RYLEE'S PLACE
Technical Information Report
October 22. 2014
Prepared for
WestPac Development, LLC
7449 West Mercer Way
Mercer Island, WA 98040
(206) 619-2992
Submitted by
ESM Consulting Engineers. LLC
33400 8`h Avenue S, Suite 205
Federal Way. WA 98003
253.838.6113 tel
253.838.7104 fax
i■ii
www.esmcivil.com
3?�2
4
TECHNICAL INFORMATION REPORT
FOR
RYLEE'S PLACE
Prepared for:
WestPac Development, LLC
7449 West Mercer Way
Mercer Island, WA 98040
Prepared by:
ESM Consulting Engineers
33400 8t`' Avenue S, Suite 205
Federal Way, WA 98003
�� � '��
�4�;�p..SH1FJQ�, L�'
C7��c �fi
���
�, �:� t
�
��.' `� l�� rs
/
October 22, 2014 Job No. 1670-003-013
Approved By:
Ciry of Renton Date
TABLE OF CONTENTS
1. PROJECT OVERVIEW......._.......................... -
...................................................._..............._.............._....._............._........._..............._..... 1
2. CONDI110NS AND REGIUIREMENTS SUMMARY....._................_..............................._.................._......._............. 2-1
3. OFF�II'E ANALYSIS.............................._......................................_...................._.._................_........._...................._............................... 3-1
4. FLOW CONTROL& WATER QUALJTY FACIUTY ANALYSIS AND DESIGN............................. 4-1
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN ..................._........._................_............... . .......... 5-1
6. SPECIAL REPORTS AND STUDIES...................._........._...........,...._........................_....._.._....._........._................................. 6-1
7. OTHER PERMITS................_........._............................._.._....................................................._.............._...................._........._................_.._ 7-1 i,
8. CSWPPP ANALYSIS AND DESIGN.._....._........._...................._...................._.._..........................._.................._......._.._.._..... 8-1 '
9. BOND QUANTITIES, FACILJTY SUMMARIES,AND DECLARATION OF COVENANT.., 9-1
10. OPERATIONS AND MAINTENANCE MANUAL...................._,...,.........................._...................._..........................,.... 10-1
LJST OF FlGURES
1.1 Vicinity Map
1.2 Existing Site Conditions
1.3 Proposed Site Conditions
1.4 Soils Map
3.1 KCGIS Parcel Fieports/Environmental Hazards
3.2 Drainage Complaint Map
3.3 Offsite Analysis Downstream Rowpath
4.1 Pond Tributary Area
Conveyance Basin Exhibit(back pocket)
APPENDIX
Appendix A: KCRTS Pond Sizing Output
Appendix B: Geotech Report prepared by Earth Solutions NW
Appendix C: Wetland Reconnaissance Report prepared by The Watershed Company
Appendix D: Operations and Maintenance Manual
Appendix E: Conveyance Analysis - StormSHED 3G Output
�
1. PROJECT OVERVIEW �'
The proposed Rylee's Place Plat is a 17-lot plat located north of the intersection of 120�'
Ave SE and SE 192"� St in the City of Renton, WA. The plat incorporates four parcels
numbered 619840-0241, 619840-0247, 619840-0260, and 619840-0280, all of which are
zoned R-4. See Fgure 1.1 for the Vciniry Map.
The existing site consists of 3 single-family dwellings and several detached structures
with associated driveways. One of the three houses will remain, which is located on
Proposed Lot 17. The existing site is relatively flat (mean slope of 7.7%, less than 10%
max slopes on site) with a localized high point in approximately the middle of the
property. The pervious portions of the north parcels are generally lawn, while the west
half of the south parcel is forested, See Fgure 1.2 for the Existing Site Conditions.
The proposed 4.95 acre project site consists of 17 residential lots and 1 storm drainage
tract As previously mentioned, lot 17 contains an existing residence which will not be
disturbed, while the remaining 16 lots will have new single-family dwelling units. The lots
will be 8,000 sf minimum and will be served by a new street cul-de-sac from 120�' Ave SE,
with two shared access easements off of this cul-de-sac; one will provide access to lots
4-6,while the other will provide access to lots 10 and 11. See Fgure 1.3 for the Proposed
Site Conditions.
The stormwater detention and water quality treatment will be provided with a combined
detention/water quality pond in the storm drainage tract located in the northeast corner of
the site. The combined detention/water quality pond will discharge south to a proposed
stormwater conveyance system in 120`h Ave SE in the project and the project to the
south's frontage and ultimately flow east and enter Big Soos Creek. See Section 3 for the
Level 1 Downstream Analysis.
According to the Geotech Report by Earth Solutions NW, the soils on site are
predominantly native weathered and unweathered glacial till deposits. See Figure 1.4 for
the Soils Map.
Based on the Ciry of Renton's Flow Control Application Map, the project site is in the Flow
Control Duration Standard (Forested Conditions) area The project will be subject to Full
Drainage Review per the City of Renton 2009 Surface Water Design Manual Amendments
and the 2009 King County Surface Water Design Manual (2009 KCSWDM}. The City of
Renton 2009 Surface Water Design Manual Amendment and the 2009 KCSWDM will
collectively be referred to as the "2009 Surface Water Design Manual".
t-t
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND II
PROJECT ENGINEER DESCRIPTION I
Project OwnerWestPac Development, LLC Project Name Rylee' s Place �'
Phone DDES Permit# !
Address 7449 West Mercer Way Location Township 23N ,
Mercer Island, WA 98040 Range 5E I�,
Project Engineer Laura Bartenhagen, PE Section 33 '
Company ESM Consulting Engineers SiteAddress18851/19003 120th Ave SE
Phone 253-838-6113 Renton, WA 98058
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
� Landuse Services ❑ DFW HPA ❑ Shoreline
bdivi / Short Subd. / UPD Management
❑ COE 404
❑ Building Services ❑ DOE Dam Safety � Structural
M/F/Commerical / SFR RockeryNau Conc .
❑ Clearing and Grading ❑ FEMA Floodplain � ESA Section 7
❑ Right-of-Way Use ❑ COE Wetlands
❑ Other ❑ Other
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review ul / Targeted / Type(circle one): Full / Modified I
(circle): Large Site Small Site
Date(include revision Date (include revision
dates): dates):
Date of Final: N A Date of Final: N/A
Part 6 ADJUSTMENT APPROVALS
Type(circle one): Standard / Complex / Preapplication / Experimental 1 Blanket
Description: (include conditions in TIR Section 2)
N/A
Date of A roval:
2009 Surface Water Design Manual I i9,�2009
1
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No Describe:
Start Date:
Completion Date:
I Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan : Soos Creek
Special District Overlays:
Drainage Basin: Duwamish/Green
StormwaterRequirements�'low Control Duration Standard (Forested) /Basic W
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
❑ RiverlStream ❑ Steep Slope
❑ Lake ❑ Erosion Hazard
❑ Wetlands ❑ Landslide Hazard
❑ Closed Depression ❑ Coal Mine Hazard
❑ Floodplain ❑ Seismic Hazard
❑ Other ❑ Habitat Protection
❑
Part 10 SOILS
Soil Type Slopes Erosion Potential
Alderwood 6% to 15%
❑ High Groundwater Table(within 5 feet) ❑ Sole Source Aquifer
❑ Other ❑ Seeps/Springs
❑ Additional Sheets Attached
2009 Surface Water Design Manual 1/9/2009
2
KING COUNTY, Vb'ASHINGTON, SURFACE Vb'ATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION/SITE CONSTRAINT
� Core 2—Offsite Analvsis
❑ Sensitive/Critical Areas
❑ SEPA
❑ Other
❑
❑ Additional Sheets Attached '
Part 12 TIR SUMMARY SHEET rovide one TIR Summa Sheet er Threshold Dischar e Area
Threshold DischargeArea: Existing Roadside Ditch
name or descri tion
Core Requirements(all 8 apply)
Dischar e at Natural Location Number of Natural Dischar e Locations: 1
Offsite Analysis Level: 1 / 2 / 3 dated:Septe er 19, 2 013
Flow Control Level: 1 / 2 / 3 or Exemption Number
incl. facili summa sheet Small Site BMPs
Conveyance System Spill containment located at:
Erosion and Sediment Control ESC Site Supervisor:
Contact Phone: I
After Hours Phone:
Maintenance and Operation Responsibility: Private / ublic
If Private, Maintenance Lo Re uired: Yes /No
Financial Guarantees and Provided: Yes / o
Liabilit
Water Quality Type: asic Sens. Lake / Enhanced Basicm / Bog
(include facility summary sheet) or Exemption No.
Landsca e Mana ement Plan: Yes / No
S ecial Re uirements as a licable
Area Specific Drainage Type: CDA/SDO/MDP/BP/ LMP/Shared Fac. /None
Re uirements Name:
Floodplain/Floodway Delineation Type: Major / Minor / Exemption / one
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe: N/A
Source Control Describe landuse: N/A
(comm./industrial landuse) Describe any structural controls:
2009 Surface Water Design Manual 1!9�2009
3
�
KING COUNTY, �'�'ASHINGTON, SURFACE W'ATER DESIGN MANUAL
' TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Oil Control High-use Site: Yes No
Treatment BMP:
Maintenance Agreement: Yes �o
with whom?
Other Draina e Structures
Describe:
�
�I ; , Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
� Clearing Limits � Stabilize Exposed Surfaces
� Cover Measures � Remove and Restore Temporary ESC Facilities
� Perimeter Protection � Clean and Remove All Silt and Debris, Ensure
� Traffic Area Stabilization Operation of Permanent Facilities
� Sediment Retention � Flag Limits of SAO and open space
preservation areas
� Surface Water Collection ❑ Other
❑ Dewatering Control
� Dust Control
� Flow Control
Part 14 STORMWATER FACILITY DESCRIPTIONS Note: Include Facili Summa and Sketch
Flow Control T e/Descri tion Water Qualit T e/Descri tion
� Detention Bas i c/Pond ❑ Biofiltration
❑ Infiltration � Wetpool Basic/Pond
❑ Regional Facility ❑ Media Filtration
❑ Shared Facility ❑ Oil Control
❑ Flow Control ❑ Spill Control
BMPs
❑ Flow Control BMPs
❑ Other
❑ Other
��- �
2009 Surface Water Design Manual 1/9;'2009
4
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTS/TRACTS Pa�t 16 STRUCTURAL ANALYSIS
❑ Drainage Easement ❑ Cast in Place Vault
❑ Covenant � Retaining Wall
❑ Native Growth Protection Covenant ❑ Rockery>4' High
� Tract ❑ Structural on Steep Slope
❑ Other ❑ Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this woricsheet and the attached Technical Information Report. To the best of my
know g e ' r on ro � ere is accurate. [
�� �7'� �
Si ned/Date
2009 Surface Water Design Manual 119i2009
5
N
I= I�
SE 184TH ST m
� �m
n
SE 186TH ST j
— J� i
� c,
o i � SE 188TH ST
� m o
m cn =
m �
m m
515 S ITE m
SE 192ND ST n�
�
�
x
D
<
m
SE 196TH ST �_ I J cn
m
VICINITY MAP ,
NOT TO SCALE
Flgure 1.1
Vicinity Map
1-2
Fgure 1.2
Existing Site Conditions
— SiC�S
A PORTION OF THE S.W. 1/4 OF THE S.W_ 1/4 OF SECTION 33, TOWNSHIP 23 NORTH, RANGE 05 EAST W.M. °""",°°" a'
n
� I � '' '
I E19840C222 E19840D2C0 I
6"9840G2Z1 DAbID CHRISTMAPI '
i �AVID CHRISTMAN GORDON ANC L015 YORK I ,
I �. B9'43'c.p^�� �gq 5��� \�
' — _ _ _ — — _ ' � _ _
<A-EG � "�'_ � _
� -i�C�16" I _ I
�� GRAGE 1 4 � I
, ACCESS EASEMENT-� 30' FF I�n 7 I e..� � �.
. REWRDING N0. Z � �}• . -I ' I � I
� 7404250236 � �c � 1 , �/ �c -
i � . h � � �. '� �� � ROM1 � 4JA�E�L���.�F,^_ 5�'�.
_ 6 �1 : s\ ��. : � �,z' NOT TO SCALE
51>d400243 I \ -' � - e ^ � II I .onc-sor.t<
I o:Nws c��SrE� ^ s• �E � � CONTOUR INTERVAL= 1' _
� PARCEL B,� ! �Ws` :,. I � ��
.��E M �,; �...=� �", � I �� �
--� � � � �/ _ � � — -
� �•,, � � � ;�
ACCE55 FASEMENT � � _ / � i+ � 619Ea0D242 � N
519E�GCr•pE � � l u' RECORDING N0. 3�I z c796aUC245 � �— ; _
� � PARCEL A,� � � w+�wno Rio_R � w
DE�.SE k:_L_Y ��RS ���T - 8101160233 ! PC�� & 4NPB�L� NICHOLSON i�' j¢
, RECORDINC N0. � l � r°" conc=se�.�e w�
I I / 8101160233 ..-�-- — —�a-�•��- ��b� __ � �f'i _�y..n _H. r_ni�:.E ,-s rricr vuri FEti�_ � Z_ W s ,
— �_- ��'��`_--' ` � r',' � !•.�,1 i �` —
- ',\S9'48�53� �r! 3l C3' �z'i: Y'a' �,-� � �„E� v�r . I e c=5co=.r
��'a.t.-3' v�' 2 S 9.%i' z�
- �'�_. — - ----- ��--- '� �� .n,' — ` �I I� is' W e� -'
_ _ I �� � '\ ^ �� ', -' �,_- . � L.5 � I �� � /rill�, % I OnC=SJt.i� C7_a E
� �.
'� 10' — � i � 2(� ���Yir2� ��� =,' r — �' una�,= ^ �1� �1�., i i Zv;
w / . �.,�� Z � ��� � I F.� ' � ���� � ..,. �;a
�w I /' \ � a� — —i� ar �` Pr�5 a.q-� (� �eNc-5�,i s3 r°>� E
�� � iz' �' — i. � � �<m' o
i \ I
— I�
o�c i � \ � J . . 1 D I .. Nm� U
2 1 �]�`Q I 15' �. 3 /'�. � _ � r�` \�O� / Z oD �j a
2G�2� I �� ,� - - - _� �` �, ��� � �� � � =1�� �`� :� I �� \ � � �� ��9 � _
� _ � .PARCEL C " � � '' �� — — — — o
� �`� � f �� �,. �. ���Z� � � ;�1 ���SE�,. ��'; � �� w<
u I � J 1 J � � I I •� 1 � 1 , FF'4� �•I I �I I � ! �C 3 ��?
-- / ' ( C — ' � ' 'i��, ; a z 3 -
� i , �� � / F � / ,_/v i I 5 �. �` - - - - - __
. � J�.e�s•.e• '� � �} ! � �I � 1 � _ -�,�'--. � j . I ��. =c �
6' ',\ ��. � 16"� , � Y � . I � ~x -�
- 13�. 'J' / -r 'E� I Q I Q�
:�l la' I J- — �� � Q � �'1'C=5C35f < � � I � T �a
z � eo«�F«,�E } a �—�_. —� 1 _ 1 ��,- , �
�`'�� ;� — �`'��'� �� ^ � `�.l'` � 1 � � �- "�� � Pvc=so..5. .� e i�-
T
-� �' 1 ' & Z
� ry W � \'�I � ��\ — — �J T _/ H � 5 Z 5' � / pCCS rencc � i �� coNc=so�.�- p
h- C— k � �—�-"1� 3..��.-.��. ][�.�_.....-�k�B9'S}�5E'N 629.6fi" ' " II' 'S".e'.'+6''�9',5:S?6 vlPSTIC'C�___'_<>"__""_P-S?_"'"'_'___ _ / M �
Ci � 3' � 1� � _ / � _9_ .
Q w J O 3 ' — _ "
�. J.:Q � z �� ° -1 -- ��� S ap :ws: �
1�
.. � ��>L O ^-��:�0 � � 11'.2�" i6�.2C�. 1"� g• Sr.EC — — — — _ - — � � I i�j; .0 nN�1E.-44'�.6� 3
� a Z � t.ss'� \ � � — — — — — � — — — ��'—� � suFs,, �raas cacvc_ �I z�� ' J 3z. LEGEND -- - U
- � ` . ,. PARCEL D �;• �� �, r'� ,��� i .�s -� -; �. �PP�E�,.��r P�. ���A,��N; J
'TRAG�T B .� � � 6' E-�Sv�J� 6"r� � � ��c 57aP5 CNCWE' I- I I �I� � � SANRAR"SEWER M?NNOL= � Z
�Z� �� ' � V �C V��2�� � .6 � �I ',� - ■ STORM DFWN CATGH 64�IIJ 1 1 1 �
F�`\ t0;a. O I O + 10 ��,3• - - - I J STORM CR41N 1/4NH0_E L W/
r 6. ��' r 0
/�) ��/�j��� OQ � t8/,' t0'.16' ��i', i m R�C1F JPaN Z � Z
JE�S_ �_E�. r��',.1E •�I ' {�/ �.f � 1�'. '3' � O �� I I � SSMy O G15'M;TEP. W � �
- G nSC:J�.F."�''J �-J 1 -1,� F } �$ AiN=5C5.80 < U
�JN1�_R_ � ��l J pU HOUSE � I � WD C
y�:3 \.%- r"`i,a' -�i� �. - i . iio. o F-.J J '" Rmrtc=�� - m �15 vn�v_ L � W
131�� .. H s \�_� ��""J I � � ='_ECTRIGL M_f=F /''� �
� 4-9 R-E ?-' �-� iS� F-2 I'�'6 I I I LL
A-i �
��..� P-IC �_ � 7$ g $' � ��� ' I C- POMER POLE W%u��1' O �
ik
n � " � �� � � I _� O GOWER POLE J //� (7
, `p j�A.. Ml E?y.a5' V 1 . � � Z
� �J tE�EVHaNE a��[ W v�
i L 519b4C0_'CO �� I J �N� � T > I 1 � �
FiRE HYOR4N'
�ri��cr•, siG�-r I W W X
HOSE Bi8 I I I W
� � W
"� I... Q KAIER 4A4��GL_
I .�•:. � � K0.7EZ ME"E� /1 � N
L/ `
'��-� D4 MAlE7 ea�.YE � � W
� I��I N � � DECiDUOUS a /� j
� � � � i � � 'i �
I � DOJGLRS FiF
� CON F� � �
_ � CLUSTER J O
� H
s � HJLLY W
= o �
M.�LE
�
.-. '� i ._C_ y
F
' c 5=T H!i3 Ac T<.�v V
'� 4 5_T PN ryAl� JC9 v t6]C-GC3-Ct3
' . � {'NCE. BON1C ?KG. �.AM_�. EV-:�'�
- J_5�.^.N�D B".
. . .. �=NCE.CHah-LIN+
F.c e '
_uE0 3�:
' . _- iF.EPHONF. 9Jil:.� oar-� a�-is-_a�a
. � ' re�Ea�otiE. cvek�-ao =er
v�crE.
E; E N-03
r �
� i
i
�_) I
_- l I
( � '
I
�
!
r I
Fgure 1.3
Proposed Site Conditions
� _,
I�
i '_,
�
� �
I '
�
�
1-4
I
f�ir-\\eamB\�M�\t`M JOtl`.\18)(1\(J1\'�I�\e.nib'�n\FN-�anwg
Piolled:6/9/20ia 5�]��M Pio��l�a Py:Cio��K
� — _
� I�— — .—___ - _— ___.—.__--..—
III
I �
U p
I �
I
p D
� � o 0
lPI � 1
�
n� " o ob
cn� e
� � �
� �
I �
I�I __- -
_
�I �I _ ,
I � � -
�I -___.. 55' '.
_ .;% c�
v q��
108'
II J0. v �
I � � a U
_ o
,�� �� � ��
iln /..�, N li
f6 �l � � OI �
� u N � ��
�� o � I ' � � �01
.� , � : : ' �o ( D
— � � -= - ------- -- ------__.'�+ �
II S p � � � �� J./
O "{.' .� ,1. e� / �
II
A� � w � I� � Q
(� �y ti �� � Z
gv � � /,�� g � � � O
O U T
�� � � �m � � �� 11
�. —� � . �A N �
I � I J �� O
D
� �� � m
�� ,
� � o , - � �
� A �
J
� p �
I J � � � 72' --_ �
I f
n;o �� �w
� A T
(p I A
� � II - 0
b ;�
o -�, � �
N J I �
�p � 1�.. T
A �. � 1
� � O I m
°# � �� - �
__ � � � �
� �
g I -.`_ � 1
�
� ��--=-•l
I A °' / .�— O
a n —
,38• — � � —= � m
._ - �
. ��� ;- � = � �.,
m �1�� �I'III� o �j J+ o �
I 11���II ��� ��� Z
� D_ W
� �1� � P D �� � �
o V �,
«i�� � � iii �� z
� , ������ ,�,� iii � _
_ � ����i � �
_— — r o"! � v` _—_
— , . ,�,.: N
` � —— �- W
:-— T-- -. , T�� ,
� _./--__-- -- � -�,__;n_ - —
_ _ _ _ _ ------------ -� - - - - - -�� 0
; - — — _ ,
— _ �
-� r ----- — — �
r� ------- � _
— _ __ 120TH AVE.S.E. �
'�� (RESiDENTIA�ACCESS) - _ _.
