HomeMy WebLinkAboutContract 4111110 CAG-15-198
PSE PUGET SOUND ENERGY Conservation Schedule
Agreement No.: E250
14893
Project No.: 101-5981
CONSERVATION
GRANT AGREEMENT
This AGREEMENT is made this V day of 9fit- , 20 LI , by and between
PUGET SOUND ENERGY ("PSE")and CITY OF RENTON ("Participant").
•
RECITALS
A. Under PSE's Electric Schedule 83 and Gas Schedule 183,as currently in effect and on file with the Washington
Utilities and Transportation Commission(collectively,"Tariffs"),PSE offers grants for certain conservation
measures installed or implemented at facilities that receive electric or natural gas service from PSE.
B. Participant intends to install or implement conservation measures and is requesting a grant from PSE.
AGREEMENTS
PSE and Participant agree as follows:
1. PROJECT PREMISES/METER LOCATION ADDRESS: 1055 S GRADY WAY RENTON,WA 98057 -
CITY OF RENTON-PHASE 2,STREET LIGHTING (Please note:meter location/address may differ
from the site mailing address). Participant will install or implement the conservation measures listed in paragraph
2("Conservation Measures")at the above located facilities(the"Premises").Participant represents either(a)that
it is the owner or otherwise has the lawful authority to make the statements herein on behalf of the owner of the
Premises,or(b)that it is the lawful tenant of the Premises and that it has obtained written authorization from the
owner of the Premises.
2. Conservation Measures.Participant represents that it will purchase equipment or materials or has entered or will
enter into an agreement with one or more contractors(the"Contractor")for the purchase and installation or
implementation at the Premises of the Conservation Measures which may be detailed in Attachment C:
Attachment to Conservation Grant,at the following costs:
Conservation Measures Measure Total Cost Eligible Grant
Life
1 Street Lighting Standard with Controls 20 $489,921.98 $184,451.40
TOTAL(includes sales tax) $489,921.98 $184,451.40
Participant represents that the total cost of the Conservation Measures is the net amount of its obligation with
respect thereto.
3. Grant. Subject to PSE acceptance,PSE will grant the Participant,after installation of the Conservation Measures,
an amount equal to the Eligible Conservation Grant(the"Grant")set forth on Attachment C,provided,however,
that such Conservation Measures must be installed,and Grant paid within 24 months or less of the signing of this
Conservation Grant Agreement.If for any reason the installed cost of the Conservation Measures is less than the
amount shown above and on Attachment C,PSE may decrease pro rata the amount of the Grant. Participant shall
be responsible for paying any amount in excess of the amount of the Grant.
4386 4%I3 Agreement No.C-14893 Page 1 of3
} E p G N ERG Conservation ScheduleE250
Agreement No.: C-I4893
Project No.: 101-5981
CONSERVATION
GRANT AGREEMENT
4. Separate Contract.Participant acknowledges and agrees that PSE is not,and shall not be deemed to be,a party
to any purchase or installation contract relating to Conservation Measures,which shall be installed pursuant to a
contract between Participant and its Contractor(s).Participant expressly acknowledges that PSE's involvement
with respect to any aspect of the Conservation Measures is limited to the furnishing of the Grant. PSE HAS NOT
MADE AND DOES NOT MAKE(AND PARTICIPANT ACKNOWLEDGES THAT PSE DOES NOT
MAKE)ANY IMPLIED OR EXPRESS WARRANTY(INCLUDING BUT NOT LIMITED TO ANY
IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS)REPRESENTATION,OR PROMISE
WITH RESPECT TO EITHER(A)THE CONSERVATION MEASURES,(B)ANY MATERIALS AND
LABOR REQUIRED FOR OR USED IN THE INSTALLATION OF THE CONSERVATION
MEASURES,OR(C)THE INSTALLATION OF THE CONSERVATION MEASURES.
5. Final Cost Documentation,Access&Inspection: Participant agrees to promptly provide PSE,upon request,and
for a period no shorter than the longest applicable measure life:(1)documentation verifying equipment purchased
and/or work performed in connection with the Conservation Measures installed;(2)reasonable access to and
inspection of the Facility and Conservation Measures installed therein before,during and/or after implementation;
and(3)reasonable access to,inspection and use of energy usage data related to the Conservation Measures
including release of utility bills and Facility energy consumption information following implementation.
6. Release.Participant releases PSE from any and all claims,losses,harm,costs,liabilities,damages and expenses
directly or indirectly resulting from or in connection with(a)the Conservation Measures,(b)any materials and
labor required for or used in the installation of the Conservation Measures,(c)the installation of the Conservation
Measures,or(d)the identification,handling and disposal of any associated hazardous waste materials.
