HomeMy WebLinkAboutR-375813�ANn5CAP� IMPPOVFMFNi
[�F IWA.LLFb �Y NIR
PApT OF NIPPING PF
ADOA
JC
CviK I/. -mCCc rte, r --C Or, <AIK IC r)
INSTALL "TREE BOOT" OR
"ARBORGARD" IN LAWN AREAS.
PLANT TREE 1"-2" HIGHER
THAN IN NURSERY
WATERING BASIN
SPECIFIED PLANTING SOIL
UNDISTURBED GROUND
12" MIN. FOR WOOD —
STAKES & 18" FOR REBAR
STAPLE
TREE
PLASTIC INTERLOCKING TIES
DETAIL
PRUNE DISEASED AND
BROKEN BRANCHES
PLASTIC INTERLOCKING TIES
SEE DETAIL ABOVE
REMOVE BINDING TWINE & TOP
1/3 OF BURLAP.
2" SETTLED DEPTH WITH SPECIFIED MULCH
FERTILIZER TABLETS
(4-21 GRAM -20-10-5)
ROOT DEF CTOR FOR TREES
ADJACENT 0 SIDEWALKS
-SCARIFY PLANTING PIT
SIDES AND BOTTOM
-6" DEEP, FIRM, NATIVE
SOIL MOUND
I . zx ROOTBALL WIDTH !� IN HEAVY SOILS, AUGER 8"x6' DEEP
HOLE (OR THROUGH HARDPAN) FILL
WITH CRUSHED ROCK. VERIFY GOOD
InWITH
PRIOR TO PLANTING.
NOTE: DO NOT PIERCE TREE ROOTBALL WITH TREE STAKES
DEI-."IDUOUS TREE PLANTING & STAKING DETAIL
NOT TO SCALE
1�Y n�VFLOPFp UNn�p
COWPI'LIC110N UTILITY p�pM r
LANP5CAP� NOTES
1 . CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING THEM4,StLVES WITH ALL OTHER
SITE IMPROVEMENTS AND CONDITIONS PRIOR TO STARTING LANDSCAPE WORK.
2. CONTRACTOR SHALL USE CAUTION WHILE EXCAVATING TO AVOIr DISTURBING ANY UTILITIES ENCOUNTER'`D. Cf NTRACTOR
IS TO PROMPTLY ADVISE OWNER OF ANY DISTURBED UTILITIEF )CATION SERVICE PHONE 1-800-424-55510-
3.
-800-424-55533. CONTRACTOR SHALL MAINTAIN AND WATER ALL PLANT MATERIAL -OR 1 YEAR OR UNTIL FINAL INSPECTION ANI' ACCEPTANCE
BY OWNER.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPUTING SPECIFIC QUANTITIES OF GROUND COVERS AND PLANT MATERIALS
UTILIZING ON -CENTER SPACING FOR PLANTS AS STATED ON THE LANDSCAPE PLAN AND MINIMUM PLANTING DISTANCES AS
SPECIFIED BELOW IN THESE NOTES.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE QUANTITIES OF PLANTS THAT ARE REPRESENTED BY SYMBOLS ON
THE DRAWINGS.
6. SUBGRADE IS TO BE WITHIN 1/10- OF ONE FOOT AS PROVIDED BY OTHERS. ALL PLANTING AREAS TO BE CLEARED OF ALL
CONSTRUCTION MATERIAL AND ROCKS AND STICKS LARGER TH ` ° . 2" DIAMETER.
7. 4"' DEPTH NEW TOPSOIL IN NEW BEDS SHOWN. ROTOTILL INTI: OP 6" OF SOIL.
8. ALL BEDS TO RECEIVE A MINIMUM OF 2" FINE FIR BARK.
9. ALL PLANT MATERIAL SHALL BE FERTILIZED WITH AGRO TRANSPLANT FERTILIZER 4-2-2 PER MANUFACTURER'S CI "'CATIONS
10. ALL PLANT MATERIAL SHALL CONFORM TO AAN STANDARDS FOR NURSERY STOCK, LATEST EDITION. ANY
REPLACEMENTS MADE AT ONCE.
A. GENERAL: ALL PLANT MATERIAL FURNISHED SHALL BE HEALTHY REPRESENTATIVES, TYPICAL OF THEIR SPIECIE
OF VARIETY AND SHALL HAVE A NORMAL GROWTH HABIT. THEY SHALL BE FULL, WELL BRANCHED, WELI,
PROPORTIONED, AND HAVE A VIGOROUS, WELL DEVELOPED ROOT SYSTEM. ALL PLANTS SHALL BE tAARD'f
UNDER CLIMATIC CONDITIONS SIMILAR TO THOSE IN THE LOCALITY OF THE PROJECT.
