HomeMy WebLinkAboutRES 2054 ) • • CITY OF RENTON RESOLUTION NO. 2054 WHEREAS the City of Renton has heretofore adopted an "Arterial Six-Year Street Construction Program" , pursuant to Chapter 7 , Extraordinary Session Laws of 1961 of the State of Washington, and Chapter 195 of the 1961 Session Laws of the State of Washington, and as same has heretofore been amended from time to time, and such plan and program having heretofore been duly amended and modified from time to time as authorized by law, and WHEREAS the City Council , after recommendation of its Public Works Department, caused to be held a public hearing thereon on June 28, 1976 , after notice to the public as provided by law, for the purpose of considering the adoption, modification and amend- ments of said plan and program, and WHEREAS at such public hearing held on June 28 , 1976 , due consideration was given to the proposed changes and amendments for the purpose of updating such plan and program, NOW THEREFORE THE CITY COUNCIL OF THE CITY OF RENTON DO RESOLVE AS FOLLOWS : SECTION I : The City' s Six-Year Arterial Construction Program" and the City' s "Arterial Street Plan" are hereby further amended and modified, all as more particularly shown on the attached Exhibits , entitled "Exhibit A", "Exhibit B" , and "Exhibit C" , and same being incorporated herein as if fully set forth. SECTION II : The aforestated plan and program, as evidenced by said Exhibits shall be and constitute the City' s "Six-Year Construction Program" and the City' s "Arterial Street Plan" and same to remain in full force and effect until further revised., amended and modified as provided by law. • • + SECTION III : The Director of Public Works and the City Clerk are hereby authorized and directed to file this Resolution, together with Exhibits , with the Director of Highways for the State of Washington, and as otherwise provided by law. PASSED BY THE CITY COUNCIL this 12th day of July , 1976 . xed„,„,i) a . Delores A. Mead, Cit ,Clerk APPROVED BY THE MAYOR this 12th day of July , 1976 . Charles . Delaurenti , Mayor Approved as to legal form: '91 A /al Gerard M. Shellan, City Attorney - 2- DISTRIBUTION: SIX YEAR CONSTRUCTION PROGRAM (1) copy: District Engineer. Dept- of Highways • (I) copy: UABUAB-1 "EXHIBIT A"with Original Form Pag e 1 of 10 1977 - 1 9 82 6-28-76' HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (COUNTY) King County, (CITY) Renton ROAD FCUR ESTIMATE OF COST LOCAL NAME ITEM LENGTH NO. OF STREET N AB R TYPE OF WORK IN ROAD OR STREET NO. C S A A MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9 8 p— 8 2 TOTAL TSNL MAJOR (PRINCIPAL) ARTERIALS 1. SW 43rd St. , E Valley Rd. 4102 M U Reconstruct 2-lane roadway and 1.2 500,000 713,000 2,889,000 4,102,000 to W Valley Rd. (Joint widen to 3 lanes (first phase) (3-lane) Project w/City of Kent and to 5 lanes with new railroad undercrossing structure (second phase) . Curbs, sidewalks, bicycle paths, drainage system, illumination, & signalization also included in 2nd phase. Note: The 4th E 5th lanes could be constructed with the 1st phase (3 lanes) if LID participation is available at the east end of • project. 2. NE 3rd Street (Sunset 3103 M U Restoration of street shoulders * 3,140 3,140 Blvd. N to Monroe Ave. placing crushed rock $ oil NE) application. 3. Talbot Rd. S (Extension) 5351 M U Construct new 4-lane (44') 0.06 122,000 122,000 (S Grady Way to S 7th roadway section with full St.) improvements. 