CITY OF RENTON
RESOLUTION NO. 1916
WHEREAS the City of Renton has heretofore adopted an:.."Arterial •
Six Year Street Construction Program'; together with a certain
"Urban Area Six Year Construction Program" , all pursuant to
Chapter 7 , Extraordinary Session Laws of 1961 of the State of
Washington, and Chapter 195 of the 1961 Session Laws of the State
of Washington, and as same have heretofore been amended from time
to time , and such plans and programs having heretofore been duly
amended and modified from time to time as authorized by law , and
WHEREAS the City Council , after recommendation of its Public
Works Department , caused to be held a public hearing thereon on
June 24 , 1974 , after notice to the public as provided by law, for
the purpose of considering the adoption, modification and amendments
of said Plans. and Programs , and
WHEREAS at such public hearing held on June 24 , 1974 changes
and amendments were duly made for the purpose of updating such Plans
and Programs , NOW THEREFORE
THE CITY COUNCIL OF THE CITY OF RENTON DO RESOLVE AS FOLLOWS :
SECTION I : The City' s "Six Year Arterial Construction Program"
and tle ,City''s "Arterial Street -Plan" • are hereby further
amended and modified, all as more particularly shown on the attached
Exhibits , entitled Exhibits "A" , "B" and "C" , respectively , and all
said Exhibits being incorporated herein as if fully set forth.
SECTION II : The aforestated Plans and Programs , as evidenced
by said Exhibits shall be and constitute the City' s "Six Year
Construction Program" and the City' s "Arterial -Stree-t 'Plan"
and same —to remain in full force and effect until further
revised , amended and modified as provided by law.
SECTION III : The Director of Public Works and the City Clerk
are hereby authorized and directed to file this Resolution, together
-1-
•
with Exhibits , with the Director of Highways for the State of
Washington, and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this 1st day of July, 1974.
D
Delores . Mead, Cit Clerk
APPROVED BY THE MAYOR this 1st day of July, 1974 .
vt'r Ga� ett , Myo
Approved as to form:
(efaZ,
G rard M. Shellan, City attorney
-2-
- V
DISTZIBUTION:
SIX YEAR CONSTRUCTION PROGRAM "EXHIBIT A" Page 1 of 6
(1) copy: UAB withnOgri1copy: District nalDUAB-1r. Form Highways
• 1975 - 1980
(COUNTY) OF KING
HEARING DATE 6/24/74 : ADOPTION DATE 7/1/74 RESOLUTION NO 1916 (CITY) OF RENTON, WASHINGTON
ROAD FCUR ESTIMATE OF COST
ITEM LOCAL NAME OR ULRU • LENGTH
NO. OF STREET N AB R TYPE OF WORK IN
ROAD OR STREET NO. C S AA MILES 1975 1976 1977 1978-80 TOTAL
T SNL
STATE ADMINISTERED PROJECTS
1. SR 515 Relocation, 5201 M X Construct roadway with_ curb, 3.0 No estimate available.
Puget Dr. to S. 196th drainage, sidewalk, illumination,
landscaping.
2. SR 515 Extension, Grady 5351 M ' X Construct/reconstruct roadway 0.6 No estimate available.
Way S. to S. 2nd St. with curb, drainage, sidewalk,
illumination, landscaping
•
3. SR 515 Extension, S. 2nd 2411 M X Construct/reconstruct roadway 1.5 No estimate available,
to N. Park Dr. (N. Renton with curb, drainage, sidewalk,
Interchange) illumination, landscaping.
4. FAI 405 2541 M X Widening, revision of on & off 6.7 No estimate available.
ramps & elimination of "S" curve.
•
1
s
DISTRIBUTION: SIX YEAR CONSTRUCTION PROGRAM f�EXHT_BiT ALl Paga 2 of 6 '
(1) copy: District Engineer, Dept. of Highways
. (1) copy: UAB with Original UAB-1 Form .