D
� Z
I m
I �
m
D
�
�
�
�
n
O
z
0 0
c �
� �
0
m �
� D
D m
r
a:n i n m f o CONSULTINp ENpINEERS LLC
WESTPAC DEVELOPMENT L.L.C. - �
r � " m � � 33100 61h w . e 2ai A
m � � � Federd Wey,WA 98003 I � I � I�I � I'1
Z � m m m au wn, ni io'-a'voo Y N
o _ R RYLEE'S PLACE WWW•eamcivil.tom E��� � g �
� ('�v�i �n�inerw'�nA InnN Surveying Land Planninp � N I
CITY OF RENTON FIGURE 1.3 PROPOSED SITE CONDITIONS WASHINGTON o„ti�= �'^��s' I P���•=�M�^�9.m.^� I �a�d•�a�•�•_^��•«�•• �y
a
� a
T �
W � 1/'1
' y r.
� �
. . . - -..
. _.
, � � .�� � .� •� � � :�
' �.,� ., � �-i� :�•,„�,-t ,.. � , . � �
r`' K � c,'� � :��.�� �.
, ,
, ,
. . . _.
.' � . . a , ..: � � ,
- �.
• . . • .; . ��`
. i�
.a , , t _• ,i :"j � *,
'-i .� .�" ,, � .; ., � r
� , ...
� � .,�,,v�i�e:'� 1: "� , .`' � ; ,
� '" � , �� �;�• � �� " . . �*,. ,�'
,�Y_tb.�' ' , .,'e1 1. "+.�.
,r h�.� �'� �� . � '!� ,
., ��� � �h�, •��•;�.. . .� � 'f , . ,
- """ .� '
� .
• .,..
. . . ` . ��'t ��'. - . ' '.
� ' . .,� � c. .
' a�; �,��3 ,� a� � � ..•.�� °V,.. �� � �-,.M i. ... . � ` J
�i���� . ♦ �� ��., '* � . .
�t �� � . �. . .� . .
""• 118th Ave Se °' .
yY�.�� +i....�� ` �+ N
,' '1 MR 1 r7 .ti.
' � � � •'�' ��`'-����}� �i f'�'�"� *_ •.L .
':`� y.
.
} i •� � r ¢ . +..Y' ,��� � t, • N '� r
! � '�"� � 1 � �, t� � ��
t �,. j . '.�, ,',� �.� � ' ,.;y� .
. � �*..��`",� �'i-'�,, ,! ,r: �'`'',�w� �• i
� : r .,�� .'S; r ',�. .• �, , �A9g .� -
A'�,,, . • ., .
� '` • •: ,,,_, 3*. ' � �`,w.w.��.. •, '
� ,,,,
.� 4,,�4`' w�"`.r s "^ �y+fi "�f". ' i� �` ' � .� ►
r�1����.a��,� .7:.'�a.. �� ,t� °.w ti �'�+ � a�
. ,1.r . �+.� •�. �
� s :r ,�;• , ';�3�y
� r` , �`'1 �'f',r�'"�` ' +,.� '4w? `"''� y '� � �
'' `y�i�.�w.' 's�r1�M^ k�*� �+Y. ��-�S. +t �';�S '1t. _,.
'� �• A �, .4 I�y��,�,�Y 't �� M
� � ��R.,�;�, ��{ZZ 4 ��11r.�'t �`� ��-'1� `�{;r 1 �• � � (•,.
� ey t'` '�Tir'� �C �:` t' „ y,, si°.�. ,� � y�:
�;*'�"" ti: + "� �Y"�p �a '�i*;� '1�►. 4 �� 4 .R37
M °,y'
7 ������ �'� '��� ' ' � ' �*
� w A y w.�_'a.i '� .�+..e1 +� +� � �T � -' i .�.
,,' 3 -�. _,4„` �.�.* w�..: s�t.� . r,�,•.. r �`:� r�'�� �..i�� � r�4�
� y. . �. �
� -M ��•S^ r"�,�„#, * `1�� w.. ;M,. Yt�....� - `� .,- .r1" °t` '„� + ��.. •
«� .� \k . �i Q. �,Ph•. \^ltr )�4�y -F.
w
... . � ,. ' ��. � .�`�" � .,.* ` , ' � _ ` .`* 'f � 1
� , " .` � .. � -t , t��. t4` .. � .'�I ♦. .. , . ... I.
� •� � .11 . 1 ..1 .•1 1 � :1
.�
1 � .1 '1
� , , „ „ ,;
A'� 1 A•.
Custom Soil Resource Report
Map Unit Legend
King County Area,Washington(WA633)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
Ag6 Alderwood gra�elly sandy loam, 6.7, 100.0%
0 to 6 percent slopes
Totals for Area of Interest 6.7 100.0°/a
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the soils
or miscellaneous areas in the survey area. The map unit descriptions, along with the
maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas.A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils.On the landscape,
however,the soils are natural phenomena,and they have the characteristic variability
of all natural phenomena. Thus, the range of some observed properties may extend
beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic
class rarely, if ever, can be mapped without including areas of other taxonomic
classes.Consequently,every map unit is made up of the soils or miscellaneous areas
for which it is named and some minor components that belong to taxonomic classes
other than those of the major soils.
Most minor soils have prope�ties similar to those of the dominant soil or soils in the '
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a ',
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management.These are called contrasting,or dissimilar,components.They generally
are in small areas and could not be mapped separately because of the scale used.
Some small areas of strongly contrasting soils or miscellaneous areas are identified
by a special symbol on the maps. If included in the database for a given area, the
contrasting minor components are identified in the map unit descriptions along with
some characteristics of each.A few areas of minor components may not have been
observed, and consequently they are not mentioned in the descriptions, especially
where the pattern was so complex that it was impractical to make enough observations
to identify all the soils and miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the usefulness
or accuracy of the data. The objective of mapping is not to delineate pure taxonomic
classes but rather to separate the landscape into landforms or landform segments that
have similar use and management requirements. The delineation of such segments
on the map provides su�cient information for the development of resource plans. If
intensive use of small areas is planned, however, onsite investigation is needed to
define and I�cate the soils and miscellaneous areas.
10
i '
� �
;
2. CONDITIONS AND REQUIREMENTS SUMMARY
Review of the 8 Core Reauirements and 6 Saecial Reauirements
This section describes how the project will meet the 2009 Surface Water Design Manual's
Core and Special Requirements.
Core Requirement No. 1 Discharge at the Natural Location
In the existing conditions, the site drains to the southwest and southeast, however the
flows converge about 800' downstream, at the intersection of SE 191� St and 120"' Ave
SE. In the proposed condition,the combined detention/water quality pond will discharge
south on 120�' Ave SE,which is the natural discharge location for the project site.
Core Requirement No. 2 Off-site Analysis
A Level 1 Downstream Analysis was performed by ESM on September 5, 2013. See
Section 3 for the offsite analysis.
Core Requirement No.3 Flow Control
Based on the City of Renton's Flow Control Application Map,the project site is in the Row
Control Duration Standard (Forested Conditions) area. See Section 4 for Flow Control
Analysis and Calculations.
Core Requirement No.4 Conveyance System
The stormwater drainage conveyance system will be sized to convey the 25 year design
storm event and to contain the 100 year design storm event. See Section 5 and
Appendix E of this report for a detailed Conveyance System Analysis and Design.
Core Requirement No. 5 Erosion and Sediment Control
The proposed project will include clearing and grading for the 16 new single-family units,
associated roadways, and pond area. The 1 existing unit will remain undisturbed:
however some minimal grading may occur on the lot Erosion and sediment controls will �
be provided to prevent, to the maximum extent possible, the transport of sediment from
the project site to downstream drainage facilities, water resources, and adjacent
properties. The Temporary Erosion and Sedimentation Control (TESC) Plans are shown
on the final construction plans, additionally see section 8 of this report for TESC
calculations.
Core Requirement No.6 Maintenance and Operations
The Operations and Maintenance Manual is provided in Appendix D.
Core Requirement No. 7 Fnancial Guarantees and Liability '
All drainage facilities constructed or modified for projects will comply with the financial
guarantee requirements as provided in the City of Renton Bond Quantities Worksheet
The Bond Quantities Worksheet, Facility Summaries, and Declaration of Covenant will be
provided at a later date,with the final submittal,
Core Requirement No. 8 Water Quality
According to King County iMap, the project site requires Basic Water Quality. The site
does not meet the requirements for enhanced treatment in the 2009 Surface Water
Design manual. Treatment for the pollution generating surfaces will be provided by a
combined detention/water qualiiy pond. See Section 4 for more information.
2-1
Special Requirement No. 1 Other Adopted Area-Specific Requirements
There are no master drainage plans, basin plans, salmon conservation plans, stormwater I
compliance plans, flood hazard reduction plan updates, or shared facility drainage plans I
for this project Special Requirement No. 1 does not apply. �,
Special Requirement No. 2 Flood Hazard Area Delineation ',
There is no 100-year flood plain associated with a large body of water(i.e. lake or stream)
on the site or adjacent to the site. Special Requirement No. 2 does not apply.
Speclal Requlrement No. 3 Flood Protectlon Facllltles
The project lies outside any pre-defined flood plain. Special Requirement No. 3 does not
apply.
Speclal Requlrement No.4 Source Control
The project is a residential subdivision and is not subject to this requirement. Special
Requirement No.4 does not apply.
Speclal Requlrement No. 5 OII Control
The project does not have a "high-use site characteristic" and is not a redevelopment of a
high-use site. Special Requirement No. 5 does not apply.
Speclal Requlrement No.6 Aqulfer Protectlon Area
According to the "Groundwater Protection Areas in the City of Renton" map, the project
site is not in an Aquifer Protection Area. Special Requirement No. 6 does not apply.
I
2-2
3. OFF-SITE ANALYSIS
Task 1: Studv Area Definition and Maqs
Fgure 1.2 shows the existing site conditions. Figure 3.3 shows the extent of offsite
analysis and the downstream flow path from the site.
Task 2: Resource Review
• Flow Control Map
According to the City of Renton Flow Control Application Map, the site is in a Flow
Control Duration Standard (Forested Conditions} area.
• Soil Survey Maq
According to the Geotech Report prepared by Earth Solutions NW on September
10, 2013, the geologic map of the area indicates the site is underlain by glacial till I,,
(G�vt) deposits throughout the site. The native soils observed at the test pit i,
locations are generally consistent with glacial till. I
• Kinq Countv iMap
According to the King County GIS Viewer (iMap), the project is NOT in any of the
following areas:
o Streams & 100 year floodplains
o Erosion Hazard Areas
o Seismic Hazard Areas
o Landslide Hazard Areas
o Coal Mine Hazard Areas
o Wetlands
• City of Renton 2009 Surface Water Manual Amendments
According to the Reference 11 in the City of Renton 2009 Surface Water Design
Manual Amendments,the project is NOT in any of the following areas:
o Aquifer Protection Areas
o Groundwater Protection Areas
• Road Drainage Problems
None noted
• Wetlands Inventorv
There are no recorded wetlands on or near the site. See Appendix C for the
Wetland Reconnaissance Report, prepared by The Watershed Company.
• Migratinq River Study
None noted
3-1
Flgure 3.1
KCGIS Parcel Report/Environmental Hazards
� ;
� �
f {
_�
,I_ �
I ,
; ;
I '
I
' i
� i
3-2
L ,
l'�K���►
King County Districts and Development Conditions for parcel 6198400280
---- __ -- ___ ---- ----- --- --------
Parcel number 6198400280 Drainage Basin Soos Creek ''� i:�'s "
•�• ' [��y
Address 19003 120TH AVE SE — �� . .� � - '
Jurisdiction ReMon - j� �. �
Zipcode 98058 PLSS SW-33-23-5 E'C�—''�����• f
Kroll Map page 605 Latitude 47.43194 F�� � , , �
Thomas Guide page 686 Longitude -722.18376 __ ��_
- Electoral Districts
— RNT 11-0456 Fire district dws not apply
_
District 5,— Water district do�s not apply
(206)296-1005 [] Sewer district dws not apply
Congressional district 9 Water 8 Sewer district Soos Creek Water&Sewer District
Legislative district �_ _____ Parks 8 Recreation distnct do�s not apply
School district _— _ Hospital district Publlc Hospkal DlstNct No.1
Seattle school board district does not apply(not in Seattle) Rural library district Runl King County Llbrary System
District Court electoral district Southeast Tribal lands? No
- ------— --- . ___--- —_ — ____ . _
- King County planning and designations __
— NA,check with jurisdiction do�s not apPh�
None -- — 342 _ —
um dws not apply
— Urban — Forest Production district? Na
does nM apply Agricultural Production district? No
Soos C reek No
Coal mine hazards? None mapped None mapped
Erosion hazards? No�e mapped 100-year flood plain? None mapped
Landslide hazards? None mapped Wetlands a[this parcel? None mapped
Seismic hazards? None mapped
This repoA was generated on 9l1312013 9:36:22 AM
Contact us at
:�2010 King County
�King County
King County Districts and Development Conditions for parcel 6198400260
_ _ -_ _ _--- ----
Parcel number 619840026D Orainage Basin Soos Creek �' ��
— � • ` �
Address 1885'I 120TH AVE SE ��, �.
' I Jurisdiction ReMon - � �'� �
Zipcade 98058 PLSS SW-33-23-5 -
;;,i`��: �
_— _ '��`",,�`'�' '
Kroll Map page 605 Latitude 47.43274 �'� {'
Thomas Guide page 686 Longitude -122.18322 - .y_�
_. �. � - � __ 1
- Electoral Districts
_ -- -__-----
— RNT 11-0456 Fire district does not appty
_ _ ___ __
District 5,— Water district does not apply
(206)296-1005 Q --- —
Sewer distrid does not apply
Congressional district 9 Water&Sewer district Soos Creek Water&Sewer District
Legislative district � ___ Parks 8 Recreation district does not apply
_-------
School district — _ Hospital district Publie Hospkal Distriet No.1
Seattle school board district does not apply(rrot in Seattle) Rural library district Runl King County Libnry System
- --
District CouA electoral district Southeast Tribal Lands? No
-- -------- -._
__-- ----
- King County planning and designations ______
— NA,check with jurisdiction does not apply ---
None __ — 342
um _ does not appy ��
, — Urban Forest Production district? Na �i
does notapply _ Agricultural Producbon district? No II
Soos Creek No
Coal mine hazards? None mapped None mapped
Erosion hazards? None mapped 100-year flood plain? None mapped
Landslide hazards? None mapped Wetlands at this parcel? None mapped
Seismic hazards? None mapped
This report was generated on 9/13/20'13 9:35:34 AM
Contact us at
OO 2010 King County
�King Courrty
King County Districts and Development Conditions for parcel 6198400241
Parcel number 6198400247 Drainage Basin Soos Creek ���'`��
Address 18842 118TH AVE SE
� f�, _.1� ;
Jurisdiction Renton - , # ��
Zipcode 98058 PLSS SW-33-23-5 ,
---- � t ' t,.
Kroll Map page 605 Latitude 47.43275 �� + T
Thomas Guide page 686 Longitude -122.18284 i : ���
_ -
_ _ --- --
- Electoral Districts
- RNT 71-0456 Fire district do�s not apply
District 5,- Water district doss�at apply
(206)296-1005 0 Sewer district does not apply
Congressional district 9 Water&Sewerdistrict Soos Creek Water&Sewer District
Legislative district � Parks 6 Recreation district does not apply
School district - Hospital district Publie Hospital DlatHct No.1
Seattle school board district does not apply(not in Seattle) Rural library district Runl King County Llhnry S�ratem
District Court electoral district Southeast Tribal Lands? No
- King County planning and designations
- NA,check with jurisdiction does not app�Y
None - 342
um does not apply
- Urban Forest Production district? No
does not apply Agricultc-al�roduc[ion d�,stnct� No
Soos Creek No
Coal mine hazards? None mapped None mapped
Erosion hazards? None mapped 100-yea��iooa p a�,% None mapped
Landslide hazards? None mapped Wetlands at this parcel7 None mapped
Seismic hazards? None mapped
This report was generated on 9/13l2013 9:34:01 AM
Conlact us at
�02010 King County
�w^s c«,�y
King County Districts and Development Conditions for parcel 6198400247
_ _—. -- _ _ _
Parcel number 6198400247 Drainage Basin Soos Creek � �' "�:�
Address NotAvailabb — j��;••�r
Jurisdiction Renton _
1 �
Zipcode 98058 PLSS SW-33-23-5
Kroll Map page 605 Latitude 47.43315 ��� ��
Thomas Guide page 686 Longitude -122.18306 `^��. � ` �, i
-- '- _. _ �
--- -- -----------_ -
- Electoral Districts
-- -- _----__
— RNT 11-0456 Fire district do�s not apply
__-- - _ ---——
District 5,— Water district does not apply
(206)296-1D05 � Sewer district doea not appty
Congressional district 9 Water 8 Sewer district Soos Creek Water&Sewer District
Legislative distnct � Parks 8 Recreation distnc[ does not apply
School district — __ _ Hospital district Publlc Hospkal Distrlet No.7
Seattle school board districf does not apply(not in Seattle) Rural library district Runl King County Libnry System
District Court electoral district Southeast Tribal Lands? No
— - -- __— -----
- King County planning and designations _
— NA,check with jurisdiction ao.s na appy
___ __
None — 342
um doea not aPPN
— Urban Forest Production district9 No
does not apply Agncultural Production district? No
Soos Creek No
Coal mine hazards? None mapped None mapped
Erosion hazards? None mapped 100-yearflood plain? None mapped
Landslide hazards? None mapped Wetlands at this parcel? None mapped
Seismic hazards? None mapped
This report was generated on 9/13/2013 9:31:55 AM
CoNact us at
�,20�0 King County
I
Downstream Drainaqe Complaints
There is one downstream drainage complaint within the last 10 years. The drainage
complaint number is 2009-0408 and is on parcel #6199000180, street address 19133
121ST PL SE. Following is a copy of the iMap info on the drainage complaint (note that
Complaint 1 is closed, and over 10 years old):
__ --- _ _
! Complaint T Close
Rec No Problem Type Recd Date Date I' Address ' PIN ( Comments
1 '1998-0926 ;DRAINAG C 12/30/199 �1/29/1999 19133121ST 619900018 APPARENT OBSTRUCTION IN
' ���E 8 I 1 PL SE TO 1 ROAD DRNG SYS
� -- _ ---
r2 '2009-0408 i DDM R 4/8/2009 T �19133121 ST 619900018 �
' ; �PLSE 0 �
According to the "Complaint Type" excel sheet obtained from Will Peddy at King County
Stormwater Services, DDM means "Drainage Miscellaneous". The type "R" refers to
"Engineering Reviews°. This does not pertain to flooding or any drainage system
problem; therefore the project site would not impact any downstream drainage
complaints.
�
3-3
i
� ,
;__
� �
� �.
�-�
Flgure 3.2
Drainage Compiaint Map
I
3-4
Figure 3.2 Drainage Complaint Map
���T►f R
Le g�r�d
� r'J �x�tj BQundaY f,,, 3tr�am6
�
� { 1�o�r�in Peaka Jra ra$e Canplainlc
� � 1 ]n rag�5txlos
' 'lr �leiyfi»iwod Dr��age Projec�
' f' �
�� � �o�a ��a�r Faci ide6
# �sidai�al90rmurat�
� r a�lUtiei
w ��
_ � # �nRe�ial Starrn•�a�a-
— �-�- - _ y' -acil�ti�s
° .�:,..,.�..�,,,,�„�.�,r-.�-�...� , � ; �_. s��Msr i i9h*�aYs
�' sE�a�n�a � r�corpa�D�d krea
�
3tr���
s -
� H4ire�
Renton �� �' �
;
I �
? �arcals
i
PROJECT SITE �" r' � Jrsa�Gb�rlh/�raa Lir�
sF,a�rn� • '
_ -� �i _ � ,�kB6 illd�PQB�Y8f5
� ;
�
:J-`r,� .,.��.d:,;. � .�:-�c. . i
. �19t�� COMPLAINT
2009-0408
,.
.:.
� y � '
� � �' �
� � , I
� �
St '4�NU ST _ j
--_: � —
i � I � ' � � .. ' .
��} T�."'�' . � _ ���
� `{
d �y'
�
� w
� _�; Kent � �
_.
