take over and perform the Contract,
provided, however, that if the surety within fifteen (15) days after the serving upon it of
such notice of termination does not perform the Contract or does not commence
performance thereof, the City itself may take over the work under the Contract and
prosecute the same to completion by Contract or by any other method it may deem
advisable, for the account and at the expense of the Contractor, and his surety shall be liable
to the City for any excess cost or other damages occasioned the City thereby. In such event,
the City, if it so elects, may, without liability for so doing, take possession of and utilize in
completing said Contract such materials, machinery, appliances, equipment, plants and
other properties belonging to the Contractor as may be on site of the project and useful
therein.
4) The foregoing provisions are in addition to and not in limitation of any other rights or
remedies available to the City.
5) Contractor agrees and covenants to hold and save the City, its officers, agents,
representatives and employees harmless and to promptly indemnify same from and against
any and all claims, actions, damages, liability of every type and nature including all costs
and legal expenses incurred by reason of any work arising under or in connection with the
Contract to be performed hereunder, including loss of life, personal injury and/or damage to
property arising from or out of any occurrence, omission or activity upon, on or about the
premises worked upon or in any way relating to this Contract. This hold harmless and
indemnification provision shall likewise apply for or on account of any patented or
unpatented invention, process, article or appliance manufactured for use in the performance
of the Contract, including its use by the City, unless otherwise specifically provided for in
this Contract.
The Contractor agrees to name the City as an additional insured on a noncontributory
primary basis, and provide the City the endorsement page of their insurance policy and the
Accord form. In the event the City shall, without fault on its part, be made a party to any
litigation commenced by or against Contractor, then Contractor shall proceed and hold the
City harmless and he shall pay all costs, expenses and reasonable attorney's fees incurred or
paid by the City in connection with such litigation. Furthermore, Contractor agrees to pay
all costs, expenses and reasonable attorney's fees that may be incurred or paid by City in the
enforcement of any of the covenants, provisions and agreements hereunder.
Nothing herein shall require the Contractor to indemnify the City against and hold harmless
the City, from claims, demands or suits based solely upon the conduct of the City, its
officers or employees and provided further that if claims or suits are caused by or result
2 C1-2009
'rrr vrrp+
from the concurrent negligence of(a)the Contractor's agents or employees and(b)the City,
its agents, officers and employees, and involves those actions covered by RCW 4.24.115,
this indemnity provision with respect to claims or suits based upon such concurrent
negligence shall be valid and enforceable only to the extent of the Contractor's negligence
or the negligence of the Contractor's agents or employees.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115,then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the contractor
and the city, its officers, officials, employees and volunteers, the contractor's liability
hereunder shall be only to the extent of the contractor's negligence. It is further specifically
and expressly understood that the indemnification provided herein constitute the
contractor's waiver of immunity under the Industrial Insurance Act, Title 51 RCW, solely
for the purposes of this indemnification. This waiver has been mutually negotiated by the
parties. The provisions of this section shall survive the expiration or termination of this
agreement.
6) Any notice from one party to the other party under the Contract shall be in writing and shall
be dated and signed by the party giving such notice or by its duly authorized representative
of such party. Any such notice as heretofore specified shall be given by personal delivery
thereof or by depositing same in the United States mail, postage prepaid, certified or
registered mail.
7) The Contractor shall commence performance of the Contract no later than 10 calendar days
after Contract final execution, and shall complete the full performance of the Contract not
later than thirty (30) working days from the date of commencement. For each
and every working day of delay after the established day of completion, it is hereby
stipulated and agreed that the damages to the City occasioned by said delay will be the sum
of $200.00 per day per Section 1-08.9 of Standard Specifications as liquidated damages
(and not as a penalty) for each such day, which shall be paid by the Contractor to the City.
8) Neither the final certificate of payment not any provision in the Contract nor partial or
entire use of any installation provided for by this Contract shall relieve the Contractor of
liability in respect to any warranties or responsibility for faulty materials or workmanship.
The Contractor shall be under the duty to remedy any defects in the work and pay for any
damage to other work resulting therefrom which shall appear within the period of one (1)
year from the date of final acceptance of the work, unless a longer period is specified. The
City will give notice of observed defects as heretofore specified with reasonable promptness
after discovery thereof, and Contractor shall be obligated to take immediate steps to correct
and remedy any such defect, fault or breach at the sole cost and expense of Contractor.
Defective or Unauthorized Work. The City reserves its right to withhold payment from
Contractor for any defective or unauthorized work. Defective or unauthorized work
includes, without limitation: work and materials that do not conform to the requirements of
this Agreement; and extra work and materials furnished without the City's written approval.
If Contractor is unable, for any reason, to satisfactorily complete any portion of the work,
the City may complete the work by contract or otherwise, and Contractor shall be liable to
the City for any additional costs incurred by the City. "Additional costs" shall mean all
reasonable costs, including legal costs and attorney fees, incurred by the City beyond the
maximum Contract price specified above. The City further reserves its right to deduct the
3 Cl-2009
,%No, *"o
cost to complete the Contract work, including any Additional Costs, from any and all
amounts due or to become due the Contractor.