1975 - 1980
(COUNTY) OF KING
HEARING DATE 6/24/74 ADOPTION DATE 7/1/74 RESOLUTION NO. 1916 (CITY) OF RENTON, WASHINGTON
ROAD F C U R ESTIMATE OF COST
ITEM LOCAL NAME OR U L R U LENGTH
NO. OF STREET N A B R TYPE OF WORK IN
ROAD OR STREET NO. C S A A MILES 1975 1976 1977 1978-80 TOTAL
TSNL
MAJOR ARTERIALS ,
1. S.W. 43rd St. , E. Valley 4102 M X Reconstruct roadway with. curb, 1.2 1,200,000 1,700,000 2,900,000
Road to W. Valley Road drainage, sidewalk, illumination,
(Joint Project with railroad crossing structure,
City of Kent) .
2. Sunset Blvd. N. , Bronson 2104 M X Reconstruct roadway with curb, 0,5 588,600 588,600
Way N. to FAI 405 drainage, sidewalk, illumination,
landscaping.
DISTRIBUTION: SIX YEAR CONSTRUCTION PROGRAM "EXHIBIT A"
(1) copy: District Engineer, Dept. of Highways gage 3 of 6
(1) copy: UAB with Original UAB-1 Form
• 1975 - 1980
(COUNTY) OF KING
HEARING DATE 6/24/74 ADOPTION DATE 7/1/74 RESOLUTION NO. 1916 (CITY) OF RENTON, WASHINGTON
ROAD FCUR ESTIMATE OF COST
ITEM LOCAL NAME LENGTH
OR U L R U
OF STREET N A B R TYPE OF WORK IN
NO. ROAD OR STREET NO. C S AA MILESTOTAL
T S N L 1975 1976 1977 1978-80
SECONDARY ARTERIALS .
1. S.W. Grady Way, Lind Ave. 4202 S X Reconstruct roadway with curb, 1.2 635,500 2,967,500 3,603,000
S.W. to West City Limits drainage, sidewalk, illumination,
new bridge, landscaping.
2. S. 7th St. , Rainier Ave. 4802 S X Reconstruct roadway with curb, 0.5 192,000 192,000
S. to S. Grady Way drainage, sidewalk, illumination,
landscaping.
3. Lake Washington Blvd. 2501 S X Reconstruct roadway as scenic 2.5 263,500 891,000 971,500 2,126,000
N. Park Dr. to N. 44th St. route with curb, drainage, side-
(Parkway Section) walk, illumination, landscaping.
4. Sunset Blvd. N.E. , 3203 S X Reconstruct roadway with curb, 0.9 _ 1,046,400 1,046,400
FAI 405 to N.E. Park Dr. drainage, sidewalk, illumination, ,
landscaping. 733,000 733,000
5. Benson Road S. , S. Grady 5303 S X Reconstruct roadway with curb, 1.8
Way to S. E. 31st St. ' drainage, sidewalk, illumination,
landscaping.
6. N. 30th St. , Burnett Ave. 2352 S X Reconstruct roadway with curb, 0.4 150,000 150,000
To FAI 405 drainage, sidewalk, illumination,
• landscaping.
7. Garden Ave.N.-:,rT. .4th_ St.., 2551 S X Reconstruct roadway with curb, 0.5 280,000 280,000
to N. 8th St. drainage, sidewalk, illumination,
landscaping.
' • 8. Union Ave. N.E. , N.E. S X Reconstruct roadway with curb, 0.7 355,000 355,000
Sunset Blvd. to N.E. drainage, sidewalk, illumination,
• . 24th St. landscaping.
•
• DISTRIBUTION: SIX YEAR CONSTRUCTION PROGRAM "EXHIBIT A" Page 4 of 6 •
(1) copy: District Engineer, Dept. of Highways
(1) copy: UAB with Original UAB-1 Form
• 1975 - 1980
6/24/74 (COUNTY) OF KING
HEARING DATE ADOPTION DATE 7/1/74 RESOLUTION NO, 1916 (CITY) OF RENTON, WASHINGTON
ROAD FCUR ESTIMATE OF COST
ITEM LOCAL NAME OR ULRU LENGTH
NO. OF STREET N A B R TYPE OF WORK IN
ROAD OR STREET NO. C S A A MILES 1975 1976 1977 1978-80 TOTAL
T SNL
•
COLLECTOR ARTERIALS
1. N. E. 12th St. , Edmonds 3552 C X Reconstruct roadway with curb, 1.0 425,000 425,000
Ave. N.E. to Union Ave. drainage, sidewalk, illumination, 1
N. E. landscaping.
•
2. Taylor Ave. N.W. & Taylor 1003 C X Reconstruct roadway with curb, 0.6 300,000 300,000
Pl.N.W. from Renton Ave. drainage, sidewalk, illumination,
Ext. to Stevens Ave. N.W. landscaping.