7. Disclaimer.PSE conducts energy analyses at the request of its customers to determine the extent to which
conservation measures are cost—effective. Any estimate of energy savings made by PSE in connection with any
such analyses is solely for the purpose of determining the cost—effectiveness of the particular conservation
measures and not to be used for any other purpose.PSE has not and does not make any promise,warranty or
representation with respect to any savings in energy consumption from Conservation Measures.
8. Termination. In the event a Participant's contribution to PSE's recovery of energy efficiency program costs is
affected by all or a portion of Participant's electric and/or gas delivery service being provided by a party other
than PSE,then Participant shall refund to PSE an amount equal to the ratio of the unused Measure Life of the
measure(s)to the total Measure Life of such Conservation Measure(s)multiplied by the dollar amount of the
Grant with respect to such Conservation Measure(s).
9. Incorporation of tariffs by reference.This Agreement and the Attachment To Conservation Grant are subject to
the terms of the Tariffs,incorporated herein by reference. Specific terms and conditions from one or more
conservation schedules from similar filed tariffs may also apply,as determined by PSE at its sole discretion,based
on various criteria.A complete list of conservation schedules is available at:
httpi/pse.com/aboutpse/Rates/Pages/Electric-Ratc-Scheduies.aspx?Schedule x0020 Type=Conservation.
10. Entire Agreement.This Agreement and its attachments set forth the entire agreement between the parties and
supersede any and all prior agreements with respect to the Conservation Measures.No change,amendment or
modification of any provision of this Agreement shall be valid unless set forth in writing and signed by both
parties.
4386 4'13 Agreement No.C-14893 Page 2 of 3
PSE PUGETSOUND E ERGf Conservation Schedule
Agreement No.: E250
4893
Project No.: 101-5981
CONSERVATION
GRANT AGREEMENT
PUGET SOUND ENERGY PARTICIPANT
By: By:
Name: Ryan Lambert Print Name: Denis Law
Title: Mgr.,Business Energy Management Title: Mayor
Federal Tax I.D. o.:
By: �,i `���� Attest: / ,ib
J.son Se.h, City ler
Name: Bob Stolarski
4V RE N
Title: Dir.,Customer Solutions,Energy Efficiency
Ac
ISEAQ
"al la
rrn/mumillit a
4386 4,13 Agreement No.C-14893 Page 3 of 3
PSE • Conservation Schedule E250
Agreement No.: C-14893
Project No.: 101-5981
ATTACHMENT C
TO CONSERVATION GRANT
Conservation Measure(s)shall consist of the following:
City of Renton-Phase 2 Location,install:
Streetlight replacements:
• (116)70W HPS with(116)43W LED
• (1978)100W HPS with(1978)43W LED
• (209)150W HPS with(209)52W LED
• (201)200W HPS with(201)102W LED
• (68)250W HPS with(68)102W LED
• (21)400W HPS with(21)133W LED
LED products must be on one of the following lists of qualifying products: Energy Star, Design Lights
Consortium,or the Lighting Design Lab approved products.
PLEASE NOTE: Projects installed by IntoLight and owned and maintained by PSE are not subject to
Sections 4 and 7 of the Grant Agreement.
The above specifications are solely for the purpose of defining energy-related components of Conservation Measure(s) for
which the Grant is offered. Puget Sound Energy is not responsible for ensuring the health, safety, comfort, or well-being of
workers or facility occupants or the suitability of equipment selected for the intended application. It is the responsibility of the
grant Participant and the Participant's hired designers, contractors, consultants to ensure compliance of the Conservation
Measure(s)with Participant's needs and all applicable codes and standards.
The following shall be submitted by Participant prior to Grant payment:
® Completed Request for Taxpayer I.D.Number("W-9").
• Copies of invoicing (no purchase orders, quotes, or estimates)for all expenses, including but not limited to equipment,
materials,and labor associated with installation of Conservation Measure(s).
❑ Other(specify):
6011 4/13 Page 1 of 2
PSS RIGET SOUND EER Y Conservation Schedule E250
Agreement No.: C-14893
Project No.: 101-5981
ATTACHMENT C
TO CONSERVATION GRANT
Conservation Measure(s)shall be verified as follows prior to Grant payment:
• A final site visit shall be conducted for projects greater than 25,000 kWh by a PSE Energy Management
Engineer to verify as built fixture types and quantities. PSE reserves the right to conduct on-site
verifications for projects with savings at or under 25,000 kWh. Projects installed by Intolight will be
verified using the red line diagrams provided by IntoLight's contractor.
If intended energy savings are not being achieved by Conservation Measure(s) because specified equipment efficiency
parameters or performance parameters defined above are not used, Participant shall be required to correct such deficiencies
prior to Grant payment. Failure to comply with specified equipment efficiency or performance parameters may result in
forfeiture or reduction of Grant payment.
