Loading...
HomeMy WebLinkAboutR-382902u a� 0 U cn a _n c� LO 0 N d' N ca 6 E 0 0 cn 3 Q LO LO N a� a� C C ILO LO N cn CD0 N N L,_ O Y z O 0 53 Z 4j 0 W 3Q W W 0 1... a Q N W V J O L, j d noloo Cly n U U Q .I.- .� o +J :3 E m 0'N Alm CD U O U1 LLJ �E E-� Q S O U W � W :3 a. 1 (7' U a c F 1 = a� :3 E m 0'N Alm CD .• O cn w Iz • 25 50 100 • below, Cal I before you dig. CONSTRUCT)ON SEQUENCE: 1. SCHEDULE AND ATTEND PRE -CONSTRUCTION MEETING WITH CITY 0] LIGHT DUTY ASPHALT PAVEMENT PER DETAIL OF RENTON OFFICIALS. SHT C 15. 2. MAINTAIN THE EXISTING FLAGS FOR THE CLEARING AND GRADING HEAVY DUTY ASPHALT PAVEMENT PER DETAIL S LIMITS FOR PROJECT AS SHOWN ON THE TESC PLANS. CONTACT Q THE CITY FOR INSPECTION AND APPROVAL PRIOR TO CLEARING SHT C 15. AND GRADING ADDITIONAL LIMITS. Q3 BARRIER CURB PER DETAIL SHT C15. 3. MAINTAIN TEMPORARY CONSTRUCTION ENTRANCES AS SHOWN ON THE TESC PLANS. F4� CONCRETE CURB AND GUTTER PER DETAIL 4. MAINTAIN TEMPORARY FILTER FABRIC FENCE AS SHOWN ON THE C 15. TESC PLANS. INSTALL ADDITIONAL FENCE AS NECESSARY. 5 CONCRETE SIDEWALK PER DETAIL SHT C15. 5. IMAINTAIN INLET PROTECTION ON EXISTING CATCH BASINS. INLET PROTECTION SHALL BE INSTALLED ON NEWLY CONSTRUCTED 6 4" WIDE WHITE PAINT STRIPING CATCH BASINS AS WELL, THROUGHOUT THE CONSTRUCTION 0CONCRETE PAVEMENT PER DETAIL SHT C15. PROCESS. 6. TIME LIMIT APPLIES TO ANY WORK PERFORMED IN THE CITY OF 8 ADA PARKING SPACE PAVEMENT MARKING AN RENTON ROW. CONTRACTOR TO COORDINATE WITH CITY OFFICIAL SIGN(S) PER DETAIL SHT C19. FOR TIMING OF ANY CONSTRUCTION WITHIN ROW. [i]t 0 LANDSCAPE AREA, REFER TO LANDSCAPE P 7. PROTECT ALL PROPERTIES ADJACENT TO THE PROJECT FROM SEDIMENT DEPOSITION. SIDEWALK RAMP PER DETAIL SHT C19 AND 8. NO RUNOFF IS TO LEAVE SITE WITHOUT TREATMENT. 9. EROSION CONTROL MEASURES MUST BE IN PLACE AND IN GOOD F111 WHITE THERMOPLASTIC PEDESTRIAN CROSSIN REPAIR PRIOR TO ANY ADDITIONAL CLEARING, GRADING OR CONSTRUCTION. 12 STOP SIGN AND PAINTED STOP BAR 10. MAINTAIN AND/OR COMPLETE TEMPORARY SEDIMENT AND EROSION CONTROL POND. A) THE EXISTING SITE HAS CONTAMINATED SOILS, THEREFORE 13 CONCRETE TO BE FLUSH WITH ASPHALT. SPECIAL REQUIREMENTS ARE NECESSARY DURING EXCAVATION. PROVIDE DETECTABLE WARNING STRIP. B) WHEN EXCAVATING FOR THE PROPOSED POND, SOIL WILL BE 14 WHEEL STOP PER DETAIL SHT C 15. STOCKPILED ON THE EXISTING ASPHALT SURFACE SOUTHWEST OF THE POND AS SHOWN ON THE PLAN. 15 FIRE LANE MARKING C) THE EXCAVATED SOIL STOCKPILE WILL BE LIMITED TO 5000 16 SAWCUT EX. ASPHALT MIN 1' FROM EXISTIN CUBIC YARDS PER DAY. EDGE OF