Loading...
HomeMy WebLinkAboutRES 1891 CITY OF RENTON, WASHINGTON RESOLUTION NO . 1891 WHEREAS the City of Renton, a municipal corporation operating as a non-charter code city, has heretofore executed certain Agreements in connection with the Green River Watershed Drainage Plan, and WHEREAS supplemental work plan agreements have been submitted which supersede the original Watershed Work Plan Agreement of. 1966 , and WHEREAS the execution of said supplements_ is reasonable and advisable and in the public interest , NOW: THEREFORE BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, AS FOLLOWS : SECTION I ; The Mayor and City Clerk are hereby authorized and directed to execute the attached "Supplemental Watershed Work Plans" and same are incorporated herein as if fully set forth . PASSED BY THE CITY COUNCIL this 28thday of January , 1974. 0,649-te . Delores A. q ad, CCity erk APPROVED BY THE MAYOR this 28thday of January, 1974. very t , Mayor ';.proved . form , / G=rard M. She lan, y Attorney .:0 . SUPPLEMENTAL WATERSHED WORK PLAN AGREEMENT //2. between the CITY OF AUBURN CITY OF KENT #6F4't 4'" hewq.arc..:4; CITY OF RENTON • CITY OF TUKWILA KING COUNTY CONSERVATION DISTRICT GREEN RIVER FLOOD CONTROL ZONE DISTRICT COUNTY OF KING % 9 (hereinafter referred to as the Sponsoring Local Organizations) • x State of Washington 1 and the SOIL CONSERVATION SERVICE UNITED STATES DEPARTMENT OF AGRICULTURE (hereinafter referred to as the Service) Whereas., the Watershed Work Plan Agreement for West Side Green River Watershed, State of Washington, executed by the Sponsoring Local Organiza- tions named therein and the Service, became effective on the twenty- second day of August 1966; and Whereas, the said Watershed Work Plan Agreement for West Side Green River Watershed, King County, Washington, was modified by a Supplemental :- Watershed Work Plan Agreement #1 , executed by the Sponsoring Local Organi- krizr zations and the Service, which became effective on the thirty-first day '._-.. of July 1967; and Whereas, the title of the King County Soil and Water Conservation - District has been changed by the Washington State Legislature 'and shall F be hereafter titled the King County Conservation District; and r Whereas, the Sponsoring Local Organizations have requested the f•.•,,. Secretary of Agriculture through the Service to administer all construc- tion contracts; and .. f Whereas , in order to carry out the Watershed Work Plan iL has become necessary to supplement the Work Plan Agreement to provide for assistance and funds as needed to comply with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Public Law 91-646, 84 Stat. 1894) , Whereas, it has been found necessary to modify said Watershed Work Plan Agreement to change references of installation services and , . R""1"I • _j. -�' jig- f•"" =.t'"vy': _ .^ 1 ` ..h �a- , .� :.� d � ::•r :A`.yu .t` � :�,;,,,.yrr_�,,.ini .,�. � .•-rn4 s �••e.t�" v,ip.. ii'„.,' •� )'"' �t t - �.��'tirra.0r � ,-: � 'a `` ti _`�" �`".r•.,� "�+�`" -ar".,�,ret .,,f"`� t�)i`7:Y�'",,:•.` f t v"! f i 4 a, q� « e of 4, �n; Y3 s �c�^ 4., �,..i.:a. .c,', tE "'�,'�": �. i�"'.* �'R��. �• �'�''r r- ., st•`�c.. '•�s�`-a -x..",,� .sk�"f"• ..�,.r., �• rani• ..i , ; . • :., ' . ,7dmin) �,trdlion of contracts to en<lineerinc cervi :rdnrin( sIraCion; and1 services and I�rr>jrcl. s Whereas, it has been found necessary to m lif ;..,; . work plan bydeletingP- r / the watershed ' � channels; and 17A, P-176,• P-17C, and 8,500 feet of P-17 ..,;r..: Whereas, a Supplemental Watershed Work Plan which modifies Watershed Work Plan dated the tweet the said watershed has been developed through nth��coopey of rative 1966, for :::: 1 the Sponsoring Local Organizations and the Service; whichefforts of annexed to and made a part of this agreement; plan is y Whereas, this agreement will not become effective until the 445 Service has issued a notification of approval and authorizes assistance; Now, therefore, the Sponsoring Local Or Service agree upon the following modifications of the terms, Organizations and the f y tions, condi- and stipulations of said Watershed Work Plan Agreement; i 1 . Supplemental Watershed Work Plan Agreement #1 , executed `'° sori n by the