� r�
.
�� ���, �\���':�:��`:�� ,�\ ; ,.,�'�� �,
�\ ♦ � \�� � i
� � � � \ .
SE 147iD R . . �\���� � ,+ t
. _ .\��� �.,..,�, ' .
�CI�Kmg County
0 569ft
The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice.King County makes no representations or warranties,express or implied,as to accuracy,completeness,timeliness,or rights to the use of such infortnation.This document is not
intended for use as a survey product.King County shall not be liable for any general,special,indi2ct.incidental,or consequential damages including,but not limited to,lost revenues or bst profits resuking from the use or misuse of the information contained on this map.Any sale of this map or information on this map is
prohibited except by written permission of King Caunty. a
King County
Date:9/7 3l2013 Source:King County iMAP-Stortnwater(htlpJlwww.metrokc.gov/GIS/iMAP)
Task 3: Feld Inspection (Level 1 Inspection)
A Level 1 Downstream Analysis was completed by ESM Consulting Engineers on
September 5, 2013. During this inspection it was found that the project site is at about
the high point of 120�' Ave SE, therefore no offsite frontage will be flowing into the project
site. Additionally, all surrounding properties are at about the same elevation as the
project site,therefore there are no anticipated upstream areas that will be flowing onto the
project site.
Task 4: Drainaae Description and Problem Descriptions
According to iMap, the entire project site is in the Soos Creek (King County WRIA #9)
basin. Big Soos Creek is located to the east of the project site.
There is a localized high point at about the center of the site, causing the existing site to
flow to the southwest and southeast comers of the property. From the southwest, these
flows sheet flow south onto the parcel adjacent to the project, then enter the storrn
drainage system in SE 191� street and flow to the east The southeast discharge point
flows into a large existing roadside ditch and flow to the south. At the intersection of
120th Ave SE and SE 191 S' St, these offsite flows converge, which is about 800 feet
downstream following the longest flowpath.
Once the fiows converge, they continue south on 120th Ave SE towards SE 192"d Street,
where they enter a catch basin with a bird cage lid then flow east along SE 192"d Street,
in a piped catch basin system. The flows continue east on the north side of the road until
just before 124"' Ave SE,where the pipe outFalls to a well defined,well vegetated channel.
From here the fiows sheetflow about 700 feet to the east and enter Big Soos Creek
Task 5: Miti4ation of Existina or Potential Problems
All runoff from the site will be collected in a piped storm system and directed to the
proposed combined detention/water quality pond. From there, runoff will be discharged
at the Row Control Duration Standard (Forested Conditions) into the existing storm
drainage system in 120�'Ave SE.
Note: There is a project on the south-adjacent property called "Bob Singh PIaY' that is
approved initially in King County and in the City of Renton on 11/30/2012 and currently in
construction. The project will have fronta�e improvements that will remove a portion of
the existing ditch on the west side of 120 Ave SE up to Rylee's Place's south property
boundary and replace it with a catch basin and pipe system. Construction Plans were
obtained from the City of Renton for this project,and the structure locations, rim and invert
elevations, and sidewalk location will be taken from these plans,with conservatism added
in for construction variances. These will need to be field verified for proper sidewalk/road
frontage connection.
3-5
Flgure 3.3
Offsite Analysis Downstream Flowpath
3-6
') — �.' --- .g1�fN1T. .. .. �j��. � �� .
� ��i_. � �{�` � � � � • '
= I ! �, I I � Blg SOOS
.., � � i;.
r� . � . Creek
,,.a-.,"' � ���� SE 1�STM R
- ) '� € �� 'i '�
i 't ` i } � �
� � � � � � ��
I I � i
�-= -, '1�� �`Z� , � '� �
. '��i����., �\�� �t�-
_ � ��:. ��� J +. •�' .
� ', `�, �
� _.� � ' '! �
� � � , � ; � � '
� _ � � � r�� � � ��� � � �� � �,' �
� �'�
SRE ji E�,,t ' � I � i
scu�r� 2 � ., s,I, •� � , , �
Renton �
.-1 '
� ,�}I)� , ; ',} '
3 _ ��5� r �
• . � : � �
. . ;- , ` � ;
. . , ; �
/J�.................... .4 � � � , �
� 1
V�.. _SE 191ST ST ~ � � . �""� � _� . �r I
L�J' J„'° " { 'I
7 —
� � � _` � I�- .
_� ' � ' M
� ' '' . � ~ � � ' �� _�
.8 � � , ' „-
_ � , , �
, �
^ :Q ` -� • . � � ' '�
� _ t �
, � � G a �► t ..••-•••�' �
� .
M1 ♦ �'�
•
��- ����■ •����•• � �
st+vzNu sr 11 1 1 1 1 1 �__ � � Y--- -
��� � ' �
� � � �
� ,,
� f --� � Kent � • ,
� ;:�, � � t � � ' �
"�'- � .. ___�':,--._,:._._ ' �
/�---- ,� �� � � � '�.� �p r' � � �
�CI�KmqCeunty O sa�n .
Fgure 3.3 Offsite Analysis Downstream Flowpath
•r
+
_ �
}. f•
12"s Concrete -
Culvert � '�
_ . �� � -:�;q��
,
�� -
_�-�
� x
— .,��
'k:.�'� ., �?t
a� .ti
./� ��Y a �,`. ,.
a � "
� ��r�-`�: • � �S'`�..�t.'�.
s � . _ ��.R��_ �
Picture 1. Looking south on 120"' Ave SE, about the middle of the north parcel of the project site.
The stormwater flows in this existing ditch into a 12°r� concrete culvert which goes under the
existing north driveway.
� r a ,_ �i!''/;I,',j;
t i �"w �
�: - I - "- - -- -
� f ♦ .: ,�
� �,! � .. �� -�
__ _ • � � �`�'.,-
. - 12"a CPP � - -
_ _ + ,.,._� �w;: �-_�"'.:'`��
,�L��-,;�g�,�'�.�s.c'���A.t�� ,Xs •t�`� `
•' . `
r"s,� . " ' • �. i'! . . . �� s'. ���``'
. ��'�.. .. 7.' �. r�^�� •� �i r
r��.`:�-�t - - _ - • , -. .-�(i''j` - y
���� � �. � �_ - � _��.y;•s �i
�� . "
� �} »y�'�, '+�t�� . -.���
��` w.r'�c .t�is f�t���`J�� ,�%.�y�. .`�'+v_ ..� I
f L
�F;�� .=frr -��,�� ,��"�.f.ae,�-� r +�r.'-•.F i
.a.- � ''�' .+c�• �`��,��+4'�,�.`�s �f `�
i:.� �,� �� r •� > �:- � ,:.e-�
; _ '� �r . r1,s v��'p _ -
J �
'y �V. Yr�; � i ��S )ey=`�F��.�.►
rt ':�'��+41 � Y' � �5:�.�� '�, 'r��*.�
�C� ��i r�. Y } i y i 'r 4 :�r' �
.' �' ��� ' .la.����"c_ '�t a� � '��- ..���� "2 y� '�;� `�s� i
- �.,�, •
.. 8 � �{-�y a�, `d`�'lx. 0 _ .�. �..
ti �
�..'�'� { :sltr-�ut' .�.3� ' ,j��r+� �: a"�.� � �"aF -
+�� •.
,�{�► � ` �5+ �i ' +i'�.
_ '6
,r f t r '���.�-�s,,�,,��- y ' �e,'x�' ,
i�� �..i.�'k � '7w. 'i 1'- "'�.,�` . t J,����r� i. � uY. rw d�'5.�.
-? �/��/ 4 �','p����� .-`- .r..i► . � .�s� . .N
. � +: � -��'�d #. 't a '1.�y_" .. � '.. '� "3ti
'�" 'zi , � i�f K f�- . .„ ✓ id e ��� .1��• �1 �. _ Y� �
, . � �y - I q fI' r4 �r'.1� .1.�u.� n! J.
�� F#� �i t. �1� x�.f�� s~�f[!�����{� `t �,�y" ��
Y �� �
��`' !p • �� r � ,;3'�' �` ��1 .� `t
f Ty,^.! Y'.�
�'' r� -:i�G+'���L��f�a,��'�r^T�..•`. . `�'}I- �"
Picture 2. Looking south on 120`h Ave SE, at the middle of the south parcel of the project site.
The stormwater flows in this existing ditch into a 12"ra corrugated plastic pipe, which goes under
the existing south driveway.
i
i ,
ij
� I
1i
�� (
,.'�•.. 3�{ � 't_'' � .
,..� �
-. �� y�• r` ,
�� ��`f�
. ,. ,� . _
� . __ -`'"
{,� t ."al -� '
_` - � .. � '� � �� � r
�
�. � , y :
�
. 1! r;. �y,.a '� � � �+4o-�i' � _•e
. .
� _ � ,..� ��" .�_+��,d• �• .�� -� '��� .. . �.. �..�°� �� � � � �
�' ��s �oP"t ..�'`-r,1 ��. i r
' ��� -. ... �� �� � �� . . . . .4;..T f � '"�+�}yt,��,yp�. ",e 3...�' �..
. '°y"� .S� ,.+^C� 7g,, s'.�+ , . � .` .lt��n'S,,'�.` �~'_7 rl��`
, . w . ` 4 �' � �.
� �.r: �? � , r � � j - ,y� .- "j,Ar.
"`�^.c � � .`�,�t `'� � �'� C`.,tiF''� ��y� ��'
.
..
=-�i�'�'qi�"`'4 �-+r , ,,� ��,�c�' v�s . , ► '�•�� �- ,,;�,"`{t•x� ��
,. �
� .F"� . �`-. .a"Rti.-'�` . f i,�„�:;�'
."�T �p � {'%`� � y` ..i•" : �!-.* � �r
.
. �
y . . _ . § .. „ .
. ... ' .. ���1 {�. #' �t. , S,. jn d��lj .����f��Y ��.:. t s :�.��� ��-.,�,.
�.� �� +.,. s+rt. , . .. _���� ���}y. � y. `
. ��y, �K' ,;. y'1:':S"" .� .i�w �►'�t' `��ira�,,�� ��,�.,
'. , �a,�2 ���..i�;.��.�. . . ��. �i_,'y {. _ t� .�� � ��vy�� � �t
. _:.� __ .. _
yr 'Jte
��� .... �!� `_ �+-� �y�.F v.�; �e . � �.a�.�F'`f �Y*� �a4„t' +C�'� '�
- � �'+c�F �yfL� a��L . " ' ; .�,3j,.,�f�� 'wC�-� `4'�ry��?R�.��.� ��������x, '
�fi 4 •
- « '��. ��A .a. $`S`' (� J�'"1 ' . �,. - .
Y�7!'w0'r.f � x -y. '1�ij ��;Y' �' �� `��}��+
�� {" +F.rI�'���� =ti „���.,+„�'�',.c;�J• ��� .t � �Y.. ^.fY�in �,+' . � �f''` a f��
.. (-�js,'^�. . . �1 �r.��' :-F,� �.' .,; . �, �r ,t� ,s f� � .♦� �' j,�, *_, ,,, `��
•�l^� ki�i{.S`F'.�-t�i.�`� '�;t �'r��" Yat'"': , 'K �' ,�4�e ' `�.' ���i f
t ,,, � ��� � -,�,.
�_- ��. •„rt;jr 7 t�'+� � f,i � g', +��, � �� i�'}� � .4�--_
� ._'rii..�'f..,TT� 't,N•�#��M - � �w �.L4 =1,.� ' ��lf. :4���. e r. . �A� -v��.�3J' . .�
Picture 3. Looking south on 120�' Ave SE, at the southeast comer of the project site. The
stormwater flows in this existing ditch along 120th Ave SE until meeting SE 191�`St
�r.T- e''�
�.� j
�.t��.� . �',„
l-
1,
- °� �` S.E. 191�`Street #�.�'����
p�" r =<» ' � . _, _
.,�_ �- _
: -
.
--_ �� _ a. _ �. �. ,
� �'��� Pond in + '�
�_
. .
�1�► ,
, � ����+� �`� Construction �,1_� � .
� .�
,
.., . ,
� � � -- _�4�„��--.:; ,;�"--- `' _-'`"';;r,!
.
.
.. , . > _ ��» , NF' �r��
.. �' . . ' .�r' ' � `
, IF t ' ' s,.-. a,A`' w' - —�..N
. �� ' .. R�� FA�{���t...' P�� ...
`'.
- , 4`.S�ty���}' • ,i g:. +x � "�'1"�t Ix.�+� . - /j�
� �� . `' �.Y�' �.,. � _ �7`�„�fk . ` `�
�s}l� L,:. �r•��3+ � .� .�1. atr "� �.
�._ � ~ �d� , � ' � �, e°'
�� � *^, �� '�A1� ��ih� w� �:., ~,f, •rh
� • , � � ��� � ._,�,;. ,`
?�, g fr +,. �`s��s► � . � _ �
�'. .
., ^-; � -.• 1�{ ,� :�'
.. ��i' '7��� �— ��.'��''1 , '�.-, ���.
� �, � ;�`f �'� �.��- �_ �. .�,,
� + h..��� A a.� `s� a
. � . .
�f. -. 4,i�„ . . *-"f
, . , .
� :�__��,..._ .. _. .. . . �. �+-�6a.�'..x� � . ,,z. -. .�. z.
Picture 4. Looking south on 120`h Ave SE, near the intersection of SE 191�` Street There is
currently a plat being built here with a stormwater pond in construction.
.; '�,
' 1
� �;
, ,
�
I
I �
i ;
,
,
ti
s�`,— � `��' ��, ,� .'.
1 �� -'� + ;,.
. .; f :
�� �, :.
I� _- . • - -` - _ - �
:� • _.
� w .` �- +i• � �--�'"��:.r•.,. , :�..
- :-�.� ' � . . . .. °�-.+i.l; :� - �;''��'�ayR�:r�c�.-.
"f� , -- ..,. ._ '�+�Rx^`�'' -
� ,,r .. , -,.
/ . � , �;=:� .�•
;� J r ' � . . , -' � -; ��1
'?�' � �rL�jt.•_�� . ,'�.,' �. r.
r i ..�1• � ,r` e . �• i+ . . . . . � •.�� ��
� �i,`r�'.�' i � ��/�; . (`,_ �� � ' !s:; . ... �,�ss
:S c�,�y�� .�,� � a'T.R��' '� _ . . � . . � .Y
.
� _
. , . � �
. , . � _
, , .. {� , � �tAL . '� 4c� `
; . - t ..� , .v �1'� �. !.^.�� ' ' _ , .. �� .
�,
�
: .. . . ���y� .'ts .,�, �^'` . .+..
���� �� �L l r a� �~4 � 'a 1f4., *'`�{5`�i�.�� 'x
.s °'�y'*r�wi` ,•, -.,. ,-:�` � ;'��E.: �,• `�
lIf4T�•' ,4�}r'�•� � .�i'n.GR.ty�s ',.�� 1kQ;_.'� t4,�t
..�� 4 � a ii'�I' ,s,3� ��;
a r � '4Sc
�� .1 �� ���1.•� , _ r ,�r,�• ..�1 ��_ r _ �`.�x. Ver��i�'2e . .
Picture 5. Standing on SE 191 S'St, looking at the southwest boundary of the project site. There is
a break in the chain link fence at the approximate low point of the south boundary of the project
site. Row from this low point runs on to the plat currently in construction.
�
t����
a � �.
J-'n` - 4 _
�+
1[�
��t�.�-�..
� � s.. �/
�-
'`L�, � 'Fp .!f 7�'.re; � �
.. � � _..�!�!n!.�( 4 ��Y`11-'' ' ` ;yt,tY '_ _ _�
. . . � � "� � ' �. _ .x� i
_... . A�!`i.. - - _ .r.;�sr-.
, ' ' +
- � .
r . ._ �• '-._ . . . ..
... rt�as. .r` � 3"-'r.�- h . ..:�� �,��.. a., ��' .,r r� ...
" . .• . , _ . . 7.,,.�
� aR.. - � ,��iC�r � •�- �� �_� 9 •� i3''da.'+.. �' +7k�� 2 �
•
..� .�..�. . . _+ � ` +�� - � j's1
..p^�� . .. �LS1M �-i ..' 'I f{ '�.�!..
� � t
_ .
� -L- . �y�. \ �. �' �
" . .. y �� �. �`�.: � tl''"�+r.. �`�r' �`�'D
_ " � ^ ��.e'�"`'_� ��4 _ �� r ,
� �� .,_ � •t
y,^^�'� • .�°'.` ��
r, _ �
' ,�.s: a ` - - . :
� �� _, '� _ .
� :.y ;
�' ��r—.{,4 '� ; � , , �s
�,'d,.��7►L s�� ' " .'.:c. '�� .� h. _i �/))��,� . �; �,'��.
i. �; . . -� � � �....�� �� _ �yl r.i �� A�� �.
` f,�*t�'r ��°{ ,y�� � „�.'�"Y""•
� . *�� ���'� �s,,•X.� ,�
y. A_ . F,� . �� zf f'
:`�i wa�'t�; •- . - � �- - s z:.
. �x� '�•`.5,, � . . � �i I��f�t ' �.����'
,''`.`� . � � �f �.i`l'd''� . ,�
'.
I � s� th '
Picture 6. Looking east on SE 191 St towards 120 Ave SE. It appears that there is a proposed
' stormwater system,which will direct flow to the stormwater pond currently in construction.
�
� ;
�i
� i
� �
' I
- �� .
�
�
0c r
K„*'
i
r '�`
�r� �� '
1 �'
4 r �� s .,
�- ,� -
M �� � t , � �
,.�:� . '��.
. � _ rF�=-- �Y.
i . . iN _'i'i : -+F `� �Y � �
. , j ��
. ...... �.,....s�' ,.. 'Cy.� ,.�,�• ,�Y�:�J.�.� . --- - �\
� ' �f_ F .Y �-. .
./f`.,": F � .' � � � . _
.�.. � t. � . . +���..� �^ Y�y ay� 4.
.,'t 1 _ �'z .q� �� ., f�• __ ^>6r� ,♦� �Ir.I�` 1 _
��� ;i
. ����.� . .. �_ . ''�� �4 � �y` � r��t
a! .l''. +�� � �`�"'iv *�i •�.�#.,.. -,tj•�•
- -,', EX. JCSSit � + �rc�",,r� ,.•r:
Glen Pond � �" ' �` �`� ,•'��
•4 � ��A�i X� �#.
!'! A� *� �} a��.
���•.'�- � .y��„y �� -4F �„��: X'i!.`
�"-,, r ��¢�,!""�� " .� ` r ='^•� .�
� � �i *` � �i� • - �+,t.'� Y .
4 • =r w `�.��.w A.�; fg" ��^e.� � -'-��.
', w. �t
:..k��.s�� et•���. �- _:Z�� �;;J-f���•K `�. .i�� _` ` _'�- . _
� ��+r �w. y� '.a� .`� �+� S �: i ��.'s� "° �/' _ . . .
+� �r�r �( Y �T� X�i� �q;{�� ��1�7
'! t•t�;,,t, �.'` !t`,#�.i � .. � p .r'ta `���5 a'� Z'�`-ia�4�
""T '���^ s �' T :���'�� ��"E+a' ` lEw�`�Ud��4n�': ��` .
�;. • ,_.�>�.,- -. � --� , ^ ',- _
� Y �' �'-�` •,�� �,�,,'�,:'
t'i'� �;}�'�i f'*+�1[,► �'�i �' �"~ �.!- t x
�r�-��t j � � �t s r r�f T..��'t!� �4 F , i ��
I �' ,;.. �..A �'...,y�y p �t� .-k � t —.��'�3
. y�4 J�,� �.:�t�'��"4.y p#j
�� f »�
t_ e.i`M, ^y;s ��.r! ..er'�i'R�}'� i _
�.s � '��� �y,�
�i�'s_3�.{e���F` �_6::"�i"� -
Picture 7. Looking north on 12�`h Ave SE. The flow from the west is from the west side of the
project site.
� �' � �����
, -;
� �
; �
,
; i
� i
� ;
; ,
s �
i _� .
, � �'
c
_ ' ' �} f i
� . _ �.� ._'!K
- .�,�--�y �.
A
.�
Ouiflow Structure '�"'�
from Jessie Glen � �-�`
pond :; . _
� - I -
Y4.
,'L
����� l
'��
/��� � �;
��� f
�. i � � .�
k •
�,
Picture 8. Looking south on 120�' Ave SE, at the east edge of Jessie Glen. At this point, both
discharge points from the project site converge. The emergency overflow spillway for the Jessie
Glen pond discharges to the ditch.
� —�� I
�
�OMPRESSION r
T`IPE BR�KES
PRON�BIIE�
_ • �k ��,�
��.'
