Loading...
HomeMy WebLinkAboutR-3268061 P • Cn E ccZ M J CY 3 -o X N �I cn 0 Y L cc a L U m m cv I cY) 0 N U W O CL z E 0 0 0 0 N co 0 No. I Date NOTE: INLET PROTECTION SHALL BE INSTALLED ON SPECIFIED EXISTING CATCH BASIN PRIOR TO CLEARING AND GRUBBING ANY UPHILL AREA. INLET PROTECTION SHALL BE INSTALLED ON NEW CATCH BASINS IMMEDIATELY AFTER INSTALLATION TESC LEGEND RETRIEVAL OF CATCH BASINS. INLET PROTECTION SHALL REMAIN STRAP FUNCTIONAL UNTIL THE UPHILL AREA IS STABILIZED AND AREAS DIRECTING DISCHARGE TO IT ARE PAVED. INLET ADAPTER BOOT PROTECTION SHALL BE "STORM WATCH CATCH BASIN HYDRO—SEED & MULCH _ INSERTS" FOR SEDIMENT ONLY, DISTRIBUTED BY PRICE—MOON ENTERPRISES, OR AN EQUAL APPROVED BY CONCRETE REMOVAL THE ENGINEER. - SILT FENCE OVERFLOW WATER ' - OUTLET SEDIMENT CATCH BASIN / GRATE INLET WITH GRATE PRnTFr.TinN 153+00 _ +_ Revision STA 1538+82 R/Wi r By I Appr. Pert 425-252-77C 2707 Colby Everett, Wa eet Inc. 00 11-800-615-9900 Avenue, Suite 900 shington 98201 MATCH SEE LINE STA 11 +00 DRAWING TS2 MAPLE VALLEY HIGHWAY cQ I r%o CTA I K10 -L"752 f1l) V"Lf"N IN V Lei♦ FPI&NM AVVL.7.7 J Ir% .7TV 1 .V.7 WA Ob c 'PO 24043 p �' G/ s�pNA L E�� EXPIRES: 11/25/ nr1/1r'%e% e%rm r% iu. FA STPUL 0169 (19) CONSTRUCTION NOTES: O1 TEMPORARY SILT FENCE PER CIN OF RENTON STD. PLAN BR21. O3 IRRIGATION BOX TO BE RELOCATED BY OTHERS. 4O INSTALL INLET PROTECTION, PEI DETAIL THIS DRAWING. 5 REMOVE AND/OR ABANDON EXI°STING PSE ELECTRICAL VAULTS PER PSE DETAILS SHOWN IN APPENDIX C OF CONTRACT SPECIFICATIONS. SEE SPECIAL PROVISIONS. O6 REMOVE CHAIN LINK FENCE AS DIRECTED BY ENGINEER. 7 GAS REGULATOR TO BE RELOCATED BY PSE. COORDINATE WITH PSE TO ALLOW INSTALLATION OF NEW GAS LINES AND PIPE SLEEVES BY PSE PRIOR TO CONSTRUCTION OF WALL 1 AND ROADWAY EMBANKMENT. O8 TELEPHONE PEDESTAL TO BE RELOCATED BY QWEST. GREMOVE RETAINING WALL AS DIRECTED BY ENGINEER TO CONSTRUCT IMPROVEMENTS. 10 SAWCUT EXISTING PAVEMENT. 11 EXISTING POWER POLE TO BE RELOCATED BY PSE. 12 TEMPORARY CONSTRUCTION FENCING. 14 REMOVE EXISTING BUILDING FOUNDATION TO LIMITS SHOWN OR AS DIRECTED BY THE ENGINEER. SEE SPECIAL PROVISIONS. 1547+00 � � M R-316806 SCALE RENTON 7 .... ....... ..�,.. Drawn � ooze 5 OS9"`° a' �n�kea � 05 �p.o.ea By 05 SCALE -� CITY OF RENTON ,, 1, I--- �""` "° 6 32 of Total Project P 21031.0, _J 1 o, LL_; 4 2 TY ++` 00-Jnk j� to � � , STA 10+70 LO (42LT) I-- w W. (,()mm;.� eet Inc. 00 11-800-615-9900 Avenue, Suite 900 shington 98201 MATCH SEE LINE STA 11 +00 DRAWING TS2 MAPLE VALLEY HIGHWAY cQ I r%o CTA I K10 -L"752 f1l) V"Lf"N IN V Lei♦ FPI&NM AVVL.7.7 J Ir% .7TV 1 .V.7 WA Ob c 'PO 24043 p �' G/ s�pNA L E�� EXPIRES: 11/25/ nr1/1r'%e% e%rm r% iu. FA STPUL 0169 (19) CONSTRUCTION NOTES: O1 TEMPORARY SILT FENCE PER CIN OF RENTON STD. PLAN BR21. O3 IRRIGATION BOX TO BE RELOCATED BY OTHERS. 4O INSTALL INLET PROTECTION, PEI DETAIL THIS DRAWING. 5 REMOVE AND/OR ABANDON EXI°STING PSE ELECTRICAL VAULTS PER PSE DETAILS SHOWN IN APPENDIX C OF CONTRACT SPECIFICATIONS. SEE SPECIAL PROVISIONS. O6 REMOVE CHAIN LINK FENCE AS DIRECTED BY ENGINEER. 7 GAS REGULATOR TO BE RELOCATED BY PSE. COORDINATE WITH PSE TO ALLOW INSTALLATION OF NEW GAS LINES AND PIPE SLEEVES BY PSE PRIOR TO CONSTRUCTION OF WALL 1 AND ROADWAY EMBANKMENT. O8 TELEPHONE PEDESTAL TO BE RELOCATED BY QWEST. GREMOVE RETAINING WALL AS DIRECTED BY ENGINEER TO CONSTRUCT IMPROVEMENTS. 10 SAWCUT EXISTING PAVEMENT. 11 EXISTING POWER POLE TO BE RELOCATED BY PSE. 12 TEMPORARY CONSTRUCTION FENCING. 14 REMOVE EXISTING BUILDING FOUNDATION TO LIMITS SHOWN OR AS DIRECTED BY THE ENGINEER. SEE SPECIAL PROVISIONS. 1547+00 � � M R-316806 SCALE RENTON 7 .... ....... ..�,.. Drawn � ooze 5 OS9"`° a' �n�kea � 05 �p.o.ea By 05 SCALE -� CITY OF RENTON ing No. o aWTS 1 MAPLE VALLEY HIGHWAY SR169)/ CEDAR RIVER PARK ACCESS IMPROVEMENTS SITE PREP/TESC PLAN �<n' �rvumn<. �""` "° 6 32 of Total Project P 21031.0,