Loading...
HomeMy WebLinkAboutR-326817zN �LO :o �3 N O U E cc z 3 N) T UI M O r Y L cc a. L L cc U m ail CL m I ch O V_ CN U W O it CL z E 0 c� 0 0 N 0 C 12+0 0 Perteet Inc. 425-252-7700 11-800-615-9900 2707 Colby Avenue, Suite 900 No. Date Revision By qpPr. Everett, Washington 98201 T. 23 N., R. 5 E., W.M. FLASTPUL 0169 (19) CHANNELIZATION NOTES O WHITE EDGE LINE 0 45' TO CENTERLINE AND 5 SPACING (RPM SUBSTITUTION PATTERN WITH TYPE 1 RPM'S SPACED AT 1 ' 0/C) 3 3x _ 00 :. STA 14+10 18' RT BEGIN CROSSWALK LINE STA 15+40 18 RT END CROSSWALK LINE %r Ir. . 0 O ` 4' W A Y 1d Q. 5 + 5 4 p� y O. AIAIAIAIAIAIA� 4A A 5 STA 14+90 (18' LT,18' BEGIN CROSSWALK LINE STA 15+25 (18' LT,18' END CROSSWALK LINE E�14V Q� °F WA <0' Ob 24043 IST 12 EXPIRES: 11 /25/ STA 15+30 STOP LINE (CL-12'RT) END DOUBLE YELLOW CENTER LINE (CL) STA 15+40 (12'LT & 12'RT) CROSSWALK LINE STA 15+50 (15'RT) BEGIN CROSSWALK LINE STA 15+75 15'RT) END CROSSWALK LINE 2O WIDE LINE (RPM SUBSTITUTION PATTERN) 3O DOUBLE YELLOW CENTER LINE (RPM SUBSTITUTION PATTERN) 4O PLASTIC STOP LINE O5 PLASTIC CROSSWALK LINE O EDGE LINE (THERMOPLASTIC TYPE A. PER STD. SPECIFICATION 9-34.3(1)). 7O PLASTIC TRAFFIC ARROW TYPE 2L 8O YELLOW EDGE LINE @ 45' TO CENTERLINE- AND 10' SPACING (RPM SUBSTITUTION PATTERN WITH TYPE 1 RPM'S SPACED AT 2' 0/C) NOTES: 1. SEE STANDARD PLANS M-3.30-00, M-15.10-00, M-24.20-00, M-20.50-00, H -3A, H -5C THRU H-51) FOR PAVEMENT MARKING DETAILS. 2. EXISTING PAINT LINES AND TRAFFIC MARKINGS SHALL BE REMOVED PRIOR TO INSTALLATION OF PAVEMENT MARKINGS. PLASTIC MARKINGS SHALL BE REMOVED B'YI GRINDING. 3. TRAFFIC ARROWS, STOP LINES, AND CROSSWALK LINES SHALL BE METHYL METHACRYLATE (MMA) FLAT TYPE D, PER STD. SPECIFICATION 9-34.3(4). 4. SEE SHEET CH2 FOR PARKING STALL "A" 'DETAIL om 'E PAINT LINE PARKING STALL A DETAIL NOT TO SCALE R-326811 SCALE 5b 25 0 FEET �0 100 o�s By Date F CITY rCH2OF RENTON °"'"' No. Designed By 505Horiz RENTON� ��e�k., � �5- Vert f, MAPLE VALLEY HIGHWAY (SR1 69)/ Sheet No ::,n:,;,,; �,;,.i,;�,A WE os CEDAR RIVER PARK ACCESS IMPROVEMENTS Approved � I Project Nunieefl 1 CHANNELIZA11ON PLAN �� 32 o, roe LO it U� o� W� a zN �LO :o �3 N O U E cc z 3 N) T UI M O r Y L cc a. L L cc U m ail CL m I ch O V_ CN U W O it CL z E 0 c� 0 0 N 0 C 12+0 0 Perteet Inc. 425-252-7700 11-800-615-9900 2707 Colby Avenue, Suite 900 No. Date Revision By qpPr. Everett, Washington 98201 T. 23 N., R. 5 E., W.M. FLASTPUL 0169 (19) CHANNELIZATION NOTES O WHITE EDGE LINE 0 45' TO CENTERLINE AND 5 SPACING (RPM SUBSTITUTION PATTERN WITH TYPE 1 RPM'S SPACED AT 1 ' 0/C) 3 3x _ 00 :. STA 14+10 18' RT BEGIN CROSSWALK LINE STA 15+40 18 RT END CROSSWALK LINE %r Ir. . 0 O ` 4' W A Y 1d Q. 5 + 5 4 p� y O. AIAIAIAIAIAIA� 4A A 5 STA 14+90 (18' LT,18' BEGIN CROSSWALK LINE STA 15+25 (18' LT,18' END CROSSWALK LINE E�14V Q� °F WA <0' Ob 24043 IST 12 EXPIRES: 11 /25/ STA 15+30 STOP LINE (CL-12'RT) END DOUBLE YELLOW CENTER LINE (CL) STA 15+40 (12'LT & 12'RT) CROSSWALK LINE STA 15+50 (15'RT) BEGIN CROSSWALK LINE STA 15+75 15'RT) END CROSSWALK LINE 2O WIDE LINE (RPM SUBSTITUTION PATTERN) 3O DOUBLE YELLOW CENTER LINE (RPM SUBSTITUTION PATTERN) 4O PLASTIC STOP LINE O5 PLASTIC CROSSWALK LINE O EDGE LINE (THERMOPLASTIC TYPE A. PER STD. SPECIFICATION 9-34.3(1)). 7O PLASTIC TRAFFIC ARROW TYPE 2L 8O YELLOW EDGE LINE @ 45' TO CENTERLINE- AND 10' SPACING (RPM SUBSTITUTION PATTERN WITH TYPE 1 RPM'S SPACED AT 2' 0/C) NOTES: 1. SEE STANDARD PLANS M-3.30-00, M-15.10-00, M-24.20-00, M-20.50-00, H -3A, H -5C THRU H-51) FOR PAVEMENT MARKING DETAILS. 2. EXISTING PAINT LINES AND TRAFFIC MARKINGS SHALL BE REMOVED PRIOR TO INSTALLATION OF PAVEMENT MARKINGS. PLASTIC MARKINGS SHALL BE REMOVED B'YI GRINDING. 3. TRAFFIC ARROWS, STOP LINES, AND CROSSWALK LINES SHALL BE METHYL METHACRYLATE (MMA) FLAT TYPE D, PER STD. SPECIFICATION 9-34.3(4). 4. SEE SHEET CH2 FOR PARKING STALL "A" 'DETAIL om 'E PAINT LINE PARKING STALL A DETAIL NOT TO SCALE R-326811 SCALE 5b 25 0 FEET �0 100 o�s By Date F CITY rCH2OF RENTON °"'"' No. Designed By 505Horiz RENTON� ��e�k., � �5- Vert f, MAPLE VALLEY HIGHWAY (SR1 69)/ Sheet No ::,n:,;,,; �,;,.i,;�,A WE os CEDAR RIVER PARK ACCESS IMPROVEMENTS Approved � I Project Nunieefl 1 CHANNELIZA11ON PLAN �� 32 o, roe