3. Monroe Ave. N.E. , N.E. 4th 3401 C X Reconstruct roadway with curb, 1.0 507,000 507,000
St. to N. E. 12th St. drainage, sidewalk, illumination,
landscaping, •
4. Burnett Ave. N. from Lk. 2451 C X Reconstruct roadway with curb, 0.6 300,000 300,000
Wash. Blvd. N. (S. Term.) drainage sidewalk, illumination
to Lk. Wash. Blvd. N. landscaping.
(N. Term.)
DISTRIBUTION: SIX YEAR CONSTRUCTION PROGRAM "EXHIBIT A" page 5 of 6 •
(1) copy: District Engineer, Dept. of Highways
. (1) copy: UAB with Original UAB-1 Form
• 1975 - 1980
(COUNTY) OF KING
HEARING DATE 6/24/74 ADOPTION DATE 7/1/74 RESOLUTION NO. 1916 (CITY) OF RENTON, WASHINGTON
ROAD FCUR ESTIMATE OF COST
ITEM LOCAL NAME OR U L R U LENGTH
NO, OF STREET N A B R TYPE OF WORK IN
ROAD OR STREET NO. C S A A MILES 1975 1976 1977 1978-80 TOTAL
TSNL
•
COLLECTOR ARTERIALS (Cont)
•
5. S.W. 16th St. , Lind Ave. 4902 C X Reconstruct roadway with curb, 0.9 725,000 725,000
S.W. to Monster Rd. S.W. drainage, sidewalk, illumination,
landscaping, new bridge.
6, Aberdeen Ave. N.E. ,Sunset 3251 C X Reconstruct roadway with curb, 1.3 1,340,000 1,340,000
Blvd. N.E. to N.E. 27th drainage, sidewalk, illumination
St. landscaping.
7. Talbot Rd. S. ,S. 19th St. 5701 C X Reconstruct roadway with curb, 1.5 1,141,000 1,141,000
to S. 43rd St. drainage, sidewalk, illumination,
- landscaping.
8. Park Ave.N. & N. 40th St. , 2491 C X Reconstruct roadway with curb, 0.4 195,000 195,000
N. E. 30th St. to Lake drainage, sidewalk, illumination, `
Wash. Blvd. N. landscaping.
DISTRIBUTION: b` 1A X EAU VON b'1'nU V'1 IUN rltUt ttAM
(1) copy: District Engineer, Dept. of Highways "EXHIBIT A" Page 6 pf 6
(1) copy: UAB with Original UAB-1 Form
3 1975 - 1980
OF KING
HEARING DATE 6/24/74 ADOPTION DATE 7/1/74 RESOLUTION NO, 1916 (C(CCITY)Y) OF RENTON, WASHINGTON
ROAD F CUR ESTIMATE OF COST
ITEM LOCAL NAME OR U L R U LENGTH
TYPE OF WORK
NO OF STREET N AB R IN
ROAD OR STREET NO. C S AA MILES 1975 1976 1977 1978-80 TOTAL
TSNL
SPOT IMPROVEMENTS
1. Wells Ave. Bridge, Cedar X Construct new bridge. 0,0 420,000 . 420,000
River
2. Shattuck Ave. Railroad X Construct new railroad 0.0 293,000 293,000
Undercrossing undercrossing.
TRANSPORTATION STUDY
1. "Renton Area Transportatirn TYPE OF WORK:
Study" (RATS) 1. Review arterial classification 90,000 90,000
2. Review public Transportation
systems.
3. Develop priority rating
system for transportation
improvements.
-
SA-1 REV. 4/74