CONDITIONS FOR WET SEASON CONSTRUCTION
1. ANY CONSTRUCTION THAT WILL RESULT IN DISTURBED AREAS ON OR WITHIN A
CRITICAL AREA OR ASSOCIATED BUFFER, SHALL BE SUBJECT TO THE "CRITICAL AREA
RESTRICTIONS" CONTAINED IN THE ESC STANDARDS. THESE PROVISIONS INCLUDE
PHASING THE PROJECT WHENEVER POSSIBLE SO THAT CONSTRUCTION IN THESE
AREAS IS LIMITED TO THE DRY SEASON.
2. DURING CONSTRUCTION, ESC PLANS SHALL BE REVISED AS NECESSARY BY THE ESC
SUPERVISOR OR AS DIRECTED BY THE CITY TO ADDRESS CHANGING SITE
CONDITIONS, UNEXPECTED STORM EVENTS, OR NON-COMPLIANCE WITH THE ESC
PERFORMANCE CRITERIA IN SECTION D.4.1 (P. D-69). IF NON-COMPLIANCE WITH
THE ESC PERFORMANCE CRITERIA OCCURS, THE PLAN MUST BE UPDATED WITHIN 48
HOURS (FAILURE TO DO SO COULD RESULT IN A "STOP WORK" ORDER AS
DETERMINED BY THE CITY INSPECTOR) OF INSPECTIONS OR INVESTIGATIONS.
IMPLEMENTATION OF THE ONSITE CHANGES MUST OCCUR WITHIN 5 DAYS.
3. ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR BASIS AS
PRESCRIBED IN THE MAINTENANCE REQUIREMENTS FOR EACH BMP AND IN THIS
SECTION. THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST WEEKLY DURING
THE WET SEASON, AND WITHIN 24 HOURS OF SIGNIFICANT STORMS. IN GENERAL, A
SIGNIFICANT STORM IS ONE WITH MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR
LESS. THE CITY MAY REQUIRE THAT A WRITTEN RECORD OF THESE REVIEWS BE KEPT
ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 48 HOURS.
WET SEASON PROVISIONS
NOTE: THE FOLLOWING MEASURES ARE REQUIRED FOR CONSTRUCTION DURING THE WET
SEASON (OCTOBER 1 - APRIL 30) IN ADDITION TO THE STANDARD TESC MEASURES.
1. THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT COVER
MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN
(SECTION D.3.2).
2. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED
FOR MORE THAN 12 HOURS (SECTION D.3.2).
3. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED
ON SITE (SECTION D.3.2).
4. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED
WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON (SECTION D.3.2.5).
5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS (SECTION D.3.2.1).
6. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF
DISTURBANCE MUST BE STOCKPILED ON SITE (SECTION D.3.3.1).
7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES
UNLESS THE SITE IS UNDERLAIN BY COARSE-GRAINED SOIL (SECTION D.3.4.2).
8. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR
THE SPECIFIED DESIGN FLOW (SECTION D.3.5).
9. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS
ANTICIPATED FOR THE SPECIFIED DESIGN FLOW (SECTION D.3.6).
10. PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONSTRUCTION
ACTIVITY NEAR THE SURFACE WATERS (SECTION D.5.3).
11. ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE
SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND
FILTER SYSTEMS, OR HOLDING TANKS.
12. THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY
(SECTION D.5.4).
STRUCTURAL NOTES
1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY.
PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A
SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
2. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT-OF-WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
8' - 10'
n w I % iw ►u'7rn calor
J 1 LLL 1 L�I�VL.. I VJ 1
OR 2' x 2' WOODEN POST
r
TEMPORARY CONSTRUCTION FENCE DETAIL
EROSION / SEDIMENTATION CONTROL NOTES
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS -SITE IMPROVEMENTS, SURFACE WATER
�m
••••
UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
STANDARDS
2.
BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, APRE- CONSTRUCTION
0 M
AIR-DRIED; FREE FROM
MEETING MUST BE HELD WITH THE CIN OF RENTON, PUBIC WORKS DESIGN ENGINEER.
•h
•
3.
THE80UNDARIESOFTHECLEARINGLIMITSANDAREAS OFVEGETATIONPRESERVATIONAS PRESCRIBED
DESS
•
ON THE PLAN(S) SHALL 8E CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE
E
2-3 TONS PER ACRE
FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE
3 ! �l11
1'T�L �I
DRAW EL
CHECKED:
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE
• �� �• �'
Geotechnical Engineer)
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SWILL BE
AVOID WIND BLOW. THE THICKNESS OF STRAW
NO.
PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC
DATE APPR APPROVED:
MAY BE REDUCED BY HALF WHEN USED IN
SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
Z
4.
STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
Q
NO GROWTH INHIBITING
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
�
CELLULOSE
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
am
NOT BE USED WITHOUT SEED AND TACKIFIER
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO
1000-1500 LBS PER
ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
' •�
1" Clean
ACRE
DOUBLED. SOME WOOD FIBER WITH VERY LONG
5.
ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND
" .
FIBERS CAN BE EFFECTIVE AT LOWER
IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT
O
TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT
FM
PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A
TACKIFIER.
COMPOST
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING ANO/OR CONSTRUCTION IS
2" THICK MIN.;
MORE EFFECTIVE CONTROL CAN BE OBTAINED BY
COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION,
06
APPROX. 100 TONS
MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL
HANDLING. MUST BE
SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMfTEE.
0
4" Diameter Perforated PVC
PURCHASED FROM
Q
6.
THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
O
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
WASTE HANDLING
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
AMENDMENT. SOURCES FOR COMPOST ARE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
AVAILABLE FROM THE KIND COUNTY COMMISSION
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
Z
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND
O
RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
(206) 296-4439.
CHIPPED SITE
CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE
�.
THIS IS A COST-EFFECTIVE WAY TO DISPOSE OF
MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND
BE SEVERAL INCHES.
THICKNESS
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
Q
7.
APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATI ON CONTROL ONLY. R GOES NOT
Q
BURNING. GENERALLY, IT SHOULD NOT BE USED
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
0
8.
ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
IT IS NOT RECOMMENDED WITHIN 200 FEET OF
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST TROUGH MARCH
J
30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30)
(M�
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G.,
SHORTLY AFTER MULCH, THE DECOMPOSITION OF
SEEDING, MULCHING, PLASTIC COVERING, ETC.).
um
THE CHIPPED VEGETATION MAY TIE UP NUTRIENTS
Q
9.
WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
W
CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
J
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
Z
10.
COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE
W
SURFACE WATER DESIGN MANUAL.
W
a:
11.
ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
�R
V
ADDRESSED WITHIN SEVEN (7) DAYS.
12.
THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A
MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13.
AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDMAENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL
BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14.
DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT
DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN
12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15.
ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN
SWILL BE AAODIFlED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
16.
PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. I), ALL DISTURBED AREAS SWILL
BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE
WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE
GINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND
THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CIN OF RENTON
FOR REVIEW.
p12 Wo Drj►s 9No►o You Db
811
unwe th I �a I W CUM I CMAW
c�,�rr.�oa�,wn►�
G�hiSULTING ENGINEERS33400 81h LLG
Suite 206Aver South 10 10 1 I
Federal Way, WA 90003
MONK wwr (00 M-1113
www.00ncml.can ENIM1* (+25) 297 -MW
Civil1 Land Sur #4)dng Land
1 Pl�rmirp
PublicE� Project man wormlt Loma Archlbecturs
ESM JOB #258-044-013
CONDITIONS FOR WET SEASON CONSTRUCTION
1. ANY CONSTRUCTION THAT WILL RESULT IN DISTURBED AREAS ON OR WITHIN A
CRITICAL AREA OR ASSOCIATED BUFFER, SHALL BE SUBJECT TO THE "CRITICAL AREA
RESTRICTIONS" CONTAINED IN THE ESC STANDARDS. THESE PROVISIONS INCLUDE
PHASING THE PROJECT WHENEVER POSSIBLE SO THAT CONSTRUCTION IN THESE
AREAS IS LIMITED TO THE DRY SEASON.
2. DURING CONSTRUCTION, ESC PLANS SHALL BE REVISED AS NECESSARY BY THE ESC
SUPERVISOR OR AS DIRECTED BY THE CITY TO ADDRESS CHANGING SITE
CONDITIONS, UNEXPECTED STORM EVENTS, OR NON-COMPLIANCE WITH THE ESC
PERFORMANCE CRITERIA IN SECTION D.4.1 (P. D-69). IF NON-COMPLIANCE WITH
THE ESC PERFORMANCE CRITERIA OCCURS, THE PLAN MUST BE UPDATED WITHIN 48
HOURS (FAILURE TO DO SO COULD RESULT IN A "STOP WORK" ORDER AS
DETERMINED BY THE CITY INSPECTOR) OF INSPECTIONS OR INVESTIGATIONS.
