Loading...
HomeMy WebLinkAboutS-367201W Q z U W O n G12 wao%v Nlora You Dip 811 CONSULTING ENGINEERS LLC 334M M Arwxm soupSuits 205 I • Federal way, WA 98003 111� •MI ('i1g 400-0113 www.esmcivii.com 00111M (•tea 2W-� aia..ua: (on) see -ms ESM JOB #1670-003-013 _ XX 0 FIRST SUBMITTAL ESM /28/14 ic SURVEYED: s�E' 1==40' 1 SECOND SUBMITTAL ESM 05 14 cn O DEMNED: LGB 2 THIRD SUBMITTAL ESM 7/17/14 3 MYLAR SUBMITTAL ESM /18/14 Dom": CJR ONE INCH AT FULL SCAtF IF NOT ONE HdCH S Y CHECKED: NO. REVISION BY DATE APPR m: n SCALE: 1 " = 40' 09.za-smi "62!&p iiin I 40 20 0 40 80 LEGEND s PROPOSED STORM DRAIN s PROPOSED SANITARY SEWER PROPOSED WATER MAIN STORM NOTES: 1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS CONSTRUCTED AS PART OF THIS SUMIVISION. COMPLIANCE WITH THIS REQUIREMENT WILL BE ADDRESSED IN THE DRAIINAGE PLAN SUBMITTED FOR RESIDENTIAL BUILDING PERRtrMT DRAINAGE REVIEW WHEN APPLICATION IS MADE FOR A SINGLE FA *LY RESIDENTIAL BUILD PERMIT FOR EACH LOT. 2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD REPAIR BY EACH LOT OWNER. 3. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION PER THE FOLLOWING PROCEDURE: A) THE PROJECT DEVELOPER SHALL. SUBMIT TO THE CITY THE CCTV INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE ALL PROJECT STORM DRAIN L.MNES AND CONNECTING CATCH BASIN AND MAWOLE STRUCTURES THAT WILL BECOME CITY OWNED/MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING CATCH BASMd AND MANHOLE STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL REFERENCE EACH PROJECT DRAIN PIPE SECANT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION PLANS. B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REGURIED BY THE CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY. C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCN INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE DEVELOPER. VIDEO TO BE PROVIDED TO CITY INSPECTOR. 8. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. W - 316201 R- 316208 11311IN111 CHECKED FOR COMPLIANCE TO CIN STANDARDS 9/24//W fLf .201 N43"WAL N" H°"` WD ''� "'�"" CITY OF RYLE E'S PLACE !R RENTON STORM DRAINAGE KEY MAP DATUM & COMPOSITE UTILITY PLAN Planning/Building/Public Works Dept. os/is/2o» ama�— KEY—SD Iff"cV. s 2, H b =c � m ic CAN z m m m cn O t•,� D H b sN �J J 4J J N t•,� n �0 °M 0 a 0