HomeMy WebLinkAboutR-377518z
0
U
0 0
0
Ua
Z
CQ
L
2
3
A PORTION OF THE NW 1/4 OF THE NW 1/4 OF SECTION 15, TWP. 23 N., RGE. 5 E., W.M., KING COUNTY, WA
SEE SHEET 'D
22 23
\ ...
:...
f
�`,•�_ _.���•��: � •� ���` Ilse' � � r��
i
Sf3
E SHEET RD -02
i
/ / 4ca -- - -- j
V_
SEEP HEET RD -02
I
%- 77=-
Cd 2 WorUV Da1ys More You 019
UtWea Undw OJW Location Canter
01D►1g100ItwN
405
11
395
375
x
25
�f (TYP,) ' 6.0 ROOF DRAIN
0 S =1.0% MIN. (TYP)--jE
\ 32
PAD- 387.50
\ " ; 31 30 29 28
�... PAD = 387.50 PAD = 387.50 PAD - 388.50 PAD = 389,50
ROAD D. _ I
- - SEE SHEET R.
r- - -- - -_ -
PROPOSED WALL
TRACT L
SEE SHEET RD -04
ROAD C
i NVz \ \,xA
26\
27
= 391.50 I f
CB f5 TYPE 2 -48 "0
W / SOILD LOCKING LIN
STA 2 +39.19, 0.00' CL
TRACT J'
j X56 LF, 12 "0
PAD= 394.80
35
PAD - 394.80
34
PAD = 394.80
33
N: 180455.86
E: 1312301.69
IE= 392.03, 12 "0
INLET PIPE FOR EX. DRAINAGE
SWALE FROM VAULT
1 +00
NO.
REVISION
2 +00
auw ":
BY I DATE I APPR I w"y9""n,
3 +00
405
//
395
n
-,
}
1_
KEY MAP
SCALE: 1 =20• HORIZ.
1• =5• VERT.
20 10 0 20 40
NOTES:
1. SEE SHEET HOR -01 - HOR -03 FOR HORIZONTAL CURVE DATA.
2. EXISTING DRY UTILITIES SHALL BE REMOVED OR RELOCATED BY THE
APPROPRIATE UTILITY COMPANIES AND COORDINATED WITH THE
CONTRACTOR. NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM THE
ENGINEERING PLANS. THESE RECORDS SHALL BE KEPT ON
CONSTRUCTION DRAWINGS AND TURNED OVER TO THE ENGINEER UPON
COMPLETION OF THE PROJECT.
4. STREET NAME SIGNS AND STOP SIGNS TO BE INSTALLED PER CITY OF
RENTON STANDARDS G012 & GI FINAL LOCATIONS TO BE
DETERMINED DURING CONSTRUCTION BY THE CITY. SIGNS WILL NEED TO
BE INSTALLED PRIOR TO AS- BUILTS AND COMPLETION OF
CONSTRUCTION.
5. ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF
RENTON TRENCH RESTORATION AND STREET OVERLAY DETAIL
6. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
7. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1
FOOT.
8. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION
PER THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV
INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION
SHALL INCLUDE ALL PROJECT STORM DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CITY
OWNED /MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER
DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE
STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND COMPATIBLE
WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY
WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS
VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE
FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL
REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE
UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN
(AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION
PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION
SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER
SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY
DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE
COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING
OR AIR TESTING THAT MAY BE REQURIED BY THE CITY TO VERIFY
THE CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED
IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF
THE DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
390
ALLOWABLE PIPE MATERIALS
1. REINFORCED CONCRETE PIPE
385 2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52)
3. SOLID WALL POLYETHYLENE PIPE (SWPE ALSO
KNOWN AS HOPE PIPE OR HOPP)
4. CORRUGATED POLYETHYLENE PIPE (CPEP)
0
375
3 +40
UTILITY CROSSING TABLE
O I.E.
M
00
CD
O
suiwa 5
M
?
N�
N
MM
f0
^-
NIA
O
a
N
N
welk wo,w
b
t..
I vmpct uo. «.,a «. I InM.Cppe MWlslu,.
�m
it
WIC
ri
W�
00 OJ
Oi
UD m�
O
�I�
M10.
N
mT
Nj
Olm
IQ
�'�
IA
CIA
,l'l Cal
f0
tn Ch
i0 ^.O
�'T
m
MM
MM
MM
MM
MM
M,7
M!n
MM
MM
ROCK
WALL BUILDING
PERMIT TO BE
OBTAI
ED BY OWNE
_ - --
_ _ -- --
DRAIN ROCK
_-
I
- _._ ---
a
I
PRO
OSED GRADE
; ,.
I
III
I,,
OF PIPE
15.5'
EXISTING
(GROUND
/
"0
0 OL
OF PIPE
8 W.M
_
= '' -�- "1
E.= 392.03
j
-
- -- -----
- - - -..
_. -
._ - - - -
- - - --
---
i
�
GONG. BASE/
COLLAR TO
BE DETAILED
/ BUILDING
PERMIT PLANS
r__ - - -- -i
-
_ - 214 LF,
120 SD 0
5 =1.74%
8•02• PERF
PIPE TEE _-
pQ.vp'c6
TO BE DETARED
W/
O
BUILDING PERMIT
PLANS
.�'
CB 5 TYPE
2 -48'0
56 LF, 12.0 S
0 S= 12.27%
FT11*0
W /SOLLD�OC((Nj
UND
S.S.
IE= 385.16 12
"0 E
IE= 385.66
0 SW
C13 #3
IE= 385.16 12
"0 W
SEE SHEET
I
1 +00
NO.
