HomeMy WebLinkAboutS-070305GENERAL NOTES:
1. SURVEY CONTROL MONUMENTS ARE LOCATED WITHIN THE EXISTING R.O.W. OF
S.W. 16th STREET CONSISTING OF BRASS CAPS 3 1/2" DIAMETER WITH THE
INSCRIPTION:
N PAC a PAC
�. 277 �� ,W 277 7
h 9 - h 9
+
A B
STATE PLANE COORDINATES (WASHINGTON COORDINATE SYSTEM NORTH ZONE
1927 NORTH AMERICA DATUM APPROX. & TRUNCATED) U.S. SURVEY FEET.
MONUMENT A MONUMENT B
N73,142.69 N73_149_62
E 52897_46 E§12-7-706
ELEVATION 117.155 ELEVATION 1174515
ALL COORDINATES SHOWN & REFERENCED ON THESE DRAWINGS HAVE BEEN
TRUNCATED AS NOTED BELOW;
ACTUAL STATE PLANE COORDINATES,
N 173,400 E 1,653,000
AS SHOWN ON PLANS•
4 N 73,400 E 53,000
2. VERTICAL ELEVATIONS ARE BASED ON METRO DATUM WHICH IS NVGD
(USC & GS. GEODETIC MEAN SEA LEVEL) PLUS 100 FEET. SUBTRACT 100 FEET
FROM ELEVATIONS TO OBTAIN ELEVATIONS PER CITY OF RENTON DATUM.
3. EXISTING UTILITIES AND OTHER SUBSURFACE INFORMATION SHOWN ON THE
PLANS IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE. THE
CONTRACTOR SHALL LOCATE ANY SUBSURFACE OBJECTS THAT MAY AFFECT OR
CONFLICT WITH THE WORK OF THIS CONTRACT.
4. THE P -1 CHANNEL HAS BEEN COMPLETED NORTH OF GRADY WAY. THE DESIGN
OF THE 108 INCH DIAMETER SOUTH INTERCEPTOR PARALLEL ACCOMODATES A
FUTURE EXTENSION OF THE P -1 CHANNEL BY CONSTRUCTING A LOW HEAD BOX
STRUCTURE. THIS STRUCTURE IS PROVIDED AT THE SAME LOCATION AS THE LOW
HEAD STRUCTURE LOCATED ON THE EXISTING 72 INCH DIAMETER SOUTH
INTERCEPTOR.
5. THE BOEING COMPANY HAS A PROJECT (THE CSTC SITE DEVELOPMENT) THAT
WILL BE UNDER CONSTRUCTION CONCURRENTLY IN PARCEL 1 (SEE LOCATION MAP,
SHEET 1). UTILITIES THAT WILL BE CONSTRUCTED UNDER THAT CONTRACT ARE
SHOWN AS PROPOSED ON THE PIPE PROFILES. THESE PROPOSED UTILITIES ARE
NOT SHOWN ON THE PLAN SHEETS. ALL UTILITIES NOT MARKED PROPOSED OR
3 FUTURE ARE EXISTING.
6. WETLAND BOUNDARIES SHOWN ON THE PLANS WERE DEVELOPED USING THE
JANUARY 1989 FEDERAL MANUAL FOR IDENTIFYING AND DELINEATING JURISDICTIONAL
WETLANDS.
7. A COPY OF ALL DESIGN STANDARDS SPECIFIED FOR USE ON -SITE SHALL BE
AVAILABLE IN THE CONTRACTOR'S OFFICE AT ALL TIMES.
8. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION
COLLECTION AND EROSION CONTROL FACILITIES AND POLICIES, TO ENSURE
THAT EROSION OF THE SITE DOES NOT OCCUR AND THAT SEDIMENT -LADEN
WATER DOES NOT LEAVE THE SITE. FACILITIES AND POLICIES SHALL BE
ADJUSTED AS SEASONAL CHANGES OCCUR AND AS SITE CONDITIONS CHANGE.
9. THE CONTRACTOR SHALL PROVIDE CONTINUAL, RATHER THAN PERIODIC,
MAINTENANCE AND CLEANING OF THE WORK AREAS, THE ROADS AND
FACILITIES USED BY THE CONTRACTOR AND HIS SUBCONTRACTORS, AND
THOSE PORTIONS OF THE CONTRACTOR'S YARD AND THE LAY -DOWN AREA
USED BY THE CONTRACTOR AND HIS SUBCONTRACTORS.
10. THE CONTRACTOR SHALL PREVENT CONSTRUCTION DEBRIS FROM ENTERING
NEARBY WATERWAYS AND WETLAND AREAS.
