Loading...
HomeMy WebLinkAboutR-375106CV CID r r C7 �O r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e.g. DOMESTIC WATER CONVEYANCE, SEWER EASEMENT Q LOCATIONS OF ALL CONVEYANCE, GAS, ELECTRICAL, ETC.). THE SURFACE WATER DRAINAGE SYSTEM SHALL BE 25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT J I w CONSTRUCTED ACCORDING TO THE APPROVAED PLANS, WHICH ARE ON FILE WITH THE CITY. RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABLILTY CONNECTED WITH CL IJO ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY Q IrLd IOf OF RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION. OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING = Iwo of CONSTRUCTION. ............................................. 5. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION rnhN8110n 4BMl Q of V) a- IS IN PROGRESS. 26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY 15.0' 1 - rooi Aram DEVICES PROTECTIVE EQUIPMENT, FLAGGERS AND ANY OTHER NEEDED ACTIONS TO PROTECT THE U) 6. GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOUYRS OF 7 A.M. TO 7 P.M., LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE I _1 2" MONDAY THROUGH SATURDAY AND NO WORK ON SUNDAY IS ALLOWED, UNLESS OTHERWISE PERFORMANCE OF WORK. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT I- pwbrafed pipe APPROVED WITH A WRITTEN DECISION BY THE CITY OF RENTON. NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE PUBLIC WORKS ccDEPARTMENT, CLASS "B" ASPHALTIC CONCRETE TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOT STANDARD 7. IT SHALL BE THE APPLICANT/CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY. Ir � 6"MIN. CRUSHED EASEMENTS NECESSARY BEFORE INITIATING OFF-SITE WORK. EASEMENTS REQUIRE CITY REVIEW O CRUSHED SURFACING AND APPROVAL PRIOR TO CONSTRUCTION. 27. PROJECT LOCATED WITHIN THE AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL line maim `-ce sump Mir ria DETERMINED BY FIELD CONDITIONS REQUIREMENT #6 OF THE SURFACE WATER DESIGN MANUAL AND AQUIFER PROTECTION PRIVATE ROAD 8. FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS REGULATIONS RMC 4-3-050). Y SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL REQUIREMENTS ILL! OF CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL ARE SUBMITTED TO THE CITY OF LU , RENTON. ( c o p4doralW pipo 24^ U 9. DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON. IT 0R )a` Cl Jq REFERENCE BENCHMARK AND ELEVATIONS ARE NOTES ON THE PIANS. VERT. CURB Q 10. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES MUST & GUTTER BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW AND APPROVAL. SECTION_ A NTS 11. ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO C -4s 95% (PERCENT) DENSITY, STANDARD PROCTOR. 12. OPEN CUTTING OF EXISTING ROADWAYS FOR NON -FRANCHISED UTILITY OR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF RENTON AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY OF RENTON TRENCH RESTORATION STANDARDS. 13. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTANED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON-SITE EROSION HAS PASSED. 14. ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER SECTION. 15. ALL PIPES AND APPURTENANCES SHALL BE LAID ON THE PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION OF ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS, PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS "C", WITH THE EXCEPTION OF PVC PIPE. 16. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE. 17. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES SHALL HAVE SOLID LOCKING LIDS, UNLESS OTHERWISE SHOWN ON THE APPROVED PLANS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION FACILITY SHALL HAVE SOLID LOCKING LIDS. 18. BUILDING AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACK LINES. 19. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL. 20. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY OF RENTON RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. ROCK FOR EROSION PROTECTION OF ROADWAY DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A DEPTH OF ONE (1) FOTT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 - 8 INCH ROCK / 40 - 70% PASSING; 2 - 4 INCH ROCK / 30 - 40% PASSING; AND LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 21. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY UPON COMPLETION. 