Spon- r g Local Organizations and the Service, which became effective on the thirty-first .day of July 1967, is declared null and void y 2. The Secretaryof ract A. Agriculture throughy fror... tfor and administer all contracts coveriinge Sconstructionervice will coftstruc- tures in the work plan. (Estimated cost $ 113,200) ill 3. Numbered paragraph 4 is changed to read : ':.:. as follows; 4. The percentages of the Engineering costs to be bo i Sponsoring Local Organizations and the Service are asrfollo the follows-: Works f .. . Sponsoring # ":OP' `,y Improve- Local Estimated ment Engineering ii Organiz. Service (percent) Costs (percent) (dollars) All measures O '•..n 100 452,800 «` 4. Numbered paragraph 5 is changed to read as follows: 5. The Sponsoring Local Organization(s) and bear the costs of Project Administration which hite Sincurs, willervice each r estimated to be $37,735 and $679,245 respectively, 5. The following paragraph shall be added as numbered paragraph 15: • L 15. The Sponsoring Local Organization assures that comparable replacement dwellings will be available for individuals and ( persons displaced from dwellings, and assistance advisory services and relocatilonl passistancee �cmake nthe row ii f ' 4 ..,e 4.;;;; '7'4;4,'!C.};h t.. 4 .s. ,,:, �' :Ve fpy -34,...-4-.;.:. °}79r,u«4 .nisiN'-" ,.1%- -te`' --ter- - _..�,_•___, _ }.: 7 relocation payments to displaced persons , and otherwise comply with the real property acquisition policies contained in the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Public Law 91-646, 84 Stat. 1894) effective as of January 2, 1971 , and the Regulations issued by the 5-. Secretary. of Agriculture pursuant thereto. The costs of reloca- tion payments will be shared by the Sponsoring Local Organization ; and the Service as follows: 1...---.. Sponsoring Estimated , , Local Relocation Organization . Service Payment Costs (percent) (percent) (dollars) ••:--r''"'-7 am_- Relocation J . Payments 29 - • 71 0 _ ; w`• Investigation has disclosed that under present conditions the project measures will not result in the displacement of any person, business, or farm operation. However, if relocations become neces- sary, relocation payments will be cost-shared in accordance with the percentages' shown. _� RR•l. i(:". 6. The following shall be added as numbered paragraph 16: ..t e:! c-,;,;--,-.-- 16. This agreement will not become effective until the Service plow has issued a notification of approval and authorizes assistance. r The Sponsoring Local Organizations and the Service further agree to all other terms, conditions and stipulations of said Watershed Work Plan Agreement not modified herein. , CITY OF AUBURN By ': Local Organization Title 1`" • Address Zip Code Date r 'A F".,C4. The signing of this agreement was authorized by a resolution of the governing body of the City of Auburn I•`- • Local Organization w I • adopted at a meeting held on N':, . Secretary, Local Organization Address Zip Code - K, Date i i i i vtiA.. > POW. t. is r j r-45.,;55 :--;.)547>.;,: e -wY:`�.s^.'�3� '✓:, - fie' r . i.„ +✓' . '.,,k- >Y' a. fn z''' ;-' 4 Y�..x t �z..+.,". : `.,-:.?`;':"..;.':"-4,...•':.44-..',1:-;17';, f�1 ` - .*'d' i�kN - ,•' '� ,, fh- , .44-7.,7:*:'''ti .'; ',.';,' <,',,-'.' r , .ate' Y� ,M1 i r.s 'r� � 4 1:p+. t,4-",,'"`-`' ..." .. *" . .1v _.r '� i,4 j.;'f:j-v ,4N4;; .Cl" .t y , .3 .r,. A b 4 � -? r {.' pti(4 rs'r, I AZ; � `'}e'"' t � .' + :a «"fes 't� ,x ._.,,,,;-,,•,,-., vs,- I. • . CITY OF KENT By ' . ! Local Organization Title Address Zip Code Date ,..._�. The signing of this agreement was authorized by a resolution of the ``" .r governing body of the City of Kent Local Organization adopted at a meeting held on Y Secretary, Local Organization Address Zip Code Date :',`; Citte46dr CITY OF RENTON ByE Local Organization Title MAYOR Ivo 1 a41-(-3. 