HomeMy WebLinkAboutS-072609A 0 A C A 0 A L A F O H
AIN
-7
illillillilljllllllllllilljllllllllllllllllI —
111111111111 0�_ IN,,
4
- — -- — — — — --
22
SEE NOA It"/
CONNE To
TO
01
)I&OGOO
- 4'Z2�
N07 2
T I
-Cn3
4
6
18&00
16TH
77= Sr
5'F
1, 65,2.9 2.9 34
-
NOTES: : 47-1
4
I. FOR CONDUIT CARS. SEE DWG ES AND TRENCH
DETAIL 013.
STA 17+81.55 T
2. W Di LINES CONSTRUCTED By OTHERS IMTH 12' _W M (IPX FOR N 173,191.
SEPARATION. 16• IRR CONTINUATION E 1.652,1
A- 4
1)
3. TRANSITION FROM 24' PIPE SEPARATION TO 12' D,
SEPARATION AT CONNECTION To E)IISTING 30• Di 4W BEND
LINES BY mum STA 22+
3
125
S-O.0b072
120
As SWU Drawbog
81
= ofr
2
110.
W
z
105
100 IE 107.87
95
0 AS-BUILT
A
x
14+00 14+40
0 *"of
oc ez 9e
Seattle. Washington CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
C v 0
E
::If ,07.8.
07.15 105
+
^v
100
95
18+60 18+40 16+60,
LKM/MPW 411METRO MUFACIP&Hty of matmpautan ftatth FED 1"3
AD TEAMI MVO BOEING CHILLER COOLING WATER SUPPLY SYSTEM 6956GOO9.DVG
AS NOTED EI'm AND "m LINES
a WARBURTON PLAN AND PROFILE G9
W/m 15 -93 STA 14+00 TO 19+12.33
F 0 v
2
5
4
3
61P
10 12•
NMI! If ii-l-a" CLOW ii" tug
mice It :18 on to the qm1jt7 of the ~MAL Meet
ge *a cc at 19 oz at 91 41 91 91 at u OL 6 • 4 9 9 111 c a 0
jr
III llllllllllnul Inllllnlnllllllllnnlnlllllllllulllulllullllnlnlllnll�
S-O.0b072
qrl
As SWU Drawbog
= ofr
14+86 . . . ........ 4+66
18 +40 16+80 i7+'2' 0 17460
SCALE: HORIZ. 1' -20' VERT. 1*-6'
Brown and Caldwell
Consultants
Seattle. Washington CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
C v 0
E
::If ,07.8.
07.15 105
+
^v
100
95
18+60 18+40 16+60,
LKM/MPW 411METRO MUFACIP&Hty of matmpautan ftatth FED 1"3
AD TEAMI MVO BOEING CHILLER COOLING WATER SUPPLY SYSTEM 6956GOO9.DVG
AS NOTED EI'm AND "m LINES
a WARBURTON PLAN AND PROFILE G9
W/m 15 -93 STA 14+00 TO 19+12.33
F 0 v
2
5
4
3
61P
10 12•
NMI! If ii-l-a" CLOW ii" tug
mice It :18 on to the qm1jt7 of the ~MAL Meet
ge *a cc at 19 oz at 91 41 91 91 at u OL 6 • 4 9 9 111 c a 0
jr
III llllllllllnul Inllllnlnllllllllnnlnlllllllllulllulllullllnlnlllnll