Type 2 CB with {
birdcage ;`� •"
� -.
structure �+ ��;
�� ._ ���-_ .,
, , #� .�+
.�..s:�� �_, ••� " � Y�; , t P
a::�� �`� �' �• "ti _ _ ; _ , k
� � �� � _„ �y.,.:x ��;'r'
..y • ,_
F � . y `c �.,r..
;«�f
i1t� " gi �p��aT�F`��, -��� .. �
��
d � "��_ � � a` 'Y�� �,C � �S'" �,. k e+• �„�,�J,
� ' . .. �,.�� r e
K_. � : `.• ' �. " rt
`• -` tP _ �°"�"� i� - ;" . • . -y �„t � ���� • '
_ a���.. � , r . A:' _ .;� .� x". � .�P .�
'�.�" . • -„�. �'-�'� �`+�R � r��"�.a
. �It�t� �t� • ! d': ►. ?' � ►. ., � � � � ��,,.q• .-.':.��a/!� .r _ .�
_ ` ,�i�"� ..(' � y � . '+ w�.+.� �', � R� .,� . i . . �
: �t
�q:t� � e �'� 4�M : _ .. , � r ;• � 'YA�,�y'l!!,''t,»o,.' '��'. �!•,� .+�)"a
.r � i.. i - �J L . „ . ` . ,� y 4 Y
' � ���'R�•.. L {� t ..�R�^M
�t 1� Y' .: ��I � , � r' \ !
��'* � �,e,� , " �� a .! . rx,�1� � ;� ��,�i `�
- �., s ` , `,.�Y�; , :� f 'y�d�'� 'r���
?!_ .. . ' ,c .?��y • L .���` �� ;l�.t'���a 1",�i�'A�7R i�. .*,a,^h'���'`'�l
,. .
�, _ �� . i i . ' . • ..;.r��� -�t. {�,..
. �„ ,<�j �'M;.. .,�f�f^':v�N . N'�`�;t�t 'y 4 , ���-�•'�� . ���� �,� �.�:..
�♦,;. �►►t .R �;� 4y��:•' .. , j
,+�4'�G P t � [[ a•. t - � �3� � y .t
����=1'.{Y.��`.i�r�. .. •��NY'��'i'.��",s �n*i�.lJ•Y.�,���� ' ���M'S��L', .
Picture 9. Looking south on 120�' Ave SE, almost to the intersection with SE 192�d St The flow in
the ditch is captured by a type 2 stormwater structure with a birdcage opening on top.
���� .
,
�. . ..
--- � �:r: �.
� � � �. .-; . � _.: .. + '�,y��• .. Y�
�� N' (y�. I �2�.', l �!� Y+ �• _�• `r
.' �.r++t' ��i-y�.,. � . .._ . _,,`A���.p�_ �y/�'Tl• !, :s . .
�"�r�.��j��. .,� %�`•,:,;a � �k:� �A` i � �t . ��,
� .�� � . y �� �`L�/4^ .. • '�'. .'��"t
''�,�.'/:-�.+=9iy. .-', �. . _�'���_ _ �.a'�d�� t �,Le�r.�+.
r 'r� �f"4!�Y�, ��, � t�lAr f ,�'+. •.' :. �.., � —a... ^ ��,�� 4G♦ ?1 • �
i,` +� `_ .. `.� �� , *��.
y` � �:r.� R ��,R`�t..f� �.;�F'��'�'' ,\\_ . g''� ....�� � "r"� ,� ... r�4 �
.,�.` �` 4i` � yhj � _ .�t� '• 1
�'t ��� �- ik4i�.,.�w �• .4 a - ��. �/��¢.��qs li��I s� '� � ��T -.f
r 1� .� 7 i +r:�,2�. �.� • ��5, ' +�J�I�} ~ ♦ �!'. ,�.\o�y�~ ,�..�`'+yys ya,...'
♦y_ rr� ,j+�� .rG,.p,J " 'a:,�""�P � ��. :..a� �»�.�. -�.
� t T ��,�,�. �',"s�-��.�,t, , - _.. - �• � : .,
,,����. d ''��', � }+?�'� !f' �1}'•�'�p, - ` ' v� �. � 4 t� ���. 7"'�
F +P• .. ,�f� .as�la � s! ;��� Y�`�- 'v
��'.•. t�'�;�/ f.1.� ,�hf . '+�sR'�'3��` k-�..;"�,��. � ,� - • �, .-L�'�•'+C'Iy'��'i
..U, ,j ' � -.�h�• '! :!' � � �`� :}. / l�.d`.
i } �'�.r� y.� +a�` 4, '�i(��,, - �. . ���� �� �+�s'��p•�- /, -�'.;7�
^.�f'" ' � 4 ~.r ' • � !,. t � .�'�'w, � ' ��
`' � ,,f,d�.T k r'�, '`>�_ �' !�• a . -.� ;�` "2,o,#' 4�#�M�►. ,� �
...� • .. . G �•t� i� 1> �ie�' `� � �� � ! _ �
tF �� ���,. ��y•,� 'tg y�C� s.�� �,,Z..s 4_ :�t tti`,t v 1i ��:a.'yr ; *
� � "� i �f`� •t $.�F�K�,�S` _�-l� J �"�"� _ "�� '�' 3,a,� ��" �k•
, � e �+�c � 'tle` ♦:`�"�S�� ���+�. . _}h '�,.'�i'��,� ^ ..•�'.�yf t. '� _ ���'t� ��'.WC e�
1. T �' � w
�
. .
.
' �,� -• �.,,� ` �rsy�ti . �s 'ct : � R .
�f
� '� . .a. ,�.� e ;� � . �4 s�' •
+V � ' �� � � �r . �,�-,k
�,f�r7c._��r . ' � 4 ,� ��s.'��5�� ..'�;. � "i'�� ` �- 'i�,;
�. ;K ,�
�M��ti'�. "'h '!,� �� :� .� " , :r' ;��� .. . -. . � dr r F• ' �i.�t _
i .�-'��. � . �f� ` F. .L " . y.' trq �' J� a�i.. ' . .: ' � � T� e 4yt�y�j�. �.ir
j� ,�, � , � t" -'�3;'i
��. ..i+�*' : �'� s t.,�, tp .�;�} r'���t'� ` r;,J'� . _.i�C.� �l'p �,i.t `
s.�. .s �. t,;..y �'. � 't�.� +.1 ,, °• .�',� 4+ -� •:=� � e'.
f �,f� �.. . � � � �+ �'�1 �" �
y � ...�i ��,.`f , .�:4, ..,� ' ., ' �r , �• � t 'R"
ti+�t�. �e ' .l r � � 1 .w,',��r��.t' ���Y ��a y� j�'���} t `N�•��,".i•�-..
,;•� 'L,�, ��� . �A -q� �;'t`► �! :..'r q!i��j� ' . �� �'�`�.e:
i ��,y�y(,�j .�` '� *. 0' '` _ ;�i:'�' 9��'� `�r }' ��"�'"�a�3�T�. r.
�!�7�9:?::7[,. .w1.s.�1��, .. �n «J:,♦ - .'A !� ;... _ � _e " C ' .. '�i.1-`.��..•7. '.'����i �+ ���
Picture 10. Flow from the ditch ente�s the stormwater structure here, and flows into a CB on the
north side of SE 192"�St The CB then flows to the east on SE 192`�St
�
.. -.,._...�_. -
'�� . .
_ -�� ��� ���
w
o^- . . ,���• y�
� ' *.t ,
s �. ` �; ' '.� 4i � �'
��>F :� .� _ , � �
..,.,.,.. .;
� ,.. , � _
1f .wt�.. �Y•• _ �� -� .
_ .. til. .�� ��;: � raC ..
� � ... , . � t • ♦�^ . � � �
t . � ' j , _ . _ ` i.
. � . , . Y � .. �
�.� � , �
� • �
Picture 11. Flow continues to the east on SE 192"� St to a CB structure with a solid lid. Flow
continues east on SE 192"�St
� ��. �.., ,�
� '4
`� .�� '_
� �� ; , � � ��.
. .
`� , � �_ � . _ � . . . �zv
..,� �
�-;;�;�. .-- , , �
���,� . :. . ' _ " � � �'`��r.
,
�� � ��,�y..;�.. ''`'^e+++�
�r�"„�*�`,_ � l+�y�}N �� i.�c�*r . �k ._ -, _��
_ �' ' "'�If� . `
�K �F , y 11�� "�'�t�•a�^ ti .. \
, r
�.ti..-; �'► ,.�+� .t�+'� �y� ' ..
�'j.6'• K � `'`<7" .t:"k'+ .�r.
F��� ��,�+�t�:�i��'�g��,� `a�+.ir�cc.,.,�ic�.,
, �-� ��'�., r r I�,.'� .,o +�l�
.� +!r�.y���_�.d � . . '..�.s
T.. � �`) :�..
A � ,1,'�Y�+t � ' `�`.�,j . `z�� y
��'r ,�%r � �'.L� � r� � ,�b . '�-�_
_� it • - a,� �. = �"�'-�
E w � '� v_ �t�� ��� -. .
.,��+.� � `�,,�� ��� � . ..��z r j�,�e-��- � o t 4� fir�-„�;, e �" .,
' ',, "� ...34t.L.at�+ " � ; .. ?.
�.J �` '' �� k� � ' �
. '* K, ,l�~ �r^ ' a� +� "J�' '.
6 -?'�9'�� + ,y '� _ �'�. .;._ ;r�;�'�i t
•�1�1 ��" � r �� �•tl �a�=� � �
���,��hj �►�� S�;�j -� ',y,t;y��'����s, .�''.�\ t •
��wc'{�x ,�����4�����.. y �< �� .�:.-' _ .
� ... ",i.r + .a '�,i��.
�6 Js'+ c Y� ,
y� � ' �( •Y aVi .y�j � v�`. ..
' J`�4J�C��(r=l .. ,• ,��`,�,`�jf'r.r'j
�s Y
'�'��_ ;�I�" M JJ `.�.� ,��4 i�� . 1 ♦ : � .�..e,
L,�,1�J' �3 : ` �i�.�� .. =�f . . _ . . , iA,:". '
1/��,�� t.��K sl�'°er.� r !�- ` "�
��'�l���� t. �? .,; � �r ,:� "��,p 1 , -' ��'���
* �'7_=.s,� �•+�-�;i-�� �v..�f!4 }� � � � �� ,Y. ���'�,� ������
✓t�� .. r,/►�ci's j�lA���, � �- . � w`�"��r„�
s� .i. r s.S�.'.• ... . , A.� •:r. �': a.
Picture 12. Row continues east on SE 192"�St to this CB, and continues to the east
?
;
i '
� �
! (
�
�-
w '
�
� r
L. ,
'� a.�s
� �
. �
t �
_ . �r'A"' �'Y� � +
R^• at+'� ,�t'�� � �
�'� �» ' � }��l�� - -'�.�
� ��.- r '�(�" _
�.
' '�' ;�. „���{�i���'� � { � +
� :`,•t-r^ k� ,f��I` �[':�4�, «'��� ..
� 4'' f "r .^ s .r. ���' j� + '�At�.�- ' ,..
s*� ���;t �+' `' �k . �•�y, �
' r��'�y���f•.�� �• -'�c
'�t . y A ��'�^
�. �� T` �1:� a���.e�+s� y ' . . � - -_ . ,
r �;a- n
'� r: [r ';'fr����� ��V• ��:��� ! - .'...; '�a�♦ � �., i��
r� �� t :
��Fn`{�.[�!�p�^'�4V�f'7 . � 7e„t.*.yt��S.. ° A..4r-
� �� p -r� r 'RtN.► TI�Y ''< L � . 1, ••'S {. 'C . i r t .
.,lG �� � 1�1' (�tl�.. � � � Z y�8 �-e,. Ah'.
%`',�e , �.«i,t ¢�'���;. �,'�;� � , � ti•. �,. •����
� �'R�'t•, + ,.� *�1'. i+'�.ut'�. "�, ", ^M1 '
�3v �iT'• ���,t�'f�i�-� ��� �l.C�+'�• . .�€.�' . _ .
�� �fT����' • .'�:,,. .., ��2��.. ;`
.;�•� ,,
�� .•'J?�°}�,`•�""t�!� ,. � � ''� �ti, '
��'��*. '"'��i � 'i . �, ',r"i.��r�, d • ,' , �_ . . , »
..�.n � *,� �4.5=
_k-r,.. } 't��"�.'� '�.�-
Picture 13. Row continues east on SE 192`�St to this CB, and continues to the east
; �
� ;
� ;
_ � I
� �
Jp I! .�
S � � :7
� �
�T-.. .�-. �"'�$� ' II
*�If • ,•r,�' �� �
.�.:��:�� - - � . __
-..�-L.��..__ _
��
.���� - -
_ „ ii_
' :'►"...i«+y� „.n
' . + . ��`.� � �` � ,K ' • . • - - .
� ;�''� _. .�sti,, !�`�s'�.�' •r.n,--,, �„�•-
•J� •', 4`�i L�',«'��'.�����- �� :�.1" F.. . .
> . •f�"�. � 'r�• ���:i�w7 .
�,�. �• .�� �' F• .. F�� � •. .
�:..�f �; :F.- �►�,^` .�w�_
� t�....� .�*''�,'3 ;s' ,� _
u" �,t,�
+ -�';��1.:..�;. .
1 . : ,�. .
, w
. . �s w�3 r.�,+d ,2;. "�`'. ,. • '
Picture 14. Row continues east on SE 192�'St to this CB, and continues to the east
i
r_
;- ��
' �-�
y
�� � fi :
_p �.t -_. /. I
1 ir
r��✓ �.�.eL� '� � ' Y�1�
. . ��
�7y�:
,'i" '� _ ' a�
i .. " `�~r .. ' . . • . _ . ..•�n
I . -' . + ' �)� ` y�`� .t ��.
$ '�
• . ��GilfY'P
. �,�� ��:� �_ .
� � ``` �
. � � � .�.��`\`�` .�' .
. ._ +�` ..` �4 a�. . . ..
�,,._,
. .'$���'`,' 4�A�������•: �
����,^• �� A�.
�' .,N� . �!� �
� •�,�' ��• +��:r :�, .:1�"+''�l"�+.
- � y. . :�• ,, .�v�e �.rs
�� ti �
...�+ ��,; .2�,.� . .� � � . i'
� � +��..:tl� �Ftl �, � .
�r� �Yrdr��
t C ,. g'� * t.+. ' ,V .
�£� �;' �►�, °•'t, 7�c
�� �S��. .�� �Y J �.j .
�!'..�r�1 ` � �b� � 4��'}Y��' � `
. y,N '• , '� .
r .�.. .
. ..
' s � . Y � � r - - _ '� �N:
� ' .. ..;�..
�-y� ' : ;1, s t y,::
; •.
. . .
_ .
, «.
!°w yr a'' �'t�!+ ��`,�j'r v.
l� . .. °� . r .raS.`}.'IY'.x�..� ... _ . '�.._
Picture 15. Flow continues east on SE 192"� St to this CB, and continues to the east to another
CB,then keeps flowing to the east
� '
�___
� '
�
j ��
+ �--c. '�." ��t✓�
. �
_ .p .�-. ,,r
. «�t«.�
�� f
. � 4* �r��''.
-,,� -� r,. .I ..
�si. "�� + � - ^ ..
.i - :''S.• � . , � ..,�. � - .
t��c - •c• � -
., .:� ��,.d� �
t ,�„i « ="x. i�f �� '� ' '�� �',, ji�f' h1�=�' �
�� t tt � �„[`� � ��!�' �{�k� '•+`-,�r�V' � �"j F�
s- � �s .� .lu�, .�t�t. ��, � -
.i
•S � L�'tr , � �- ^`r
��. � , .
. .._s�,��.�i �'r'"",� „�' . ..
' '� �lT'i��`�s �3', ..�!�.nL' .� _� ��. . � '�
` s?* ^� ��'� �1!� '. � ti ��-',�. •
Y► i�: `t .� �-._ ..J ��1 's - %�e:�-`�r .
I'�� . z.;� � d '1" �ri� '� ��� �i
.� � ,tf'r �
�,�, ..• , . � ;��l'j1.�
F ..,t�n . t. '�4 �' ..
r• yp �S
��t.�'�y+y�.����� �}�t;�� ��'.A .. ,.� .
•,�f,� E},rt4F� `��aR't�,� ,.'� y
F k"' � � � � �t ���i� �"�� � '- ►T9�.
� °}.t a..�'� �r.��,. ,p '�� �
fid �.r�1�Q ri:S.����t � a.�y.,t� �� �ii� , ..
� C�.�=r iJ,-� " `.t��-�t +`���• ��'✓� ..-� �.
♦
\, ,�,s `'j ! ';� ' t`"i' �♦ "�
�'_..�t��\�t�,�,� ;��� r ���y������,:
►�;..� '�+�''�'% ; `� + '`� ' ���
-�o �� �.�:�:►Vi�w.dr.._v.+.'�:..uc,4�"•.:.>._.
Picture 16. Flow continues east on SE 192`�St to this CB, and continues to the east
-r
. � .x • ,�, ' _a +�, � h
{
-, �' t;: .
a` � �� - ��.L - , � {* �< '�
, ��� r�� • ' � �,,
:.�` �ti ' _• *-�!'
�' '} 'r�
. \
:� -
4
,�''��.�"'�.
. �.,,
:� . - _ .
. , -�.
C�", .�.:» 4��',����'� ,
�- ,.i �-.. ,.> ,
r«. ,r .. ' . .��,, _ ,- i .
� . :
��r ,�,�4 �'_,�! �jP:� ..
K %� � ._ .
Ff'*� ��,'jf�i��''''m�y�"�, "
,� �µ,; �r�{ ,�i�r '�.,•,� ,�-3 .
� `�r�n'�� .� �
,
"t����'_ `4`;�%.
�,�_ �,��t� ��:. .
.'��';+.�`'1c�`,:k`.„�-,1����
Picture 17. Row continues east on SE 192"d St to this CB,and continues to the east
�
�
_ . _ - -- .c:� -�
3� tit�c � E� _ ��. '� �,� 7
f' �a�: ��, ��,.
� ..�'��e k '�.. .� :'� .* ` ' � ��
�`. � t 1� �_� �1'It�'OGn -�' !
" ��. ��^ �� � !'6 'i•i�� r ..J�r,' ► -� �
.`�5.. . Y * • .l'L �.....y } 7�� �.�. ,. , �i
� '
�7��;� +��t � �� �Y� � + ] i� _
� f A
.�7��� _ t {' i t . ��,. . , . '��+1��,,r �.... , - i` .
. L, L" � `�� w.� ��• , ,�yl���h,�,f� .1`-+l � ,F'
� � ���
.� ��1�ti' � •�' .�-. ��r �!R�!,�. � .. ��
�� t �c,... .a�t
R ,;;� �,r " %7��� '.. �'Y �.Y �{.1� ,� � .��gNI!< `�.l,'$ , ^.��
.'Y}� ^"� -s��::�od ..: T �'''"�t, �" � 'YW " '. � " +�
��Jl'�1� � � �.,r���`�yj���' �rv�b .- �1 ��.`{� t , , r.�.
- tir �a,� t `�.. �T'= ..',M'�(V��,�� ��tv~��k, L �f:rt •�l�L.=1' ��`�+. , ��• • . ^ -t �
;���.�.� 3' �g�4. �. �L1��y i4�!',� �� S,�' .', �,�, � `
�'` �' �rw��.@��#��'1^�s�` �, 4 w . 4.. y-�, ��1_�•����t'�-t�';Af�+., ��� ' •� �\':
:��
1 �� ��t- . '�,*Ay Krt* �
���^ ,�ft� . � •�-„�,k � _ ts��� ti�`, ,�� +`4�-�,�� � '�,�, �'".C'1
- � .�{ "`t^ ti���} �'- , -, � :� �'�;` 3 +y'� �'�: ' �'!� r:�
�, •t. f , � ' a . ,
•�' �x .rR � ��, � ! � _+R -�� 1
t-� �.
f� ,~�� ` '� � �r���t '� '� �'�t�'.
� a..�"{�!l '^� 1� '�T.•` �+�k '� ~ C+�� 1[ , -t'" ` �y;�`���
�l� �•. „+
s . i � �� .. � �y _ sL.t� � .-.�` � ��' ��`l
� �:.I.�+ �•! �, r��:� � �,,}ai.\� 4e1�� �'t I'�y+ �_ �
/"'i '� t♦ '��
�C� `�y � ,I{.�', � �r
� r ` ' • ` ~
. _y �' + +� '� -�a!�^ �. r�i ��
� �q t ' � �,
'.� � ,� r _ �.VF ��J���
�+ �1,1 � ,,i� - i.;°`�.Q�'�` �+ � � •_+3►►'�,- ��
.c ��y • �° \ !� '�i*�J1! 1
� �,
��` �'�� i � !� ' �' S
� '""°' .�� ! � • _,� � ' � `� ; �,�
t
� • ' -
,,*�`� `► ^tt ► rr -� .r`; �1►. .�' +'�.. :v.