9io Address Zip Code Date / /9757 .. _ / The signing of this agreement was authorized by a resolution of the 4;5 governing body of the City of Renton Resolution #1891 ' 'f • w Local Organization adopted at a• meeti ng held on January 28 , 1974 /&J / Q: `i e-a o ao d 12 - /4 96190s- , Secretary, :+Local Organization Address Zip Code i; e,17-11- ak R 1,C, Date /97X ,___ priNPI CITY OF TUKWILA By Local Organization c:r Title Address Zip Code Date ii:."v` The signing of this agreement was authorized by a resolution of the . governing body of the City of Tukwila " Local Organization L' adopted at a meeting held on k 7" S. Secretary, Local Organization Address Zip Code F Date , iv -- ;:x ' I r . S ' n �a ^eKt s ' os i " / t •„,-. ' ;' tx _ 3nc F"t'}�w `"r":;',''':`,-C.':''• bwu%ac.d ``- a` -t ^ F.f ' . `. ;� ” S' " 4��h �" `,s ,erraT �}�x.I �Y� Sy �d`.' � �w X ' -,- ', x , " r ' `' . �': �.�,,i�t«<ts"'+o'y, iraR: y<T,, �3a ��te:t ,i'�r: -� sLw .",.Er��`_ic '` en a;� rs-?4`,r. 4%ti. _.r*:„_ • . ... . .. . " ^ ^ ~ . . ^ | : Appropriate and careful mnsidoroLiun has been given to the environmental statement prepared for this project and to the environmental aspects thereof. Soil Conservation Service United States Department of Agriculture• Approved pprovu by: , | � • State Conservationist Date p----- �. • • • . . * ~W • • P + ^` ' ' t ' vi PPP" • • 1 � �' ' . . " ^ ^ . . . .^ ^ ^ . i / ' � ^ . ~ ^ ^ . ^ KING COUNTY CONS . DISTRICT By --- '---izaLn Local Title _ • *or~��- ' dress Zip Code Date � �� The signing of this agreement was authorized by a resolution of the ..--.1- governing body of the King County Conservation District : ,• Local Organization adopted at a meeting held on ' � ' . ' Secretary, Local Organization Address Zip Code :.-f ����� Dater., � �` r���. � | GREEN RIVER FLOOD CONTROL ZONE DIST. By i t ` Local Organization ` Title Address Zip Code Date ' The signing of this agreement was authorized by a resolution of the ,- governing body ofthe Green River Flood Control Zone District !mow' Local Organization adopted at a meeting held on ^ � . | _-_-___- ___--_- _-_- '---- ^ Secretary, Local Organization Address Zip Code , Date __-_-___- -_� __ -- ' ----------- COUNTY OF KING By ' Local Organization ' Title � � Address Zip Code Date 4; ': ' � i 1,. Thc signing of this agreement was authorized by a resolution of the governing body of the CounLy of Kingr'''''' Local Organization :. adopted at a meeting held on i- . 'r Secretary, Local Organization Address Zip Code ___' ' Date ���� , . v ^ � � ^ . ' ^---. • WEST SIDE GREEN RIVER WATERSHED SUPPLEMENTAL WORK PLAN (attachment to Supplemental Work Plan Agreement #/2) EXPLANATORY NARRATIVE The Supplemental Work Plan Agreement provides for the following: 1 . inclusion of' Uniform Relocation Assistance and Real Property W7777"' SG: Acquisition Policies Act provisions, although investigation •• •. �<F: has disclosed that under present conditions the project mea- !,tiros wi I I not.. re ;trl t in Chu (II .;j I;tc:c•nucnt o{ any {>cr!.on, .—�. business, or i',trm operation. However, if relocation Lec;imi, necessary, relocation payments will be cost-shared on the basis of 29 percent local and J1 percent PL-566, 2. In accordance with requests from the sponsoring organizations, the Service will perform the Administration of Contracts, *• {_ 'F' w 3. Floodways which will adequately substitute for Channels P-17A, P-17B, and P-17C have been installed by land developers in piffi"rforp the. al-ea. Therefore those sections are deleted from the work plan measures. 44 All references related to Installation Services and Adminis- tration of Contracts on pages 31 and 32 and elsewhere shall be changed to consider engineering services and project adminis- •.6,_ _ tration. PL-566 costs are estimated as Engineering Services $452,800 and Project Administration $679,245. Costs for other ° "z, funds are estimated to be $37,735. P. • • • t • FW�. f f> • i • • • pinew •- • • prp` • S - r.. ..r, �� _ `••a:.e:�,. .t ?.r:.:.:.r• ..y,�.j, rf •_ !_ ,• 5. ,a, :{ iy �, Y ' • r f a, e•�'�}�"nSi6 7�r' � ' ' a > yr s r ;' r a ::.,ten z .t 1 -yr, 4..�' •P .y'''r.n./-- ., y4 - %. �, +e " s..: .t rY,. • ��yy, '•Y...t �- a 1kt ,.y. ;K3t �- �u+��,. •! -• • i�4R.�t..�'- �+u;. .T$'C-..P:��.� +«Y�_:'nb .:«y" ';pae h�= �w ;'L*�. t � C.f r y..s .o,:. :�?tc,�. -- ,:fat':;'IAYsi - TAB I E 1 - ESTI MATED PROJECT INSTALLATION COSTS - . •• ,�. 