2 11. CONSTRUCTION EQUIPMENT SHALL BE CONTINUOUSLY MAINTAINED IN TOP
WORKING ORDER AND FREE FROM LEAKING FLUIDS. EQUIPMENT WHICH, IN
THE SOLE OPINION OF THE ENGINEER IS IN POOR OPERATING
CONDITION, SHALL BE REMOVED FROM THE SITE TO THE SATISFACTION OF
THE ENGINEER.
12. CONSTRUCTION EQUIPMENT SHALL BE SERVICED AND MAINTAINED ONLY
WITHIN AREAS APPROVED FOR THAT PURPOSE. THE CONTRACTOR SHALL
SUBMIT TO THE ENGINEER A REQUEST SHOWING THE AREA
REQUESTED AND THE PROVISIONS TO BE MADE FOR BERMING COLLECTING
WASTE OIL. AND PREVENTING RUNOFF OF PETROLEUM PRODUCTS INTO
THE SURROUNDING AREAS. ,
13. PIPES ENCOUNTERED DURING DEMOLITION SHALL BE TRACED OUT AND
REMOVED OR SUPPORTED AS REQUIRED DURING CONSTRUCTION.
14. THE CONTRACTOR SHALL SUBMIT A DETAILED PLAN FOR
CONTROLLING DUST ON THE SITE, TO BE APPROVED BY
THE ENGINEER.
15. POWER POLES AND TELEPHONE POLES WITHIN THE EASEMENT WHICH
CONFLICT WITH PIPE OR STRUCTURE INSTALLATION SHALL BE REMOVED
BY THE CONTRACTOR. OVERHEAD POWER AND TELEPHONE LINES WILL BE
1 RELOCATED BY THE CONTRACTOR IN AREAS SHOWN ON THE PLANS.
CONTRACTOR WILL COORDINATE WORK WITH THE AFFECTED UTILITIES. ALL WORK
PERFORMED BY THE UTILITIES SHALL BE AT THE CONTRACTORS EXPENSE. HIGH
VOLTAGE POWER WILL REMAIN IN PLACE NEAR THE PIPELINE - CONTRACTOR
SHALL TAKE MEASURES TO PROTECT WORKERS AND POWER LINES.
16. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -
CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS AND THE ENGINEER.
N
m
1
m
0
0
REISKN 8Y DATE
A A
w U
17. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
18. ROCK FOR EROSION PROTECTION WHERE REQUIRED,
SHALL BE SOUND QUARRY ROCK PLACED TO A DEPTH OF i FOOT AND MUST
MEET THE FOLLOWING SPECIFICATIONS: 4 " -8" ROCK /40 % -70% PASSING; 2 " -4"
ROCK /30% -40% PASSING; AND -2" ROCK /10 % -20% PASSING.
19. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMIT BY THE CITY OF
RENTON DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL
OBLIGATION AND /OR LIABILITY CONNECTED WITH STORM SURFACE WATER
DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY
013UGA11ON FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE
SYSTEM PROVIDED DURING CONSTRUCTION.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE
SAFEGUARD, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND
ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY
OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE
PERFORMANCE OF WORK COVERED BY THE CONTRACT. ANY WORK WITHIN THE
TRAVELED RIGHT -OF -WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW
SHALL REQUIRE AN APPROVED TRAFFIC CONTROL PLAN BY THE TRAFFIC
ENGINEERING DIVISION OF THE DEPARTMENT OF PUBLIC WORKS CITY OF RENTON.
21. ANY REED CANARY GRASS ENCOUNTERED DURING CLEARING AND GRUBBING
OPERATIONS SHALL BE REMOVED FROM THE SITE. REED CANARY GRASS HAS
BEEN IDENTIFIED FROM STA 4 +00 TO 15 +GO AND STA 26 +00 TO 40 +00.
22. ALL 12 AND 36 INCH DIAMETER PIPE SHALL BE PER ASTM C -76
CLASS 5.
23. ALL 108 AND 78 INCH DIAMETER PIPE SHALL BE M -LOAD DESIGNED
REINFORCED CONCRETE PIPE. THE WALL THICKNESS AND REINFORCEMENT
SHALL BE DESIGNED BY THE PIPE SUPPLIER USING THE LOADS LISTED
BELOW.