�- �i� � ��
/ �► t " ' �'�1�;��i"�3..�� ��`+1� . ►.i
�� �► �;.t�a�. �
Picture 18. Looking north from SE 192"� St According to the previous downstream analysis
completed for Jessie Glen, the flow from the stormwater system in SE 192"d St outfalls to this
vegetated channel. However, the channel was overgrown and the outfall pipe could not be
located.
� .�
. =
�
.�
'yr' �;:
� 'L �� .. .
i � � 4 ~'t .� ,...JF 4. �.�{'r,.� ` e._� ��� " y +,
-� �f,�'j;••ik�������'��',`t• •• -.
? 4 �..t w 7 � c . 1��'r�'
��a. �s�.�. � e ..� ,� ���,�w 4 �4
,��' "��, ��` ='" 'y''�'!" ��'��►
1 4� � . . .. .li•- � "•AW.-t-�„'��5�;
• !" 1 �
�C.Y�'A,�"". - �:,�"ar� � , �3 .. ,�= j
.. _ .L._.. ���-
��
' � -• �. a�._ . ; .
*''„ a -
.-- .
'� �� .ty>e.j�f�s "i , � - •.. ` '1' ' � � . -
. _ . .il'�+'. .?,,! i:.t.. ... . i'✓ �����ar.. . . � . •�����>.HS�.
Picture 19. The vegetated channel crosses this gravel driveway and enters Big Soos Creek
4. FLOW CONTROL & WATER QUALITY FACILITY ANALYSIS AND DESIGN
4.1 Existing Site Hydrology
The existing site consists of 3 single-family dwellings and several detached structures with
associated driveways. One of the three houses will remain, which is located on Proposed
Lot 17. The existing site is relatively flat (mean slope of 7.7%, less than 10% max slopes on
site) with a localized high point in approximately the middle of the property. The pervious
portions of the north parcels are generally lawn, while the west half of the south parcel is
forested.
According to the Geotech Report prepared by Earth Solutions NW, the soils on site are
glacial till. See Figure 1.4 for the Soils Map. This report shows that the site is generally
underlain with Till soils, which are incapable of infiltration. Therefore Till soils are used in
the KCRTS model, with the predeveloped area being modeled as Till Forest
There is a localized high point at roughly the center of the site, causing the existing site to
flow to the southwest and southeast comers of the properry. These flows, however,
converge about 800' downstream of the project site.
The predeveloped basin for the project site also includes the frontage improvements. This
area will be improved with a half street overlay, and additionally a new sidewalk and curb
and gutter will be added.
TABLE 4.1
Pre-Developed Tributary Area
SUBBASIN TOTAL AREA TILL FOREST
(Ac) (Ac) I
Rylee's Place 4.95 4.95
120 Ave SE Frontage 0.20 0.20
TOTAL 5.15 5.15 �
4.2 Developed Site Hydrology
The project will create 17 single family lots with associated roadway, sidewalk, driveways,
roof areas, landscaped yards, and a combined detention/water quality pond. Lot 17 will
contain an existing residence which will not be disturbed, while the remaining 16 lots will
have new single-family dwelling units.
The majority of the frontage improvement area, along with a portion of the proposed
roadway, will be unable to be captured by the pond and will be treated as bypass area. For
more information, see Table 4.3 below and Figure 4.1.
The maximum impervious surface area allowed by the City of Renton Zoning Code 4-2-
110A for R-4 zoned lots is 55%. However, the site will utilize Flow Control BMP C2.9
Reduced Impervious Surface Credit, and reduce on-site allowable impervious area by 10%.
Therefore, building rooftops and impervious areas (driveway, porch, patios) are modeled as
45% impervious.
The combined detention/water qualiry pond is located in the north eastern corner of the
site. In order to achieve the pond depth, the existing storm drainage system in 120`h Ave SE
will be replaced for approximately 300' south of the south project boundary and adjust the
12"ra inlet into the existing rype 2 structure in front of the Jessie Glen project The
4-1
combined detention/water quality pond will discharge to this new system to the south,
which is the site's natural discharge location.
TABLE 4.2
Developed Pond Detained Area
SUBBASIN TOTAL IMPERV. TILL
AREA AREA(Ac) GRASS
(Ac) (Ac)
R lee's Place 4.86 2.23 2.63
TOTAL 4.86 2.23 2.63
TABLE 4.3
Bypass Area
SUBBASIN TOTAL IMPERV. TILL
AREA AREA (Ac) GRASS
(Ac) (Ac)
Bypass Onsite road + 0.22 0.16 0.06
Frontage Area
Frontage Area added to 0.07 0.05 0.02
the Pond
TOTAL 0.29 0.21 0.08
See Fgure 4,1 for a visual representation of the Developed Tributary Area.
4.3 Performance Standards
Performance Standards for flow control design use the KCRTS Methodology with hourly
time steps as described in Section 4.4 below. Runoff files for the existing, proposed, and
bypass conditions were created using the historic KCRTS time series data sets for the
SeaTac Rainfall Region with a Correction Factor of 1.0.
The site requires basic water quality treatment Water quality will be satisfied with a
wetpond,which will be located in the combined detention/water quality pond.
�-�
4.4 Flow Controi System
The pond was sized per the requirements in the 2�09 Surface Water Design Manual. Per
the City of Renton's Flow Control Application Map, the project site is in the Flow Control
Duration Standard (Forested Conditions) area This standard requires the site to match the
durations of high flows at their predevelopment levels for all flows from one-half of the 2
year peak flow up to the 50 year peak flow.
KCRTS v6.0 was used to design the proposed pond. Procedures and design criteria
specified in the 2009 Surface Water Design Manual were followed for the hydrologic and
hydraulic modeling. The KCRTS pond sizing output is included in Appendix A
The KCRTS output models the required detention volume as 54,020 cubic feet of storage,
with 5.75 feet of detention. The proposed pond provides 57,853 cubic feet of storage,
which results in a construction factor of 7.1�'o.
4-3
Figure 4.1
Pond Tributary Area
�
4-4
REvi510N5
A PORTION OF THE S.W. 1/4 OF THE S.W. 1/4 OF SECTION 33, TOWNSHIP 23 NORTH, RANGE 05 EAST W.M.
n
i �
i
I �
�
, o I
I ; NOT TO SCALE
- - F
5 . - CONTOUR INTERVAL= t'
- ---- - � �� 3s
,—PONC TRIBUTARY � Q� �
s ;� AREA � w � JJ
BYPASS AREA ADDEC T� THE POND Z� �� �
, o —
� _ —1 N�
_ 4 r�r{T��r-��_ � O p �
— � N$ E
� '�li . .. � i o 3 � 2 1
i _ � I��II � i w ' �; �
zgm >
s . g A '��(s� � ; �w <a -� _
---- 508.80 508.90 . • - ° . .. .. .. � W a i o m�' m
.- \ 510.00 _ �'E`� �. I Q z m o
',� - �� `���.y''� i � � 3
�
\`.� .. .` �— ✓���i o 3 °�
�
� �'
__ _ __ __ ' '_ , \ I � ' -���i - -� i 3
- �,��,' �.'Y F-� oi
- - - - -- - - - - - ~�k:'��" p`- i
� � � B�YP.AS� AREA -°
; � � � �a
;' ,
� '- - - - ' -- "� �' �: L-�
� rJ
z
, I U
o � p. a � � i ... Z
_ ____ _ "" ' _ _
' _' '_ '_ __ ___' . . ._ _' ' 'i " '. I Q
e � 4 ;
uuTeoREOAD`Pccess - .:
.- ". \
-- -- --- -- ---- � .
- , _ ; U
, _
, _ _ - -- � i J
�� —
� -- -- - -- -- -- - — - --— - -- — -
_- - - -- - i � w
- - - - - - - � � � Z v m
i t = . � o � - 0 5 � w Q =
_ , - � J w
; a � ?
, � O Q
J r^ m
W v!
I � W w
� ! � W o
J
J W
I � } �
I � � � � �
� Z
0
Z
- W
�
�
0
�
- U
'. ''. '.5'a-�C3-o'.�
�. � o+a �.,ue -
. oEswuEo e-�.
❑K
C�E-✓E� B
. - - IC-22-^_Gt+
- C<T�O
EN-01
: �� �-E.,
4.5 Water Quality Facility
The proposed water quality pond for Rylee's Place will use the 2009 Surface Water Design
Manual guidance for Basic Menu wetpond(s) that would be sized to a VB/VR ratio of 3.0,
which will treat approximately 95 percent of all runoff.
A VB/VR - 3 is calculated by dividing the wetpond volume N� by the volume of runoff
N� from the mean annual storm. The sizing of wetponds is accomplished by
deterrnining the acreage of pervious and impenrious land. Runoff volumes from
penrious and impe►vious areas were determined by multiplying the acreage of each
category by the mean annual sto�rn (0.47 inches). Runoff factors of 025 for till grass
areas, 0.10 for till forest areas and 0.90 for impervious areas were utilized. The sum of
these values is the total runoff volume N�• The required basin volume or the volume of
the wetpond is determined by multiplying the VR by 3.0.
Volume runoff from till grass -2.63 Ac (Table 4.2)x 0.47 in.x 025/12 - 0.0258 Ac-ft.
Volume runoff from impervious = 2.23 Ac (Table 4.2)x 0.47 in x 0.90/12 = 0.0786 Ac-ft.
Total runoff volume VR - 0.1044 Ac - ft
Total basin volume VB- 0.1044 x 3 - 0.3132 Ac -ft- 1�
Wetpond Volume provided =2�
Due to topography,the bypass area will not be able to be treated. However,the on site
water quality wetpond is greatly oversized to offset this. The wetpond has 64°� additional
volume (8,756 c�over the required wetpond volume.
Back calculate this volume for treating only impenrious area:
Volume provided -8,756 cf
Total basin volume VB-0.0670 x 3 = 02010 Ac -ft. -$Z�
Volume runoff from impervious = 1.90 Ac x 0.47 in x 0.90/12 =0.0670 Ac-ft.
Effectively,the wetpond is sized such that it could treat an additional 1.90 acres of
impervious area, This will overtreat the on-site basin,which will maintain water quality at
the point of compliance,which is the southeast comer of the project area
Additionally,the wetpond will not have a till liner, as the existing soils are impermeable till.
4-5
e �
5. CONVEYANCE SYSIEM ANALYSIS AND DESIGN
A conveyance analysis was performed for the mainline storm drainage systems and the
pond outfall/frontage conveyance systems. The StormSHED results provided in Appendix �
E demonstrate that the pipe networics function per the requirements of the 2009
StoRnwater Manual for peak storm conveyance. The proposed conveyance system's �
parameters are as follows: �
Backwater was analyzed using StormSHED 3G proprietary software, using the rational II
methodology to analyze each sub-basin area. The project is not located near a location
with an IDF curve table created,therefore the IDF values for Seattle are used.
The outfall system was sized using the entire on site basin from Table 4.2. This simulates '
the entire on site basin area runoff being point discharged to the top of the first pipe, '
which assumes there is no detention pond (or the detention pond completely failed). This '
models the maximum flow rate possible through the outfall system in 120"'Ave SE.
Developed Land Uses used:
Lawn (c-0.25)
Pavement and roofs (c=0.90)
Rainfall Data Used:
25 year: 3.40 in �
100 year. 3.90 in I
The time of concentration is set at the 2009 Stormwater Manual minimum, 6.3 minutes, to I
add conservatism to the system design. I
The system was designed to convey the 100 year storm with no capaciry or backwater II
issues. This was done to determine that no flooding or backwater would occur.
Naming Convention used in StormSHED: �
• Drainage basins are referred to as "Basins° ��
• Catch basins are referred to as "Nodes"
• Pipes are referred to as "Reaches"
The StormSHED output is located in Appendix E and includes the following:
• Conveyance System Diagram
• Contributing Drainage Areas Table
• 100 year conveyance analysis
A Conveyance Basin Exhibit is provided in the back pocket of this report.
s-i
�
6. SPECIAL REPORTS AND STUDIES
Following are the reports and studies referenced for the proposed development:
• Geotechnical Engineering Report, by Earth Solutions NW, LLC, dated September
10, 2013.(Appendix B)
• Wetland Reconnaissance Report, by The Watershed Company, dated September
30, 2013 (Appendix C)
I
6-1
. - �I
— 7. OTHER PERMITS
The National Pollutant Discharge Elimination System (NPDES) permit will be prepared with
the final construction plans.
This project also requires the following permits:
Building Permits
Clearing & Grading Permits
7-1
8. CSWPPP ANALYSIS AND DESIGN
The permanent Rylee's Place pond will be used as a temporary sediment pond during
construction. For this calculation, the tributary area is assumed to be fully built out The
total contributing area to the proposed sediment pond is the same as the developed
area,4.86 acres.
STEPS:
1.) Obtain the discharge rate for the 10-year/24 hour(15-minute)developed storm.
Total Area = 4.86 acres
Impervious Area= 2.23 acre
Penrious Area = 2.63 acres
Forest Area= 0.00 acres
�10-15min� 2•32 cfs (calculated using KCRTS)
2.) Determine the Surface Area (S�4? required at the top of the pond with 1' of
freeboard.
SA= Q�o-�5 mi� (2080)= 2.32 * 2080 = 4,826 Sf
Minimum pond surface area is 4,826 sf. (7,305 provided)
3.) Sizing the Dewatenng Mechanism:
a.) Principal Spillway(Riser Pipe)
The diameter shall be the minimum necessary to pass the pre-developed
10-year, 24-hour design storm. Use Fgure 5.3.4.H (KCSWDM)to determine
this diameter(h = one foot). �
Q,o = 0.245 cfs
Per Figure 5.3.4.H, the minimum riser diameter is 10 inches to convey this
flow rate. However, a 12" riser pipe will be used.
b.) Emergency Overflow Spillway
The emergency overflow spillway shall convey the 100 year, 15-minute
developed design storm. Minimum spillway width (W) is 6.00 feet
1) Determine minimum spillway width:
W - Q�o��s�'� _2.4H (Equation 5-3 from KCSWDM)
(3.21)(H3'2)
0100�15min�5.08 cfs (Calculated using KCRTS) ,
H = 0.50ft ,
8-t I
5.08
W = -2.4(0.5) =3.28 tr
(3.21)(0.5'�')
Use 6.0 feet for spillway width
c.) Dewatering Orifice
1.) Size the dewatering orifice (1 n minimum diameter) per the following
equation from the KCSWDM:
A��Zh�o.;
A° (0.6)(3600)(T)(g°�')
Where: Ao= orifice area (square feet)
AS= pond surface area (square feet)
H = head of water above the orifice (riser height in ft)
T= dewatering Time (T- 24 hours)
g = acceleration of gravity
(4,826)(2(4))o.s
�� A° (0.6)(3600)(24)(32.2os�
A�, =0.046sf
2J Convert Onfice Area (Ao)to Diameter(D) in inches
D= 24 �`�°�
�
D=24 r 0.0461 =2.90in
� � �
Use 3" diameter for the dewatering orifice.
Per the KCSWDM, the perforated pipe shall be a minimum of 2
inches larger than the orifice sizes.
Use 6" diameter for the perforated pipe.
4.) Sediment Pond Summary;
Basin Area- 4.86 acre
Developed Inflow 10yr/24hr(15 min) = 2.32 cfs
Developed Infiow 100yr/24hr(15 min)= 5.08 cfs
Pre-developed 10yr/24hr= 0.245 cts
Surface area required = 4,826 sf
Emergency spillway width = 6 0 ft
Refer to Appendix A for flow rate an,; ,�=
, `
9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF
COVENANT
The Site Improvement Bond Quantity Worksheet is attached following this page.
I 9-t
Site Improvement Bond Quantity Worksheet S,5 Webdate: 02/22/2013
� King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: Ryle2's Place Date: 10/24/2014
�ocac�on: 18851 120th Avenue SE Project No.: U14005653
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
yes n0
If yes,
Forest Practice Permit Number:
(RCW 76.09) I�
I
Page 1 of 9
Unit prices updated: 02/12/02
Version: 11/26/2008
li-wks-sbq.xls Report Date: 10/29/2014
— I
Site Improvement Bond Quantity Worksheet S,5 Webdate: 02/22/2013
Unit #of �
Reference# Price Unit Gluantity Applications Cost �
EROSION/SEDIMENT CONTROL Number
Backfill &compaction-embankment ESC-1 $ 5.62 CY 9000 1 50580
Check dams,4"minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each 4 1 270 '
Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY
Ditching ESC-4 $ 8.08 CY 85 1 687
Excavation-bulk ESC-5 $ 1.50 CY 7750 1 11625
Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 2100 1 2898
Fence,Temporary(NGPE) ESC-7 $ 1.38 LF
Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY 18000 1 10620
Jute Mesh ESC-9 SWDM 5.4.2.2 $ 1.45 SY
Mulch, by hand, straw, 3"deep ESC-10 SWDM 5.4.2.1 $ 2.01 SY '
Mulch, by machine, straw, 2"deep ESC-11 SWDM 5.4.2.1 $ 0.53 SY ,
Piping,temporary, CPP,6" ESC-12 $ 10.70 LF
Piping,temporary, CPP,8" ESC-13 $ 16.10 LF I
Piping,temporary, CPP, 12" ESC-14 $ 20.70 LF
Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY ��I
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 39.08 CY j
Rock Construction Entrance,50'x15'x1' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each
Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each 1 1 2929
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 1,949.38 Each 1 1 1949
Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 17.91 LF
Sed.trap,5'high,riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF
Seeding, by hand ESC-22 SWDM 5.4.2.4 $ 0.51 SY
Sodding, 1"deep, level ground ESC-23 SWDM 5.4.2.5 $ 6.03 SY
Sodding, 1"deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY
TESC Supervisor ESC-25 $ 74.75 HR
Water truck, dust control ESG26 SWDM 5.4.7 $ 97.75 HR
WRITE-IN-ITEMS *"** (see paqe 9)
Each �
ESC SUBTOTAL: $ 81,557.90 I
30%CONTINGENCY& MOBILIZATION: $ 24,467.37 �
ESC TOTAL: $ 106,025.27 i
COLUMN: A
Page 2 of 9 �
Unit prices updated: 02/12/02
Version: 11/26/2008 �
li-wks-sbq.xls Report Date: 10/29/2014 '
I
Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008
Existing Future Public Private Quantity Completed
Right-of-Way Right of Way Improvements (Bond Reduction)'
8�Draina e Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
GENERAL ITEMS No.
Backfill&Compaction-embankment GI-1 $ 5.62 CY 9000 50,580.00
Backfill&Compaction-trench GI-2 $ 8.53 CY
Clear/Remove Brush,b hand GI-3 $ 0.36 SY
Clearin /Grubbin /Tree Removal GI-4 $ 8,876.16 Acre 4.61 40,919.10
Excavation-bulk GI-5 $ 1.50 CY 7750 11,625.00
Excavation-Trench GI-6 $ 4.06 CY
Fencin ,cedar,6'hi h GI-7 $ 18.55 LF
Fencin ,chain link,vin I coated, 6'hi h GI-8 $ 13.44 LF 460 6,182.40
Fencin ,chain link, ate,vinyl coated, 2 GI-9 $ 1,271.81 Each 1 1,271.81
Fencin ,split rail,3'hi h GI-10 $ 12.12 LF
Fill 8 compact-common barrow GI-11 $ 22.57 CY
Fill&compact- ravel base GI-12 $ 25.48 CY
Fill&compact-screened topsoil GI-13 $ 37.85 CY
Gabion, 12"deep,stone filled mesh GI-14 $ 54.31 SY
Gabion, 18"dee ,stone filled mesh GI-15 $ 74.85 SY
Gabion,36"deep,stone filled mesh GI-16 $ 132.48 SY
Gradin ,fine,b hand GI-17 $ 2.02 SY
Gradin ,fine,with rader GI-18 $ 0.95 SY 1000 950.00 22000 20,900.00
Monuments,3'lon GI-19 $ 135.13 Each 1 135.13 5 675.65
Sensitive Areas Si n GI-20 $ 2.88 Each
Soddin , 1"deep,sloped round GI-21 $ 7.46 SY
Surve in ,line 8 rade GI-22 $ 788.26 Da
Surve in ,lot location/lines GI-23 $ 1,556.64 Acre
Traffic control crew 2 fla ers) GI-24 $ 85.18 HR
Trail,4"chipped wood GI-25 $ 7.59 SY
Trail,4"crushed cinder GI-26 $ 8.33 SY
Trail,4"top course GI-27 $ 8.19 SY
Wall,retainin ,concrete GI-28 $ 44.16 SF 1500 66,240.00
Wall,rockery GI-29 $ 9.49 SF 1100 10,439.00
Page 3 of 9 SUBTOTAL 1,085.13 208.832.96
Unit prices updated: 02/12/02 �I
'KCC 27A authorizes only one bond reduction. VerS1011: 11/26/08 ��
ii-wks-sbq.xis Report Date: 10/29/2014 �
I
Site Improvement Bond Quantity Worksheet Webdate 12/02/2008
Existing Future Public Private Bond Reduction•
Right-of-way Right of Way Improvements ,
8 Dreinage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Com lete Cost
ROADIMPROVEMENT No.