4.e ;'� West Side Green River Watershed, Washington • . :, 4y r:. • •• Number C1 ass) Esti sated Cost (Dollars) _ '11"=.N, - P. L .5 06 Funds Other •_ • ' gin'': . �` _' • Installation Cost :Unit: Nonfederal Land: Nonfederal Land • Nonfederal Land GRAND TOTAL "v. fk, R SCS 3/ • SCS 3/ • . - A, 4. Item • ,.,t` •? -4'. LAND TREATMENT `: • ..4; _ ,f Land Areas 2/ ,0 p� Cropland ac, 9,325 586,240. 586,240 4'N. '`s: Rurb�,n Development ac, 13,360 1 i7 000 117 000 ,,,...- Vii •:.•‘:: . Technical Assistance _ 137,210 15,980-----_----- 153_z 19° ``�", :; ::' { TOTAL LAUD TP,i:i�TI1Ei�T x .,, xrxx 1 37,2 '0 719,220 __856.430 - -4i _ • -`" STRUCTURAL MEASURES — - -- - — tt • -' :{ Construction r ).-- ,t'i' Channel Modification 4/ • {_ , ' : P--4 P-7 System mi , (N)2.7; (0) 1 .3 1 , 167,735 81 , 180 1 ,248,915 ,ip , (m) 18.3 r ,,*1• i'. : : P-6 " mi . (N) .4 (M)2.0 109,050 7,580 • 116,630 i� q;;'� .y'""4 P-17 " mi , (11) ,4 28,200 1 ,800 30,000 ~' � k`' P-21 " mi . (01 .6 19,285 1 ,335 20,620 .1 til , 7�$; at. V, fir,V 1 • TABLE 2A - COST ALLOCATION AND COST SHARING SUMMARY i r'. ).!..o. West Side Green River Watershed, Washington ' :kt . h (Dollars) 1/ ___________ - - Cost Allocation . -- ---- Co-st Sharing r-i ng y Puros ,i - Po Lo 6Je Other ' Flood Flood • Flood: ,.., •, , � ---- Item Pre- Drain- Pre- Drain- Pre- Drain- :-. . vention age Total vention age Total vention__ age Total ,i Multiple Purpose: '•- Channels rt 4I. P-4 P-7 Systems 2,001 ,595 090 2 685 1 144 85 1 ,315,845 8 6 810 128 030 984 840 29J°f J 300 f , ,7 171 ,060 S , , ,'' P-6 System 166, 185 24,830 191 ,015 106,910 15,975 122,885 59,275 8,855 68, 130 „4.11�' '*I P`.,17 " 35, 165 5,255 40,420 27,645 4, 130 31 ,775 7,520 1 , 125 8,645 iii,h) P-21 Channel 41 ,085 6, 140 47,225 18,905 2,825 21 ,730 22, 180 3,315 25,495 41.1 P-25 " 16,690 2 495 191, 195 4, 175 625 /-1..„800 12,515 1,870 870 . 14 385 4'' Subtotal 2. 260 720 337,810 2,598,580 1 ,303,290 194,745 1 ,497,035 958,300 143, 195 1 , 101 49.5 O` • _ Discharge Works P-4 P• 4B P--7 l',640,770 245, 170 1 ,885,940 1 571 968 234,890 1 ,806,860 68,800 ;10 280 79,080 1'ks-.4 P-6 231 ,985 34,665 266,650 222,260 33,210 255,470 9,725 1 ,455 11 ,180 `4_;.. ., P-17 316,825 47,340 364, 165 302,685 45,230 347,915 14, 135 2, 115 16,250 " `' P-24 73,520 10,985 84,505 68,615 10,255 78,870 • 4,900 735 5,635 •.'.-: •:4.1 P-25 33,070 4_.2. 38 010 31= 31 680 4735 362,415 1390 205 1 , 595 f.�.4 Subtotal 2,2.96, 170 343, 100 2,639,270 2, 197,210 328,32.0 2,525,530 98,950 14,790 113,740 t . GRAND 4y 4j556,890 680,908 5,237,800 3,500,500 523,065 .4,022,565 1 ,057,250 157,985 1 ,215,235 TOTAL I AL -- ..''' '•' 1/ Price base: 1972 Date December1973 T, . .,4, �yc1 °i rim ,� ! 1- � [`��,„ r : ,^ 4.r4,' *.r t „f ' A. •r . . k- •' , e , . TABLE 4 - ANNUAL COST "'=;�. .I West Side Green River Watershed, Washington (Dollars) Amortization of Operation and . Evaluation Installation • Maintenance Total I Unit 1/ . Cost 2/ Cost 3/ Cost (-1) (2) (3) ( ) x�; P-h Channels and ^�� Discharge Works 166,590 52,350- 218,9-'-x0 I r P-6 Channels and Discharge Works 18,215 7,040 25,255 • P-17 Channels and - ::r Discharge Works 16, 100 8,900 25,000 : '... P-21 Channel 1 ,880 260 2, 140 r"' i t P-24 Discharge Works 3,365 620 3,985 P-25 Channel and <Discharge Works 2,280 3,770 6,050 mo ,,::.. Project Ad- *f, c .. Ministration 28,530 28,530 w . C' GRAND236,960 72,940 309,900 ..,<- TOTAL 3/ - ,, 1/ See Table 7 for complete listing. . 2/ Amortized at 3-1/8%, 50 years (factor .03979) . i i 3/ Long-term price from ARS Composite Index. 1,, Date December 1973 . L____. pointw • <„v� . ''c, .1 "n.";_ .4-.t,„•.-,v , -::. : :1, r5. Aq. AP ... Sl;'sSrfir- y e. -"s .r X . -' . a-A 4 *" '�PT .' ' v •{1 '1 f * it -.."-''-'7,4•-',-,-.--••c rY -":.-'43s � 4_ 1fi' t- , cr ,,,, , -0 `:a ., .,i 'Fi ,rec*r „,1,;:kf'a-. : ...!- t ,,.yc ,a.,«4.K�+, ,, w 0. gr,, ,,,,,aZ'1 _.. {....3;+ ...r- .c. � � Al ^ • "^ ` . ~tii:Y . t '' TABLE 6 - COMPARISON OF BENEFITS AHD COSTS FOR STRUCTURAL MEASURES . - West Side Green River Katershed, Washlngton (Dollars) l/ ` ^ _ ,1:4 _ -' ' : �vera�aAI��L�� Benefits • : •: • : Flood �A4r. Water : •; •: : Prevention :Mena4ement : : ; • : Damage : More :. Changed : : Total : Average : Benefit- , .,,1 Evaluation : Reduc- : Intensive : Land Use : Drainage : Benefi.ts : Annual � Cost Unit tion : Land Use : to Urban : _' : � Cost : Ratio / ' (\) (2) (3) (4) (5 (6) `7) (U) ' P~4, p~7 Channels & Discharge Works l26� l20 75,820 152`070 116, 218,540A8O 470,89O £l�� �O 2. 