B. TREES, SHRUBS, AND GROUND COVER: QUANTITIES, SPECIES, AND VARIETIES, SIZES AND CONDITInNS 45
SHOWN ON THE PLANTING PLAN. PLANTS TO BE HEALTHY, VIGOROUS, WELL FOLIATED WHEN IN LEAF. FREE OF
DISEASE, INJURY, INSECTS, DECAY, HARMFUL DEFECTS, AND ALL WEEDS. NO SUBSTITUTIONS SHALL
MADE WITHOUT WRITTEN APPROVAL FROM LANDSCAPE ARCHITECT OR OWNER.
11. NO PERMANENT IRRIGATION SYSTEM IS PROPOSED. TREES LOCATED ON THE PROPOSED LOTS WILL BE IRRIGATED BY FUTURE
HOMEOWNERS. LANDSCAPE STRIP PLANT MATERIAL IS CONSIDERED 100% DROUGHT TOLERANT AND SHALL BE PROVIDED TEMPORARY
IRRIGATION FOR THE FIRST TWO (2) YEARS.
12 HOME BUILDER SHALL BE RESPONSIBLE FOR INSTALLING PROPOSED LOT TREES UPON COVPLETION OF THE PROPOSED HOMES.
STREETSCAPE PLANT MATERIAL SHALL BE INSTALLED BY DEVELOPER.
0
s IN
m
p�ANr SCNr�iu��
L/\Nb5CAP� IMPPOV�M�1\11'5 TO CSF IWA�L�P �Y
NIMP\ A5 FAP\T OF NILPNG P PM 1"
r.C'1ANICA, NAME COMMON NAME QTY 9zE pEMW:KS
fP\E�5
CercidiphqIlum japonicum
Katsura
3
2"
cal
dull and Matching
Betula jacauemorrti*
Jacauemoritii birch
M
2"
cal
dull and Matching
STATE OF
Flowerinq pear
3
2"
cal
dull and Matching
WASHINGTO
Katsura
3
2"
cal
dull and Matching
E D
Serviceberrq
2
2"
w
z
dull and Matching
LAND H CT
14 11?��5 ppOVln�n
l3
Q
Q-
z
C11"
z
z
oQ_mCL
JE M. VAR EY
CERTIFICATE No. 774
c~
S
L
V)
coin
o
w
o
W
o
cn
�
cn
OfoOf
W
V)
Qf
L/\Nb5CAP� IMPPOV�M�1\11'5 TO CSF IWA�L�P �Y
NIMP\ A5 FAP\T OF NILPNG P PM 1"
r.C'1ANICA, NAME COMMON NAME QTY 9zE pEMW:KS
fP\E�5
CercidiphqIlum japonicum
Katsura
3
2"
cal
dull and Matching
Betula jacauemorrti*
Jacauemoritii birch
3
2"
cal
dull and Matching
pqrus callerqana 'Capital's
Flowerinq pear
3
2"
cal
dull and Matching
Acer Campestre Tv(�Iqn' *
Katsura
3
2"
cal
dull and Matching
Amelanchier grandiflora 'Autumn �rilliance'*
Serviceberrq
2
2"
cal
dull and Matching
6 DOTAL X01"5 X 21,01MINIMUM - 12p�QUlp�n
14 11?��5 ppOVln�n
5&05 and 6P\OUNP cov�p\
Viburnum JaviJii*
Pavid Viburnum
12
2 gallon
Carex tes+,acea*
Orange Sedge
io
2 gallon
Miscanthus sinensis
Maiden Grass
26
2 gallon
Nel ictotrichon sempervirens*
131ue Oat Grass
6
2 gallon
I.avandula sp,�*
Lavender
20
2 gallon
Arctostaphullos uva-ursi*
Kinnikinnik
660
I gallon
Lawn
dull and Matt:��nq
dull and Matching
FU1! arv' Matchmq
dull and Marching
dull and Matching
dull and Marching/
plani, 30" o,c:
Note; Adju5t grounol cov, oa5eol on iY 5tall eol drivewaq l ocat.iooz,.-: /Hpical
t- �n� in Fac if � Nor�.hwe5� once e5�ab ,shed
Con5 Jereol drought t R m 375813
�.
PIC
No p\\T20'-C,' 5H51ZL 2211 0411
0 20 4r0 HU
r
U_�
;c N U-) c0
N
CDv N
DESIGNER: JMV
DRAFTING BY: JMV
DATE: 11-6-13
SCALE: AS SHOWN
SHEEP 1 3 OF 18,
CIO
c
l3
s
Q-
S
L
DESIGNER: JMV
DRAFTING BY: JMV
DATE: 11-6-13
SCALE: AS SHOWN
SHEEP 1 3 OF 18,