Loading...
HomeMy WebLinkAboutS-072609A 0 A C A 0 A L A F O H AIN -­7 illillillilljllllllllllilljllllllllllllllllI — 111111111111 0�_ IN,, 4 - — -- — ­ — — — -- 22 SEE NOA It"/ CONNE To TO 01 )I&OGOO - 4'Z2� N07 2 T I -Cn3 4 6 18&00 16TH 77= Sr 5'F 1, 65,2.9 2.9 34 - NOTES: : 47-1 4 I. FOR CONDUIT CARS. SEE DWG ES AND TRENCH DETAIL 013. STA 17+81.55 T 2. W Di LINES CONSTRUCTED By OTHERS IMTH 12' _W M (IPX FOR N 173,191. SEPARATION. 16• IRR CONTINUATION E 1.652,1 A- 4 1) 3. TRANSITION FROM 24' PIPE SEPARATION TO 12' D, SEPARATION AT CONNECTION To E)IISTING 30• Di 4W BEND LINES BY mum STA 22+ 3 125 S-O.0b072 120 As SWU Drawbog 81 = ofr 2 110. W z 105 100 IE 107.87 95 0 AS-BUILT A x 14+00 14+40 0 *"of oc ez 9e Seattle. Washington CITY OF RENTON DEPARTMENT OF PUBLIC WORKS C v 0 E ::If ,07.8. 07.15 105 + ^v 100 95 18+60 18+40 16+60, LKM/MPW 411METRO MUFACIP&Hty of matmpautan ftatth FED 1"3 AD TEAMI MVO BOEING CHILLER COOLING WATER SUPPLY SYSTEM 6956GOO9.DVG AS NOTED EI'm AND "m LINES a WARBURTON PLAN AND PROFILE G9 W/m 15 -93 STA 14+00 TO 19+12.33 F 0 v 2 5 4 3 61P 10 12• NMI! If ii-l-a" CLOW ii" tug mice It :18 on to the qm1jt7 of the ~MAL Meet ge *a cc at 19 oz at 91 41 91 91 at u OL 6 • 4 9 9 111 c a 0 jr III llllllllllnul Inllllnlnllllllllnnlnlllllllllulllulllullllnlnlllnll� S-O.0b072 qrl As SWU Drawbog = ofr 14+86 . . . ........ 4+­66 18 +40 16+80 i7+'2' 0 17460 SCALE: HORIZ. 1' -20' VERT. 1*-6' Brown and Caldwell Consultants Seattle. Washington CITY OF RENTON DEPARTMENT OF PUBLIC WORKS C v 0 E ::If ,07.8. 07.15 105 + ^v 100 95 18+60 18+40 16+60, LKM/MPW 411METRO MUFACIP&Hty of matmpautan ftatth FED 1"3 AD TEAMI MVO BOEING CHILLER COOLING WATER SUPPLY SYSTEM 6956GOO9.DVG AS NOTED EI'm AND "m LINES a WARBURTON PLAN AND PROFILE G9 W/m 15 -93 STA 14+00 TO 19+12.33 F 0 v 2 5 4 3 61P 10 12• NMI! If ii-l-a" CLOW ii" tug mice It :18 on to the qm1jt7 of the ~MAL Meet ge *a cc at 19 oz at 91 41 91 91 at u OL 6 • 4 9 9 111 c a 0 jr III llllllllllnul Inllllnlnllllllllnnlnlllllllllulllulllullllnlnlllnll