SE 1/4 SEC TION 3, TOWNSHIP 23 N, RANGE 5 E, W.M.
SAwCU,LINETINS RANCH
REMOTE EX. PVIl1T.`ERSOUTH OF CUT
E 16-TH�
DEMOLITION NOTES: CONSTRUCTION NOTES.•
LEGEND:
DC '�� 1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND
WITH 2 DEEP SEDIMENT BASIN
Y i i X 4 ( 7RANSPORTAT70N PLANS:
7 Q DEP 77 SUMP BOTTOM
.. � .
" w
• ` EL. 456.00
TYPE & SIZE OF PUMP T8D
; ,
X . ';.
., ..
A T CONSTRUCRUN
WI TH 7HE Cl TY OF REN TON.
1
---`---- "
t� --_
DC
J. FLAG OR FENCE CLEARING LIMITS AND PROVIDE TREE PROTECTION.
---
J. THE BOUNDARIES OF THE CLEARING L.' 317"S AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLANS SHALL BE CLEARLY
O
X `
FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONS TRUC T/ON /N A CCORDA NCE WITH APPENDIX D OF THE SURFACE WATER
•
410
•
--ir_
PRO TEC 77 VE FENCE
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
80 REMOVE EXISTING BRICK COLUMN
mCn
Q
AND CONSTRUCTION
= '"'
4. STABILIZED CONSTRUC77ON ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF
:.;
�� ;
- --
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
90 REMOVE EXISTING WALL NORTH FROM BACK OF SIDEWALK
m
STAGING AREA
•<
MU
CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROS/ON
STABILIZED WITH THE APPROVED ESC COVER METHODS E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
I
------_
-
6. INSTALL PER/METER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
zzzi_.a..
00,
_�
X
72
_; _-: -
---
»
48 DIA. SUMP PUMP
7. CONSTRUCT SEDIMENT POND.
10 EXISTING WATER SERVICE TO BE ABANDONED
R
I
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL.
Ps
2
'
�� 2
•
_
--; --- -----
SYS7EMWITH 2' DEEP
8. GRADE AND STABILIZE CONSTRUCTION ROADS
SOIL AMENDMENTS:
I
-
� �
pC
2�
STOCKPILE AREA - -'
--
-- -- -
SED/HENT BASIN
DEPTH SUMP BOTTOM
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMUL TANEOUSL Y WITH CLEARING AND GRAD/NG FOR
Qo
.�..� ' •
LIMITS OF
13. A T NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CA TCH BASIN. ALL CA TCH BAS/NS AND
Z.
;
I
-
e
DOWNSTREAM SYSTEM.
PROJECT DEVELOPMENT.
PERMANENT LANDSCAPE AREA /N INDIVIDUAL LOTS AS WELL AS AREA WITHIN
LS%
DIST!�RNivCE
(TYP.)
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 307H, ALL PROJECT DISTRIBUTED SOIL AREAS, THAT ARE TO BE LEFT
TEMPORARY C T
I
_.
\
-- ------'--
--
EL. 456.00
TYPE & SIZE OF PUMP
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND MANUFACTURERS
TRACT "A" WILL UTILIZE SOIL AMENDMENTS TO IMPROVE THE OVERALL SOIL
QUALITY.
CONTROL MEASURES AND SHALL PROVIDE A DEQUA TE STORAGE CAPACITY. IF THE PERMA NEN T FACILITY /S TO FUNCTION UL T/MA TEL Y AS AN
s
»
59 LF 12 0, s=2. o
PROWDE MIN. 2'' O
I
,.
N
��
•�
o
h
o
Mu
P5
- --
-- _._
----------
'
TBD A T CONSTRUCTION
RECOMMENDA TIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT
FUEL/NG NOTE.
ALL TRUCK AND EQUIPMENT FUELING SHALL BE DONE IN THE CONS7RUCTION
SEEDED IN PREPARATION FOR THE WINTER RAINS DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET
T_
a`
COVER 3
v
7 7'
RENTON FOR REVIEW.
- -
--t-- .------.._
6.00 TEMPORARY
CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS.
