Loading...
HomeMy WebLinkAboutORD 5279Amends:ORO 3635,ORO 5153 CITY OF RENTON,WASHINGTON ORDINANCE NO.5279 AN ORDINANCE OF THE CITY OF RENTON,WASHINGTON, AMENDING SECTION 4-1-180 OF CHAPTER 1,ADMINISTRATION AND ENFORCEMENT,OF TITLE IV (DEVELOPMENT REGULATIONS)AND 9-14-8 OF CHAPTER 14,VACATIONS,OF TITLE IX (PUBLIC WAYS AND PROPERTY)OF ORDINANCE NO.4260 ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF RENTON,WASHINGTON"BY ADJUSTING FEE SCHEDULES. THE CITY COUNCIL OF THE CITY OF RENTON,WASHINGTON,DOES ORDAIN AS FOLLOWS: SECTION I.Section 4-1-180.A of Chapter 1,Administration and Enforcement, of Title N (Development Regulations)of Ordinance No.4260 entitled "Code of General Ordinances ofthe City of Renton,Washington"is hereby amended to read as follows: A.FRANCmSE PERMIT FEES: Unless otherwise specified in a franchise agreement,the fee shall be due and payable at or prior to the time of construction permit issuance.If a franchise agreement does not specify the fee amount,the generic fee,as identified in the following table,shall be collected.A bond as stipulated in RMC 9-10-5,Street Excavation Bond,is also required. Frontage Length of Replacements and 'Permit Fee Amount Improvements and/or Proiect Scale Small work,including trenching less than $350.00 sixty (60)linear feet or installation of six (6)or less utility poles All other work $350.00 plus $60.00 per overtime hour of inspection SECTIONll.Section 4-1-180.E of Chapter 1,Administration and Enforcement, of Title IV (Development Regulations)of Ordinance No.4260 entitled "Code of General Ordinances ofthe City of Renton,Washington"is hereby amended to read as follows: 1 ORDINANCE NO.5279 E.PUBLIC WORKS PLAN REVIEW AND INSPECTION FEES: All developers,municipal or quasi-municipal entities,or utility corporations or companies,except those specifically exempted,shall pay fees under this Section.Exempted entities include City~franchised cable TV,cable modem,natural gas,telecommunications,and electrical power.Half ofthis fee must be paid upon application and the remainder when the permit(s)is issued.There are additional construction permit fees which are also payable upon issuance.The fee will be based upon percentages of the estimated cost of improvements using the following formula: STREET AND UTILITY PLAN REVIEW AND INSPECTION FEES Estimated Construction Cost:The applicant Fee Amount: must submit separate,itemized cost estimates for each item of improvement subject to the approval by the Public Works Plan Review Section $150,000.00 or less 6%of cost Over $150,000.00 but less than $9,000.00 plus 5%of cost over $300,000.00 $150,000.00 $300,000.00 and over $16,500 plus 4%of cost $300,000.00 and over Construction cost,also known as the Engineer's Estimate or the Contractor's Bid,shall mean cost estimate for all project related improvements outside of the building envelopes, including,but not limited to,all costs required to construct the following:paved parking lots, private sidewalks or walkways;private and public stormwater management facilities;temporary erosion and sedimentation control facilities;water quality facilities;public and private streets; public and private sanitary sewers;public water main improvements;required off-site street,bike and pedestrian improvements;street lighting improvements;required landscaping and street tree improvements;and site grading and mobilization costs. 2 SECTION III. ORDINANCE NO.5279 Sections 4-1-180.G and H of Chapter 1,Administration and Enforcement,of Title IV (Development Regulations)of Ordinance No.4260 entitled "Code of General Ordinances of the City of Renton,Washington"are hereby amended to read as fonows: G.RIGHT-OF-WAY USE PERMIT FEES -REVOCABLE PERMITS FOR THE USE OF EXCESS PUBLIC RIGHT-OF-WAY: These fees are payable at the time of application.The imposition,collection,payment and other specifics concerning this charge are detailed in chapter 9-2 RMC,Excess Right-of-Way Use. Type of Use Fee Amount Single family and two family uses $10.00 annually,plus leasehold excise tax\ if applicable All uses without public benefit 0.5%per month of property value:l ofland to be utilized,plus leasehold excise taxI,if applicable.Payable yearly in advance Uses with public benefit 0.5%per year of assessed value ofland adjoining the property,plus leasehold excise taxI,if applicable.In no case less than ten dollars ($10.00).Payable yearly in advance IThere is hereby levied and shall be collected a leasehold excise tax on the act or privilege of occupying or using public owned real or personal property through a leasehold interest at the rate established by the State of Washington. 2Right-of-way value shall be based on the assessed value ofthe land adjoining the property as established by the King County Assessor. H.STREET AND ALLEY VACATION FEES: The imposition,collection,payment and other specifics concerning this charge are detailed in chapter 9-14 RMC,Vacations. Type of Fee Fee Amount Filing fee,payable at time of application $500.00 Processing and completion fee,payable upon Council approval ofthe vacation and 3 ORDINANCE NO.5279 upon administrative determination of appraised value of vacated Right-of-Way. Appraised value of vacated Right-of-Way Less than $25,000 $25,000 to $75,000 Over $75,000 $750.00 $1,250.00 $2,000.00 SECTION IV.Section 9-14-8 of Chapter 14,Vacations,of Title IX (Public Ways and Property)of Ordinance No.4260 entitled "Code of General Ordinances of the City of Renton,Washington"is hereby amended to read as follows: 9-14-8.COMPENSATION FROM VACATIONS: Compensation received from the vacation shall be placed in the Street Construction Fund for street capital improvements,unless otherwise provided by the City Council. SECTIONV. 30 days after publication. This ordinance shan be effective upon its passage, approval,and PASSED BY THE CITY COUNCIL this 7th day Of __=M=aYL-"2007. Bonnie 1.Walton,City Clerk APPROVED BY THE MAYOR this 7th dayof M_a--'Y'-,2007. ;;t::..pI"ed as to fonn .~~£l?Y~ Lawrence J.Warren,City Attorney Date of Publication:5/12/2007 (summary) ORD.1343:3/28/07:ma 4