4. Bronson Way N , S (Main) 2253 M U Improve existing 4-lane roadway 0.2 80,000 80,000 Ave. S to Houser Way N) (no widening) . Replace curbs, gutters, F, sidewalks on north • - side. Place asphalt overlay & upgrade drainage system, • signalization, $ channelization- • • *Started in 1976. SA-1 REV. 4'74 t.+STR,BUToON: SIX YEAR CONSTRUCTION PROGRAM (i) copy: District Engineer, Dept. of Highways (I) copy: UAB with Original UAB-I Form Page 2 of 10 "EXHIBIT A" 1977 - 1 9 82 6-28-76 • (COUNTY) HEARING .DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) l<ing County, Renton ITEM LOCAL NAME ROAD F CUR LENGTH ESTIMATE OF COST OR ULRU TYPE OF WORK N0. OF STREET N ROAD OR STREET NO. C S A A MILES 1 9 7 7 1 .9 78 19 79 19 80— 82 TOTAL TSNL • 5. Sunset Blvd. N (Bronson 2104 M U Improve existing 4-lane roadway 0.5 588,600 588,600 Way N to FAI 405) (No widening) . Replace deter- iorated curbs, gutters, E upgrade channelization, signal- ization & illumination. 6. Longacres Pkwy. SW (SW 4201 M U Construct new 4-lane (56') road- 1 .7 43rd St. to SW 16th St. way with full improvements. (Phase I) 7. Longacres Pkwy. SW (SW 4201 M U Construct new 4-lane (56') road- 1.0 Grady Way to S 140th St.) way with full improvements. (Phase II) 8. Longacres Pkwy. SW (SW 4201 M U Construct new 4-lane (56') road- 0.1 16th St. to SW Grady Way way with full improvements. (Phase III) 9. Longacres Pkwy. SW (S 4201 M U Construct new 4-lane (56') road- 0.6 140th St. to SW Sunset way with full improvements. Blvd.) (Phase IV) SECONDARY (MINOR) ARTERIALS 1. Misc. street repairs & S U Pavement overlay; shoulder * 49,000 6,000 55,000 improvements (to be improvement; storm sewer upgrade. • identified on prospectus & in Street Dept. 5-Year Plan) . *Started in 1976. SA-I REV. 4'74 ()isT..TION: .SIX YEAR CONSTRUCTION PROGRAM t1) copy: District Engineer, Dept. of Highways (I) copy: UAB "EXHIBIT A" • with Original UAB-I Form Page 3 of 10 1977 — 19 82 • 6-28-76 HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (COUNTY)(CITY) King County,Count , Renton ROAD FCUR ESTIMATE OF .COST LOCAL NAME OR ULRU ITEMNOOF STREET N A B R TYPE OF WORK LENGTH ROAD OR STREET NO. CSAA MILES 1 9 7 7 19 78 19 79 19 80- 82 TOTAL T $ N L 2. S 7th St. (Rainier Ave. 4802 S U Widen existing 2-lane roadway to 0.5 72,000 72,000 S to Smithers Ave. S) 44' . Construct new curbs, gutters, sidewalks, $ .asphalt pavement. Upgrade drainage system, illumination, 4 channelization. 3. Garden Ave. N (N 4th St. 2551 S . U Widen existing 2-lane roadway to 0.5 133,000 133,000 to N 8th St.) 44' . Construct new curbs, gutters, sidewalks, F, asphalt pavement. Upgrade drainage • system F channelization. . 4. Shattuck Ave. S Railroad 5501 • S U Construct a new railroad underpass 0.23 110,000 290,000 400,000 Underpass $ Road Improve- structure to replace the present ment (S 4th Place to S substandard wooden underpass 7th St.) bridge, in conjunction with widening existing 2-lane roadway to 44' . Install new curbs, • gutters, sidewalks, asphalt _ - pavement, illumination, channelization, & upgrade drainage system. - 5. Shattuck Ave. S Access 5501 S U Construct new 4-lane (44') road- 0.06 94,268 94,268 Road (S 7th to S Grady way with full improvements Way) . 