STAGING AREA VIA FUEL TRUCK. NO FUEL
C.O.R.
:
n-�-- I
CONSTRUC77ON
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET
ONSITE STORAGE SHALL TAKE PLACE.
X `,
, �' •
•
�N000
i OC
EASEMENT
SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT.
VBF
•
����
I
EQUIPMEN T MAINTENANCE NOTE:
i
�:
*��
13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WI THIN SEVEN DAYS
- --
H B F
- = - _
14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS
ALL TRUCK AND EQUIPMENT MAINTENANCE SHALL BE DONE /N THE CONSTRUCTION
_
_
STAG/NG AREA. DRIP PANS AND PLASTIC SHEET/NG BENEA TH VEHICLES SHALL BE
y . `
..�,:
ASU
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE.
USED. ALL WASTF FUILDS TO BE PROPERLY DISPOSED OF OFFSITE. NO ONSI7F
o
��
l
STORAGE OF WASTE VEHICLE FUILDS SHALL TAKE PLACE. CONTRACTOR TO POST
SIGNS INDICATING THAT NO VEHICLE WASH/NG IS TO TAKE PLACE /N MAINTENANCE
• :,
EROS/ON CONTROL NOTES & SPEC/F/CA TIONS.
��N
AD" lA MP 01111D-11 CYCTr
AREA.
DC '�� 1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND
WITH 2 DEEP SEDIMENT BASIN
Y i i X 4 ( 7RANSPORTAT70N PLANS:
7 Q DEP 77 SUMP BOTTOM
.. � .
" w
• ` EL. 456.00
TYPE & SIZE OF PUMP T8D
2• BEFORE ANY CONS 7RUC 710N OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONS TRUC TION MEETING MUST BE HELD WITH THE CED DEPAR TMEN T
X . ';.
., ..
A T CONSTRUCRUN
WI TH 7HE Cl TY OF REN TON.
1
ANY NEW CONDI TIONS THAT MAY BE CREATED BY THE ACT70TIES AND TO PROVIDE ADDI T70NAL FACILITIES, OVER AND ABOVE MINIMUM
DC
DUST CONTROL
SS
J. THE BOUNDARIES OF THE CLEARING L.' 317"S AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLANS SHALL BE CLEARLY
SC
X `
FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONS TRUC T/ON /N A CCORDA NCE WITH APPENDIX D OF THE SURFACE WATER
•
�C
DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONS7RUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEAR/NG LIMITS
X
PRO TEC 77 VE FENCE
SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
=
/
mCn
DESIGN, SIZE NOR L OCA TION OF PIPES, RESTRIC TORS, CHANNELS, OR RETENTION FACILITIES.
y
9
• TREES TO BE
RETAINED TYP.
( )
4. STABILIZED CONSTRUC77ON ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF
'
THE PROJECT. ADDI T70NAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL
8. ANY AREAS OF EXPOSED SO/LS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON
PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURA 77ON OF 7HE PROJECT.
5. ALL REQUIRED SEDIMENTA TION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERA 77ON PRIOR TO LAND CLEARING AND/OR
•<
CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROS/ON
STABILIZED WITH THE APPROVED ESC COVER METHODS E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
_
'
AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SA RSFACTORY CONDI TION UNTIL SUCH 77ME THAT CLEARING AND/OR CONSTRUC77ON /S
-
COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO
EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMI TEE.
00,
AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET
AN77CIPA 7ED SITE CONDITIONS. AS CONSTRUCT70N PROGRESSES AND UNEXPECTED OR SEASONAL CONDI TIONS DICTATE, THE PERMI TEE SHALL
AN T7C/PA 7E THAT MORE EROSION AND SED/MENTA TION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLE7E SIL TA 77ON CONTROL ON
Call 2 Working Days Before You Dig
811
Utilities Underground Location Center
(ID,MT,ND,OR,WA)
A. J
�&PN
,�
s YA�� �•' 1'�i.� TT!\T TTA T1-1 fl T T !-I
D.R. STRONG
CONSUL TING ENGINEERS
ENGINEERS PLANNERS SURVEYORS
620 - 7TH AVENUE, KIRKLAND, WA 98033 N0.
