HomeMy WebLinkAboutRES 2966 i
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 2966
A RESOLUTION OF THE CITY, OF RENTON, WASHINGTON
AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN
INTERLOCAL COOPERATIVE AGREEMENT WITH THE WASHINGTON
STATE DEPARTMENT OF TRANSPORTATION FOR PREPARATION OF
PLANS, SPECIFICATIONS AND ESTIMATES FOR CONSTRUCTION OF A
PEDESTRIAN/BICYCLE FACILITY TO BE ' LOCATED ALONG LAKE
WASHINGTON BOULEVARD.
WHEREAS, the City of Renton desires to build a pedestrian/bicycle
facility along Lake Washington Boulevard from Gene Coulon Park South
Access to N. 44th Street; and
WHEREAS, the Washington State Department of Transportation is
willing to assist in the funding for preparation.- of plans.,
specifications and estimates for such construction;-,anal
WHEREAS, the current. estimate. of; part cipation. by- the .Washington .
State Department, of Transportation ,is 80% of the; costs; and:
WHEREAS,' : it is, n.ec-essary-: to .doc.ument,�_t:he =firndingg agreement:- between-
thee. Washington. State Department. of-. Transportat=ion= -.and. the City- of.
Renton:;.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The above recitals are found to be true and correct
in all respects.
SECTION II. The Mayor and City Clerk are hereby authorized to
enter into an agreement with the Washington State Department of
Transportation for funding of the cost of plans, specifications and
estimates for construction of a pedestrian/bicycle facility to be
RESOLUTION N0.
2966
located along Lake Washington Boulevard from Gene Coulon Park South
Access to N. 44th Street.
PASSED .BY THE CITY COUNCIL this 26th day of April , 1993 .
Marilyn etersen, City Clerk
APPROVED BY THE MAYOR this 26th day of April , 1993 .
Earl Clymer, or
.Approved to form:
Lawrence J. Warren, City Attorney
RES. 279 :4/8/93 :as .
-2-