AC Grindin ,4'wide machine<1000s RI-1 $ 28.00 SY
AC Grindin ,4'wide machine 1000-200 RI-2 $ 15.00 SY �
AC Grindin ,4'wide machine>2000s RI-3 $ 7.00 SY '
AC RemovallDisposal/Re air RI-4 $ 67.50 SY
Barricade,t pe I RI-5 $ 30.03 LF
Barricade,type III(Permanent RI-6 $ 45.05 LF
Curb&Gutter,rolled RI-7 $ 17.00 LF
Curb&Gutter,vertical RI-8 $ 12.50 LF 300 3,750.00 1150 14,375.00
Curb and Gutter,demolition and disposa RI-9 $ 18.00 LF I
Curb,extruded as halt RI-10 $ 5.50 LF
Curb,extruded concrete RI-11 $ 7.00 LF
Sawcut,asphalt.3"depth RI-12 $ 1.85 LF 300 555.00
Sawcut,concrete,per 1"de th RI-13 $ 1.69 LF
Sealant,as halt RI-14 $ 1.25 LF I
Shoulder,AG see AC road unit price RI-15 $ - SY �
Shoulder, ravel,4"thick RI-16 $ 15.00 SY
Sidewalk,4"thick RI-17 $ 35.00 SY 170 5,950.00 650 22,750.00
Sidewalk,4"thick,demolition and dispos RI-18 $ 29.50 SY
Sidewalk,5"thick RI-19 $ 38.50 SY
Sidewalk,5"thick,demolition and dis os RI-20 $ 37.50 SY
Si n,handica RI-21 $ 85.28 Each
Stri in , er stall RI-22 $ 5.82 Each
Stripin ,thermoplastic, for crosswalk RI-23 $ 2.38 SF
Striping,4"reflectorized line RI-24 $ 0.25 LF
Page 4 of 9 SUBTOTAL 10,255.00 37,125.00 '
Unit prices updated: 02/12/02
`KCC 27A authorizes only one bond reduction. Vefslon: 11/26/08
li-wks-sbq.xls Report Date: 10/29/2014
Site Improvement Bond Quantity Worksheet Webdate: 1 210 2/2 008
Existing Future Public Private Bond Reduction*
Right-of-way Right of Way Improvements
&Draina e Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost QuanL Cost Complete Cost
ROAD SURFACING (4"Rock=2.5 base&1.5"top course) For'93 KCRS(6.5"Rock=5"base 8 1.5"top course)
For KCRS'93, additional 2.5"base)add RS-1 $ 3.60 SY
AC Overlay,1.5"AC RS-2 $ 11.25 SY
AC Overla ,2"AC RS-3 $ 15.00 SY
AC Road,2",4"rock,First 2500 SY RS-4 $ 21.00 SY
AC Road,2",4"rock,Qt .over 2500SY RS-5 $ 19.00 SY
AC Road,3",4"rock,First 2500 SY RS-6 $ 23.30 SY
AC Road,3",4"rock,Qt .over 2500 SY RS-7 $ 21.00 SY
AC Road,5",First 2500 SY RS-8 $ 27.60 SY 500 13,800.00 1600 44,160.00
AC Road,5",Qty.Over 2500 SY RS-9 $ 25.00 SY
AC Road,6",First 2500 SY RS-1 $ 33.�0 SY
AC Road,6",Qty.Over 2500 SY RS-11 $ 30.00 SY
As halt Treated Base,4"thick RS-1 $ 20.00 SY
Gravel Road,4"rock,First 2500 SY RS-1 $ 15.00 SY
Gravel Road,4"rock,Qt .over 2500 SY RS-1 $ 8.50 SY
PCC Road,5",no base,over 2500 SY RS-1 $ 27.00 SY
PCC Road, 6",no base,over 2500 SY RS-1 $ 25.50 SY
Thickened Edge RS-1 $ 8.60 LF
Page 5 of 9 SUBTOTAL 13,800.00 44,160.00
Unit prices updated: 02/12/02
`KCC 27A authorizes only one bond reduction. Vefslon: 11/26/08
li-wks-sbq.xls Report Date: 10/29/2014
_ �
Site Improvement Bond Quantity Worksheet Webdate 12IO2/2008
Existing Future Public Private Bond Reduction•
Right-of-way Right of Way Improvements
8 Dreina e Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
DRAINAGE (CPP=Corrugated PlastiC Pipe,N12 or Equivalent) For Culvert prices, Average of 4'cover was assumed.Assume perforated PVC is same price as solid pipe.
Access Road,R/D D-1 $ 21.00 SY 200 4,200.00
Bollards-fixed D-2 $ 240.74 Each
Bollards-removable D-3 $ 452.34 Each
'(CBs include frame and lid)
CB T e I D-4 $ 1,257.64 Each 1 1,257.64 8 10,061.12
CB T e IL D-5 $ 1,433.59 Each
CB T e II,48"diameter D-6 $ 2,033.57 Each 5 10,167.85 5 10,167.85
for additional depth over 4' D-7 $ 436.52 FT
CB T pe II,54"diameter D-8 $ 2,192.54 Each 1 2,192.54
for additional depth over 4' D-9 $ 486.53 FT
CB T pe II,60"diameter D-10 $ 2,351.52 Each
for additional depth over 4' D-11 $ 536.54 FT
CB T pe II,72"diameter D-12 $ 3,212.64 Each
for additional de th over 4' D-13 $ 692.21 FT
Throu h-curb Inlet Framework(Add D-14 $ 366.09 Each 4 1,464.36
Cleanout,PVC,4" D-15 $ 130.55 Each
Cleanout,PVC,6" D-16 $ 174.90 Each 20 3,498.00
Cleanout,PVC,8" D-17 $ 224.�9 Each
Culvert,PVC,4" D-18 $ 8.64 LF
Culvert,PVC,6" D-19 $ 12.60 LF 820 10,332.00
Culvert,PVC, 8" D-20 $ 13.33 LF
Culvert,PVC, 12" D-21 $ 21.77 LF
Culvert,CMP,8" D-22 $ 17.25 LF
Culvert,CMP,12" D-23 $ 26.45 LF 30 793.50 355 9,389.75
Culvert,CMP,15" D-24 $ 32.73 LF
Culvert,CMP,18" D-25 $ 37.74 LF 515 19,436.10 280 10,567.20
Culvert,CMP,24" D-26 $ 53.33 LF i
Culvert,CMP,30" D-27 $ 71.45 LF �
Culvert,CMP,36" D-28 $ 112.�1 LF I
Culvert,CMP,48" D-29 $ 140.83 LF �i
Culvert,CMP,60" D-30 $ 235.45 LF I
Culvert,CMP,72" D-31 $ 302.58 LF
Page 6 of 9 SUBTOTAL 31,655.09 61,872.82
Unit prices updated: 02/12/02
"KCC 27A authorizes only one bond reduction. Ve�sion: 11/26/08
i�-wks-shq xi� Report Date: 10/29/2014
Site Improvement Bond Quantity Worksheet Webdate: 12102/2008
Existing Future Public Private Bond Reduction'
Right-of-way Right of Way Improvements
DRAINAGE CONTINUED 8 Drainage Facflities Quant.
No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
Culvert,Concrete,8" D-32 $ 21.02 LF
Culvert,Concrete, 12" D-33 $ 30.05 LF
Culvert,Concrete, 15" D-34 $ 37.34 LF
Culvert,Concrete, 18" D-35 $ 44.51 LF
Culvert,Concrete,24" D-36 $ 61.07 LF
Culvert,Concrete,30" D-37 $ 104.�8 LF
Culvert,Concrete,36" D-38 $ 137.63 LF
Culvert,Concrete,42" D-39 $ 158.42 LF
Culvert,Concrete,48" D-40 $ 175.94 LF
Culvert,CPP,6" D-41 $ 10.70 LF
Culvert,CPP,8" D-42 $ 16.10 LF
CulveR,CPP. 12" D-43 $ 20.70 LF
Culvert,CPP, 15" D-44 $ 23.00 LF
Culvert,CPP. 18" D-45 $ 27.60 LF
CulveR,CPP,24" D-46 $ 36.80 LF
Culvert,CPP,30" D-47 $ 48.30 LF
Culvert,CPP,36" D-48 $ 55.20 LF
Ditchin D-49 $ 8.08 CY
Flow Dispersal Trench 1,436 base+ D-50 $ 25.99 LF
French Drain 3'depth D-51 $ 22.60 LF
Geotextile,laid in trench,pol pro lene D-52 $ 2.40 SY
Infiltration pond testin D-53 $ 74.75 HR
Mid-tank Access Riser,48"dia, 6'deep D-54 $ 1,605.40 Each
Pond Overflow S illwa D-55 $ 14.01 SY
Restrictor/Oil Separator,12" D-56 $ 1,045.19 Each
Restrictor/Oil Separator, 15" D-57 $ 1,095.56 Each
Restrictor/Oil Separator,18" D-58 $ 1,146.16 Each
Riprap,placed D-59 $ 39.08 CY 10 390.8
Tank End Reducer 36"diameter D-60 $ 1,000.50 Each
Trash Rack,12" D-61 $ 211.97 Each
Trash Rack,15" D-62 $ 237.27 Each
Trash Rack,18" D-63 $ 268.89 Each
Trash Rack,21" D-64 $ 306.84 Each
Page 7 of 9 SUBTOTAL 390.8
Unit prices updated: 02/12/02
'KCC 27A authorizes only one bond reduction. Version: 11/26I08
li-wks-sbq.xls Report Date: 10/29/2014
Site Improvement Bond Quantity Worksheet Webdate 12102I200a
Existing Future Public Private Bond Reduction`
Right-of-way Right of Way Improvements
8 Draina e Facilities Quant.
Unit Price Unit Quant. Price Quant. Cost Quant. Cost Complete Cost
PARKING LOT SURFACING
No.
2"AC,2"top course rock&4"borrow PL-1 $ 21.00 SY
2"AC, 1.5" top course 8 2.5"base cou PL-2 $ 28.00 SY
4"select borrow PL-3 $ 4.55 SY
1.5"to course rock&2.5"base course PL-4 $ 11.41 SY
UTILITY POLES 8� STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Statement
Utilit Pole s)Relocation UP-1 Lump Sum
Street Li ht Poles w/Luminaires UP-2 $ 2,000.00 Each 3 6,000.00 9 18,000.00
WRITE-IN-ITEMS �
(Such as detention/water uali vaults.) No� II
W I-1 Each �
WI-2 SY
WI-3 CY
WI-4 LF
WI-5 FT
WI-6
WI-7
WI-8 �
WI-9
wi-i0
SUBTOTAL 6,000.00 18,000.00 I
SUBTOTAL(SUM ALL PAGES): 62,795.22 370,381.58 I
30%CONTINGENCY 8 MOBILIZATION: 18,838.57 111,114.47
G RAN DTOTAL: 81,633.79 481,496.05
COLUMN: B C D E
Page 8 of 9
Unit prices updated: 02/12/02
'KCC 27A authorizes only one bond reduction. Version: 1 1/26/08
li-wks-sbq.xls Rep�rt I�ate� 10/29/2014
Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008
Original bond computations prepared by:
Name: Laura Bartenhagen oace: 10/24/2014
PE Registration Number: 40111 Tel.#: (253)838-6113
F�rm Name: ESM Consulting Engineers, LLC
a,ddress: 33400 8th Avenue South, Suite 205 Pro)ect No: U14005653
ROAD IMPROVEMENTS&DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND' PUBLIC ROAD 8 DRAINAGE
AMOUNT BOND'AMOUNT MAINTENANCE/DEFECT BOND'
REQUIRED AT RECORDING OR
Stabilization/Erosion Sediment Control(ESC) (A) $ 106,025.3 TEMPORARY OCCUPANCY"`
Existing Right-of-Way Improvements (B) $ -
Future Public Right of Way 8�Drainage Facilities (C) $ 81,633.8
Private Improvements (D) $ 481,496.1
Calculated Quantity Completed (E) $ -
Total Right-of Way and/or Site Restoration Bond'/" (A+B) $ 106,025.3
(First$7,500 of bond"shall be cash.)
Performance Bond'Amount (A+B+C+D) = TOTAL (T) $ 669,155.1 T x 0.30 $ 200,746.5 OR
inimum on amount is . ,
Reduced Performance Bond"Total"' (T-E) $ 669,155.1 II
Use larger o x a or - �B+C)x
Maintenance/Defect Bond'Total 0.25 = $ 20,408.4
NAME OF PERSON PREPARING BOND'REDUCTION: Date:
'NOTE: The word"bond"as used in this document means a financial guarantee acceptable to King County.
" NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum,not a maximum. In addition,corrective work,both on-and off-site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example,if a salmonid stream may be damaged,some estimated costs for restoration
needs to be reflected in this amount. The 30%contingency and mobilization costs are computed in this quantity.
�"NOTE: Per KCC 27A,total bond amounts remaining after reduction shall not be less than 30%of the original amount(T)or as revised by major design changes.
REQUIRED BOND'AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES
Page 9 of 9 Unit prices updated: 02/12/02
Check out the DDES Web site at www.kin_qcountv.qov/permits Version: 11/26/08
li-wks-sbq.xls Report Date: 10/29/2014
10. OPERATIONS AND MAINTENANCE MANUAL
The Operations and Maintenance Manual is provided in Appendix D.
�o-t
APPENDIX A
KCRTS Pond Sizing Output
Rvlee's Place KCRTS Outnut
Pre-Developed Land Use Condition
5.15 C.00 C.000000 Till Forest
O.CO 0.00 C.000000 Till Pasture
0.00 0.00 0.000000 Till Grass
0.00 0.00 0.000000 Outwash Forest
0.00 0.00 0.000000 Outwash Pasture
0.00 0.00 0.000000 Outwash Grass
0.00 0.00 0.000000 Wetland
0.00 0.00 0.000000 Impervious
predev.tsf
ST 1.000000
Flow Frequency Analysis LogPearson III Coefficients
Time Series File:predev.tsf Mean= -0.905 StdDev= 0.233
Project Location:Sea-Tac Skew= -0.144
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.153 16 2/16/49 22:00 0.346 1 89.50 0.989
0.298 5 3/03/50 16:00 0.327 2 32.13 0.969
0.327 2 2/09/51 18:00 0.310 3 19.58 0.999
0.103 32 1/30/52 9:00 0.303 4 19.08 0.929
0.079 42 1/18/53 19:�0 0.298 5 10.99 0.909
0.115 26 1/06/59 5:00 0.252 6 9.01 0.889
0.203 9 2/07/55 21:00 0.293 7 7.64 0.869
0.173 13 12/20/55 17:00 0.219 8 6.63 0.849
0.135 21 12/09/56 15:00 0.203 9 5.86 O.H29
0.143 20 1/16/58 20:00 0.203 10 5.29 0.809
0.118 24 1/24/59 2:00 0.201 11 9.�5 0.789
0.219 8 11/20/59 21:00 0.175 12 9.34 0.769
0.119 23 2/29/61 15:00 0.173 13 3.99 0.749
0.071 44 1/03/62 2:00 0.169 14 3.70 0.729
0.099 36 11/25/62 19:00 0.158 15 3.94 0.70G �
0.117 25 1/O1/64 18:00 0.153 16 3.22 0.69C
0.083 40 11/30/64 12:00 0.151 17 3.03 0.67�
0.090 38 1/06/66 3:00 0.151 18 2.85 0.65�
0.201 11 1/19/67 19:00 0.197 19 2.70 0.63C
0.119 22 2/03/66 23:00 0.193 20 2.56 0.61C �'
0.116 27 12/03/68 17:00 0.135 21 2.99 0.590 �I
0.099 34 1/13/70 23:00 0.119 22 2.32 0.57C j
0.080 41 12/06/70 8:00 0.119 23 2.22 0.55C
0.243 7 2/28/72 3:00 0.118 29 2.13 0.53�
0.108 29 1/13/73 5:00 0.117 25 2.04 0.51�
0.117 26 1/15/74 2:00 0.117 26 1.96 0.990
0.175 12 12/26/74 23:00 0.116 27 1.89 0.47C
0.108 30 12/03/75 17:00 0.115 28 1.82 0.45C
0.012 50 3/24/77 20:00 0.108 29 1.75 0.43C
0.093 37 12/10/77 17:00 0.108 30 1.70 0.91,_
0.056 96 2/12/79 8:00 0.105 31 1.64 0.39i_
0.151 18 12/15/79 8:00 0.103 32 1.59 0.3-G
0.083 39 12/26/80 4:00 0.101 33 1.54 0.35(!