6. S Puget Dr. $ Benson Rd. 6203 S U Phase I : Signal controller 160,000 160,000 • S Intersection (Phase I) replacement; improved channeliza- tion. See page 4, Item 8 for Phase II. r • SA.1 REV. 4,74 (•I TRIBUTION: ,SIX YEAR CONSTRUCTION PROGRAM (I) copy: District Engineer. Dept. of Highways Page 4 of 10 • (I) copy- UAB with Original UAB-1 Form "EXHIBIT A" 1977 1 9 82 6-28-76 (COUNTY) HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton -- ROAD ' F CU R ESTIMATE OF COST ITEM LOCAL NAME OR ULRU LENGTH NO, OF STREET N A B R TYPE OF WORK IN ROAD OR STREET NO. , C S A A MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9.8 0-8 2 TOTAL TSNL 7. Lind Ave. SW (Phase I) 4401 S U Construct new 4-lane (44') road- 1.7 1,195,000 1,195,000 (SW 16th St. to SW 43rd .. way with full improvements and St.) construct the required structure over the P-9 drainage channel . 8. S Puget Drive and Puget 6203 S U Widen existing 2-lane roadway to 1 .0 325,000 325,000 Drive SE (Benson Road S 4 lanes (44') . Construct curbs, to Edmonds Ave. SE) gutters, sidewalks. Upgrade (Phase II) drainage system, illumination, & channelization. 9. Lake Wash. Blvd. North 2501 S U Improve existing 2-lane roadway. 2 .5 263,500 891,000 971,500 2,126,000 (North Park Drive to Construct curbs, gutters, North 44th Street) sidewalks . Upgrade drainage (Parkway Section) system, illumination, $ channelization. 10. SW Grady Way (Lind Ave. 4202 S U Widen existing 2-lane roadway to 1.2 3,603,000 3,603,000 SW to West City Limits) 4 lanes (44') . Construct curbs, gutters, sidewalks. Upgrade drainage system, illumination, ?, channelization. Replace existing steel bridge structure with a new 4-lane overpass with - sidewalks, illumination, & - . channelization. 11. Union Ave. NE (NE Sunset 3801 S U Widen existing 2-lane roadway to 0.7 355,000 355,000 • • Blvd. to NE 24th St.) 44' . Construct curbs, gutters, E sidewalks. Upgrade drainage system & channelization. SA.1 REv. 4 "4 CAST RIBUTION: SIX YEAR CONSTRUCTION PROGRAM (1) copy: District Engineer. Dept. of Highways (1) copy: UAB with Original UAB-i Form Page 5 of 10 9 7 7 — 1 9 8 Z "EXHIBIT A" . 6-28-76 (COUNTY) HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton ROAD FCUR ESTIMATE OF COST ITEM LOCAL NAME OR U L R U - LENGTH OF STREET N. A B R TYPE OF WORK IN NO. ROAD OR STREET NO. C S A A MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9 8 ©—82 TOTAL TSNL 12. SW 27th St. (W Valley 4222 S U Construct new 4-lane (44') Road to E Valley Road) roadway with full improvements. 13. N 30th St. (Burnett Ave. 2352 S U Widen existing 2-lane roadway to 0.4 ' 150,000 150,000 N to FAI 405) 44' . Construct curbs, gutters, $ sidewalks. Upgrade drainage - system & channelization. 14. Lind Ave. SW (Phase II) 4401 S U Widen existing 2-lane roadway $ 0.2 1,400,000 1,400,000 (SW 16th St. to SW structure over I-405 to provide Grady Way) 4-lane (44') capacity. Construct new curbs, gutters, sidewalks, extra 2 lanes of roadway $ • structure, drainage system, landscaping, illumination, signalization, & channelization. 15. Sunset Blvd. NE (FAI 405 3203 S U Improve existing 2-lane roadway. 0.9 1,046,400 1,046,400 . to NE Park Drive) Construct curbs, gutters, $ sidewalks. Upgrade drainage system & channelization. 