HomeMy WebLinkAboutContract • CAG-09-176
Project No.998053
REIMBURSEMENT AGREEMENT
THIS REIMBURSEMENT AGREEMENT("Agreement")is made and entered into this l day of September,
2009,by and between Allstream Fiber U.S.Inc.,a Delaware corporation("Allstream"),having a principal place of business
at 200 Wellington St W,Toronto,ON,Canada M5V 3G2,and The City of Renton,Washington[determine the type of legal
entity:corporation,municipal corporation,joint venture,partnership,etc.]("Reimbursor"),having an address at City Hall—5th
Floor, 1055 S. Grady Way, Renton, WA. 98507. The signatories to this Agreement shall be referred to individually as a
"Party"and collectively as the"Parties".
WITNESSETH:
WHEREAS,Reimbursor is constructing,reconstructing,crossing,or otherwise changing a portion of the Burlington
Northern SantaFe Railroad easement or right-of-way at Shattuck Avenue and the BNSFRR ROW which requires the protection
or relocation of Allstream facilities along,over and/or under said easement or right-of-way;
WHEREAS, as a result of Reimbursor's construction activity, Reimbursor has requested Allstream to relocate or
protect a portion of its facilities without cost or risk to Allstream;and
WHEREAS,Allstream,under the terms hereinafter stated,is willing to undertake such relocation or protection of its
facilities(the"Project")solely in order to accommodate Reimbursor,provided Reimbursor reimburses Allstream for all of its
costs,both direct and indirect,associated with the Project.
NOW THEREFORE,in consideration of the foregoing and of the mutual promises and covenants herein contained,
the Parties agree as follows:
1. Reimbursor agrees that Exhibit A, attached hereto and made a part hereof, represents the scope of work for the
Project.
2. Reimbursor may, at its own expense,inspect construction Allstream performs in connection with the Project.
3. Reimbursor agrees to bear all direct and indirect costs incurred by Allstream and relating to any construction by
Allstream in connection with the Project,including,but not limited to,labor,materials,construction,damages,administrative
overhead,taxes,travel expenses,legal fees and other reasonable out of pocket expenses. Reimbursor waives any and all delay
damage claims,except if caused solely by the gross negligence or willful misconduct of Allstream.
4. The total cost of the Project is estimated to be Nine thousand eight hundred and twenty Dollars ($9,820.00), as
detailed in Exhibit B, attached hereto and made a part hereof. Reimbursor acknowledges and agrees that this amount is an
estimate and shall not be construed as limiting the amount Allstream is to be reimbursed by Reimbursor under this Agreement.
Allstream shall provide notice to Reimbursor when Allstream becomes aware that actual costs will exceed the estimate by more
than ten percent(10%). Allstream may,in its sole discretion,submit to Reimbursor an itemized invoice for actual Project costs
not more often than monthly. Reimbursor shall pay the full amount billed within thirty(30)days following receipt of the
invoice from Allstream.
5. Following completion of the Project,Allstream shall make an accounting of final,unpaid,actual costs of the Project
andprovide Reimbursor with a copyof the accountingand an itemized invoice therefore. Reimbursor shall paythe full
amount billed within thirty(30)days after receipt of the invoice from Allstream.
6. Reimbursor shall perform no work within ten feet(10') on either side of the existing Allstream facilities located
within the right-of-way until the Project has been completed.
7. The obligations of Allstream are subject to force majeure and Allstream shall not be in default of this Agreement if
any failure or delay in performance is caused by strike or other labor problems;accidents;acts of God;fire;flood;adverse
c:\allstream\standard reimbursement\outside plant 9/9/2009
•
1111
RECEIVED
SEP 2 1 2009
Transportation Systems Div.
•
weather conditions;material or facility shortages or unavailability;lack of transportation;the imposition of any governmental
codes,ordinances,laws,rules,regulations or restrictions,including,without limitation,the necessity of obtaining permits or
environmental assessments or environmental approvals;condemnation or the exercise of rights of eminent domain;war,civil
disorder or acts of terrorism;or any other cause beyond the reasonable control of Allstream.