0.151 17 10/06/81 15:00 0.099 34 1.49 0.330
0.147 19 1/05/83 8:00 0.098 35 1.45 0.310
0.098 35 1/29/84 11:00 0.099 36 1.41 0.251
0.097 48 2/11/85 6:00 0.093 37 1.37 0.271
0.252 6 1/18/86 21:00 0.090 38 1.33 0.251
0.203 10 11/29/86 4:00 0.083 39 1.30 0.231
0.077 43 1/19/88 13:00 0.083 40 1.27 0.211
0.049 47 4/05/89 i6:00 0.080 91 1.24 0.191
c.s�6 i 1��5iso ::oo o.��a �z ,.�= o.,�i
0.303 9 4/05/91 2:00 0.077 43 1.18 0.151
0.101 33 1/27/92 1�:00 0.071 49 1.15 0.131
0.105 31 3/23/93 0:00 0.059 95 1.12 0.111
0.029 49 3/03/94 9:00 0.056 96 1.10 0.091
0.158 15 2/19/95 20:00 0.049 97 1.08 0.071
0.310 3 2/09/96 1:00 0.047 98 1.05 0.051
0.169 19 1/02/97 9:00 0.029 99 1.03 0.031
0.059 45 1/07/98 11:00 0.012 50 1.01 0.011
Computed Peaks 0.910 100.00 0.950
Computed Peaks 0.360 50.00 0.980
Computed Peaks 0.310 25.00 0.96G
Computed Peaks 0.295 10.00 0.900
Computed Peaks 0.232 8.00 0.87�
Computed Peaks 0.196 5.00 0.800
Computed Peaks 0.126 2.OQ 0.500
Computed Peaks 0.083 1.30 0.�3�
Developed Land Use Condition
C.00 0.00 C.00GC00 Till FGrest
0.00 0.00 0.000000 Till Pasture
2.63 0.00 0.000000 Till Grass
0.00 0.00 0.000000 Outwash Forest
0.00 0.00 0.000000 Outwash Pasture
0.00 0.00 0.000000 Outwash Grass
0.00 0.00 0.000000 Wetland
2.23 0.00 0.000000 Impervious
dev.tsf
ST 1.000000
Flow Frequency Analysis LogPearson III Coefficients
Time Series File:dev.tsf Mean= -0.136 StdDev= 0.121
Project Location:Sea-Tac Skew= 0.900
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.765 20 2/16/99 21:00 1.94 1 89.50 0.989
1.39 2 3/03/50 16:00 1.39 2 32.13 0.969
0.810 19 2/09/51 2:00 1.29 3 19.58 0.999
0.566 42 10/15/51 13:00 1.21 9 19.08 0.929
0.565 43 3/24/53 15:00 1.02 5 10.99 0.9Gu
0.704 26 12/19/53 19:00 1.01 6 9.01 0.85°
0.713 29 11/25/54 2:00 0.992 7 �.69 0.869
0.708 25 12/20/55 17:00 0.966 8 6.63 0.849
0.860 13 12/09/56 19:00 0.935 9 5.86 0.629
0.739 22 12/25/57 16:00 0.920 10 5.29 0.809
0.538 96 11/18/58 13:00 0.887 11 4.75 0.789
0.720 23 11/20/59 5:00 0.873 12 4.34 0.769
0.639 34 2/19/61 21:00 0.860 13 3.99 0.749
0.604 39 11/22/61 2:00 0.857 19 3.70 0.729
0.638 33 12/15/62 2:00 0.855 15 3.94 0.709
0.698 27 12/31/63 23:00 0.892 16 3.22 0.690
0.620 37 12/21/64 9:00 0.829 17 3.03 0.6�0
0.633 35 1/05/66 16:00 0.821 18 2.85 0.650
0.966 8 11/13/66 19:00 0.810 19 2.70 0.630
1.02 5 8/24/68 16:00 0.765 20 2.56 0.610
0.580 91 12/03/68 16:00 0.743 21 2.49 0.590
0.640 32 1/13/70 22:00 0.739 22 2.32 0.570
0.620 38 12/06/70 8:00 0.720 23 2.22 0.550
l.�l c �, � , .� �:CC �. _� �_ �.13 0.530
G.556 44 1/13/73 2:00 0.708 25 2.04 0.510
0.697 28 11/28/73 9:00 0.709 26 1.96 0.45G I
0.935 9 12/26/74 23:00 0.698 27 1.89 0.9?0 '
0.583 40 12/02/75 20:00 0.697 28 1.82 0.950
0.630 36 8/26/77 2:00 0.683 29 1.75 0.930
0.687 11 9/22/78 19:00 0.660 30 1.�0 0.91�
0.743 21 9/08/79 15:00 0.693 31 1.69 0.39C '
0.842 16 12/14/79 21:00 0.640 32 1.59 0.3?�
0.857 19 11/21/80 11:00 0.638 33 1.59 0.3��
1.21 4 10/06/81 0:00 0.639 34 1.99 0.33�
�.821 18 10/28/82 16:00 0.633 35 1.45 0.310
0.683 29 1/03/84 1:00 0.630 36 1.91 0.291
0.554 95 6/06/85 22:00 0.620 37 1.37 0.2�1 �
0.855 15 1/18/86 16:00 0.620 38 1.33 0.251 '
0.992 7 10/26/86 0:00 0.604 39 1.30 0.231 '
0.930 49 1/14/88 0:00 0.583 40 1.27 0.211
0.534 47 8/21/89 17:00 0.560 91 1.29 0.191
1.49 1 1/09/90 6:00 0.566 92 1.21 0.171
1.29 3 11/24/90 8:00 0.565 93 1.18 0.151
C.660 30 1/27/92 15:00 0.556 99 1.15 0.131
�.401 50 12/10/92 6:00 0.559 95 1.12 0.111
�.466 98 11/30/93 22:00 0.538 96 1.10 0.091
0.693 31 11/30/94 9:00 0.539 97 1.08 0.071
0.920 10 2/08/96 10:00 0.966 98 1.05 0.051
0.824 17 1/02/97 6:00 0.430 99 1.03 0.031
0.873 12 10/09/97 15:00 0.401 50 1.01 0.011
�omputed Peaks 1.52 100.00 0.990
�omputed Peaks 1.38 50.00 0.980
�omputed Peaks 1.24 25.00 0.960
�omputed Peaks 1.06 10.00 0.900
Computed Peaks 1.02 8.00 0.875
Computed Peaks 0.919 5.00 0.800
Computed Peaks 0.719 2.00 0.500
Computed Peaks 0.590 1.30 0.231
15 Minute Flow Frequency Analysis
Fiow Frequency Analys�s LogPearson III Coefficients
Time Series File:devl5.tsf Mean= 0.139 StdDev= 0.179
�roject Location:Sea-Tac Skew= 1.428
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
rlow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
1.97 9 2/16/95 17:95 5.88 1 89.50 0.989
2.72 5 3/03/50 15:00 3.92 2 32.13 0.969
1.05 38 10/08/50 4:15 2.98 3 19.58 0.999
1.30 25 10/17/51 7:15 2.79 9 19.08 0.929
0.908 95 9/30/53 3:00 2.72 5 10.99 0.909
1.08 35 12/19/53 17:30 2.08 6 9.01 0.869
r�,ggl 46 il/25/54 1:00 2.08 7 7.69 0.869
�.29 27 10/09/55 10:00 2.09 8 6.63 0.849
1.37 19 12/09/56 12:45 1.97 9 5.86 0.829
1.23 31 1/16/58 10:00 1.61 10 5.29 0.809
1.50 19 10/18/58 19:95 1.57 11 4.75 0.789
1.57 11 10/10/59 22:00 1.56 12 4.39 0.769
1.39 21 2/14/61 20:15 1.53 13 3.99 0.749
1.03 90 8/04/62 13:15 1.50 14 3.70 0.729
1.06 36 12/O1/62 20:15 1.95 15 3.44 0.709 �
G.?95 99 6/05/69 15:00 1.93 16 3.22 0.690 '
1.27 28 4/20/65 19:30 1.39 1� 3.03 0.670 '
0.823 98 1/�5%60' 15:00 _.38 18 �.85 O.ESG I
;.9� "_5 il%"_3/6n 1?:95 l.s? 1: �.�0 0.630
2.98 3 8/24/68 15:00 1.39 20 2.56 0.610
1.27 29 10/20/68 12:00 1.34 21 2.94 0.590
0.757 50 1/13/70 20:95 1.34 22 2.32 0.570
0.921 43 12/06/70 7:00 1.33 23 2.22 0.550
2.09 8 12/08/71 17:15 1.31 29 2.13 0.530
1.05 37 9/18/73 9:30 1.30 25 2.04 0.510
1.39 20 11/28/73 8:00 1.30 26 1.96 0.990
1.33 23 8/17/75 23:00 1.29 27 1.89 0.970
0.977 92 10/29/75 7:00 1.27 28 1.82 0.450
0.838 97 8/26/77 1:00 1.27 29 1.75 0.930
1.53 13 9/17/78 1:00 1.24 30 1.70 0.910
2.08 6 9/08/79 13:95 1.23 31 1.69 0.390
1.61 10 12/14/79 20:00 1.22 32 1.59 0.370
1.39 17 9/21/B1 8:00 1.19 33 1.54 0.350
3.42 2 10/05/81 22:15 1.09 34 1.99 0.330
1.31 24 10/28/82 16:00 1.08 35 1.95 0.310
1.03 39 1/02/89 23:95 1.06 36 1.91 0.291
0.921 49 6/06/85 21:15 1.05 37 1.37 0.271
1.38 18 10/27/85 10:95 1.05 38 1.33 0.251
1.56 12 10/25/86 22:95 1.03 39 1.30 0.231
1.22 32 5/13/88 17:30 1.03 40 1.27 0.211
1.19 33 8/21/89 16:00 1.01 41 1.24 0.191
2.08 7 1/09/90 5:30 0.977 42 1.21 0.171
1.39 22 4/03/91 20:15 0.921 43 1.18 0.151
1.01 91 1/27/92 15:00 0.921 99 1.15 0.131
1.24 30 6/09/93 12:15 0.908 95 1.12 0.111
1.09 34 11/17/93 16:45 0.881 96 1.10 0.091
1.30 26 6/05/95 17:00 0.838 47 1.08 0.071
1.93 16 5/19/96 11:30 0.823 98 1.05 0.05=
5.88 1 12/29/96 11:45 0.795 99 1.03 0.03=
2.79 9 10/04/57 19:15 0.757 50 1.01 0.01:
Computed Peaks 5.08 100.00 0.99u
Computed Peaks 4.09 50.00 0.980
Computed Peaks 3.20 25.00 0.960
Computed Peaks 2.32 10.00 0.900
Computed Peaks 2.18 8.00 0.875
Computed Peaks 1.80 5.00 0.800
Computed Peaks 1.29 2.00 0.500
Ccmputed Peaks �:.00 1.30 0.231
Bypass Land Use Condition
0.00 0.00 O.��UOOC Til��� Forest
0.00 0.00 0.000000 Till Pasture
0.08 0.00 0.000000 Till Grass
0.00 0.00 0.000000 Outwash Eorest
0.00 0.00 0.000000 Outwash Pasture
0.00 0.00 0.000000 Outwash Grass
0.00 0.00 0.000000 Wetland
0.21 0.00 0.000000 ImpervioLs
dev.tsf
ST 1.000000
Flow Frequer.c, Analysis LoqFearson =II Ceef_"cients
Time Series File:bypass.tsf Mean= -1.231 StdDev= 0.109
Project Location:Sea-Tac Skew= 0.475
---Annual Peak Flow Rates--- -----Flow Erequency Analysis-------
Elow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.060 21 2/16/4° 21:00 0.102 1 89.50 0.989
0.�9� _ 310�.��0 -6:����J 0.�5� _ ��. _3 0.5'c�
u.��o �� � ���,-si _:�o .,.oG� � iu.ss �.�9G
0.049 40 10/15/51 13:00 0.094 9 14.08 0.92°
0.046 93 3/29/53 15:00 0.085 5 10.99 0.909
0.056 27 12/19/53 19:00 0.084 6 9.01 0.889
0.058 23 11/25/54 2:00 0.077 7 7.69 O.SE9
0.057 24 11/18/55 15:00 0.076 8 6.63 0.849
0.066 15 12/09/56 14:00 0.079 9 5.86 0.829
0.059 22 12/25/57 16:00 0.070 10 5.29 0.8C9
0.044 47 11/18/58 13:00 0.069 11 4.75 0.789
0.056 25 11/20/59 5:00 0.069 12 9.34 0.76°
0.050 36 2/19/61 21:00 0.068 13 3.99 0.'795
�.050 37 11/22/61 2:00 0.067 19 3.70 0.729
0.050 39 12/15/62 2:00 0.066 15 3.49 0.709
0.056 26 12/31/63 23:00 0.066 16 3.22 0.690
0.051 34 12/21/69 9:00 0.065 17 3.03 0.6�C
0.051 35 1/05/66 16:00 0.069 18 2.65 0.650
0.077 7 11/13/66 19:00 0.063 19 2.70 0.630
0.084 6 8/24/68 16:00 0.060 20 2.56 0.610
�.046 99 12/03/68 16:00 0.060 21 2.44 0.590
0.051 33 1/13/70 22:00 0.059 22 2.32 0.570 i
0.099 91 12/05/70 9:00 0.058 23 2.22 0.550
0.074 9 2/27/72 7:00 0.057 24 2.13 0.530
0.095 96 1/13/73 2:00 0.056 25 2.09 0.510
0.053 30 11/28/73 9:00 0.056 26 1.96 0.990
0.070 10 12/2E/79 23:00 0.056 27 1.89 0.970
�.046 45 12/02/75 20:00 0.055 28 1.82 0.450
�.055 28 8/26/77 2:00 0.054 29 1.75 0.930
0.0�6 8 9/17/78 2:00 0.053 30 1.70 0.410
0.067 14 9/08/79 15:00 0.053 31 1.69 0.390
u.065 17 12/14/79 21:00 0.053 32 1.59 0.370
U.069 11 11/21/80 11:00 0.051 33 1.59 0.350
0.095 3 10/06/B1 0:00 0.051 34 1.99 0.330
0.069 12 10/28/82 16:00 0.051 35 1.95 0.310
0.054 29 1/03/89 1:00 0.050 36 1.91 0.291
0.096 92 6/06/85 22:00 0.050 37 1.37 0.2?1
0.069 18 1/18/86 16:00 0.050 38 1.33 0.251
0.085 5 10/26/86 0:00 0.050 39 1.30 0.231
0.039 49 11/11/87 0:00 0.049 90 1.2� 0.211
0.050 38 8/21/89 17:00 0.049 91 1.29 0.191
0.102 1 1/09/90 6:00 0.048 92 1.21 0.171
0.099 9 11/24/90 8:00 0.046 93 1.18 0.151
0.053 32 1/27/92 15:00 0.046 44 1.15 0.131
�.036 50 11/O1/92 16:00 0.096 45 1.12 0.111
0.091 98 11/30/93 22:00 0.095 46 1.10 0.091
0.053 31 11/30/94 9:00 0.049 47 1.08 0.071
0.066 16 2/08/96 10:00 0.091 98 1.05 0.051
0.063 19 1/02/97 6:00 0.039 99 1.03 0.031
0.068 13 10/04/97 15:00 0.036 50 1.01 0.011
CoT:puted Peaks 0.111 100.00 0.990
Computed Peaks 0.102 50.00 0.980
Computed Peaks 0.093 25.00 0.960
Computed Peaks 0.081 10.00 0.900
Computed Peaks 0.078 8.00 0.875
Computed Peaks 0.071 5.00 0.800
Computed Peaks 0.058 2.00 0.500
Computed Peaks 0.049 1.30 0.231
Detention Pond Facility
Retention/Detention Facility
Type of Facility: Detention Pond
Side Slope: 2.00 H:lV
Pond Bottom Length: 154.00 ft
Pond Bottom Width: 45.00 ft
Pond Bottom Area: 6930. sq. ft
Top Area at 1 ft. FB: 13032. sq. `t
0.299 acres
Effective Storage Depth: 5.75 ft
Stage 0 Elevation: 0.00 ft
Storage Volume: 59020. cu. _`_
1.290 ac-�t
Riser Head: 5.75 ft '
Riser Diameter: 18.00 inches
Number of orifices: 3
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 1.00 0.065
2 9.30 2.13 0.147 6.0
3 9.75 1.88 0.095 9.0
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolatior. Surf Area �
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) (sq. ft)
0.00 0.00 0. 0.000 0.000 0.00 6930.
0.01 0.01 69. 0.002 0.003 0.00 6938.
0.02 0.02 139. 0.003 0.004 0.00 6996.
0.03 0.03 208. 0.005 0.005 0.00 6954.
0.04 0.04 278. 0.006 0.006 0.00 6962.
0.05 0.05 398. 0.008 0.006 0.00 6970.
0.06 O.OE 917. 0.010 0.007 0.00 6978.
0.07 0.07 987. 0.011 0.007 0.00 6986.
0.08 0.08 557. 0.013 0.008 0.00 6999.
0.09 0.09 627. 0.014 0.008 0.00 7002.
0.21 0.21 1973. 0.039 0.012 0.00 7096.
0.32 0.32 2259. 0.052 0.015 0.00 7186.
0.43 0.93 3054. 0.070 0.018 0.00 7275.
0.59 0.59 3859. 0.089 0.020 0.00 7365.
0.66 0.66 9749. 0.109 0.022 0.00 �962.
0.77 0.77 5575. 0.128 0.029 0.00 �552.
0.69 0.88 6410. 0.197 0.025 0.00 7643.
1.00 1.00 7333. 0.168 0.027 0.00 7742.
1.11 1.11 8190. 0.188 0.029 0.00 7833.
1.22 1.22 9057. 0.208 0.030 0.00 7925.
1.33 1.33 9939. 0.228 0.031 0.00 8017.
1.95 1.95 10902. 0.250 0.033 0.00 8118.
1.56 1.56 11800. 0.271 0.034 0.00 8211.
1.67 1.67 12708. 0.292 0.035 0.00 8304.
1.78 1.78 13627. 0.313 0.036 0.00 8398.
1.90 1.90 14690. 0.336 0.037 0.00 8500.
2.01 2.01 15581. 0.358 0.038 0.00 8595.
2.12 2.12 16531. 0.380 0.040 0.00 8689.
2.24 2.24 17580. 0.904 0.041 0.00 8793.
2.35 2.35 18553. 0.926 0.042 0.00 8889.
2.46 2.96 19536. 0.948 0.043 0.00 8985.
2.57 2.57 20529. 0.471 0.049 0.00 9081.
2.69 2.69 21625. 0.996 0.044 0.00 9187.
2.80 2.60 22691. 0.520 0.045 0.00 9284.
2.91 2.91 23668. 0.543 0.046 0.00 9382.
3.03 3.03 24800. 0.569 0.097 0.00 9989.
3.19 3.14 25849. 0.593 0.098 0.00 9567.
3.25 3.25 26909. 0.618 0.099 0.00 9686.
3.36 3.36 27980. 0.642 0.050 0.00 9785.
3.98 3.98 29161. 0.669 0.051 0.00 9899. �
3.59 3.59 30255. 0.695 0.051 0.00 9999. ��
3.70 3.70 31360. 0.720 0.052 0.00 10099.
3.81 3.81 32476. 0.796 0.053 0.00 10195.
3.93 3.93 33706. 0.7�9 0.059 0.00 10305.
9.09 4.04 39895. 0.800 0.055 0.00 10407.
9.15 4.15 35995. 0.826 0.055 0.00 10509.
4.27 4.27 37263. 0.855 0.056 0.00 10621.
4.30 9.30 37582. 0.863 0.056 0.00 10699.
4.32 9.32 37795. 0.868 0.057 0.00 10667.
4.34 9.34 38009. 0.873 0.061 0.00 10686.
4.37 9.37 38330. 0.880 0.067 0.00 10714.
4.39 9.39 38544. 0.885 0.075 0.00 10733.
4.91 4.41 38759. 0.890 0.085 0.00 10752.
9.43 4.43 38974. 0.895 0.097 0.00 10770.
9.45 4.45 39190. 0.900 0.105 0.00 10789.
9.48 4.98 39519. 0.907 0.109 0.00 10817.
9.50 4.50 39731. 0.912 0.112 0.00 10836.
9.61 4.61 90928. 0.990 0.127 0.00 10940.
9.72 4.72 92137. 0.967 0.139 0.00 11049<
4.75 4.75 92469. 0.975 0.141 0.00 11072.
4.77 4.77 92691. 0.980 0.149 0.00 11091.
4.79 9.79 42913. 0.985 0.148 0.00 11110.
4.81 9.81 43135. 0.990 0.153 0.00 11129.
4.83 9.83 43358. 0.995 0.160 0.00 11198.
4.85 9.85 43581. 1.000 0.168 0.00 11167.
4.87 9.87 43604. 1.006 0.178 0.00 11186.
4.89 9.89 44028. 1.011 0.188 0.00 11205.
9.91 9.91 49253. 1.016 0.193 0.00 11224.
5.02 5.02 45993. 1.049 0.214 0.00 11329.
5.13 5.13 96745. 1.073 0.232 0.00 11435.
5.29 5.29 98009. 1.102 0.298 0.00 11540.
5.36 5.36 99400. 1.139 0.263 0.00 11656.
5.47 5.97 50689. 1.169 0.277 0.00 11763.
5.58 5.58 51988. 1.193 0.290 0.00 11870.
5.70 5.70 53420. 1.226 0.302 0.00 11987.
5.75 5.75 54020. 1.290 0.308 0.00 12036.
5.85 5.85 55229. 1.268 0.780 0.00 12139.
5.95 5.95 56997. 1.296 1.630 0.00 12233.
E.05 6.05 57675. 1.324 2.740 0.00 12331.
6.15 6.15 58913. 1.352 4.090 0.00 12931.
6.25 6.25 60161. 1.381 5.520 0.00 12530.
6.35 6.35 61919. 1.910 6.960 0.00 12630.
6.45 6.95 62687. 1.939 7.490 0.00 12730.
6.55 6.55 63965. 1.968 7.990 0.00 12830.
6.65 6.65 65253. 1.998 8.460 0.00 12931.
6.75 6.75 66552. 1.528 8.910 0.00 13032.
6.85 6.85 67860. 1.558 9.330 0.00 13133.
6.95 6.95 69178. 1.588 9.730 0.00 13235.
?.05 7.05 7050�. 1.619 10.120 0.00 13337.
?.15 7.15 71846. 1.699 10.500 0.00 13439.
7.25 7.25 73195. 1.680 10.860 0.00 13592. I
7.35 7.35 74559. 1.712 11.200 0.00 13645.
7.95 7.45 75929. 1.793 11.540 0.00 13748.
�.55 7.55 77309. 1.�75 11.870 0.00 13852.
7.65 �.65 78699. 1.B07 12.190 0.00 13956.