REVISION
2 +00
auw ":
BY I DATE I APPR I w"y9""n,
3 +00
405
//
395
n
-,
}
1_
KEY MAP
SCALE: 1 =20• HORIZ.
1• =5• VERT.
20 10 0 20 40
NOTES:
1. SEE SHEET HOR -01 - HOR -03 FOR HORIZONTAL CURVE DATA.
2. EXISTING DRY UTILITIES SHALL BE REMOVED OR RELOCATED BY THE
APPROPRIATE UTILITY COMPANIES AND COORDINATED WITH THE
CONTRACTOR. NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM THE
ENGINEERING PLANS. THESE RECORDS SHALL BE KEPT ON
CONSTRUCTION DRAWINGS AND TURNED OVER TO THE ENGINEER UPON
COMPLETION OF THE PROJECT.
4. STREET NAME SIGNS AND STOP SIGNS TO BE INSTALLED PER CITY OF
RENTON STANDARDS G012 & GI FINAL LOCATIONS TO BE
DETERMINED DURING CONSTRUCTION BY THE CITY. SIGNS WILL NEED TO
BE INSTALLED PRIOR TO AS- BUILTS AND COMPLETION OF
CONSTRUCTION.
5. ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF
RENTON TRENCH RESTORATION AND STREET OVERLAY DETAIL
6. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
7. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1
FOOT.
8. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION
PER THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV
INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION
SHALL INCLUDE ALL PROJECT STORM DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CITY
OWNED /MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER
DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE
STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND COMPATIBLE
WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY
WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS
VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE
FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL
REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE
UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN
(AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION
PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION
SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER
SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY
DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE
COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING
OR AIR TESTING THAT MAY BE REQURIED BY THE CITY TO VERIFY
THE CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED
IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF
THE DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
390
ALLOWABLE PIPE MATERIALS
1. REINFORCED CONCRETE PIPE
385 2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52)
3. SOLID WALL POLYETHYLENE PIPE (SWPE ALSO
KNOWN AS HOPE PIPE OR HOPP)
4. CORRUGATED POLYETHYLENE PIPE (CPEP)
0
375
3 +40
UTILITY CROSSING TABLE
O I.E.
f °eaaesam9 0
I® I I
12.0
suiwa 5
ter/
379.41,
Faaaral Way, WA 98003
O I.E.
(W.M.)
www.eamcivil.com
8 "0
CR.
u Eno ^ «naa
vlmxu,q
two sumon"
welk wo,w
b
t..
I vmpct uo. «.,a «. I InM.Cppe MWlslu,.
ESM
JOB #1799- 001 -013
1 +00
NO.
REVISION
2 +00
auw ":
BY I DATE I APPR I w"y9""n,
3 +00
405
//
395
n
-,
}
1_
KEY MAP
SCALE: 1 =20• HORIZ.
1• =5• VERT.
20 10 0 20 40
NOTES:
1. SEE SHEET HOR -01 - HOR -03 FOR HORIZONTAL CURVE DATA.
2. EXISTING DRY UTILITIES SHALL BE REMOVED OR RELOCATED BY THE
APPROPRIATE UTILITY COMPANIES AND COORDINATED WITH THE
CONTRACTOR. NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM THE
ENGINEERING PLANS. THESE RECORDS SHALL BE KEPT ON
CONSTRUCTION DRAWINGS AND TURNED OVER TO THE ENGINEER UPON
COMPLETION OF THE PROJECT.
4. STREET NAME SIGNS AND STOP SIGNS TO BE INSTALLED PER CITY OF
RENTON STANDARDS G012 & GI FINAL LOCATIONS TO BE
DETERMINED DURING CONSTRUCTION BY THE CITY. SIGNS WILL NEED TO
BE INSTALLED PRIOR TO AS- BUILTS AND COMPLETION OF
CONSTRUCTION.
5. ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF
RENTON TRENCH RESTORATION AND STREET OVERLAY DETAIL
6. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
7. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1
FOOT.
8. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION
PER THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV
INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION
SHALL INCLUDE ALL PROJECT STORM DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CITY
OWNED /MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER
DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE
STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND COMPATIBLE
WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY
WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS
VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE
FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL
REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE
UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN
(AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION
PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION
SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER
SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY
DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE
COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING
OR AIR TESTING THAT MAY BE REQURIED BY THE CITY TO VERIFY
THE CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED
IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF
THE DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
390
ALLOWABLE PIPE MATERIALS
1. REINFORCED CONCRETE PIPE
385 2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52)
3. SOLID WALL POLYETHYLENE PIPE (SWPE ALSO
KNOWN AS HOPE PIPE OR HOPP)
4. CORRUGATED POLYETHYLENE PIPE (CPEP)
0
375
3 +40
UTILITY CROSSING TABLE
O I.E.
(S.D.)
381.64,
12.0
CR.
(S.S.)
379.41,
8 "0
O I.E.
(W.M.)
393.86,
8 "0
CR.
(S.D.)
385.90,
12.0
CHECKED FOR COMPLIANCE TO CITY STANDARDS
1z T, IN
R= 311518
CITY 0 F WHITMAN COURT 12/01/201,
DATUM RENTON ROAD AND STORM PLAN AND PROFILE
l 0HE 1XPt �
*� Planning /Building /Public Works Dept. PERMIT #1-114003820 RD -03
IE NO! q1E Ntll
SCY£ AttVNH0.Y
Cb: R - 377 / 9