O 425.827.3063 F 425.827.2423
EROSION CONTROL SUPERVISOR (CESCL):
EARTH SOLUTIONS NW, LLC (425) 284-3300
SEDIMENT POND SIZING SUMMARY (BAKER TANK TO BE UTILIZED):
THE POND WAS SIZED USING THE REQUIREMENTS STATED IN APPENDIX 'D' OF THE 2009 KCSWDM SECTION
D.4.5.2 WHICH REQUIRES 2080 S.F. OF SURFACE AREA PER CFS OF INFLOW WHICH WAS CALCULATED USING
KCRTS (15 MIN TIME STEPS) TO ANALYZE THE DEVELOPED SITE CONDITIONS.
(CA TCHMENT AREA: 4.01 AC.)
2- YEAR PEAK FLOW RATE ...................1.10 CFS
REQUIRED SURFACE AREA.....................2,288 S F.
PROVIDED SURFACE AREA.....................2, 340 S F.
NOTE: 3-10,000 GALLON BAKER TANKS TO BE UTILIZED IN PLACE OF SEDIMENT POND. BAKER TANKS
TO BE UTILIZED AS NECESSARY UNTIL SUCH TIME THAT VAULT FLOOR AND WALLS ARE CONSTRUCTED.
BAKER TANKS TO BE REMOVED AND VAULT TO BE UTILIZED FOR SEDIMENTATION AT THAT TIME.
REVISION
YLP 107.13.15
SURVEYED:
c
DESIGNED: .i77
IMA�J
DRAWN:
CHECKED:
11�UW
AP P R APPROVE
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
CONCRETE SLURRY AND WASH WA TER NOTE:
ALL SLURRY DISPOSAL AND WASHING OF CONCRETE TOOLS SHALL BE DONE /N THE
CONSTRUCTION STAGING AREA. CONCRETE WASTES TO BE CONTAINED AND PROPER
DISPOSAL METHODS FOLLOWED. - - - - - -
OP
TREE PRO TEC TION NOTE:
ARBOR/ST TO BE PRESENT AT TIME OF TREE PROTECTION FENCING INSTALLATION.
EROSION CONTROL SEED MIXTURE:
�W�'lGH T
CHEWINGS OR RED FESCUE 40
ANNUAL OR PERENNIAL RYE 40
RED TOP OR COLONIAL BENTGRASS 10
W17E DUTCH CL 0 VER
NORTH
GRAPHIC SCALE
0 25 50 100
1 INCH = 50 FT.
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
MOW
P
w
G
T
C
FOUND SECTION MONUMENT AS NO TED
FOUND MONUMENT AS NOTED
ROAD SIGNAGE
MAIL BOX
POWER METER
POWER POLE
JUNCTION BOX, SIZE VARIES
LIGHT POLE NO ARM
GUY WIRE
WATER METER
WA TER VAL VE
FIRE HYDRANT
TYPE 1 CA TCH BASIN
STORM DRAIN MANHOLE
SANITARY MANHOLE
ROCKERY
Cl TY OF REN TON
VERTICAL BOARD FENCE
HORIZONTAL BOARD FENCE
DECIDUOUS TREE
EVERGREEN TREE
SANITARY SEWER LINE
STORM LINE
OVERHEAD POWER
UNDERGROUND POWER
UNDERGROUND WATER
UNDERGROUND GAS
UNDERGROUND TELEPHONE
UNDERGROUND CABLE
EDGE OF PAVEMENT
FENCE
TEMPORARY EROSION CONTROL LEGEND:
CONSTRUCTION LIMITS, TO BE FLAGGED OR FENCED
X
SIL T FENCE
'-
THE PROPOSED SITE DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERM/TEE TO ADDRESS
10
MULCHING, MATTING, & COMPOST BLANKETS
M
ANY NEW CONDI TIONS THAT MAY BE CREATED BY THE ACT70TIES AND TO PROVIDE ADDI T70NAL FACILITIES, OVER AND ABOVE MINIMUM
DC
DUST CONTROL
SS
REQUIREMENTS, AS MAY BE NEEDED OR AS DIRECTED BY THE COR INSPECTOR. TO PRO TEC T ADJACENT PROPER TIES AND WATER QUA L / TY OF 7HE
SC
X `
k ,,^__ <'
RECEIVING DRAINAGE SYSTEM.