22. DRAINAGE OUTLETS (STUB -OUTS) SHALL BE PROVIDED FOR EACH INDIVIDUAL LOT, EXCEPT FOR THOSE LOTS APPROVED FOR INFILTRATION BY THE CITY. STUB -OUTS SHALL CONFORM TO THE FOLLOWING: A. EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON THE LOT, SO AS TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING DRAINS, DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE OR SUBSURAFCE DRAINS NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR INTENDED USE. EACH OUTLET SHALL HAVE FREE-FLOWING, POSITIVE DRAINAGE TO AN APPROVED STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTFALL LOCATION. B. OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE-FOOT HIGH, 2'1 STAKE MARKED STORM" OD "DRAIN". THE STUB -OUT SHALL EXTEND ABOVE SURFACE LEVEL, BE VISIBLE, AND BE SECURED TO THE STAKE. C. PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL AND, IF NON-METALLIC, THE PIPE SHALL BE PLACED IN A TRENCH WITH A TRACING WIRE ABOVE OR OTHER ACCEPTABLE DETECTION. D. PRIVATE DRAINAGE EASEMENTS ARE REQUIRED PRIVATE ROAD GRAVEL -FILLED DISPERSION TRENCH DETAIL - FULL DISPERSION GRAVEL -FILLED INFILTRATION TRENCH DETAIL - FULL INFILTRATION CONVEY FLOWS THROUGH INDIVIDUAL LOTS. 26' ACCESS & PUBLIC UTILITY Date: EASEMENT FOR COORDINATING THE LOCATIONS OF ALL w I our TO OTHER UTLILITES (e.g. I w L;JZI w o IJO D I Cf) I-- Z E Q IrLd IOf / _J = Iwo of w> ............................................. loo ZWI rnhN8110n 4BMl < of V) a- 11.0 15.0' 1 - rooi Aram 10' 10' 10' 5' 2% I _1 2" 4^Mid or 6'1bvWe splash dock MMM pwbrafed pipe � I 7"4"MIN. CLASS "B" ASPHALTIC CONCRETE PAVEMENT- 2-2" LIFTS REQUIRED Ir � 6"MIN. CRUSHED SURFACING TOP COURSE nT i CRUSHED SURFACING BASE COURSE TO BE . line maim `-ce sump Mir ria DETERMINED BY FIELD CONDITIONS PRIVATE ROAD igler fabrc D. PRIVATE DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE .SYSTEMS C:?:? 1:1 LLIFI'IIfIBA'IION GRAVEL -FILLED DISPERSION TRENCH DETAIL - FULL DISPERSION GRAVEL -FILLED INFILTRATION TRENCH DETAIL - FULL INFILTRATION CONVEY FLOWS THROUGH INDIVIDUAL LOTS. Date: By: Date: FIGURE C12.A TYPICAL TRENCH INFIUIRATioN* sysrEN FOR COORDINATING THE LOCATIONS OF ALL our TO OTHER UTLILITES (e.g. POWER, GAS, mem TELEPHONE, TELEVISION). PLAN VIEW NTS/-4'rigid or 6-1 ie BEFORE YOU / redorated Pipe ---- ------------------------------- ............................................. rnhN8110n 4BMl � sum, w /witl litl PLAN VIEW - rooi Aram NTS ovedlow .__ _\ 4^Mid or 6'1bvWe splash dock pwbrafed pipe � I -..._.. C1 ico G, Ir � �,. 1.na�:.. wished, mak 4"a . :.-- "Clo 'Irvin on , . _ rim- nn nT i m . line maim `-ce sump Mir ria vsksA igler fabrc acklili compacted Llexibl sa , _ 4'rigidor 6- flexible ( c o p4doralW pipo 24^ IT 0R )a` Cl Jq wa5hetl r"u4 ,. II SECTION_ A NTS :009 surae water P5p hWnml-APpvtlu C IA120e4 C -4s D. PRIVATE DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE .SYSTEMS DESIGNED TO GRAVEL -FILLED DISPERSION TRENCH DETAIL - FULL DISPERSION GRAVEL -FILLED INFILTRATION TRENCH DETAIL - FULL INFILTRATION CONVEY FLOWS THROUGH INDIVIDUAL LOTS. Date: By: Date: E. THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE LOCATIONS OF ALL STUB -OUT CONVEYANCE LINES WITH RESPECT TO OTHER UTLILITES (e.g. POWER, GAS, TELEPHONE, TELEVISION). CALL 811 BEFORE YOU DIG! OFFE ENGINEERS tiL" e•oF� 13932 SOUTHEAST 159TH PLACE qe• m RENTON, WASHINGTON 98058 Z PHONE: 425-260-3412 2J480 •"FS C/STEPS. �� CONTACT: DARRELL OFFS, P.E. AL E� 09/11/2014 NO. REVISION BY DATE APPR HANSEN SURVEYING I SCALE OFFE, P.E. AT FlILL Sa4EFlILL Sa4E F ear p1E PNN YHE AaYT NOTES 1. When the driveway width exceeds 15 feet, construct a full 6. Sidewalks at driveway approaches and driveway depth expansion joint (see Standard Plan F-3) with 3/8" pint apron to be 6" min. depth of comate. filler along the driveway centerline. 2. Construct expansion joints parallel with the centerline as required at 15' maximum spacing when driveway widths exceed 30'. See Std. Plan F-3 for sidewalk details. 3. Curb and gutter shown, see the Contract. Plans for the curb design specified. See Std. Plan F-1 for curb details. 4. Avoid placing drainage structures, junction boxes or other obstructions in front of driveway entrances. 5. When driveway approaches are constructed in a commercial zone, the concrete driveway entrance shall be thickened from 6 inches to 10 inches. This includes concrete approach Types 1-4, sidewalks constructed behind the driveway apron, and the curb and gutter associated with each driveway approach. F, DRIVEWAY. y.CZ(FQ (BY OTHERS) CEM. CONIC. Ropegry 16 % - CURB & GUTTER (SEE NOTE 3) CEMENT CONCRETE 0 33. ' DRIVEWAY ENTRANCE SIDEWALK WHERE SHOWN 5 7 SIDE SLOPE (TYP.) rDEPRESSED CURB & GUTTER (SEE OTE 3 SIDEWALK & DRIVEWAY APRON (SEE NOTE 6) CEMENT( :TE D N.T.S. � FOR APPROVAL By: - Date: 9-/9.2d/� By: Date: By: Date: By: Date: le�� R-315106 RECOMMEND a xw FOR APPROVAL By: - Date: 9-/9.2d/� By: Date: By: Date: By: Date: CITY WOF rMAY CREEK COURT SHORT PLAT xrcmoxrw: wn IaB1 IWI Wu RENTON VINEYARDS CONSTRUCTION, LLC DATUM STORM DETAILS AND NOTES Planning/Building/Public Works Dept. 2530 DUVALL AVENUE NE -i�� DET 09/11/2014 rafmoac I L- S