M -LOAD REINFORCED CONCRETE PIPE DESIGN TABLE AND NOTES:
t F
PILES
ALLOWABLE LOAD 10 TONS
CONCRETE EXCLUDING CONCRETE M -LOAD PIPE ( SEE ABOVE )
ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 pal AT
28 DAYS.
MINIMUM CONCRETE COVER FOR REINFORCEMENT BARS UNLESS DETAILED OTHERWISE,
SHALL BE AS FOLLOWS:
CONCRETE CAST AGAINST THE GROUND 3"
CONCRETE IN CONTACT WITH SEWAGE 2 -1/2"
CONCRETE ON EXTERIOR FACE OF EXTERIOR WALLS AND SLABS 2"
CONSTRUCTION JOINTS SHALL BE AS SHOWN IN THE PLANS OR SHALL HAVE THE
APPROVAL OF THE ENGINEER.
ALL EXPOSED CONCRETE CORNERS AND EDGES SHALL HAVE 3/4" CHAMFER.
REINFORCING
ALL REINFORCING STEEL SHALL CONFORM TO THE REQUIREMENTS OF ASTM 615,
GRADE 60. ALL BAR SPLICES SHALL BE AS SHOWN ON THE PLANS. ALL BENDS
AND HOOKS SHALL CONFORM TO ACI 318 -89, CHAPTER 7, '
STRUCTURAL STEEL
ALL STRUCTURAL STEEL SHALL CONFORM TO THE REQUIREMENTS OF ASTM A -36.
ALL BOLTS FOR STRUCTURAL STEEL SHALL CONFORM TO THE REQUIREMENTS
OF ASTM A -325.
ALL ANCHOR BOLTS IN CONCRETE SHALL CONFORM TO THE REQUIREMENTS
OF ASTM A -307.
ALL WELDING SHALL CONFORM TO THE REQUIREMENTS OF AWS D1.1 -
STRUCTURAL WELDING CODE - STEEL, FOR NEW BUILDINGS.
G
H
M -LOAD
PIPE DESIGN
MOMENT
ACTING ON TOP
21.4
KIP -FT
ACTING ON BOTTOM
31.7
1. DESIGN SHALL BE IN ACCORDANCE WITH THE AASHTO STANDARD SPECIF-
ACTING ON SIDE
-21.2
THRUST
ACTING ON TOP
-4.4
KIPS
ACTING ON BOTTOM
-3.5
ACTING ON SIDE
8.5
-
SFIEAR KIPS
MAXIMUM
11.6
MOMENT += TENSION ON INSIDE FACE
THRUST AXIAL COMPRESSION
1. DESIGN SHALL BE IN ACCORDANCE WITH THE AASHTO STANDARD SPECIF-
ICATIONS FOR HIGHWAY BRIDGES 14th EDITION SECTION 17.
2. CONCRETE SHALL HAVE f c -5,000 psi MINIMUM.
3. REINFORCING STEEL SHALL HAVE A fy- 60,000 psi, BUT AN fy- 40,000 psi
SHALL BE ASSUMED FOR CALCULATING THE AMOUNT OF REINFORCING STEEL
REQUIRED.
4. CROWN OF THE PIPE SHALL HAVE THE SAME REINFORCEMENT AS THE INVERT.
5. CIRCUMFERENTIAL REINFORCEMENT SHALL HAVE A MINIMUM CONCRETE COVER OF 1 INCH.
8. THE EFFECTS OF COMPRESSION REINFORCEMENT SHALL BE NEGLECTED.
7. JOINT GAPS IN EXCESS OF 7/8 INCH SHALL BE CONSIDERED DEFECTIVE.
DEEEFFFECTIVE.
8. PROVIDE JOINT SHEAR TEST IN ACCORDANCE WITH DETAIL
FOR TYPICAL JOINT PRIOR TO PIPE DELIVERY. 1
GENERAL STRUCTURAL NOTES:
DESIGN SPECIFICATIONS:
IN ACCORDANCE WITH:
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, ACI 318 -89
ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES, ACI 350 -89
STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, AASHTO 14th EDITION,
INTERIMS THROUGH 1991
CONSTRUCTION LOADS:
STRUCTURES HAVE BEEN DESIGNED FOR OPERATIONAL LOADS ON THE COMPLETED
STRUCTURE. DURING CONSTRUCTION, STRUCTURES SHALL BE PROTECTED AGAINST
EXCESSIVE CONSTRUCTION LOADS.
DESIGN LOADS:
DEAD LOAD
REINFORCED CONCRETE 155 pcf
STRUCTURAL STEEL 490 pcf
LIVE LOAD
HS -20 AS REQUIRED _
_ C
C
EARTH: .
. _ . _ _ . . ,
,�, •
BURIED STRUCTURES
WEIGHT OF SOIL 130 pcf _
_ C
C
ALLOWABLE BEARING PRESSURE 5,000 p
U
psf U
3
2