Loading...
HomeMy WebLinkAboutRES 2197 7 Ir f , . ~ • r • r i CITY OF RENTON, WASHINGTON RESOLUTION NO . 2197 WHEREAS the City of Renton has heretofore adopted an "Arterial Six-Year Street Construction Program" , pursuant to Chapter 7 , Extraordinary Session Laws of 1961 of the State of Washington, and Chapter 195 of the 1961 Session Laws of. the State of Washington, and as same has heretofore been amended from time to time, and such plan and program having heretofore been duly amended and modified from time to time as authorized by law, and WHEREAS the City Council, after recommendation of its Public Works Department, caused to be held a public hearing thereon. on June 19, 1978 , after notice to the public as provided by law, for the purpose of considering the adoption, modification and amendments of said plan and program, and WHEREAS at such public heating held on June 19 , 1978, due consideration was given tothe proposed changes and amendments for the purpose of updating such plan and program, NOW THEREFORE THE CITY COUNCIL OF THE CITY OF RENTON DO RESOLVE AS FOLLOWS : SECTION I : The City' s Six-Year Arterial Construction Program" and the City' s "Arterial Street Plan" are hereby further amended and modified, all as more particularly shown on the attached Exhibits , entitled "Exhibit "A" , "Exhibit B" , and"Exhibit C" , and same being incorporated herein as if fully set forth. SECTION II: The aforestated plan and program, as evidenced by said Exhibits shall beand constitute the City' s "Six-Year Construction Program" and the City' s "Arterial Street Plan and same to remain in full force and effect until further revised, amended and modified as provided by law. SECTION III:. The Director of Public Works and the City Clerk are hereby authorized and directed to file this Resolution -1- C . _____ A / • • I • . • Y . • 4 . , • together with Exhibits , with the Director of HIghways for the State of Washington, and as otherwise provided by law., PASSED BY THE CITY COUNCIL this l0thday of July, 1978 . a Delores A. Mead, ity Clerk APPROVED BY. THE MAYOR this l0thday of July, 1978, .6%.", z9-x. • Charles . Delaurenti, Mayor Approved as to. form: Lawrence J• ...Warren., City Attorney. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 1984 Page 1 of 9 " 777!! 6/19/78 ` Gity/County RENTON Hearing Dote 7/10/78 City No. 1070 Adoption Dote County No. 17 MAJOR (PRINCIPAL) ARTERIALS "EXHIBIT A" Resolutiorn,fNo. ?1,9.7- ____,..... . SCHEDULE Route PROJECT IDENTIFICATION c c PROJECT PHASE AND FUNDING SOURCE or ci o Y Work Total `�a a^ ESTIMATED COSTS TOTAL Z Rood z Title, Location/Termini, Description of work v 3 Code M P to MP Length 2 D v� Year o c (Miles) -- w• (S m ANNUAL . FUNDS E Log No. — .2 q tis 0.-c ELEMENT 2nd 3rd 4,586th FEDERAL STATE AB LOCAL I 2 3 4 5 6 7 8 9 )011 12, 13 14 15 16 17 18 19 20 2T 1 4102 1 SW 43rd Street - E Valley Rd. to W Valley Rd. .(joint 2 A, C, 1 .25 MU P 250 3,250 850 2,900 1 ,200 4,100 project with City of Kent) . Grading, drainage, paving 5 D, E, curbs, sidewalk, illumination, signalization, bike 7 F, G, • • route, landscaping, bridge, widen to 56' (with L. I .D. H, I , and P-1 drainage) . N '2, 3203 1 Sunset Blvd. North - Bronson Way North to F.A. I . 405. 2 C, D, 0.50 MU 589 468 120 588 Drainage, paving, curbs, sidewalk, signal , illumination 5 E, F, • (FAM) channelization, widen to 68' . 