PAVEMENT. REMOVE ASPHALT AND D) AT THE END OF EACH DAY THE STOCKPILE WILL BE COVERED 4 T PROPOSED DRIVEWAY AND/OR CURB RAMP. WITH PLASTIC SHEETING AND SECURED TO PREVENT WIND AND/OR RAINFALL EROSION THROUGH THE WINTER MONTHS. rl7 NEW FENCE (PER ARCHITECTURAL PLANS) F) THE PROPOSED POND WILL BE OVER EXCAVATED AS DETAILED 1$ SITE LIGHT (PER ELECTRICAL PLANS) ON THE PLAN TO ACCOMMODATE THE REQUIRED POND LINER. G) THE POND LINER SHALL BE INSTALLED PRIOR TO DIRECTING 19 NEW ELECTRICAL VAULT ANY SITE DRAINAGE TO THE POND. (SEE ELECTRICAL DWGS) H ANY RUNOFF OR GROUNDWATER ENCOUNTERED IN THE POND 20 REMOVE AND REPLACE EX. ASPHALT, CURB, SIDEWALK AND LANDSCAPE IN KIND FOR UTI AREA PRIOR TO THE LINER BEING INSTALLED WILL BE CONSTRUCTION. COLLECTED, TREATED AND DISCHARGED TO THE SANITARY SEWER. 21 GAS METER W/4'x8'x4" THICK CONCRETE PA 1) STABILIZE THE POND WITH TEMPORARY SEEDING OR CONCRETE PAD BY CONTRACTOR. 5 BOLLARD INSTALLED BY PSE. COORDINATE WITH PSE PERMANENT PLANTING DEPENDING ON THE TIME/SEASON OF GAS SERVICE. COMPLETION. INSTALL PERMANENT PLANTING AS SOON AS THE WEATHER ALLOWS IT. J) RUNOFF FROM THE STOCKPILES WILL NEED TO BE DIRECTED TO THE SANITARY SEWER UNTIL THE STOCKPILE IS COVERED OR STABILIZED. 11. MAINTAIN INTERCEPTOR DITCHES WHERE SHOWN, ADJUST AS NECESSARY DURING CONSTRUCTION TO MAINTAIN POSITIVE DRAINAGE TO THE POND. 12. AMEND E.S.C. FACILITIES AS REQUIRED. 13. WHEREVER CONSTRUCTION VEHICLES ACCESS ROUTE CROSSES 4 PAVED ROADS, CARE MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT (MUD) ONTO THE PAVED ROAD. IF:. SEDIMENT IS TRANSPORTED ONTO PAVED SURFACE, THE ROAD A O SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. _A 14. ALL DISTURBED AREAS WHICH HAVE BEEN EFFECTED BY GRADING,m OPERATION SHALL BE HYDROSEEDED UPON COMPLETION OF 9; O GRADING ACTIVITIES AND IN ACCORDANCE WITH GRADING AND TEMPORARY EROSION AND SEDIMENTATION CONTROL NOTES. 15. CONSTRUCT UTILITIES PER APPROVED PLANS 16. CONSTRUCT BUILDING AND SITE IMPROVEMENTS 17. FINE GRADE SITE AND PAVE 18. CLEAN UTILITIES AS REQUIRED 19. INSTALL LANDSCAPING AND LIGHTING 20. MAINTAIN E.S.C. FACILITIES UNTIL ALL RISK OF EROSION/SEDIMENTATION DRAINAGE HAS PASSED AND PERMANENT STORM DRAINAGE SYSTEM IS INSTALLED AND FUNCTIONAL. DO NOT CONVEY SEDIMENT -LADEN WATER INTO STORM DRAINAGE SYSTEM. TEMPORARY EROSION & S SEDIMENTATION CONTROL FACILITIES CAN BE REMOVED ONLY UPON FINAL SITE STABILIZATION AND APPROVAL FROM CITY OFFICIAL. 