60114/13 Page 2 of 2
�. $aak0w L15Mig Workbook itnistiall14141211.1 Wine 01111111 Aterovistens,
cow Noy:In a:ww lw 04, Hp•MY Haa amonnwPe lioducess eye
Buainass Standardmer MaoScnedm.. `� es n LEP Le4,Fem0
wl- 450
•wacaY 501 iY 3 yfar-'.">im a NEA Nome Beast Fen;be.951
customer lFacility Hun.. ON O7 RHnbn-4E,P$Vp01LghOr+p PIta99 •,• '7'
::,':0°,7-':,:.k ..,.......r., H4Fg7.Beset ewe,SDI 161
—
,rx.b Hud weed.Sox,
Son.,WA wo57
Pe.Wm Yrvu(avnmary Pral0t Unwary
Lncmion qy 119411.0 Too. Hove AWN year Srcemrve hutalled Cost lute Loaned Propel Last $400,92100
LE0'0iii>emPort-sa00WH0p141 We'4200 EH Anna Enemy Savings_ 922,257kWNyr
EEC 11•71•Mp armp 100 0/001130 00 1200 'Y.Energy Saw. 92.131%
LEO'8.120 nnmIscoo 150 H0,115 l2 4200 Total Utley W,iOo-.vg. 3111.500/5—
__ LED 101-150 wvwy,-na 290 W eV 130 1249 Taal Es PSI Mertes $054 450/0 7 .r r
-
LED+51 w-240 anewa:n 251 n HCC;29• /290 %Fn0H Payback(Bohm trow0ac1 I4 yrs - -.s• y.
_E0 2ao v:aepiecr9400 A.HID•405'x04 4200 Semple Paybaok 1ASw Nene) 0.7 yes
Documents.00 m,
LED a+u9lkanan 4 REQUIRED tot all LED 5es web eubnt40001
C avows caps.r Energy SOW,Olt el LDI Wang)
Existing 8 0•Wm a...,,,,,.q yslem Proposed Syst m
Sewn Canoes
Doe ret 1.04..4 Fon,r. Anou.I ,ow'. Too+ 1w11 limen. Fat Laa5o9 Fawn Contr.MowOs Annual Fete. Told kW Sweat Swine.
Controls ammo
a Typo Loemron My 170. 0•sonletion Hours W.50 kw 5.., (option. slot Two Description % Typo Ory Homo Wee kw Peer swan., 515500.40 Linn WM
__ _ ____�--__ caw cwt Total Cost
Itwee
LqN At WW HPS Ito HWa emHee FPS,4OW0,e 4200 03 00 40.44 its Cu4an F into. LED soft F°, 4200 43 490 20,950 00155
G'ydo Cen6,l
2 SUOIII 100 W.GPS 1070.5'''''.%Lea IPS.100%1I.Op 4,200 111 2314 on 980 194 (.'ubin Ebbs. LED 43 watt Phut,'..Conine
4 2.0 40 9605 351221 014,702
^!
+ 84.' 150 Wei MPS 200 H.Pre"‘". S.
FP160W Lamp 4,200 111 051 150.104 20T Casket FLOM. LEO snot Eeuo
4200 52 1001 16.040 10/.458
4 Leal NW 200 Wo111P5 201 So Disease FPS,200W L 00. P.M Caner%
—_ .._
Lamp /,200 221 '/50 101,033 Gunton Fba+ra LED 102W Photo GeanY 4200 102 20.5 80,100 105,525
—' •
'°
' LwW'L 2'A Was`Pa ! we tPa250W LIMP 420 . Co2ortt've LED 0 241 +9SO e4
Mes 1° 42.,0 .2 594 25131 51122
ficoRmc.man
—`
0 2..4
r400 Wrt0P0 21 .300 as HPS MOW Leta 4440 Custom L}0133 a.0 Aloe 92 34032 21 _n.c. tl rat 24501
2 19
19
TOaa 2593 3501 1473048 2503 131.1 550,792 922,25'
"...aka iooi40 IO.o401 Es12m.ad PIE Funding, NWOO Code Compliance Cas an Maws.Comely
TIMI Per nen Cat Q.Fe-� ----
Total Per Lem Sawrga MESIMMIIIMEIMEMINIIII Ma rials
Esanalwl Pm Sm:Rebates D'1•1i .11® Labor.
Trial mom Manure Cost $180021.00 Mee WeliDrawl'Coes 5440,021 04
TUal Caaannleaoa Sa479. 522.2571WNSe On.111111111- 1.5
Famend Guam Mom..2000005 3102.051 ®— Total custom 6.4410..Cost ALS0,921 94
Contr.Say 100041 111:17132MMII® C.gracwr
•.0 onP lance: Preprad By