HomeMy WebLinkAboutRES 3325 CITY OF RENTON, WASHINGTON RESOLUTION NO. 3 3 2 5 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AGREEMENTS WITH THE WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES, KING COUNTY, CITY OF SEATTLE, RENTON HOUSING AUTHORITY,U.S. ARMY CORPS OF ENGINEERS, AND ANY OTHER GOVERNMENTAL AGENCIES, FOR THE RENTON CEDAR RIVER SECTION 205 FLOOD CONTROL PROJECT REAL ESTATE AND CONSTRUCTION. WHEREAS,the Cedar River Channel in Renton was constructed in 1912 when the Cedar River was diverted into Lake Washington in anticipation of the lowering of Lake Washington as a result of the construction of the Ballard Locks; and WHEREAS, the.Cedar River Channel was not built to transport the volume of sediment carried by the river to the lake, and so has required periodic dredging since its construction to provide adequate flood protection and continued upstream passage of fish; and WHEREAS, recent sediment accumulation in the channel to approximately River Mile 1.25 has contributed to regionally significant flooding three times since 1990, damaging public and private infrastructure and threatening production of airplanes at the Boeing Renton Plant; and WHEREAS, Renton has requested federal assistance from the U.S. Army Corps of Engineers (hereinafter the "Corps") under Section 205 of the 1948 Flood Control Act (as amended) to provide technical and funding assistance for the planning, design and construction of the Project; and WHEREAS, the Corps has completed the Feasibility Study Detailed Project Report, Environmental Impact Statement, and Initial Design for the Project, which identifies the required real estate required for the project; and 1 RESOLUTION NO. 3325 WHEREAS, the Washington State Department of Fish and Wildlife Hydraulic Project Approval Permit has been issued for the project and stipulates requirements which will require real estate and agreements in addition to what is required for the initial project design; and WHEREAS, parties other than the City of Renton have ownership interest in some portions of the project area and mitigation areas for the Cedar River Section 205 Flood Damage Reduction Project; and WHEREAS, agreements with parties other than the City of Renton, including Washington State Department of Natural Resources Aquatic Lands Easement 51-070474 and Aquatic Lands Agreement for Purchase and Removal of Materials No. 31-070471, will need to be entered into for the purpose of providing for the construction of the Cedar River Section 205 Flood Damage Reduction Project in Renton; and WHEREAS, the timing for entering into additional agreements does not allow for any delays, including the City Council review and approval process, without delaying the project construction; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The above recitals are found to be true and correct in all respects. SECTION H. The Mayor and City Clerk are hereby authorized to enter into any additional agreements, including interlocal agreements, as long as these agreements do not exceed a commitment of$50,000 each, or a cumulative that exceeds the current project budget for the Cedar River Section 205 Flood Damage Reduction Project to provide regional flood protection and protect environmental resources. 2 RESOLUTION NO. 3325 PASSED BY THE CITY COUNCIL this 11th day of May , 1998 1 I • 1 k � . agenda ;Fritsvold, ,.De:puty ity Clerk APPROVED BY THE MAYOR thisi 1 th day of May , 1998 ece-4-14. 4:790V Jesse Tanner, Mayor Approved form: amyvvotite29/4-1,7bot,/ Lawrence J. Warren, City Attorney RES.651:5/07/98:as. 3