6 6 3 4201 4, Longacres Parkway SW - SW 43rd Street to SW 16th St. 6 A, 1 .7 MU 4,473 3,559 914 4,473 (Phase I ) . Grading, drainage, paving, curbs, sidewalk, D,E, , (FAM) illumination, signal , bike route, channelization, 7 G, H, landscaping, bridge, 56' roadway (withL. I .D..) 8 I , N . 4 4201 4 Longacres Parkway SW - SW 16th Street to SW Grady Way 1 A, C, 0. 1 MU 4,000 3,182 818 4,000 (Phase II) . Grading, drainage, paving, curbs, side- 6 D,E,F , (FAM) walks, illumination, signal , bike route., channel - 7 G, H, __ L._ ., ization, landsc.apin.g, bridge, 66' roadway (with LID) . 8 I , N _5 4201. • 5 Longacres Parkway SW - SW Grady Way to South 140th 1 A, C, 1 .0 M U 4,700 3,739 961 4,800 ._, Street (Phase_ II.I) (North city limit) . Grading, 6 D, E, (FAM) . _. _ _ drainage, paving, curbs, sidewalk, illumination, 7 F, G, signal , bike route, channelization, - landscaping, bridge 8 H, I , • 56' roadway. N ' _6. 420.1 4 . Longacres Parkway. SW - $ 140th St. to SW Sunset Blvd. 1 A, C, 0.6 MU (Phase_ IV) (King County project) . . Grading,. drainage, 6 D, E, ___I__________ ___ _pavi.ng, .curbs,.__s..i.dewalk, illumination, channelization, F, 1 _ __,..__._._ __ landscaping,_ 56' roadway ._ DISTRIBUTION I Copy: District Engineer, Dept. of Tronsportion (All Money Entered to 1,000's) * URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION I Copy: Chairman,Urban Arterial Board,Olympio *7 I Copy: C.R.A.B. (Counties Only) SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 1984 Page 2 of 9` ity/County RENTON Hearing Dote 6/19/78 CityNo. 1070 � �� Adoption Dote _7/10/78 . MAJOR (PRINCIPAL) ARTERIALS "EXHIBIT A _. dounty No. 17 Resolution No. 2197 N SCHEDULE Route PROJECT IDENTIFICATION N c ° PROJECT PHASE AND FUNDING SOURCE or ci ti.e. Work Total va a^ ESTIMATED COSTS TOTAL Zr; z Title, Locution/Termini, Description of work -(-4" Code M P to MP Length 2� d-- r Year FUNDS Rwd c '� till ANNUAL 1 — Lag No. c) `2 w (Miles) c c o ELEMENT FEDERAL STATE ' UAB LOCAL E— u) Mc\ L2a &if 2nd 3rd 4,586th 1 2 3 4 5 6 7 8 _ 9 1011 12 13 14 15 j 16 17 18 IS 20 2a 1 7 5313 A SR 515 (Relocated Benson Rd.) - S Puget Dr. to S 31st 1 D,E, 1 .06 M U 173 173 173 St. (South city limit) . State D.O.T. Project - 6 F,G construct new roadway. City participation: sidewalk, curbs, signalization, illumination, channelization. . DISTRIBUTION I Copy: District Engineer, Dept. of Tronsportion (All Money Entered to 1,000's) URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION I Copy: Chairman,Urban Arterial Board,Olympia 1 Copy: C.R.A.B. (Counties Only) SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 1984 Page 4 of 9 ''" 'City/County RENTON Hearing Date 6/19/78 1070 Adoption Dote 7/10/78 • City No. SECONDARY (MINOR) ARTERIALS "EXHIBIT A" ' 2197 :- County No. 17 Resolution No,- - .1 SCHEDULE • I Route PROJECT IDENTIFICATION 0c PROJECT PHASE AND FUNDING SOURCE or o o x Work Total U2° a^ ESTIMATED COSTS TOTAL 0 Road z Title, Location/Termini, Description of work v3 Code MP to MP Length o\ d� Year FUNDS Z o o (Miles) u o cu ANNUAL E Log No. ,•,-, o o 3 dli ELEMENT 2nd 3rd 4,5 BEM FEDERAL STATE AB LOCAL 1 2 3 4 15 6 7 8 9 1011 12 13 14 15 i 16 17 _ 18 19 20 21 s 8 4222 2 SW 27th Street - Longacres Parkway SW to West Valley 1 A,C, 0.53 SU 1 ,812 1 ,442 370 1 ,812 Road. Grading, drainage, paving, curbs, sidewalk, 6 D,E, (FAM) illumination, signal , bike route, channelization, land- 8 F,G, scaping, 44' roadway (Phase II with L. I .D.) I ,N 9 5101 3 Wells Ave. Bridge - S Riverside Dr. to N Riverside Dr. 7 0.04 SU p 1 ,420 1 ,065 320 35 1 ,420 • Bridge replacement. 