1 : \ .O P-6 Channels and ` Discharge Works 8»320 5,005 10,010 7,715 31 ,050 25,255 1 .2 : 1 .0 P~l7 Channels and Discharge Works 9,408 5,655 11 ,380 8,720 35, 155 25,000 1 ,4 : 1 .0 P~21 Channel 3'400 2,045 4^ 100 3, 155 12 . 700 2, 140 5"9 : 1 .0 P-24 .Discharga Works 3, 110 1 ,870 3`730 2,880 11 ,590 3,985 Z~g : 1 .0 P-25 Channel and Discharge Works 4,34O 2,615 5,220 4,0]U 16,205 6,050 2~7 : 1 ,0 ' - PROJECT 2� 5?O ADHiKlSTRAT| ON ^ -__ GRAND TOTALS 154,690 93,010 186/510 143,3.80 577,590 309 .900 1 .8 : 100 _ __- 1/ Price base: costs at 1972 prices.;benefits at long-term prices Date December 1973 _ _ � - . ~ . . ` . _ i | --777. --=-----r.. � ~ . . ' ~� ~ � ' _ _ ",q� `~� e �'�~ '' � ` `; ``��' � � ^��'�� � ~1| ` ' ' � / ,�� �� `� ' '~ - _-- '-' • ' ° ' . . ^ ' �"^ TABLE 7 - CONSTRUCTION UNITS • West Side Green River Watershed, Washington •(Dollars) 1/ Measures in � Annual Annual Construction Unit � Benefit Co! t ` . / `—' `.' . _. P-// Sysi. o: Channels P-//, P-48, P-48, P-7, • P-8, P-ll , P-12, P-13, P-15, P-16 and Discharge Works P-4, i P-4B^ and P-7 478,890 218,940 P-6 System: Channels P-6, P-6A and P-6B / and Discharge Works P-6 31 ^050 25,255 (�n- ' rommir P-l7 System: ' Channels P-l7 and P-17 Discharge Works 35, 155 25,000 • P-21 Channel 12,700 2, 140 P~24 Discharge Works • 11 ,590 3,985 P-25 Channel and P-25 Discharge Works 16,205 6,050 • ~ 1/ Price base: 1972 • Date December 1973 k • • � } � 6 • • .;s4t• � • •^ pommor . [ • • SUPPLEMENTAL ;WATERSHED WORK PLAN AGREEMENT #{3 between the CITY OF AUBURN CITY OF KENT CITY OF RENTON CITY OF TUKWILA KING COUNTY CONSERVATION DISTRICT GREEN RIVER FLOOD CONTROL ZONE DISTRICT COUNTY OF KING •i (hereinafter referred ',to as the Sponsoring Local Organizations) State of Washington and the SOIL CONSERVATION SERVICE UNITED STATES DEPARTMENT OF AGRICULTURE (hereinafter referred to as the Service) Whereas, the Watershed Work Plan Agreement for East Side Green River Watershed, State of Washington, executed by the Local Sponsoring Organiza- tions named therein and the service became effective on the twenty-fifth • day of August 1966; and Whereas, the said Watershed Work Plan Agreement for East Side Green River Watershed, State of Washington, was modified by a Supplemental Watershed Work Plan Agreement #1 , executed by the Sponsoring Local Organizations and the Service which became effective on the thirty- first day of July 1967; and Whereas, the said Watershed Work Plan Agreement for East Side Green River Watershed, State of Washington, was again modified by a Supple- `• mental Watershed Work Plan ,Agreement #2, executed by the Sponsoring Local Organizations and the Service which became effective on the fourth day of December 1969; and Whereas, the title of, the King County Soil and Water Conservation District has been changed by the Washington State Legislature and shall be hereafter titled the King County Conservation District; and Whereas, in order tocarry out the Watershed Work Plan it has be- come necessary to supplement the Work Plan Agreement to provide for assistance and funds as needed to comply with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Public Law 91-646, 84 Stat. 1894) ; and • • • if _. I assistance advisory services and relocation assistance, make the relocation payments to displaced persons, and otherwise comply with the real property acquisition -.policies contained in the Uniform Relocation; Assistance and Real Property Acquisition Policies Act of 1970 (Public Law 91-646, 84 Stat.- 1894) effective as of January 2, 1971 , and the Regulations issued by the Secretary of Agriculture pursuant thereto. The costs of relocation payments will be shared by the Sponsoring Local Organization and the Service as follows: Sponsoring Estimated Local Relocation • Orclanization Service Payment Costs percent) (percent) (dollars) Relocation Payments 30 ! 70 20,000 The Sponsoring Local 'Organizations and the Service further agree to all other terms, conditions, and stipulations of said Watershed Work Plan Agreement not modified herein.CITYk F AUBURN B yi� 0 . . Local Organization Title 17--- -....17 ,,._ Address I Zip Code Date ,�Fj -.75/ The signing of this agreement was authorized by a resolution of the governing body of the City of Auburn - Resolution No. 619 Local Organization adopt-• at a meeting held on ..2- /9. 