21. COMPLETE INSPECTION/PUNCH LIST HT D LA NS C20. G G U O U1 LLJ w 1 0-0 z_ NZ0 S O U 1 Z o W 1 z En U 1 I 1 N :° 1 I 1 1 1 A W A m W w Lj CN oY z OZ LID �Lc j z- ww W Y > o z Z w a O yr w 0 o 0 °d v 0 CL ry qa �I Jv b► Goo Q � U Q O Q W I- Q 0 .• O cn w Iz • 25 50 100 • below, Cal I before you dig. CONSTRUCT)ON SEQUENCE: 1. SCHEDULE AND ATTEND PRE -CONSTRUCTION MEETING WITH CITY 0] LIGHT DUTY ASPHALT PAVEMENT PER DETAIL OF RENTON OFFICIALS. SHT C 15. 2. MAINTAIN THE EXISTING FLAGS FOR THE CLEARING AND GRADING HEAVY DUTY ASPHALT PAVEMENT PER DETAIL S LIMITS FOR PROJECT AS SHOWN ON THE TESC PLANS. CONTACT Q THE CITY FOR INSPECTION AND APPROVAL PRIOR TO CLEARING SHT C 15. AND GRADING ADDITIONAL LIMITS. Q3 BARRIER CURB PER DETAIL SHT C15. 3. MAINTAIN TEMPORARY CONSTRUCTION ENTRANCES AS SHOWN ON THE TESC PLANS. F4� CONCRETE CURB AND GUTTER PER DETAIL 4. MAINTAIN TEMPORARY FILTER FABRIC FENCE AS SHOWN ON THE C 15. TESC PLANS. INSTALL ADDITIONAL FENCE AS NECESSARY. 5 CONCRETE SIDEWALK PER DETAIL SHT C15. 5. IMAINTAIN INLET PROTECTION ON EXISTING CATCH BASINS. INLET PROTECTION SHALL BE INSTALLED ON NEWLY CONSTRUCTED 6 4" WIDE WHITE PAINT STRIPING CATCH BASINS AS WELL, THROUGHOUT THE CONSTRUCTION 0CONCRETE PAVEMENT PER DETAIL SHT C15. PROCESS. 6. TIME LIMIT APPLIES TO ANY WORK PERFORMED IN THE CITY OF 8 ADA PARKING SPACE PAVEMENT MARKING AN RENTON ROW. CONTRACTOR TO COORDINATE WITH CITY OFFICIAL SIGN(S) PER DETAIL SHT C19. FOR TIMING OF ANY CONSTRUCTION WITHIN ROW. [i]t 0 LANDSCAPE AREA, REFER TO LANDSCAPE P 7. PROTECT ALL PROPERTIES ADJACENT TO THE PROJECT FROM SEDIMENT DEPOSITION. SIDEWALK RAMP PER DETAIL SHT C19 AND 8. NO RUNOFF IS TO LEAVE SITE WITHOUT TREATMENT. 9. EROSION CONTROL MEASURES MUST BE IN PLACE AND IN GOOD F111 WHITE THERMOPLASTIC PEDESTRIAN CROSSIN REPAIR PRIOR TO ANY ADDITIONAL CLEARING, GRADING OR CONSTRUCTION. 12 STOP SIGN AND PAINTED STOP BAR 10. MAINTAIN AND/OR COMPLETE TEMPORARY SEDIMENT AND EROSION CONTROL POND. A) THE EXISTING SITE HAS CONTAMINATED SOILS, THEREFORE 13 CONCRETE TO BE FLUSH WITH ASPHALT. SPECIAL REQUIREMENTS ARE NECESSARY DURING EXCAVATION. PROVIDE DETECTABLE WARNING STRIP. B) WHEN EXCAVATING FOR THE PROPOSED POND, SOIL WILL BE 14 WHEEL STOP PER DETAIL SHT C 15. STOCKPILED ON THE EXISTING ASPHALT SURFACE SOUTHWEST OF THE POND AS SHOWN ON THE PLAN. 15 FIRE LANE MARKING C) THE EXCAVATED SOIL STOCKPILE WILL BE LIMITED TO 5000 16 SAWCUT EX. ASPHALT MIN 1' FROM EXISTIN CUBIC YARDS PER DAY. EDGE OF PAVEMENT. REMOVE ASPHALT AND D) AT THE END OF EACH DAY THE STOCKPILE WILL BE COVERED 4 T PROPOSED DRIVEWAY AND/OR CURB RAMP. WITH PLASTIC SHEETING AND SECURED TO PREVENT