Loading...
HomeMy WebLinkAboutORD 5540CITY OF RENTON, WASHINGTON ORDINANCE NO. 5540 AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SUBSECTION 4-1-180D, PUBLIC WORKS CONSTRUCTION PERMIT FEES, OF CHAPTER 1, ADMINISTRATION AND ENFORCEMENT, OF TITLE IV (DEVELOPMENT REGULATIONS) OF ORDINANCE NO. 4260 ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF RENTON, WASHINGTON", BY ADDING A NEW SUBSECTION 4-1-180D.4, ENTITLED "HYDRANT METER FEES", AND RENUMBERING THE CURRENT SUBSECTIONS 4-1-180D.4 THROUGH 4-1- 180D.6. THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Subsection 4-1-180D, Public Works Construction Permit Fees, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington", is hereby amended to add a new subsection 4-1-180D.4, to read as shown below. The current subsections 4-1-180D.4 through 4-1-180D.6 shall be renumbered accordingly. 4. HYDRANT METER FEES: The following fees are payable at the time of application for a hydrant meter- Fees for hydrant meters: Hydrant Meter Permit Fee Deposit %" Meter and Backflow Prevention Assemblv 3" Meter and Backflow Prevention Assemblv Deposit processing charge (nonrefundable) Cost of Water Meter Rental %" Meter and Backflow Prevention Assemblv 3" Meter and Backflow Prevention Assemblv $50 per meter application $300.00 $800.00 $25.00 $3.70 per CCF Starts on dav of pickup $11.66/month ($0.39/dav) $143.67/month ($4.79/dav) ORDINANCE NO. 5540 SECTION II. This ordinance shall be effective upon its passage, approval, and thirty (30) days after publication. PASSED BY THE CITY COUNCIL this 14th day of June , 2010. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this 14t" day of jnns , 2010. Approved as to form: AAA>ws^v_w_| Lawrence J. Warren, City Attorney Date of Publication: 6/18/2010 ( summary) ORD:1631:4/22/10:scr Denis Law, Mayor