IMPLEMENTATION OF THE ONSITE CHANGES MUST OCCUR WITHIN 5 DAYS.
3. ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR BASIS AS
PRESCRIBED IN THE MAINTENANCE REQUIREMENTS FOR EACH BMP AND IN THIS
SECTION. THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST WEEKLY DURING
THE WET SEASON, AND WITHIN 24 HOURS OF SIGNIFICANT STORMS. IN GENERAL, A
SIGNIFICANT STORM IS ONE WITH MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR
LESS. THE CITY MAY REQUIRE THAT A WRITTEN RECORD OF THESE REVIEWS BE KEPT
ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 48 HOURS.
WET SEASON PROVISIONS
NOTE: THE FOLLOWING MEASURES ARE REQUIRED FOR CONSTRUCTION DURING THE WET
SEASON (OCTOBER 1 - APRIL 30) IN ADDITION TO THE STANDARD TESC MEASURES.
1. THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT COVER
MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN
(SECTION D.3.2).
2. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED
FOR MORE THAN 12 HOURS (SECTION D.3.2).
3. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED
ON SITE (SECTION D.3.2).
4. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED
WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON (SECTION D.3.2.5).
5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS (SECTION D.3.2.1).
6. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF
DISTURBANCE MUST BE STOCKPILED ON SITE (SECTION D.3.3.1).
7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES
UNLESS THE SITE IS UNDERLAIN BY COARSE-GRAINED SOIL (SECTION D.3.4.2).
8. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR
THE SPECIFIED DESIGN FLOW (SECTION D.3.5).
9. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS
ANTICIPATED FOR THE SPECIFIED DESIGN FLOW (SECTION D.3.6).
10. PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONSTRUCTION
ACTIVITY NEAR THE SURFACE WATERS (SECTION D.5.3).
11. ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE
SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND
FILTER SYSTEMS, OR HOLDING TANKS.
12. THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY
(SECTION D.5.4).
STRUCTURAL NOTES
1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY.
PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A
SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
2. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT-OF-WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
8' - 10'
n w I % iw ►u'7rn calor
J 1 LLL 1 L�I�VL.. I VJ 1
OR 2' x 2' WOODEN POST
r
TEMPORARY CONSTRUCTION FENCE DETAIL
SCALE:
I ONE INCH I
r AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
MULCH STANDARDS AND GUIDELINES
MULCH
NOT TO SCALE
�m
••••
MATERIAL
STANDARDS
SURVEYED:
REMARKS
0 M
AIR-DRIED; FREE FROM
2"-3" THICK; 2-3
•h
•
'
UNDESIRABLE SEED
DESS
•
2
E
2-3 TONS PER ACRE
�
3 ! �l11
1'T�L �I
DRAW EL
CHECKED:
0 0 1 00
• �� �• �'
Geotechnical Engineer)
��aRM��
Y Batte-
AVOID WIND BLOW. THE THICKNESS OF STRAW
NO.
REVISION BY
DATE APPR APPROVED:
SCALE:
I ONE INCH I
r AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
MULCH STANDARDS AND GUIDELINES
MULCH
2
�m
o Z
�r
MATERIAL
STANDARDS
RATES
REMARKS
STRAW
AIR-DRIED; FREE FROM
2"-3" THICK; 2-3
COST-EFFECTIVE PROTECTION WHEN APPLIED
'
UNDESIRABLE SEED
BALES PER 1000 SF OR
WITH ADEQUATE THICKNESS. HAND -APPLICATION
ComWent Cut -
AND COARSE MATERIAL
2-3 TONS PER ACRE
GENERALLY REQUIRES GREATER THICKNESS THAN
C
�• $'
(To Be Confirmed By
BLOWN STRAW. STRAW SHOULD BE CRIMPED TO
• �� �• �'
Geotechnical Engineer)
��aRM��
Y Batte-
AVOID WIND BLOW. THE THICKNESS OF STRAW
1
1 12
MAY BE REDUCED BY HALF WHEN USED IN
CONJUNCTION WITH SEEDIIVG.