16. Benson Rd. S (S Grady 5303 S U Widen existing 2-lane roadway to 1.8 733,000 733,000 Way to SE 31st St.) 4 lanes (44') . Construct curbs, gutters, F sidewalks. Upgrade . • . drainage system F, channelization. _ SA-I REV. 4'-74 ,,,s-r,. UTioN: SIX. YEAR` . CONSTRUCTION PROGRAM (1) copy: District Engineer, Dept. of Highways g • O) copy: UAB with Original UAB-1 "EXHIBIT A" Form Page 6 of 10 1977 — 1982 6-28-76 (COUNTY) HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton ROAD F C U R ESTIMATE OF COST ITEM LOCAL NAME OR U L R -U LENGTH NO. OF STREET N A B R TYPE OF WORK IN -- ROAD OR STREET NO. C 5 A A MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9 8 0- 8 2 TOTAL TSNL g bridge1,420,000 17. Wells Ave. Bridge & Wells 5101 S U Construct new across Cedar1,420,000 Ave. N (Cedar River River in conjunction with widen- south bank to North 6th ing of 2-lane roadway to 44' . . St.) Includes curbs, gutters, side- walks, paving, drainage system, landscaping, illumination, channelization. COLLECTOR ARTERIALS 1. Misc. Street Improvements C U Pavement overlay, shoulder * 27,000 23,000 50,000 (To be identified on improvement, storm sewer upgrade. Prospectus F, in Street Dept. 5-Year Plan.) 2. SW 16th St. (E Valley 4902 C U Phase I: Widen existing 2-lane 0.9 245,000 485,000 730,000 Road to Monster Road SW) roadway to 44' . Construct curbs, gutters, & sidewalks. Upgrade . drainage system, illumination, & channelization. Phase II: Construct new bridge structure over P-1 drainage channel. 3. E Valley Road (SW 16th 4501 C U Widen existing 2-lane roadway to 1.6 900,000 900,000 . St. to SR 167 Ramps) 4 lanes (44') . Construct curbs, gutters, & sidewalks. Upgrade drainage system, illumination, & channelization. *Started - . in 1976. SA-1 REV. 4174 - ( ,,,,,sUTioN: SIX YEAR CONSTRUCTION PROGRAM , (1) copy: Oistnct Engineer, Dept. of Highways Page 7 of 10 (1) copy: UAB with Original UA B•1 Form 1 9 7 7 __ 1 9 8 2 "EXHIBIT A" 6-28-76 (COUNTY) HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO.. 2054 (CITY) King County, Renton ROAD FCUR ESTIMATE OF COST ITEM LOCAL NAME LENGTH N0. OF STREET . N A .8 R TYPE OF WORK IN ROAD OR STREET NO. CSAA MILES 1 9 7 7 1 9 7 8 1 9 7 9 1 9 8 0—$2 TOTAL T S N L , f 4. Talbot Rd. S (S 15th St. 5701 C U Improve existing 2-lane roadway. 1.8 495,000 495,000 1 to S 43rd St.) ((Joint Construct curbs, gutters, $ City/County Project) sidewalks. Upgrade drainage system, illumination. Install channelization at Victoria Park (S 19th St. & Scotts Terrace) . t' 1 5. NE 12th St. (Edmonds Ave. 3552 C U Widen existing 2-lane roadway to 1.0 425,000 425,000 's NE to Union Ave. NE) 44' . Construct curbs, gutters, , sidewalks. Upgrade drainage system, illumination, & channelization. 6. Taylor Ave. NW $ Taylor 1003 C U Widen existing 2-lane roadway to 0.6 300,000 300,000 Place (Renton Ave. Ext. 44' . Construct curbs, gutters, to Stevens Ave. NW) & sidewalks. Upgrade drainage . system, illumination, & . channelization. 7. Monroe Ave. NE (NE 4th 3401 C U Widen existing 2-lane roadway to 1.0 507,000 507,000 _# St. to NE 12th St.) 44' . Construct curbs, gutters, ? sidewalks. Upgrade drainage system, illumination, $ channelization. 8. Burnett Ave. North (Lake 2451 C U Widen existing 2-lane roadway to 0.6 300,000 300,000 Wash. Blvd. N (S Term) 44' . Construct curb, gutters, to Lake Wash. Blvd. N & sidewalks. Upgrade drainage - (N Term) system, illumination, E • channelization. I, SA-1 REV. 4 74 • ,sy.. copy SIX YEAR CONSTRUCTION PROGRAM Page 8 of 10 . 11) copy: D4stnct Engineer, Dept. of Highways • (1) copy: UAB with Original UAB-1 Form 1 9 7 7 - 1 9 8 2 "EXHIBIT A" • 6-28-76 . (COUNTY) HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton . ROAD FCUR ESTIMATE OF COST ITEM LOCAL NAME OR U L' R U LENGTH NO. OF STREET N A B R TYPE OF WORE IN ROAD OR STREET NO. C S A . A MILES 1 9 7 7 1 9 7 8 1 9 7.9 1 9 8 0— 8 2 TOTAL T S N L • 1 9. Aberdeen Ave. NE (Sunset 3251 C U Widen existing 2-lane roadway to 1.3 1,340,000 1,340,000 Blvd. NE to NE 27th St.). 