9 5101 3 Wells Ave. Bridge - S Riverside Dr. to N Riverside Dr. 7 0.04 SU 1 ,420 1 ,065 355 1 ,420 Bridge replacement. , 10 4202 2 SW Grady Way - Lind Ave. SW to West Valley Road. 2 A,C, 1 . 10 SU P 300 3,700 3,000 900 100 4,000 Drainage, paving, curbs, sidewalk, illumination, 5 D,E, 1 channelization, bridge, 44' roadway (joint project 6 F,H with Tukwila) 7 10 4202 2 SW Grady Way - Lind Ave. SW to West Valley Road. 2 A,C, 1 . 10 SU 300 3,700 3,000 1 ,000 4,000 . . Drainage, paving, curbs, sidewalk, illumination, 5 D,E, , channelization., bridge, 44' roadway (joint project 6 F,H with Tukwila) 7 • 11 6203 2 , S Puget Dr. & SE Puget Dr. - Benson Rd. S to Edmonds 2 A,C, 1 .0 SU 355 282 73 355 Ave. SE. , D,rainage, paving, curbs, sidewalk, ilium- 5 D,E, (FAM) __,__ , ination, channelization, 44' roadway. 6 F r _ • �.._. " 12 2501 A. Lake Washington Blvd. North - N Park Dr. to NE 51st 2 A,C, 3.03 S U 3,3002,625p. 675 3;300 St. , (North city 1imit) . Drainage, paving, curbs, 5 D,E, (FAM) sidewal,k, illumination, channel ization. . 6 F,H - DISTRIBUTION • I Copy: District Engineer, Dept. of Tronsportion (All Money Entered to 1,000's) * URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION I Copy: Chairman,Urban Arterial Board,Olympia I f'.,...,. r R A R (r.rnmtioc Onlv1 • ' , ' SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 1984 Page 5 of 9 .7 City/County Hearing Dote 6/19/78 RENTON City No. 7/10/78 1070 Adoption Dote "EXHIBIT A" —219/ - County No. 17 SECONDARY (MINOR) ARTERIALS Resolution Nora ,Route N SCHEDULE 1 PROJECT IDENTIFICATION N o c _ PROJECT PHASE AND FUNDING SOURCE or o oY Work Total �'� o-- ESTIMATED COSTS TOTAL z Title, Location/Termini, Description of work 0 ° Code M P to MP Length o� v� Year FUNDS z° Rood = p a ANNUAL E Log No c w (Miles) C o o a ELEMENT FEDERAL STATE UAB LOCAL :' fa\ L2c2 a� 2nd 3rd 4,586ih • .1_1_3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 (9 20 21' 13 3801 2 Union Ave. NE - NE Sunset Blvd. to NE 24th St. (North 2 A,C, 0.7 S U 380 302 j8 380 _ _ city limit) . .Drainage, paving curbs, sidewalk, 5 D,E, (FAM) . channelization, 44' roadway. _ 6 F 14 2551 2 Garden Ave. North - N 4th St. to N 8th St. Drainage, 2 A,C, 0.5 S U 200 200 I paving, curbs, sidewalk, channelization, 44' roadway. 5DE; 6 F , 15 4401 3 Lind Ave. SWI - SW. 16th Street to SW Grady Way. 2 A,C, 0.2 S U 750 597 , _.n 153 75Q . Drainage, paving, curbs, sidewalk, illumination, 5 D,E, (FAM) signal , channelization, bike route, landscaping, 6 F,G, bridge, 44' roadway. 7 H, I , .. 8 N 16 3203 2' Sunset Blvd. NE F.A. I . 405 to NE Park Drive. 2 A,C, 0.9 S U 1 ,046 832 • 214, 1 ,046 Drainage, paving, curbs, sidewalk, channelization. 5 D,E, (FAM) 6 F 17 5303 A Benson Road South - S Grady Way to SE 31st St. (South 2 A,C, 1 .8 S U 1 ,800 1 ,432 368 1 ,800 city limit) . Drainage, paving, curbs, sidewalk, 5 D,E, (FAM) channelization, bridge. 6 F,H _'. _. _ ._.. . .. . ._ ._._. . . .. _ .. 7 18 _4802__ 1 South 7th Street - Rainier Ave. South to Smithers 2 A,C, 0.5 S U 100 80 20 100 ' __. Ave. South. Drainage, paving, curbs, sidewalk, 5 D,E, (FAM) ,_ �.. .___.._ _.__. _ _i_l lumination, channel ization, 44' roadway. 