WOOD FIFER
NO GROWTH INHIBITING
APPROX. 25-30 LBS
SHALL BE APPLIED WITH HYDROMULCHER. SHALL
CELLULOSE
FACTORS
PER 1000 SF OR
NOT BE USED WITHOUT SEED AND TACKIFIER
1000-1500 LBS PER
UNLESS THE APPLICATION RATE IS AT LEAST
' •�
1" Clean
ACRE
DOUBLED. SOME WOOD FIBER WITH VERY LONG
Crushed Rock
" .
FIBERS CAN BE EFFECTIVE AT LOWER
APPLICATION RATES AND WITHOUT SEED OR
i i T i l I 4D,
TACKIFIER.
COMPOST
NO VISIBLE WATER OR
2" THICK MIN.;
MORE EFFECTIVE CONTROL CAN BE OBTAINED BY
o
DUST DURING
APPROX. 100 TONS
INCREASING THICKNESS TO 3". EXCELLENT
HANDLING. MUST BE
PER ACRE (APPROX.
MULCH FOR PROTECTING FINAL. GRADES UNTIL
4" Diameter Perforated PVC
PURCHASED FROM
800 LBS PER YARD)
LANDSCAPING BECAUSE IT CAN BE DIRECTLY
SUPPLIER WITH SOLID
SEEDED OR TILLED INTO SOIL AS AN
WASTE HANDLING
AMENDMENT. SOURCES FOR COMPOST ARE
PERMIT.
AVAILABLE FROM THE KIND COUNTY COMMISSION
FOR MARK ETI NG RECYCLABLE MATERIALS AT
(206) 296-4439.
CHIPPED SITE
AVERAGE SIZE SHALL
2" MINIMUM
THIS IS A COST-EFFECTIVE WAY TO DISPOSE OF
VEGETATION
BE SEVERAL INCHES.
THICKNESS
DENS FROM CLEARING AND GRUBBING, AND IT
ELIMINATES THE PROBLEMS ASSOCIATED WITH
BURNING. GENERALLY, IT SHOULD NOT BE USED
ON SLOPES ABOVE APPROX. 10% BECAUSE OF
ITS TENDENCY TO BE TRANSPORTED BY RUNOFF.
IT IS NOT RECOMMENDED WITHIN 200 FEET OF
SURFACE WATERS. IF SEEDING IS EXPECTED
SHORTLY AFTER MULCH, THE DECOMPOSITION OF
THE CHIPPED VEGETATION MAY TIE UP NUTRIENTS
IMPORTANT TO GRASS ESTABLISHMENT.
4" Leveling Course
I, NON -REINFORCED, SINGLE BLOCK ROW
(CUT WALL) CONDITION
Not - To -Scale "
-A '
i 1' \I ` si , S Ff I \� i ri f•'.l I
I
D
2
�m
o Z
�r
�c�
12" lin.
f" -
t -
t
•.
C
Cil .
'
�>
GeoVV&N Max. ---►
'0:�b�° ; s
�� ro
ComWent Cut -
U^>
o 05:13 p•
Very Dense Glacial Till
C
�• $'
(To Be Confirmed By
4 ��
• �� �• �'
Geotechnical Engineer)
��aRM��
Y Batte-
n •+� •
•op
1
1 12
''• 0:a
ufaNNNatye Fill
' •�
1" Clean
4D �' a' >?
Crushed Rock
" .
(No Fines)
i i T i l I 4D,
o
�o;NP 0a+p
4" Diameter Perforated PVC
' • �`' °'• �' �' p' �� �''
Drain Pipe
4" Leveling Course
I, NON -REINFORCED, SINGLE BLOCK ROW
(CUT WALL) CONDITION
Not - To -Scale "
-A '
i 1' \I ` si , S Ff I \� i ri f•'.l I
I
D
�m
o Z
�r
�c�
Z
M
bq
C
Cil .
'
�>
"' z
C> ZZI
00 -+
TTI
M
M
0
ID
D
n
0
�o
Cn
C�
M-
N z
m
0
D
00
o Z
�r
00
'�
bq
� 00�
00 •�
'
�>
UJ
C> ZZI
00 -+
00
r -�
CHECKED FOR COMPLIANCE TO CITY STANDARDS
Cn
T
0
O
�. o b
�C
VERTICAL: '`�'°' GREENLEAF 3 LOT ADDITION n/wIN
� ,�,,�, CITY OF
GRADING & T.E.S.C. DETAILS & NOTES PA':
RENTON
DATUM NO:
Planning/Building/Public Works Dept. LVK-02
^r%
UTILITY PERMIT #U-150010221", 6
CD: R 3037"