HomeMy WebLinkAboutS-362514ELECTRICAL NOTES
A
1. SEE DWG NO. E02 FOR ELECTRICAL EQUIPMENT AND INSTRUMENTATION SCHEDULE.
XXX
2. SEE DWG NO. E02 FOR CONDUIT/CONDUCTOR SCHEDULES.
3
3. MOTOR CONTROL CENTER, 'MCC'. SEE DWG NO. E04 FOR DETAILS.
4
4. TELEMETRY PANEL, 'RTU'. PROVIDED BY CITY OF RENTON AT THE PRE -CONSTRUCTION MEETING.
1
CONTRACTOR SHALL INSTALL THE 'RTU' AND CONNECT ALL FIELD DEVICES.
5
5. TO EXISTING PAD -MOUNT TRANSFORMER. SEE ELECTRICAL SITE PLAN FOR CONTINUATION.
6
6. GROUND ROD PER N.E.C. (TYPICAL). USE EXOTHERMIC WELD CONNECTION AT THE GROUND ROD.
SEE DWG NO. E06 FOR ADDITIONAL DETAIL. LOCATE GROUND RODS 2' MINIMUM FROM BUILDING
m
FOUNDATION.
7
7. CONNECTION TO REINFORCEMENT GRID (TYPICAL OF 2 LOCATIONS). SEE DWG NO. E06 FOR
ADDITIONAL DETAIL.
8
13. LIGHT SWITCH FOR SITE LIGHTING NOT SHOWN. PROVIDE LIGHT SWITCH IN BUILDING NEAR B
SHOWN LIGHT SWITCHES. SEE DIAGRAM 4 ON DWG NO. E05.
Al
9. SEE DWG NO. E02 FOR LIGHTING FIXTURE SCHEDULE.
CD
U
10, LOCATE ALL LIGHT FIXTURES, SWITCHES AND DEVICES IN LOCATION SHOWN ON THE PLANS
USING ENGINEERING SCALE. ADJUST LOCATION AS NECESSARY TO AVOID INTERFERENCE WITH
OTHER EQUIPMENT.
E11.
:�
CONTRACTOR SHALL AIM LIGHTS TO ILLUMINATE WET WELL AND VAULT HATCH OPENINGS.
2
12. MOUNT SWITCH ON PRIMARY LEAF OF ACCESS HATCH (TYPICAL).
(D CENTERLINE
MAIN JtKVll.t
DISCONNECT SWITCH
UTILITY METER
@GENERATOR RECEPTACLE -
/ I 6 P3 P17
I P5 tP7
P1
0
CKUP GENERATOR AND
CONCRETE PAD
EXHAUST FAN WITH
r- LOUVER. SEE DWG.
NO E05 FOR DETAILS
FUTURE PHONE/FIBER Al J1
2" PVC CONDUIT FROM
NORTH COMM. VAULT
7
X42"–MIN.
-- 0
CONTROL BUILDING
ROOF LINE
CONTROL BUILDING
0
f
i i n i_rr mem r n An r-
EXISTING OVERHEAD
TELECOMMUNICATIONS.
CONTRACTOR SHALL
PROTECT DURING
CONSTRUCTION.
EXISTING
PAD -MOUNT
TRANSFORMER
FLOW METER
TRANSMITTER
C12 v P15
ELECTRICAL
BUILDING
WP
IT Al
!,NTELEMETRY ANTENNA
m
"RTU{
A2
I FC
07
C10 p. COMM. VAULT
INTRUSION
DISABLE KEY
07
SWITCH Q
BATTERY CHARGER Qt '– INTAKE LOUVER
FLOWMETER
TRANSMITTER
ELECTRICAL SITE PLAN
1/4" = 1'-0"
WSDOT TYPE 1 HANDHOLE
.w ioft . —:
"RTU""RTU"
--Aoo—
MOTOR SPLICE HANDHOLE
POWER DISTRIBUTION AND SIGNAL PLAN
1/2- = 1' -on
"MCC" -.rF-
"MCC" -.rte
"RTU" -�— —
"RTU" -00
1 If% -U -r nl11 C L-.1
FLOAT/LEVEL
TRANSMITTER SPLICE
HANDHOLE
WET WELL
SEE MECHANICAL
PLANS FOR LEVEL
TRANSDUCER
� MOUNTING DETAIL
os = 3625
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
ENGINEERING INC.
ACCESS HATCH ,..
OPENING
a
c�
ti
M
a
w
cn
2�
rt o a
V ,N- N
zg
rr0cn
W"
W�
2 7
z�
uj CV LL' N
N
N
O
r
g
0
z
a
z
an
W
H
cl)
J
Q
U
H
cm)
w
J
W
>_�
a
D
�m
C'
y
Z
Layuq
CD
CD
1
CD °z
M
?c
i
N
m
z
m
m
0
0
D
CD
U
LLJ
�
w
'
Z
O
U
_:
o
cis
a
0
—
V�
w
0
w:
w
Q
—
�
�
U
W
W
V
r���
v/
Z
0
u')
IS')
U
N
N
C
�
a
Q
Q
I>j,)
W
fY
O
a
v
o
LO
W
�Qo
Q
14
U
J
�
W
112U
SCALE: SHOWN
DRAWING IS FULL SCALE WHEN
BAR MEASURES 2"
WG NO.:
SH NO.:
E03
16
2�
D
�m
C'
y
Z
Layuq
CD
CD
1
CD °z
M
?c
i
N
m
z
m
m
y
0
D
0
y
C'
y
Layuq
CD
CD
1
CD °z
�o
D
r
zN
y
D
"n
m
o
01
9
�o
D
C