WIND AND/OR RAINFALL EROSION THROUGH THE WINTER MONTHS. rl7 NEW FENCE (PER ARCHITECTURAL PLANS) F) THE PROPOSED POND WILL BE OVER EXCAVATED AS DETAILED 1$ SITE LIGHT (PER ELECTRICAL PLANS) ON THE PLAN TO ACCOMMODATE THE REQUIRED POND LINER. G) THE POND LINER SHALL BE INSTALLED PRIOR TO DIRECTING 19 NEW ELECTRICAL VAULT ANY SITE DRAINAGE TO THE POND. (SEE ELECTRICAL DWGS) H ANY RUNOFF OR GROUNDWATER ENCOUNTERED IN THE POND 20 REMOVE AND REPLACE EX. ASPHALT, CURB, SIDEWALK AND LANDSCAPE IN KIND FOR UTI AREA PRIOR TO THE LINER BEING INSTALLED WILL BE CONSTRUCTION. COLLECTED, TREATED AND DISCHARGED TO THE SANITARY SEWER. 21 GAS METER W/4'x8'x4" THICK CONCRETE PA 1) STABILIZE THE POND WITH TEMPORARY SEEDING OR CONCRETE PAD BY CONTRACTOR. 5 BOLLARD INSTALLED BY PSE. COORDINATE WITH PSE PERMANENT PLANTING DEPENDING ON THE TIME/SEASON OF GAS SERVICE. COMPLETION. INSTALL PERMANENT PLANTING AS SOON AS THE WEATHER ALLOWS IT. J) RUNOFF FROM THE STOCKPILES WILL NEED TO BE DIRECTED TO THE SANITARY SEWER UNTIL THE STOCKPILE IS COVERED OR STABILIZED. 11. MAINTAIN INTERCEPTOR DITCHES WHERE SHOWN, ADJUST AS NECESSARY DURING CONSTRUCTION TO MAINTAIN POSITIVE DRAINAGE TO THE POND. 12. AMEND E.S.C. FACILITIES AS REQUIRED. 13. WHEREVER CONSTRUCTION VEHICLES ACCESS ROUTE CROSSES 4 PAVED ROADS, CARE MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT (MUD) ONTO THE PAVED ROAD. IF:. SEDIMENT IS TRANSPORTED ONTO PAVED SURFACE, THE ROAD A O SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. _A 14. ALL DISTURBED AREAS WHICH HAVE BEEN EFFECTED BY GRADING,m OPERATION SHALL BE HYDROSEEDED UPON COMPLETION OF 9; O GRADING ACTIVITIES AND IN ACCORDANCE WITH GRADING AND TEMPORARY EROSION AND SEDIMENTATION CONTROL NOTES. 15. CONSTRUCT UTILITIES PER APPROVED PLANS 16. CONSTRUCT BUILDING AND SITE IMPROVEMENTS 17. FINE GRADE SITE AND PAVE 18. CLEAN UTILITIES AS REQUIRED 19. INSTALL LANDSCAPING AND LIGHTING 20. MAINTAIN E.S.C. FACILITIES UNTIL ALL RISK OF EROSION/SEDIMENTATION DRAINAGE HAS PASSED AND PERMANENT STORM DRAINAGE SYSTEM IS INSTALLED AND FUNCTIONAL. DO NOT CONVEY SEDIMENT -LADEN WATER INTO STORM DRAINAGE SYSTEM. TEMPORARY EROSION & S SEDIMENTATION CONTROL FACILITIES CAN BE REMOVED ONLY UPON FINAL SITE STABILIZATION AND APPROVAL FROM CITY OFFICIAL. 