�C
MU
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTA TION CONTROL ONLY IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE
Cil
mCn
DESIGN, SIZE NOR L OCA TION OF PIPES, RESTRIC TORS, CHANNELS, OR RETENTION FACILITIES.
rn
m
a
8. ANY AREAS OF EXPOSED SO/LS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON
D
(OCTOBER 1ST TROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30) SHALL BE IMMEDIA TEL Y
STABILIZED WITH THE APPROVED ESC COVER METHODS E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION S/7ES CLEAR/NG BETWEEN OCTOBER 1
00,
AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS
lip
-`
_ .
I
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL.
'
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING
IMMEDIATE A TTEN TION, SHALL BE ADDRESSED WI THIN SEVEN (7) DAYS.
•
-
� �
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS
2�
STOCKPILE AREA - -'
»
FOLLOW NG AN EQUAL OR GREA TER THAN 1/4 OF RAIN STORM EVENT.
COVER' STOCKPILE "
.�..� ' •
WI THIN 24 HOURS
X
13. A T NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CA TCH BASIN. ALL CA TCH BAS/NS AND
Z.
;
I
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE
e
DOWNSTREAM SYSTEM.
LS%
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 307H, ALL PROJECT DISTRIBUTED SOIL AREAS, THAT ARE TO BE LEFT
I
UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WI TH THE NECESSARY EROSION
CONTROL MEASURES AND SHALL PROVIDE A DEQUA TE STORAGE CAPACITY. IF THE PERMA NEN T FACILITY /S TO FUNCTION UL T/MA TEL Y AS AN
s
INFIL TRA TION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THA T THE BOTTOM AND SIDES ARE A T LEAST THREE FEET ABOVE
•�
o
h
o
THE FINAL GRADE OF THE PERMANENT FACILITY.
.,.,,....
'
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE
SEEDED IN PREPARATION FOR THE WINTER RAINS DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET
SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO 7.1E CITY OF
v
RENTON FOR REVIEW.
Call 2 Working Days Before You Dig
811
Utilities Underground Location Center
(ID,MT,ND,OR,WA)
A. J
�&PN
,�
s YA�� �•' 1'�i.� TT!\T TTA T1-1 fl T T !-I
D.R. STRONG
CONSUL TING ENGINEERS
ENGINEERS PLANNERS SURVEYORS
620 - 7TH AVENUE, KIRKLAND, WA 98033 N0.
O 425.827.3063 F 425.827.2423
EROSION CONTROL SUPERVISOR (CESCL):
EARTH SOLUTIONS NW, LLC (425) 284-3300
SEDIMENT POND SIZING SUMMARY (BAKER TANK TO BE UTILIZED):
THE POND WAS SIZED USING THE REQUIREMENTS STATED IN APPENDIX 'D' OF THE 2009 KCSWDM SECTION
D.4.5.2 WHICH REQUIRES 2080 S.F. OF SURFACE AREA PER CFS OF INFLOW WHICH WAS CALCULATED USING
KCRTS (15 MIN TIME STEPS) TO ANALYZE THE DEVELOPED SITE CONDITIONS.
(CA TCHMENT AREA: 4.01 AC.)
2- YEAR PEAK FLOW RATE ...................1.10 CFS
REQUIRED SURFACE AREA.....................2,288 S F.
PROVIDED SURFACE AREA.....................2, 340 S F.
NOTE: 3-10,000 GALLON BAKER TANKS TO BE UTILIZED IN PLACE OF SEDIMENT POND. BAKER TANKS
TO BE UTILIZED AS NECESSARY UNTIL SUCH TIME THAT VAULT FLOOR AND WALLS ARE CONSTRUCTED.
BAKER TANKS TO BE REMOVED AND VAULT TO BE UTILIZED FOR SEDIMENTATION AT THAT TIME.