44' . Construct curb, gutters, $ sidewalks. Upgrade drainage system, illumination, & - channelization. 10. Park Ave. N & N 40th St. 2491 C U Widen existing 2-lane roadway to 0.4 195,000 195,000 (N 30th St. to Lake Wash. 44' . Construct curbs, gutters, F, Blvd. N) , ' sidewalks. Upgrade drainage system, illumination, $ channelization. SPOT IMPROVEMENTS . 1. Wells Ave. Bridge, Cedar U Repair structure 0.0 * 3,700 3,700 River 2. Monster Road Bridge U Repair structure 0.0 * 4,700 4,700 3. Pavement Marking Program U Install buttons $ tape (city-wide) * 60,000 60,000 - 4. Monster Rd. SW Railroad U Install automatic flashing 145,000 - 145,000 Crossing Signal Improve- signals ment 5. NE 4th St. 4 Monroe Ave. U New signal installation 20,000 20,000 NE *Started in 1976. S4.1 REV. 4 74 C-+STg(BUTioN: t - 'SIX- YEAR CONSTRUCTION PROGRAM (1) copy: District Engineer, Dept. of Highways Page 9 of 10 • (I) copy: UA9 with Original UAB-1 Form' 1 9 7 7 — 1 9 8 2 - "EXHIBIT A" 6-28-76 (COUNTY) HEARING DATE 7-12-76 ADOPTION DATE � 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton • ROAD FCUR • LOCAL NAME ESTIMATE OF COST ITEM OF STREET N A, B R TYPE OF WORK LENGTHI _ ROAD OR STREET NO. C S A A MILES 9 7 7 7 8 9 T 9 TOTAL T S N 1 9 842-82 L 6. Duvall Ave. NE F NE Sun- ' U New signal installation. 32,000 32,000 set Blvd. 7. Rainier Ave. S E1 S Grady U Replace signal controller and 13,500 13,500 ' Way include in computer system. 8. SW Grady Way $ Lind Ave. U Replace signal controller and 11,000 11,000 SW include in computer system. 9. S Grady Way & West Entr. U Replace signal controller and 9,200 9,200 to Shopping Center include in computer system. 10. S Grady Way $ East Entr. U Replace signal controller and 9,200 9,200 to Shopping Center include in computer system. 11. SW Sunset Blvd. , SW U Replace signal controller and !11;000 11,000 Langston Rd. , & Hardie include in computer system. Ave. SW 12. N 3rd St. Railroad U Install automatic flashing R/R to Crossing Signal Improve- signals , provide ment estimate ' LOCAL ACCESS STREETS - 1. Misc. Street Repairs and LA U Street overlay, sealing, shoulder *121,400 148,450 32,650 91,850 394,350 improvements (to be improvement, $ storm sewer . identified on prospectus upgrade. & in Street Dept. 5-Year Plan) ' *Started in 1976. A.i REV. ♦.74 t S • S. ( i,TRIBUTION: SIX YEAR CONSTRUCTION PROGRAM (]) copy: District Engineer, Dept. of Highways Page 10 of 10 (l) copy: UAB with Original UAB-1 Form "EXHIBIT A" 1977 - 1 9 82 6-28-76 (COUNTY) HEARING DATE 7-12-76 ADOPTION DATE 7-12-76 RESOLUTION NO. 2054 (CITY) King County, Renton ROAD F CUR ESTIMATE OF COST ITEM LOCAL NAME OR ULRU LENGTH TYPE OF WORK NO. OF STREET NABR IN ROAD OR STREET NO, C SA A MILES 1.9 7 7 1 9 7 8 1 9 7 9 1 9 8 0— 8.2 TOTAL T S N L 2. Royal Hills Dr. SE Cul- 6103 LA U Construct turn-around for bus 0.1 * 4,900 4,900 de-sac and automobile traffic. 3. N 1st St. (Park Ave. N to 2223 LA U Overlay plus curb replacement. 0.2 22,000 22,000 Burnett Ave, N) and storm sewer upgrade. 4. Renton Ave. S (S 3rd St. 5521 LA U Improve existing 25' roadway (no 0.5 215,000 215,000 to S 10th St.) widening) . Replace curbs, gutters, sidewalks; place asphalt overlay and upgrade drainage system & channelization. • • *Started . • in 1976. SA.1 REV. 4 74