8. Reimbursor shall give written notice to Allstream at least forty-eight(48)hours, excluding Saturday, Sunday and
legal holidays,in advance of commencement of any work in the immediate permitted area,subject to the limitations set forth
in Paragraph 6. The notice shall be given to those individuals listed on the Contact Sheet of Exhibit A. In the event of an
emergency,Reimbursor shall provide telephonic notice to Allstream at 1-800-355-0472 upon Reimbursor's discovery of the
emergency.
9. This Agreement supersedes every antecedent or concurrent oral and/or written declaration and/or understanding by
and between Allstream and Reimbursor pertaining to the Project.
10. The terms of this Agreement shall be binding upon and inure to the benefit of the Parties and their respective
successors and assigns.
11. Each Party warrants that it has the full right and authority to enter into this Agreement. All necessary approvals and
authority to enter into this Agreement have been obtained and the person executing this Agreement on behalf of each Party has
the express authority to do so and,in so doing,to bind such Party hereto.
IN WITNESS WHEREOF,the Parties have executed this Agreement as of the day and year first above written.
CITY OF RENTON ALLSTREAM FIBER U.S.INC.
By:
ame: Name: Shawn Mac en
Title: Title: Senior Manager OSP
Tax ID#: 91-6001271
Telephone: 425-430-7243
Email address: dakesson@rentonwa.gov
Billing Contact:
Name: Derek Akesson
Address: 1055 S. Grady Way
Renton, WA 98057
c:\allstream\standard reimbursement\outside plant 2 9/9/2009
• •
EXHIBIT A
BACKGROUND
The City of Renton, WA. Is installing a new 48" storm Waterline in Shattuck Avenue, the
Allstream Fiber Cable in the BNSFRR ROW is in conflict with the proposed project. The
conflict requires Allstream to exposing and lower Allstream Conduit and Fiber Optic
Cable to facilitate improvements for the City of Renton, Project#S36 Rainier Ave S (SR
167) Improvements Project Phase 1: Shattuck Ave S Stormwater Bypass.
SCOPE OF WORK
The project is 100% refundable and the estimated costs for the relocation are $9,820.00,
and Allstream will bill the City upon the completion of the project.
CONTACTS
Allstream:
Shawn Macken —Sr. OSP Manager Larry Yahemech—Project Supervisor
303-9th Avenue South East 6150 Lougheed Hwy
Calgary,Alberta Burnaby, BC
T2G OR7 V5B 2Z9
403-705-6138 office 604-638-4205 office
403-606-6575 mobile 604-306-2139 mobile
shawn.macken(a�mtsallstream.com Iarry.yahemech@mtsallstream.com
City of Renton Allstream Contact Representative:
Derek Akeeson Dennis Gearhart— Project Manager
City Hall —5th Fl. Plantec Cable Management
1055 S. Grady Way 360-305-2114 cell
Renton, WA. 98507 gearhart@plantec.com
425-430-7243 office
dakeson(a ci.renton.wa.us
•
a i st
mitts
OSP PROJECT BUDGET EXHIeIT B
Page 1 of
Project# S09-0006 Revision:1 Date Prepared: 8/24/09
Manager: Shawn Macken
Project Supervior: Larry Yahemech
Contact Rep: Dennis Gearhart
City: RENTON
Prev/Sate: Washington
Schedule
.;-
Dospesltien: Expense Engineering Stan: NA Construction Start: 9/28109
Construction Complete: 10/15/09
Engineering Complete: NA
Summatyof Estimated Costs
A) Engineering. $0.00
B) Inspection Services $3,850.00
Materials $0.00 included in C)
D) Contractor Unit Price $5,970.00.
E) Splicing $0.00
F) Subtotal 89,826.00
G) Overhead-15%(excludes ietrn D) 80.00
H) Overhead-5%(item D) $0.00
!) Total Project Ccists $9,820.00