REVISION
YLP 107.13.15
SURVEYED:
c
DESIGNED: .i77
IMA�J
DRAWN:
CHECKED:
11�UW
AP P R APPROVE
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
CONCRETE SLURRY AND WASH WA TER NOTE:
ALL SLURRY DISPOSAL AND WASHING OF CONCRETE TOOLS SHALL BE DONE /N THE
CONSTRUCTION STAGING AREA. CONCRETE WASTES TO BE CONTAINED AND PROPER
DISPOSAL METHODS FOLLOWED. - - - - - -
OP
TREE PRO TEC TION NOTE:
ARBOR/ST TO BE PRESENT AT TIME OF TREE PROTECTION FENCING INSTALLATION.
EROSION CONTROL SEED MIXTURE:
�W�'lGH T
CHEWINGS OR RED FESCUE 40
ANNUAL OR PERENNIAL RYE 40
RED TOP OR COLONIAL BENTGRASS 10
W17E DUTCH CL 0 VER
NORTH
GRAPHIC SCALE
0 25 50 100
1 INCH = 50 FT.
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
MOW
P
w
G
T
C
FOUND SECTION MONUMENT AS NO TED
FOUND MONUMENT AS NOTED
ROAD SIGNAGE
MAIL BOX
POWER METER
POWER POLE
JUNCTION BOX, SIZE VARIES
LIGHT POLE NO ARM
GUY WIRE
WATER METER
WA TER VAL VE
FIRE HYDRANT
TYPE 1 CA TCH BASIN
STORM DRAIN MANHOLE
SANITARY MANHOLE
ROCKERY
Cl TY OF REN TON
VERTICAL BOARD FENCE
HORIZONTAL BOARD FENCE
DECIDUOUS TREE
EVERGREEN TREE
SANITARY SEWER LINE
STORM LINE
OVERHEAD POWER
UNDERGROUND POWER
UNDERGROUND WATER
UNDERGROUND GAS
UNDERGROUND TELEPHONE
UNDERGROUND CABLE
EDGE OF PAVEMENT
FENCE
TEMPORARY EROSION CONTROL LEGEND:
CONSTRUCTION LIMITS, TO BE FLAGGED OR FENCED
X
SIL T FENCE
_I
V
00
STABILIZED CONSTRUCTION ENTRANCE
10
MULCHING, MATTING, & COMPOST BLANKETS
M
PERMANENT SEEDING AND PLAN77NG
DC
Call 2 Working Days Before You Dig
811
Utilities Underground Location Center
(ID,MT,ND,OR,WA)
A. J
�&PN
,�
s YA�� �•' 1'�i.� TT!\T TTA T1-1 fl T T !-I
D.R. STRONG
CONSUL TING ENGINEERS
ENGINEERS PLANNERS SURVEYORS
620 - 7TH AVENUE, KIRKLAND, WA 98033 N0.
O 425.827.3063 F 425.827.2423
EROSION CONTROL SUPERVISOR (CESCL):
EARTH SOLUTIONS NW, LLC (425) 284-3300
SEDIMENT POND SIZING SUMMARY (BAKER TANK TO BE UTILIZED):
THE POND WAS SIZED USING THE REQUIREMENTS STATED IN APPENDIX 'D' OF THE 2009 KCSWDM SECTION
D.4.5.2 WHICH REQUIRES 2080 S.F. OF SURFACE AREA PER CFS OF INFLOW WHICH WAS CALCULATED USING
KCRTS (15 MIN TIME STEPS) TO ANALYZE THE DEVELOPED SITE CONDITIONS.
(CA TCHMENT AREA: 4.01 AC.)
2- YEAR PEAK FLOW RATE ...................1.10 CFS
REQUIRED SURFACE AREA.....................2,288 S F.
PROVIDED SURFACE AREA.....................2, 340 S F.
NOTE: 3-10,000 GALLON BAKER TANKS TO BE UTILIZED IN PLACE OF SEDIMENT POND. BAKER TANKS
TO BE UTILIZED AS NECESSARY UNTIL SUCH TIME THAT VAULT FLOOR AND WALLS ARE CONSTRUCTED.