7/ / ,A� ` 20 "A" St. N .W., Auburn, WA. 98002 %.ecretary, Local 0 •aniz ron Address Zip Code Date February 20, 1974 • i1i . I I I * CITY OF KENT By �`-'•/.bG, / , -,...2 , Local Organization , IP Title Mayor 220 S. 4th, Kent, WA 98031 Address Zii Code Date April , 1974 The signing of this agreement was authorized by a resolution of the governing body of the City of Kent j Local Organization adopted at a meeting held On April 15, 1974 220 S. 4th, Kent, WA 98031 Secretary, Lo al Organization Address Zip Code I Date q//')/7 CITY OF RENTON By 6.w.A../ 124-19.440-1 Local Organization Title Mayor 200 Mill Ave. S. Renton; 98055 Address • Zip Code Date February 26 , 1974 The signing of this agreement was authorized by a resolution of the governing body of the City of Renton ( Resolution #1891 ) Local Organization adopted at 'a meeting held oh January 28 , 1974 � L L) o ..tei.e200 Mill Ave . S . , 98055 Secretary, Local' Organ' ation Address Zip Code Date February 26, 1974 CITY OF TUKWILA BYf/ ,E;2-7--/4/ Local Organization �� Title ' nas /(e) . /-W. ', "q5 & aC OWAddress Zip Code ' Date .3// /x'47 1 The signing of this agreement was authorized bya resolution of the governi ..body of the Cj ty of Tukwila j3 . Local Organization adopt- .,at a meeting held of ///// . / y7z11/1 /1c' 6-7 , a'ei Si 70e' 7 . Secretary, Loca O ganizatio,n Address Zip Code Date �9// iv •1 KING COUNTY CONS. DISTRICT At: Local Organization I Title CHAIRMAN "5 S. Grady Way, Renton 98055 Address Zip Code Date j� '4 /3 /775/ The signing of this agreement was authorized by a resolution of the governing body of the Kinq County Conservation District Local Organization a. •ed at . meeting f 1d On January 23, 1974 /• _ • 35 S . Grady Way, Renton 98055 e retary, Loca Organi ati!on Address Zip Code D a tce-d7� 0 a /97f GREEN RIVER FLOOD CON. ZONE': DIST. By Ar :� Local Organization 'irec or, 4Tng County Tit � Departure � •f Public Works , G�� 9 f/e/a one • . 1 Was ra or Address Zip Code D= e Oz/470- The signing of this agreement was authorized by a resolution of the governing body of the Green. River Flood Control Zone District Local Organization adopted at a meeting held on Secretary, Local Organization Address Zip Code Date 40111 AI COUNTY OF KING By Local Organization , King Ca •my Executive QPGc �-Co Goo 1sd /4",7 Address Zip; Code . 'ate 07/71 The signing of this agreement was authorized by a resolution of the governing body of the County of King Local Organization adopted at a meeting held on Secretary, Local Organization Address Zip Code Date V . • • Appropriate and careful consideration has been given to the environmental statement prepared for this project and to the environmental aspects thereof. j • Soil Conservation Service United States Department of Agriculture Approved by: ilT`---7 /.'1"-. Z State Conservatio?ist 722/7 at e • . j vi • • EAST SIDE GREEN RIVER WATERSHED 3 ' SUPPLEMENTAL WORK PLAN (attachment to Supplemental Work Plan Agreement ##3) E)cPLANATORY NARRATIVE There are four probable displacements involved in this project. On the P-1 channel atstation 169+00 there arc two domiciles that may involve relocations. Estimated cost of relocating these families is $10,000. At station 348+00 a family may be displaced at an expected cost of $5,000. 1 On the P-2 channel atstation 269+50 a family may be displaced at an expected relocation cost of $5,000. It is estimated that the cost of relocating the affected families will total $20,000. This cost will be shared by the Service and the Sponsoring Local Organizations on the ratio of PL-566 funds to other funds in total project cost.: This ratio is 30 percent Local and 70 per- cent PL-566. The Service will provide up to the first $25,000 for each displacement occurring prior. to July 1 , 1972. • The Sponsoring Local Organizations will provide relocation advis- ory services Without PL-566 cost sharing. The services to be provided by the Sponsoring Local Organizations are prescribed under Public Law 91-646 (84 