HomeMy WebLinkAboutS-367201W
Q
z
U
W
O
n
G12 wao%v Nlora You Dip
811
CONSULTING ENGINEERS LLC
334M M Arwxm soupSuits 205 I •
Federal way, WA 98003
111� •MI ('i1g 400-0113
www.esmcivii.com 00111M (•tea 2W-�
aia..ua: (on) see -ms
ESM JOB #1670-003-013
_
XX
0
FIRST SUBMITTAL
ESM
/28/14
ic
SURVEYED:
s�E'
1==40'
1
SECOND SUBMITTAL
ESM
05 14
cn
O
DEMNED:
LGB
2
THIRD SUBMITTAL
ESM
7/17/14
3
MYLAR SUBMITTAL
ESM
/18/14
Dom": CJR
ONE INCH
AT FULL SCAtF
IF NOT ONE HdCH
S Y
CHECKED:
NO.
REVISION
BY
DATE
APPR
m:
n
SCALE: 1 " = 40'
09.za-smi "62!&p iiin I
40 20 0 40 80
LEGEND
s
PROPOSED STORM DRAIN
s PROPOSED SANITARY SEWER
PROPOSED WATER MAIN
STORM NOTES:
1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS
CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION
MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS
CONSTRUCTED AS PART OF THIS SUMIVISION.
COMPLIANCE WITH THIS REQUIREMENT WILL BE
ADDRESSED IN THE DRAIINAGE PLAN SUBMITTED FOR
RESIDENTIAL BUILDING PERRtrMT DRAINAGE REVIEW WHEN
APPLICATION IS MADE FOR A SINGLE FA *LY
RESIDENTIAL BUILD PERMIT FOR EACH LOT.
2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS
SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD
REPAIR BY EACH LOT OWNER.
3. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING
INSTALLATION PER THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL. SUBMIT TO THE CITY
THE CCTV INSPECTION VIDEOS AND WRITTEN
REPORTS. THE CCTV INSPECTION SHALL INCLUDE
ALL PROJECT STORM DRAIN L.MNES AND CONNECTING
CATCH BASIN AND MAWOLE STRUCTURES THAT
WILL BECOME CITY OWNED/MAINTAINED AND ALL
PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES
AND CONNECTING CATCH BASMd AND MANHOLE
STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR
AND COMPATIBLE WITH THE CITY'S VIEWING AND
RECORDING SYSTEMS. THE CITY WILL ONLY
ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS
VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG
VIDEO FILE FORMAT) AND IS COMPATIBLE WITH
GRANITE XP. THE VIDEO SHALL REFERENCE EACH
PROJECT DRAIN PIPE SECANT TO THE UPSTREAM
AND DOWNSTREAM CONNECTING STRUCTURES AS
SOWN (AND IDENTIFIED) ON THE APPROVED
PROJECT CONSTRUCTION PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV
INSPECTION SHALL BE BORNE BY THE PROJECT
DEVELOPER. THE DEVELOPER SHALL BEAR ALL
COSTS INCURRED IN CORRECTING ANY DEFICIENCIES
FOUND DURING CCTV INSPECTION, INCLUDING THE
COST OF ANY ADDITIONAL CCTV INSPECTION,
EXFILTRATION TESTING OR AIR TESTING THAT MAY
BE REGURIED BY THE CITY TO VERIFY THE
CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL
COSTS INCURRED IN THE CCN INSPECTION
PERFORMED SOLELY FOR THE BENEFIT OF THE
DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
8. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS
LESS THAN 1 FOOT.
W - 316201
R- 316208
11311IN111
CHECKED FOR COMPLIANCE TO CIN STANDARDS
9/24//W
fLf .201
N43"WAL N" H°"` WD ''�
"'�"" CITY OF RYLE E'S PLACE
!R RENTON STORM DRAINAGE KEY MAP
DATUM & COMPOSITE UTILITY PLAN
Planning/Building/Public Works Dept.
os/is/2o»
ama�—
KEY—SD
Iff"cV.
s 2,
H
b
=c
�
m
ic
CAN
z
m
m
m
cn
O
t•,�
D
H
b
sN
�J
J
4J
J
N
t•,�
n
�0
°M
0
a
0