BAKER TANKS TO BE REMOVED AND VAULT TO BE UTILIZED FOR SEDIMENTATION AT THAT TIME.
REVISION
YLP 107.13.15
SURVEYED:
c
DESIGNED: .i77
IMA�J
DRAWN:
CHECKED:
11�UW
AP P R APPROVE
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
CONCRETE SLURRY AND WASH WA TER NOTE:
ALL SLURRY DISPOSAL AND WASHING OF CONCRETE TOOLS SHALL BE DONE /N THE
CONSTRUCTION STAGING AREA. CONCRETE WASTES TO BE CONTAINED AND PROPER
DISPOSAL METHODS FOLLOWED. - - - - - -
OP
TREE PRO TEC TION NOTE:
ARBOR/ST TO BE PRESENT AT TIME OF TREE PROTECTION FENCING INSTALLATION.
EROSION CONTROL SEED MIXTURE:
�W�'lGH T
CHEWINGS OR RED FESCUE 40
ANNUAL OR PERENNIAL RYE 40
RED TOP OR COLONIAL BENTGRASS 10
W17E DUTCH CL 0 VER
NORTH
GRAPHIC SCALE
0 25 50 100
1 INCH = 50 FT.
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
MOW
P
w
G
T
C
FOUND SECTION MONUMENT AS NO TED
FOUND MONUMENT AS NOTED
ROAD SIGNAGE
MAIL BOX
POWER METER
POWER POLE
JUNCTION BOX, SIZE VARIES
LIGHT POLE NO ARM
GUY WIRE
WATER METER
WA TER VAL VE
FIRE HYDRANT
TYPE 1 CA TCH BASIN
STORM DRAIN MANHOLE
SANITARY MANHOLE
ROCKERY
Cl TY OF REN TON
VERTICAL BOARD FENCE
HORIZONTAL BOARD FENCE
DECIDUOUS TREE
EVERGREEN TREE
SANITARY SEWER LINE
STORM LINE
OVERHEAD POWER
UNDERGROUND POWER
UNDERGROUND WATER
UNDERGROUND GAS
UNDERGROUND TELEPHONE
UNDERGROUND CABLE
EDGE OF PAVEMENT
FENCE
TEMPORARY EROSION CONTROL LEGEND:
CONSTRUCTION LIMITS, TO BE FLAGGED OR FENCED
X
SIL T FENCE
0 0 0 0 o
STABILIZED CONSTRUCTION ENTRANCE
MU
MULCHING, MATTING, & COMPOST BLANKETS
PS
PERMANENT SEEDING AND PLAN77NG
DC
DUST CONTROL
SS
S7REET SWEEPING & VACUUMING
SC
SAWCUTT/NG AND SURFACING POLLUTION PREVENTION
NE NET OR BLANKET EROSION CONTROL
OINLET PROTECTION
INTERCEPTOR SWALE Wl1H ROCK
CHECK DAM EVERY 50' (SEE DETAIL SHEET C5)
RIPRAP PAD
TREE PROTECTION FENCE (TREE TO BE RETAINED)
X TREE TO BE REMOVED
- - - - - - - - - - - - - 2" PUMP DISCHARGE LINE �
DRAWINGS NOT APPROVED
FOR CONSTRUCTION UNLESS
STAMPED OR SIGNED APPROVED
BY THE REVIEWING AGENCY
CITY OE
RENTON
Planning/Building/Public Works Dept.
IN COMPLIANCE WITH CITY OF RENTON
STANDARDS
BY Date: -1 s 5 if
BY: % Date: 7" 4 -6
BY: Date:
BY: Date:
MAERTINS RANCH I 01.20.2015
T. E.S.C. PLAN
PERMITS: U15-001308, 815-000196 4 zo
DRS PROJECT N0. 14103 Al- N NININIAI(A
100
I`
D
� z
Li
0
z
z
C S
mocn
�C
Cil
mCn
m
rn
m
a
D
D
oa
�C
m�
mCn
�rn
C`
m=
m
M
CY
�m
N
m
cn
D
Cn
n
0
0
mM
0❑
�C
mCn
t
z
a