Stat. l894) , .Sere:ices to be performed by the Sponsoring Local Organizations consist of acquainting the to-be-displaced persons of their rights under the Act and to assist these persons in finding decent, sanitary and safe housing. The cost of this service is esti- mated to be $4,000. This service is to be performed by King County without PL-566 cost sharing.; The sponsors have determined that decent, safe and sanitary housing is; available for all persons subject to dis- placement b Y the project, an0 that displaced persons will be given notice to vacate at least 90.; days before they have to move. King County, a sponsor; will1 ( ) provide personally or by first class mail , written notice of displacement and appropriate application forms to each displaced person, (2) assist in filing applications, (3) review and take action on applications for relocation assistance, (4) review and process grievances in connection with displacements , and (5) make relocation payments. The Service will assist the speci- fied sponsor in fulfilling these responsibilities. King County, as coordinating sponsor, will arrange for a specific • sponsor to finance the sponsors share of relocation payments and the cost of relocation advisory services for those relocations occurring within that sponsors area ofjurisdiction. Such payments will be from funds legally available and appropriated for this purpose. 1 i j • . There will be little or no economic effect from the small number of displacements due to this project. • Because of ambiguity lin the plan, it is agreed that the last sentence of the last paragraph on page 27 of the Work Plan be changed to read as follows: "This has been recognized by estimates of construction and cost, shown in Tables 1 and 2, which contain contingency allowances to compensate for possible latent conditions." • In accordance with requests from the sponsoring organizations the Service will perform the administration of remaining contracts. All references related to Installation Services and Administration of Contracts on page 33 and; elsewhere shall be changed to consider engineering services and project administration. PL-566 costs are estimated as Engineering Services $730, 100 and Project Adminiration $991 ,750. Costs for other funds are estimated to be $169,8401for Project Administration. • • • • • 1/ Includes $105,000 for incurred costs of Administration of Contracts for the P- 1 Discharge Works and $60,840 for such items as local sponsor coordination. • 2 _ _ ._.. .- - -. . .- • Number Estimated Cost (Dollars) i/ • : P. L. 566 Funds Other Installation Cost :Unit: Nonfederal Land : Nonfederal Land : Nonfederal Land : GRAND TOTAL ' Item SCS 3/ SCS 3/ • LAND TREATMENT . Land Areas 2/ Cropland ac. 13,270 637,000 637,000 Urban and Built-up ac. 50,760 528,800 528,800 Technical Assistance . 176,400 18,400 194,800 TOTAL LAND TREATMENT xxxx xxxx 176,400 1 , 184,200 1 ,360,600 STRUCTURAL MEASURES Construction • Channel Modification 4/ (M) P- 1 thru P-10 mi . 25.4 2,424,945 107,640 2,532,585 • (M) P-22 Line mi . 1 .2 20,875 925 21 ,800 ---...---- --- ---- - ---- .-(M).. P-23 Line -mi.,. _ _... 1„-6 28,550.._ .. . - _1 ,265 ...------- 293815- Discharge Works ea. 1 3,400,250 5/ 99,750 3,500,000 Subtotal - Construction 5,874,620 209,580 6,084,200 1 Engineering Services 730, 100 730, 100 _ Relocation Payments • 14,200 5,800 20,000 Project Administration Construction Inspection 365,050 365,050 • Other 625, 100 165,840 790,940 Relocation Assistance Advisory Services 1 ,600 4,000 5,600 Subtotal Administration 991 ,750 169,840 1 , 161 ,550 Other Costs Land Rights 1 ,818,860 1 ,818,850 Subtotal Other 1 ,818,860 1 ,818,850 TOTAL STRUCTURAL MEASURES 7,610,670 2,204,080 9,814,7;0 TOTAL PROJECT 7,787,070 3,388,280 11 , 175,350 1/ Price base adjusted to 1572 . 2/ Includes only areas estimated to be adequately treated during the project installation period. Treat- . ment will be accelerated throughout the watershed, and dollar amoiFits apply to total land areas, not just to adequately treated areas. 3/ Federal agency responsible for assisting in installation of works of improvement. 