The Contractor agrees the above one year limitation shall not exclude or diminish the City's
rights under any law to obtain damages and recover costs resulting from defective and
unauthorized work discovered after one year but prior to the expiration of the legal time
period set forth in RCW 4.16.040 limiting actions upon a contract in writing, or liability
expressed or implied arising out of a written agreement.
Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL
PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A
WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND
PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE
TIME FINAL PAYMENT IS MADE AND ACCEPTED.
9) The Contractor and each subcontractor, if any, shall submit to the City such schedules of
quantities and costs, progress schedules, payrolls, reports, estimates, records and
miscellaneous data pertaining to the Contract as may be requested by the City from time to
time.
10) The Contractor shall furnish a surety bond or bonds as security for the faithful performance
of the Contract, including the payment of all persons and firms performing labor on the
construction project under this Contract or furnishing materials in connection with this
Contract; said bond to be in the full amount of the Contract price as specified in Paragraph
12. The surety or sureties on such bond or bonds must be duly licensed as a surety in the
State of Washington.
11) The Contractor shall verify, when submitting first payment invoice and annually thereafter,
possession of a current City of Renton business license while conducting work for the City.
The Contractor shall require, and provide verification upon request, that all subcontractors
participating in a City project possess a current City of Renton business license. The
Contractor shall provide, and obtain City approval of, a traffic control plan prior to
conducting work in City right-of-way.
12) The total amount of this contract is the sum of_$_9,367.73
numbers
Nine Thousand Three Hundred Sixty Seven Dollars and Seventy Three Cents
written words
including Washington State Sales Tax. Payments will be made to Contractor as specified in
the "Special Provisions"of this Contract.
13) INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-
Employer Relationship will be created by this Agreement and that the Contractor has the
ability to control and direct the performance and details of its work, the City being
interested only in the results obtained under this Agreement.
14) LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY
LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN
120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE
OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE
FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE
STATUTORY LIMITATIONS PERIOD.
4 Cl-2009
15) Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of
the covenants and agreements contained in this Agreement, or to exercise any option
conferred by this Agreement in one or more instances shall not be construed to be a waiver
or relinquishment of those covenants, agreements or options, and the same shall be and
remain in full force and effect.
16) Written Notice. All communications regarding this Agreement shall be sent to the parties at
the addresses listed on the signature page of the Agreement, unless notified to the contrary.
Any written notice hereunder shall become effective three(3)business days after the date of
mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the
addressee at the address stated in this Agreement or such other address as may be hereafter
specified in writing.
17) Assignment. Any assignment of this Agreement by either party without the written consent
of the non-assigning party shall be void. If the non-assigning party gives its consent to any
assignment, the terms of this Agreement shall continue in full force and effect and no
further assignment shall be made without additional written consent.
18) Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative
of the city and Contractor.
19) Compliance with Laws. The Contractor agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become
applicable to Contractor's business, equipment, and personnel engaged in operations
covered by this Agreement or accruing out of the performance of those operations.
20) Counterparts. This Agreement may be executed in any number of counterparts, each of
which shall constitute an original, and all of which will together constitute this one
Agreement.
IN WITNESS WHEREOF, the City has caused these presents to be signed by its Mayor and
attested by its City Clerk and the Contractor has hereunto set his hand and seal the day and year
first above-written.
CONTRACTOR CITY OF RENTON
A"-14-, 1 C
rest ent D er/Ow r P lic ks dmmistrator
K°-ti7 f �K� j �( ATTEST
Secretaky City Clerk
dba t—A Kt IZi
irm Name
check one
❑ Individual Partnership ❑ Corporation Incorporated in
5 CI-2009
`r✓ ,44W
Attention:
If business is a CORPORATION, name of the corporation should be listed in full and both
President and Secretary must sign the contract, OR if one signature is permitted by corporation
by-laws, a copy of the by-laws shall be furnished to the City and made a part of the contract
document.
If business is a PARTNERSHIP, full name of each partner should be listed followed by d/b/a
(doing business as)and firm or trade name; any one partner may sign the contract.
If business is an INDIVIDUAL PROPRIETORSHIP, the name of the owner should appear
followed by d/b/a and name of the company.
6 C 1-2009
Scope of Work
East Side and Southeast Side New Pavement
August 30,2010
Task: Place new asphalt in two areas at the Renton Airport. Project includes all necessary action items
necessary to complete the job as detailed below.
1. Saw cut edges where specified.
2. Light grading of the two areas with 5/8" minus crushed rock, if necessary.
3. Place approximately 3,722 sq ft of new asphalt(total for both locations- HMA PG64-22.Three
inches total in two 1.5" lifts).
4. Tar-seal the perimeter of the new asphalt on all edges(approximately 440').
5. All other work items necessary to complete this job to City's satisfaction.
Renton Airport
East Side and Southeast Side New Pavement
Company Name: e e-r) , C /'IC f 4' L
Task
Add asphalt to areas that are already prepped
Items and Pricing*
* add each line item or write"included"
Mobilization $
Saw Cut Edges $ Zc�U `0
(109')
Lay.5" HMA in two 1.5" lifts(3"total) $ 30 .
(3722 sq ft total)
Tar seal perimeter $ ,1�,/�,E�
(440')
Tax(9.5%) $ Z
,
Grand Total $ q3
Price Valid Until: 1 C/)