6 F .... _ ` • DISTRIBUTION ! Copy:.District Engineer, Dept. of Tronsportion (All Money Entered to 1,000's) * URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION I Copy: Chairman,Urban Arterial Board,Olympia I Copy: C.R.A.B. (Counties Only) SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 1984 Page 6 of 9 . City/County RENTON Hearing Dote i 6/19/78 y y 1070 Adoption Dote 7/10/78 • City No. County No. 17 COLLECTOR ARTERIALS "EXHIBIT A" ResolutioQ °ory;_ _ 2197 • Route o o SCHEDULE FUNDING SOURCE . PROJECT IDENTIFICATION N PROJECT PHASE AND or o o x Work Total u. a.--,, ESTIMATED COSTS TOTAL z Title, Location/Termini, Description of work 5 8 Code M P to MP Length c' v d Road c 3 g .2''. a).o Year FUNDS E o c (Miles) as ANNUAL 4,----- (Jo FEDERAL STATE UAB LOCAL Log No. . >t 0c ELEMENT 2nd 3rd 4,5&6th j 2 3 4 5 , 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 1 Misc. street repairs and improvements - to be identi- C U 5 5 fled on prospectus and in Street Division 5-Year Plan. _2 5701 A Talbot Road South - South 16th Street to South 43rd 2 A,C, „ 1 .8 C U . , 495 . . . 495 Street (South City Limits) . Drainage, paving, curbs, 5 D,E, sidewalk, _ illumination, channelization. - 6 F 3 4902 A SW 16th Street - East Valley Road to Monster Road SW. 2 A,C, 0.9 CU 730 730- ._ . ,_ Drainage,, paving,_curbs, sidewalk, illumination, 5 D,E, ' - - ___..._. channelization, bridge, 44.' roadway. 6 F,H 4 4501 A East ValleyRoad - SW 16th Street to SR-167Ramps. 2 1 .6Cu 900 716 184 900 5A C C Drainage, paving, curbs, sidewalk, illumination, 5 D,E, (FAM) channelization, 44' roadway (L. I .D. project) . 6 F 5 . 3552 A NE 12th Street - Edmonds Ave. NE to. Union Ave. NE. • 2 A,C , 1 .0 C U 425 338 87 4�5- . _ Drainage, paving, curbs, sidewalk, illumination, . 5 D,E, (FAM) . channelization., 44' roadway. 6 F . • 6 1003 A Taylor Ave. NW & Taylor Place NW - Renton Ave. Ext. to 2 A,C, 0.6 C U 300 239 61 300 . Stevens Ave. NW. . . Drainage, paving, curbs, sidewalk, 5 D,E, (FAM) illumination, channelization, 44' roadway. . 6 F .- . 7 -3401_.- A Monroe Ave. NE „-- NE 2nd, Street to NE 12th, Street . _ 2 A,C, 1 .28C U 670 533 137 670 Drai.nage,, paving,._curbs, __sidewa1k, _ill umination, . 5 D,E, ,. _ . (FAM) '.__`_..__ ._. channelization, _44'_ _roadway___ _ ._ .__, _ __.;:. .. _ . _. 6 .F. .. .. _.._. - 8_ 2451__ A Burnett Ave. N -_ Lk. ,Wash.,- Blvd. _(S Term.) to Lk._Wash. .2 A,C, _ 'v_ . 0.6 U - 300 239 __ 61 300 - ' ___:____ . ___w .B,1.0. __(N.Term)... __Dra.i.nage, paving, curbs, sidewalk, 5 D.,.E, (FAM) _.. 111umination,-rchannel_ization, ,44'__roadwaY.._ . ,� ... :6 _F_,_ - . ._ _.. ._ . DISTRIBUTION _ (All Money Entered to 1,000's) URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION I Copy: District Engineer, Dept. of Transportion I Copy: Chairman,Urbon Arterial Board,Olympia I Copy: C.R.A.B. (Counties Only) SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 1984 Page 7 of 9 6/19/78 1 City/County RENTON Hearing Dote 7/10/7.8 City No. 1070 Adoption Dote County No. 17 COLLECTOR ARTERIALS • "EXHIBIT A" Resolution O. -2197 - C ,- SCHEDULE - Route PROJECT IDENTIFICATION N C ° PROJECT PHASE AND FUNDING SOURCE or c c i Work Total u 2 a^ ESTIMATED COSTS TOTAL Z z Title, Location/Termini, Description of work 8 Code MP to MP Length �� Year FUNKS Rood p — 'b' 1 ANNUAL E Log No o r- (Miles) o 04 c ELEMENT FEDERAL STATEAB LOCAL + > , = 2nd 3rd 4,586th I 2 3 4 , 5 6 7 8 ,, 9 ,10.11' 12 13 14 , 15 16 17 18 19 20 21 1 9 3251 A Aberdeen Ave. NE - Sunset Blvd. NE to NE 27th Street . • 2 A,C, 1 .3. C U 1 ,340 1 ,o66 274 1 ,34U Drainagepa_v-iny,_curbs_, sidewalk, illumination, 5 D,E, (FAM) _,_,___ _-_channel ization„bridge s._44 _-roadway•_ _-__..