4/ Type of channel prior to project. (N) an unmodified, well defined natural channel or stream; (M) manmade ditch or previously modified channel ; (0) none or practically no defined channel . , • 5/ Actual costs. Date December 1973 TABLE 2 - ESTIMATED STRUCTURE COST DISTRIBUTION East Side Green River Watershed, Washington (Dollars) 1/ Installation Cost - P. L. 566 Funds Installation Cost - Other Funds • Structure Total Site No. Engi- Reloc. Total Land Reloc, Total Install . , or Name Constr. neering Pymts. P. L. 566 Constr. Rights Pymts. Other Cost (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) P-1 ' Line 1 ,705,080 213,690 10,650 1 ,929,420 ' 75,685 950,250 4,350 1 ,030,285 2,959,705 P-2 " 221 ,740 27,790 3,550 253,080 ' 9,840 223,765 1 ,450 235,055 488, 135 P-2A 1' 30,440 3,815 34,255 1 ,355 16,550 17,905 52, 160 P-2B " 1 ,975 250 2,225 90 6, 175 6,265 8,490 P-2C " 2,350 295 2,645 105 2,695 2,800 5,445 P-2D " 12,580 1 ,575 14,155 560 12,860 13,420 27,575 P-2F " 17,050 2, 135 19,185 755 11 ,780 12,535 31 ,720 • P-2G " 11 ,590 1 ,455 .. .. 13,045 520 8,700._....._..._... 9,220 22,265 P-2H " . 18,275 2,290 20,565 810 12,355 13, 165 33,730 P-3 " 165,630 20,755 186,385 7,345 128,690 136,035 322,420 P-3A " 14,200 1 ,780 15,980 630 9,315 9,945 25,925 P-3B " 9,775 1 ,225 11 ,000 435 9,915 • 10,350 21 ,350 P-3C " 4,430 555 4,985 195 3,795 3,990 8,975 P-5 " 46, 140 5,785 51 ,925 2,050 58,615 60,665 112,590 P-9 " 132,045 16,550 148,595 5,865 88,280 94,145 242,740 P-10 " 31 ,645 . 3,965 35,610 1 ,400 19,250 20,650 56,260 Subtotal 2,424,945 • 303,910 14,200 2,743,055 107,640 1 ,562,990 5,800 1 ,676,430 4,419,48"5 Lower Metro Pipeline 182,000 182,000 Outlet Facility, P-1 System: Disc. Works 3,400,250g420,000 3,820,25099,750 i 10,000 109,750 3,930,000 Tot.P-1 Sys. 5,825, 195 723,910 14,200 6,563,305 207,390 1 ,754,990 5,800 1 ,968, 180 8,531 ,485 Multipurpose Channels: P-22 20,875 2,615 23,490 925 37,275 38,200 61 ,690 P-23 28,550 3,575 32, 125 1 ,265 26,595 27,860 59,985 Subtotal 5,874,620 730, 100 14,200 6,618,920 209,580 1 ,818,860 5,800 2,034,240 8,653, 160 Project Adm. 991 ,750 169,840 1 , 161 ,590 GRAND TOTALS 5,874,620 730, 100 14,200 7,610,670 209,580 1 ,818,860 5,800 2,204,080 9,814,750 1/ Price base 1972 2/ Actual cost of installed measures Date December 1973 Y TABLE 2A - COST ALLOCATION AND COST SHARING SUIt...RY East Side Green River Watershed, Washington (Dollars) 1/ Cost Allocation Cost Sharing Purpose • P. L. 566 • Other Flood Flood Flood Item Pre- Drain- Pre- Drain- Pre- Drain- vention age Total vention age Total vention age Total • -Multiple Purpose. Channels 4,321 ,690 401 ,470 4,723, 160 2,661 ,290 137,380 2,798,670 1 ,660,400 264,090 1 ,924,490 Discharge 3,705,990 224,010 3,930,000 3,696,560 123,690 3,820,250 9,430 100,320 109,750 Structure TOTAL 8,027,680 625,480 8,653, 160 6,357,850 261 ,070 6,618,920 1 ,669,830 364,410 2,034,240 1/ Price base 1972 Date December 1973 . s t 4 . • | LE 4 - ANNUAL COST East Side Green River Watershed, Washington (Dollars). • . ! | | : Amortization of : Operation and : va [ l tiun : |nst : :llat��n Maintenance Total Cost Evaluation � - Unit : CoSts l/ : Costs 2/ : ( I) ( .) (3) P- 1 System 339,470 105,900 . 445,370 P-22 Line 2,455 275 2,730 P-23 Line 2*38^� 375 2,760 � | } ' ! 4 86O Subtotal �44,�lD lU6,�5O 5O^ Project Administration ! 46,220 GRAND TOTAL �q7U8O/ 1/ Amortized at 3-1/8 %, ;50 years. (factor .03979\ ' 2/ Long-term price from ARS Composite Index. i � . Date December 1973 , | ' | � | | � | ~ | . � / � | ' u -- T AB L E TABLE 6 - COMPARISON OF BENEFITS AND COSTS FOR STRUCTURAL MEASURES East Side Green River Watershed, Washington • (Dollars) 1/ Average Annual Benefits •• • Flood : Agr. Water . Prevention : Management : • • : Damage More : Change .• Average Benefit --Evaluation _ ...: - - Reduc- I ntens i ve : Land Use : Drain- Total : -Annual_----- ---Cos t— Unit . tion : Land Use to Urban : age : Benefits : Cost : Ratio (1) • (2) (3) (4) (5) (6) (7) (8)_ P- 1 System 172,595 . 82,040 310,840 73,095 638,570 445,370 1 .4 : 1 • P-22 Line 875 2,035 2,035 4,945 2,730 1 .8 : 1 P-23 Line 6,885 3,270 2,915 13,070 2,760 4 .7 : 1 • Project Administration • 46,220 GRAND TOTAL 180,355 87,345 310,840 78,045 656,585 497,080 1 .3 : 1 1/ Price base 1972: benefits at long-term prices. Date: December 1973