21. COMPLETE INSPECTION/PUNCH LIST HT D LA NS C20. G G ' GATE RET WALL w� CONC RET WALL. O J y -, Z a vk LIGHT RTANDARD VIL SITE PLAN II n u n u n x 11 II 11 _1�-===__---- x x ---- LOT LIGHT CONIC RET � LIST LIGHT BALL U1 LLJ D 1 1 S 1 1 a O 1 1 •� 1 I 1 N :° 1 I 1 1 1 A y m C�Ti I I w Lj CN <rrn S�s N N z OZ LID �Lc j z- ww c o c 0 v 0 CL WW qa �I Jv b► Goo Q � U Q O LITY D. S FOR I I I 1 r I I I 1 ! ! r I 1 I r 1 i I r I 1 r ' GATE RET WALL w� CONC RET WALL. O J y -, Z a vk LIGHT RTANDARD VIL SITE PLAN II n u n u n x 11 II 11 _1�-===__---- x x ---- LOT LIGHT CONIC RET � LIST LIGHT BALL 1 1 1 1 1 1 IL 1 1 1 --% r--- --1 r---- ----�a11 MI n O u � •(A n � u � 11 ` � � W II � II IICD II V) (n IlIo-D u ATER Z W TR W O ' WATER AIJLT U OU W LLJ�G V)~ U Z U N ------- O W � W Q V) V) LZ ' o Lam ---- --- 0 o= Q IATERQ MANHOLE L a ` U � I Y CONTRACTOR To W W W Y Y Y U COORDINATE TRENCHING CONDUIT Y Y m TO ITD BUILDING Q ITH ELECTRICAL0. as PLArq Cp N N p -- �' 9- N Q • <<T�o EX. FENCE ON HOUSER WAY TO BE REMOVED (FROM NORTH 4TH STREET TO EXISTING DRIVEWAY NORTH OF SITE) 12'57"E(22.34' POWER CONDUIT TRENCHING PER PSE STANDARDS, REFER TO ELECTRICAL PLANS. 382902 TR iEX. FENCE ON HOUSER WAY TO BE REMOVED Mf (FROM NORTH 4TH STREET TO EXISTING DRIVEWAY NORTH OF SITE) R VAULT BEGIN FENCE REMOVAL (NORTH) {TIS ► "ilTai[1 W -�� • _ - - O� GUY r_#� WASy� Q r F- o N Z P 38950 p �� A/ s j E�� IONA 6/19/2015 O U1 LLJ D 1 1 S 1 1 a O 1 1 •� 1 I 1 N :° 1 I 1 1 1 1 1 1 1 1 1 IL 1 1 1 --% r--- --1 r---- ----�a11 MI n O u � •(A n � u � 11 ` � � W II � II IICD II V) (n IlIo-D u ATER Z W TR W O ' WATER AIJLT U OU W LLJ�G V)~ U Z U N ------- O W � W Q V) V) LZ ' o Lam ---- --- 0 o= Q IATERQ MANHOLE L a ` U � I Y CONTRACTOR To W W W Y Y Y U COORDINATE TRENCHING CONDUIT Y Y m TO ITD BUILDING Q ITH ELECTRICAL0. as PLArq Cp N N p -- �' 9- N Q • <<T�o EX. FENCE ON HOUSER WAY TO BE REMOVED (FROM NORTH 4TH STREET TO EXISTING DRIVEWAY NORTH OF SITE) 12'57"E(22.34' POWER CONDUIT TRENCHING PER PSE STANDARDS, REFER TO ELECTRICAL PLANS. 382902 TR iEX. FENCE ON HOUSER WAY TO BE REMOVED Mf (FROM NORTH 4TH STREET TO EXISTING DRIVEWAY NORTH OF SITE) R VAULT BEGIN FENCE REMOVAL (NORTH) {TIS ► "ilTai[1 W -�� • _ - - O� GUY r_#� WASy� Q r F- o N Z P 38950 p �� A/ s j E�� IONA 6/19/2015 O U1 LLJ D Lq0_ S = U v a O It') z •� U a, N :° z O A y m C�Ti I I w Lj Date: U1 LLJ D Lq0_ S = _ w Q Li a Z LLJ U W :5 i jN ,Q N N In N 00 z Cn ocoo�o z� m C�Ti I I w Lj CN <rrn S�s N N z OZ LID �Lc j z- ww c o c 0 v 0 CL WW qa �I Jv b► Goo Q � U Q O Date: U1 LLJ D N O v) �- ZW w Q Li a Z z U W :5 i jN ,Q N N In N 00 z Cn ocoo�o z� m C�Ti I I w Lj CN <rrn S�s N N z OZ LID �Lc j z- ww 'C Z W A �I Jv b► Goo Date: I � y D N E �- Date 3t8 z N % o N Date 0 ,- U r � I � y D d y ' Uq � 0 N z° m O �N m Cn D n m ;M - o �► c, a c 'C