-_-___ -__..__.. , 6 F,H _. -.-_.. _... __..__ __ _ - ' . _ . . .. _. _ —_. 10 241 A Park Ave. North 6 North 40th Street - N 30th Stto 2 A,C, Q._4 C,U .,304 242 62 304 Lk. Wash. Blvd. N. Drainage, paving, curbs, sidewalk, 5 D,E, .. (FAM) • i 11uminat_ion-, channel-izat.iorr,-.44' roadway...,_ 6 F .. • . - ._ - DISTRIBUTION r , i Cop-y: District Engineer, Dept. of Transparf,on (All Money Entered to 1,000 5) : URBAN,-.ARTERIAL BOARD SUPPLEMENTAL'. SECTION I Copy: Chairman,Urban Arterior Board,Olympia . 4 r....... r G A Q tr...nti c-i]nlvl - . SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 1984 Page 8 of 9 ,City/County RENTON Hearing Date 6/19/78 City No. 1070 Adoption Dote 7/10/78 County No. 17 SPOT IMPROVEMENTS "EXHIBIT A" Resolution fyo.- X1.97= y SCHEDULE Route PROJECT IDENTIFICATION 0e c ° PROJECT PHASE AND FUNDING SOURCE or d _oY Work Total u, a-- ESTIMATED COSTS TOTAL z Title, Location/Termini, Description of work Code MP to MP Length o\ ,� Year FUNDS 8 Rood c E Log No. -� c w (Miles) 2 o c ANNUAL T FEDERAL STATE `UAB LOCAL > > L a 2nd 3rd 4,586th ' Li.. au- I I . 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 �1 i 1 3102 A NE 4th Street & Union Ave. NE - intersection improve- 2 A,C,D U 100 100 ments. Drainage, paving, curbs, signal , channelization 6 E,F,G 2 4603 A Monster Road SW - alternate access road (due to 1 A,C,D 1J 150 - 130 20, 150 closure of. railroad crossing) 6 E,F ... (FASP) 3 4603 A Monster Road SW Bridge - repair of structure 2 H U 5 5 4 4002 A SW Sunset Blvd. , SW Langston Road and Hardie Ave. SW - 6 G U 15 12 3 1S , intersection signal controller (FAM) 5 2152 B North 3rd Street - railroad crossing signal improve- 6 G . U 66 59 7 66 ment (FAM) ' __ __ ....__.. . _.. __ _._..r - - ___- - .,_ _ . ._ . 1 DISTRIBUTION (All Money Entered to 1,000's) *URBAN ARTERIAL BOARD SUPPLEMENTAL SECTION • I Copy: District Engineer, Dept. of Tronsportion I Copy! Chairman,Urban Arterial Board,Olympia I Copy: C,R,A,B. (Counties Only) SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1979 to 1984 Page 9 of 9 6/19/78 City/County RENTON Hearing Dote ' City No. 1070 Adoption Dote 7/10/78 County No. 17 LOCAL ACCESS STREETS "EXHIBIT A" Resolution No-. ,=2:_. 2.• 197 N - SCHEDULE PROJECT IDENTIFICATION a .0 c ° PROJECT PHASE AND FUNDING SOURCE or c It;ac Work 1 Total °.`0' 11-- ESTIMATED COSTS T• OTAL Zz Title, Location/Termini, Description of work 0 Code M P to MP Length c - � -2s. vl _Year FUNDS E No 0 0 3 (Miles) 1..; o c ELEMENT FEDERAL STATEAB LOCAL :_ cn 2 q ,a'!:L.u. 2nd 3rd 4,5&6th I 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 f9 20 21, I. 1 Misc. street repairs and improvements - to be identi- A U 119 119 119 1. fled on prospectus and in Street Division 5-Year Plan. 2 2223 A North 1st Street - Park Ave. North to Burnett Ave. 2 C,F 0.2 A U 85 - 85r. North. Drainage, paving, channelization. 6 3 .552.1 A Renton Ave. South - South 3rd Street to South 10th 2 A,C 0.5 A U 270 215 55 270," . Street. Drainage, paving, curbs, sidewalk, illumin- 6 D,E (FAM) . _ ation F . .. • DISTRIBUTION I Copy: District Engineer, Dept. of Transportion (AU Money Entered to 1,000 s) , URBAN ARTERIAL . BOARD SUPPLEMENTAL SECTION I Copy: Chairman,Urban Arterial Boord,Olympio 1 r„—... r n A_14 Ir...MIA_s_()nay 1