HomeMy WebLinkAboutS-070206A Is
I
MUNICIPALITY OF METROPOLITAN SEATTLE
KING COUNTY, WASHINGTON
SEWAGE PROJECT
CONTRACT NO,,. 62 -2
4 CONSTRUCImED DRANN
BIDS RECEIVED
CONTRACT AWARDED
NOTICE TO PROCEED
CONTRACT COMPLETED
WORK ACCEPTED
RESOLUTION
NO.
FINAL CONTRACT COST
CONTRACTOR
SCHEDULE I
R202A E. SIDE INTERCEPTOR
SECTION 2
APRIL II, 1962
APRIL 19,1962
MAY I, 1962
AUG. If 1963
JULY 1811963
305
$3,375,084.99
PACIFIC MECHANICAL CONSTT,
SCHEDULE 2
R210A CEDAR RIVER TRUNK
SECTION I
APRIL
11, 1962
APRIL
19,1962
MAY
3111962
JAN.
211963
FEB. 2121963
254
$ss2,i7s.00
VALLEY, MORRISON—KNUDSEN
METROPOLITAN ENGINEERS
410 WEST HARRISON
SEATTLE 99, WASHINGTON
SCHEDULE 3
R201C BRYN M AWR-
BOEING RENTON TRUNK
APRIL I Is 1962
APRIL 19,1962
MAY 2821962
DEC. 10, 1962
DEC. 2Q, 1962
234
$ 552,816.68
FRANK COLUCCIO CONST.
u
GZ
I
1.