Hyd Inflow Outflow Peak Storage
Stage Elev (Cu-Ft) (Ac-Ft}
1 0.81 0.33 5.75 5.75 59070. 1.241
2 0.92 0.29 5.59 5.59 52105. 1.196
3 1.94 0.27 5.41 5.91 50039. 1.149
9 0.82 0.24 5.21 5.21 47709. 1.095
5 0.�2 0.29 5.19 5.19 47405. 1.088
6 0.99 0.21 9.98 9.98 45032. 1.039
7 0.86 0.05 3.78 3.78 32128. 0.738
8 0.64 0.06 9.35 4.35 38139. 0.876
Hyd R/D Facility Tributary Reservoir POC Outflow
Outflow Inflow Inflow Target Calc
1 0.33 0.06 ******** ******* 0.34
2 0.29 0.07 }******* 0.31 0.32
3 0.27 0.10 ******** ******* 0.31
9 0.24 0.06 ******** ******* 0.27
5 0.29 0.06 ******** ******* 0.26
6 0.21 0.09 ++****�* ******* �.22
7 0.05 0.07 ******** ******* 0.10
8 0.06 0.05 ******** ******* 0.09
----------------------------------
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
POC Time Series File:dsout
Inflow/Outflow Analysis
Peak Inflow Discharge: 1.94 CFS at 6:00 on Jan 9 in 1990
Peak Outflow Discharge: 0.328 CFS at 20:00 on Feb 9 in 1951
Peak Reservoir Stage: 5.75 Ft
Peak Reservoir Elev: 5.75 Ft
Pea'�: Reservoir Storage: 54070. Cu-Ft
. 1.291 Ac-Ft
F.dd ?ime Series:bypass.tsf
Peak Summed Discharge: 0.342 CFS at 20:00 on Feb 9 in 1951
Point of Compliance File:dsout.tsf
Flow Frequency Analysis LogPearson III Coefficients
Time Series File:rdout.tsf Mean= -1.058 StdDev= 0.291
Project Location:Sea-Tac Skew= 0.591
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Fiow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
i�FS) (CFS) (ft) Period
0.051 38 2/22/99 23:00 0.328 5.75 1 89.50 0.989
0.129 16 1/22/50 6:00 0.291 5.59 2 32.13 0.969
0.328 1 2/09/51 20:00 0.270 5.41 3 19.58 0.949
0.046 42 2/04/52 9:00 0.259 5.33 9 19.08 0.929
0.106 22 1/31/53 11:00 0.249 5.25 5 10.99 0.909
0.059 32 1/07/59 21:00 0.249 5.21 6 9.01 0.889
�.051 37 2/09/55 5:00 0.290 5.19 7 7.64 0.869
�.209 10 1/06/56 10:00 0.239 5.18 8 6.63 0.899
J.053 35 3/10/57 5:00 0.206 9.98 9 5.86 0.829
0.061 25 1/17/58 18:00 0.204 9.97 10 5.29 0.809
0.051 36 1/27/59 1:00 0.156 9.82 11 9.75 0.789
U.290 7 11/21/59 3:00 0.154 9.81 12 9.39 0.769
0.138 19 11/24/60 11:00 0.140 9.73 13 3.99 0.749 �
u.045 45 12/24/61 ?:00 0.13� 9.?1 14 3.?0 0.729 ��
G.Ob3 24 l�/30;C2 �G:�� 0.1�9 4.c'� 1� 3.44 0.709
0.125 17 11/19/63 10:00 0.129 4.63 16 3.22 0.690
0.140 13 12/O1/69 8:00 0.125 4.59 17 3.03 0.6?0
0.055 29 1/07/66 5:00 0.117 4.59 18 2.85 0.650
0.117 18 12/15/66 7:00 0.111 4.49 19 2.70 0.63G
0.054 33 1/21/68 1:00 0.110 4.49 20 2.56 0.610
0.055 30 12/11/68 11:00 0.110 9.96 21 2.44 0.590
0.110 20 1/27/70 3:00 0.106 4.95 22 2.32 0.5�0
0.055 31 12/07/70 18:00 0.103 4.95 23 2.22 0.55G
0.259 9 3/06/72 21:00 0.063 4.35 24 2.13 0.530
0.156 11 12/26/72 6:00 0.061 9.34 25 2.09 0.510
0.059 26 1/18/79 20:00 0.059 4.33 26 1.96 0.490
0.051 39 1/14/75 17:00 0.056 4.27 27 1.89 0.470
0.053 39 12/09/75 16:00 0.055 9.15 28 1.82 0.450
0.038 50 8/26/77 8:00 0.055 9.11 29 1.75 0.430
0.111 19 12/15/77 19:00 0.055 9.04 30 1.70 0.410 �
0.092 98 2/13/79 13:00 0.055 9.02 31 1.69 0.390
0.239 8 12/17/79 20:00 0.054 3.96 32 1.59 0.370
0.055 28 12/31/80 1:00 0.054 3.91 33 1.54 0.350
0.159 12 10/06/81 20:00 0.053 3.85 39 1.49 0.330
�.056 27 1/08/83 6:00 0.053 3.78 35 1.45 0.310
0.095 94 12/13/83 8:00 0.051 3.61 36 1.41 0.291
G.096 93 11/09/84 9:00 0.051 3.59 37 1.37 0.271
0.103 23 1/19/86 11:00 0.051 3.51 38 1.33 0.251
0.206 9 11/29/8E 8:00 0.051 3.45 39 1.30 0.231
0.098 90 12/10/87 9:00 0.048 3.18 90 1.27 0.211
0.044 46 11/06/88 1:00 0.047 3.03 91 1.29 0.191
0.270 3 1/09/90 13:00 0.046 2.89 92 1.21 0.171
0.249 5 11/29/90 16:00 0.046 2.89 93 1.18 0.151
0.110 21 1/31/92 6:00 0.045 2.82 94 1.15 0.131
0.044 47 1/26/93 7:00 0.045 2.77 95 1.12 0.111
0.040 49 2/18/94 0:00 0.094 2.73 46 1.10 0.091
0.134 15 12/27/94 8:00 0.049 2.57 97 1.08 0.071
0.291 2 2/09/96 9:00 0.042 2.39 98 1.05 0.051
0.244 6 1/02/97 12:00 0.040 2.11 99 1.03 0.031
0.047 41 1/25/98 1:00 0.038 2.03 50 1.01 0.011
Computed Peaks o.538 5.80 100.00 0.990
Computed Peaks 0.416 5.77 50.00 0.980
Computed Peaks 0.317 5.75 25.00 0.960
Computed Peaks 0.212 5.01 10.00 0.900
Computed Peaks 0.195 4.92 8.00 0.875
Computed Peaks 0.150 4.80 5.00 0.800
Computed Peaks 0.082 4.40 2.00 0.500
Ccmputed Peaks 0.052 3.70 1.30 0.231
Flow Frequency Analysis LogPearson III Coefficients
Time Series File:dsout.tsf Mean= -0.908 StdDev= 0.201
Project Location:Sea-Tac Skew= 0.839
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.097 31 2/16/99 21:00 0.392 1 89.50 0.989
0.195 16 1/22/50 3:00 0.319 2 32.13 0.969
0.392 1 2/09/51 20:00 0.308 3 19.58 0.999
0.078 94 1/30/52 8:00 0.286 4 14.08 0.929
0.114 22 1/31/53 10:00 0.275 5 10.99 0.909
0.092 34 12/19/53 19:00 0.269 6 9.01 0.889
0.101 28 11/25/54 2:00 0.262 7 7.64 0.869
0.219 9 1/06/56 9:00 0.257 8 6.63 0.899
0.104 26 12/09/56 19:00 0.219 9 5.8E 0.829
0.097 32 1/16/58 11:00 0.219 10 5.24 0.809
0.092 35 1/26/59 20:00 0.166 11 4.75 0.789
0.262 7 11/21/59 1:00 0.164 12 4.34 0.769
0.160 13 11/29/60 8:00 0.160 13 3.99 0.749 '
0.075 97 12/22/61 17:00 0.155 14 3.70 0.729
0.089 39 11/30/62 12:00 0.146 15 3.94 0.709
0.138 17 11/19/63 15:00 0.145 16 3.22 0.690
0.155 14 12/O1/64 6:00 0.138 17 3.03 0.670
0.098 30 1/05/66 16:00 0.131 18 2.85 0.650
0.131 18 12/15/66 5:00 0.119 19 2.70 0.630
0.106 25 8/29/68 16:00 0.119 20 2.56 0.610
O.OB6 90 12/03/68 16:00 0.117 21 2.99 0.590
0.119 19 1/27/70 1:00 0.119 22 2.32 0.570
0.093 33 12/06/70 B:00 0.111 23 2.22 0.550
0.286 4 3/06/72 19:00 0.110 29 2.13 0.530
0.166 11 12/26/72 5:00 0.106 25 2.04 0.510
0.091 36 11/11/73 17:00 0.104 26 1.96 0.990
G.110 24 12/26/74 23:00 0.102 27 1.89 0.970
0.085 92 12/02/75 20:00 0.101 28 1.82 0.950
0.090 38 8/26/77 2:00 0.098 29 1.75 0.930
0.119 20 12/15/77 17:00 0.098 30 1.70 0.910
0.077 95 9/OB/79 15:00 0.097 31 1.69 0.390
0.257 8 12/17/79 19:00 0.097 32 1.59 0.370
0.102 27 11/21/80 11:00 0.093 33 1.59 0.350
0.169 12 10/06/81 16:00 0.092 39 1.49 0.330
0.091 37 10/28/82 16:00 0.092 35 1.45 0.310
0.086 41 1/03/84 1:00 0.091 36 1.41 0.291
0.073 48 11/03/84 2:00 0.091 37 1.37 0.271
�.111 23 1/18/86 16:00 0.090 38 1.33 0.251
�.219 10 11/24/86 7:00 0.089 39 1.30 0.231
�.076 96 12/09/87 1E:00 0.086 40 1.27 0.211
�.082 93 11/05/88 14:00 0.086 41 1.24 0.191
�.308 3 1/09/90 9:00 0.085 42 1.21 0.171
C.275 5 11/24/90 14:00 0.082 43 1.18 0.151
0.117 21 1/31/92 5:00 0.0�8 44 1.15 0.131
C.065 49 3/22/93 22:00 0.0�7 45 1.12 0.111
0.069 50 11/30/S3 22:00 0.076 46 1.10 0.091
0.196 15 12/27/94 5:00 0.075 47 1.08 0.071
0.319 2 2/09/96 1:00 0.073 48 1.05 0.051
0.269 6 1/02/97 9:00 0.065 99 1.03 0.031
0.098 29 10/04/97 15:00 0.069 50 1.01 0.011
Con�puted Peaks 0.475 100.00 0.990
Computed Peaks 0.387 50.00 0.980
Computed Peaks 0.312 25.00 0.960
Computed Peaks 0.229 10.00 0.900
Computed Peaks 0.215 8.00 0.875
Computed Peaks 0.177 5.00 0.800
Computed Peaks 0.116 2.00 0.500
C�T:puted Peaks 0.086 1.30 0.231
Flow Duration from Time Series Eile:rdout.tsf
Cutoff Count Frequency CDF Exceedence Probability
�FS `s � $
0.005 215667 95.239 49.239 50.761 0.508E+00
0.014 66663 15.220 69.459 35.591 0.355E+00
0.023 50521 11.534 75.993 29.007 0.290E+00
0.032 93441 9.918 85.911 19.089 0.191E+00
0.091 31555 7.204 93.116 6.889 0.688E-01
0.051 19709 9.999 97.614 2.386 0.239E-01
0.060 8450 1.929 99.544 0.456 0.456E-02
0.069 370 0.084 99.628 0.372 0.372E-02
0.078 176 0.040 99.668 0.332 0.332E-02
0.088 130 0.030 99.698 0.302 0.302E-02
0.097 89 0.019 99.717 0.263 0.283E-02
0.106 138 0.032 99.749 0.251 0.251E-02
n.115 235 0.055 99.803 0.19� 0.197E-02
0.129 194 0.044 99.E47 0.153 0.153E-02
0.134 140 0.032 99.879 0.121 0.121E-0�
0.193 170 0.039 99.918 0.082 0.817E-0�
0.152 46 0.011 99.929 0.071 0.�12E-0�
0.161 32 0.007 99.936 0.064 0.639E-0:
0.170 22 0.005 99.991 0.059 0.589E-0�
0.180 17 0.009 99.995 0.055 0.550E-C�
0.189 17 0.004 99.999 0.051 0.511E-C�
0.198 26 0.006 99.955 0.095 0.452E-�3
0.20� 33 0.008 99.962 0.038 0.377E-C3
�.216 25 0.006 99.968 0.032 0.320E-G3
�.226 22 0.005 99.973 0.027 0.269E-03
0.235 25 0.006 99.979 0.021 0.212E-03
0.294 2� 0.006 99.985 0.015 0.151E-G3
0.253 18 0.004 99.989 0.011 0.110E-G�
0.262 19 0.003 99.992 0.008 0.776E-09
0.272 10 0.002 99.995 0.005 0.598E-04
0.281 6 0.001 99.996 0.004 0.911E-09
0.290 7 0.002 99.997 0.003 0.251E-09
0.299 6 0.001 99.999 0.001 0.119E-04
0.308 4 0.001 100.000 0.000 0.228E-05
0.318 0 0.000 100.000 0.000 0.228E-05
0.327 0 0.000 100.000 0.000 �.�28E-�5
Fiow Duration from Time Series File:dsout.tsf
���off Count Frequency CDF Exceedence Probabilit�s;
CFS % � a
0.005 215999 99.200 49.200 50.800 0.508E+00
0.014 65208 19.888 64.087 35.913 0.359E+00
0.024 99815 11.373 75.961 29.539 0.295E+00 I
0.034 93059 9.831 85.291 14.709 0.147E+00 ��
0.043 31E�9 7.232 92.523 7.477 0.798E-01 �,
0.053 20766 4.791 97.269 2.736 0.274E-01 '�
0.062 8071 1.893 99.107 0.893 0.893E-02 I
0.072 1586 0.362 99.469 0.531 0.531E-02
C.082 600 0.137 99.606 0.394 0.399E-02
0.091 282 0.069 99.670 0.330 0.330E-02 '
0.101 152 0.035 99.705 0.295 0.295E-02
0.111 178 0.041 99.745 0.255 0.255E-02
0.120 217 0.050 99.795 0.205 0.205E-02
0.130 19� 0.045 99.840 0.160 0.160E-02
0.139 155 0.035 99.875 0.125 0.125E-02
0.149 157 0.036 99.911 0.089 0.888E-03
0.159 55 0.013 99.924 0.076 0.763E-03
0.168 39 0.009 99.933 0.067 0.674E-03
0.178 23 0.005 99.938 0.062 0.621E-03
0.187 25 0.006 59.994 0.056 0.564E-03
0.197 21 0.005 99.998 0.052 0.516E-03
0.207 27 0.006 99.955 0.045 0.954E-03
�.216 26 0.006 99.961 0.039 0.395E-03
0.226 26 0.006 99.966 0.034 0.336E-03
0.235 22 0.005 99.971 0.029 0.285E-03
0.295 29 0.005 99.977 0.023 0.231E-03
0.255 29 0.005 99.982 0.018 0.176E-03
0.264 20 0.005 99.987 0.013 0.130E-03
0.274 19 0.003 99.990 0.010 0.982E-04
0.283 19 0.003 99.993 0.007 0.662E-04
0.293 8 0.002 99.595 0.005 0.479E-04
0.303 5 0.001 99.996 0.009 0.365E-04
0.312 6 0.001 99.998 0.002 0.228E-04
0.322 6 0.001 99.999 0.001 0.913E-05
�.331 1 0.000 99.999 0.001 0.665E-05
u.341 2 0.000 100.000 0.000 0.228E-05
�o.,xn-o..�.m�,a�.r�Kcnn .�.���
-- -------_.-----------
- -----------------_-----
a -----��---
. . � rdout.dr '-
dso:a.dur •
te-qetCur �
16=�._
-��_�
�n
R
0
�'�`�
n_ �
V �k� I
� w !, I
m o �� I
a
O �� �
�'a.
aoo
t.�
o t
t� �
a
� ~-�--
�-��__
O ~��Y
O 0
��-0 ��S ��� ��� ��z �� � �Q�
P�oOebily EmeadeiKe
D'sration Comparison Anaylsis
Base File: predev.tsf
New File: dsout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time----- ---------Check of Tolerance-------
Cutoff Base New �Change Probability Base New %Change
0.063 � O.10E-01 0.88E-02 -12.2 � O.10E-01 0.063 0.061 -2.6
0.089 � 0.51E-02 0.37E-02 -28.1 � 0.51E-02 4.089 0.073 -13.5
0.106 � 0.29E-02 0.26E-02 -5.9 I 0.29E-02 0.106 0.102 -4.3
0.128 � 0.1�E-02 0.17E-02 -3.9 I 0.17E-02 0.128 0.127 -1.1
0.150 ( 0.11E-02 0.88E-03 -18.3 I 0.11E-02 0.150 0.194 -4.0
0.172 � 0.66E-03 0.65E-03 -1.7 � 0.66E-03 0.172 0.169 -1.5
0.193 � 0.49E-03 0.53E-03 20.1 � 0.94E-03 0.193 0.209 7.9
0.215 � 0.30E-03 0.40E-03 31.6 I 0.30E-03 0.215 0.231 7.6
0.237 � 0.21E-03 0.28E-03 30.1 I 0.21E-03 0.237 0.298 4.5
0.259 � 0.11E-03 0.15E-03 32.0 I 0.11E-03 0.259 0.268 3.6
0.281 � 0.59E-09 0.75E-04 26.9 I 0.59E-09 0.281 0.286 2.1
0.302 I 0.32E-09 0.39E-04 21.4 I 0.32E-09 0.302 0.306 1.9
0.324 � 0.68E-05 0.68E-05 0.0 I 0.68E-05 0.329 0.332 2.3
0.346 � 0.23E-05 O.00E+00 -100.0 I 0.23E-05 0.396 0.392 -1.2
i�1a�;imum positive excursion = 0.016 cfs ( 8.0�)
occurring at 0.196 cfs on the Base Data:predev.tsf
and at 0.212 cfs on the New Data:dsout.tsf
t•laximum negative excursion = 0.013 cfs (-14.3�)
occurring at o.091 cfs on the Base Data:predev.tsf
and at 0.078 cfs on the New Data:dsout.tsf
APPENDIX B
Geotechnical Report
Earth Solutions NW, LLC
� ,;
,. �
.� ��
�:� : ��� -
, _ .
,. ,, , ,
„
. :
. � , �. ,
't � �?,j`�y` y'�y�'4� '• � ,,�,? '� .T'!• ��,
�. ��w 7 ���-.� �'1.� ... ��rvy� ."� :*!aY_�`.'�.�Or'Y��.
•� .1 ,~ ,�. �. �� _r .' '�sr x' •�
tj *. .��, , .��.� �_w'1�� �� 7-S l��'��
�� . , ` �' "•^'k'. -'►:T
i� �� '' r ��1� � :/. �
�: ��' .�f 'l !�Tj' .+Y. y•�'.
' ' ��.'• ,,���`S_ 1't•.�]���:�y�i{� !�_�� ' N��
� � .r y'• �t "• `�t;:�'+t�`t • _��,.�g���; , '_ ''{
-a��.}#� .�.Y �` M ri , , .�y'u'YS"�J�r.-'� v�`' � '
f !a ' , "' • ��'�+. _
� ., �
!�i- ti-7�_�'. `T T��f � ,
. •�� -
Geotechnical Engineerin�_ � •�f1
* � �
Geolo�. ' ���„ ��.° -
Environmental Scientist� ��' r `� V,,'
Construction Monitorin,_ ti� _ c .
':� �
. .y -�� , _ ..',,'.., , +�i,; , �.
� i 4
4 �
t r I
}
I • y '
� x'i d
J �,j
_.t. •; r
� '` �y ��11�r ' •` f
♦ '� .� I L
� 1�`', "...�� - �� ',
.�
- ,� -
f A. ..'-`�i�� . .`. ' i , .
� ���
' ' •°' �
_ '.� ,t Y ��
�. . 'L'ia,i.,. .. . �` ` �w :\,'.
! "T' ��
�'`i�� _ - ,�'� . • ._ � i ic�1
�
',H � j� 't- � y�' . . F
..a-,J�•• j �. ,r r,ri r� .� �.'�-�-r _,ti,.,,"�.I �: � , .
y ' '�,y���''it��rY;�, 't�' i�'�'b -{_� .- - - ' � .• - .. . E.7itlR�
t` f-�•tY: � '.
M . ' �,�
�i �'_ . . -,��"'- -
',^ �, i
r � �"
,�,� � . . ,•� ..� �, y�,`i f !� ' � .
� . �. ` _-f"r 1"�..
t���, ' - _���� I ]r�. � ' •'}
� a.r. .Y)�, F�r� �!�' •-r`'�s"'+�i�� .�' :
• .i�[�' •. �+• ' - . ' •
� � r f'" �� . � . . . .`-x�r. . _
�E�'
_ .�_:'
GEOTECHNICAL ENGINEERING STUDY -� ` '
EAGLESTON
';;' 18851 - 120TH AVENUE SOUTHEAST �
'� RENTON, WASHINGTON
� ,�_���. .
'�� ES-2971 . :
� _�
_�- /e _��.:,�{� .
�'�. • � ' • .� .��.i7► }y�` ,� p�.,�#�R._.
"y.'�'�_ a. �•���- . •��••si�.��.� ����`` _� . �_''
_ i.l, a� � �: " y�. . 4•►►`}}��T
' ��. '� '��� i..��I�� *� �.` ���� ,1 . ' ' ."_�
� +a �
e�, 1�• �. •
180� -�13fiih�=P�,t �1►J �,'S�i't�,2�t'�� ��elievu�-.''1�.98Q,�3► - _'.-'t:�. .:y'�..;,,�;i:
_� .:; (�25�'4�;�z�{�`'Y ��-�a,,'� (�25,) :�4�,4,��l , � � ,�;4>`. -�;_��'~':.��'�•,�`j:�;J
. ,�v� r tl+� •�t'Y YY1� ' ��IVI��IIj�� � -�~ ���* s �\. •V�� '� ►���T�a `i' J�
, '�{' 1�r1 �� '� �1� L`. '.� {' =� ,�� �!� '����-�.i�T� �� � �"s.�
� s erl4F►. f s `y+� _ a
. `�y:��M��'�1. .�a��._.t L� i�'� 1�.it.. ��j_.'�_1�h':.������•' A���y� ��-'�.. '
!
PREPARED FOR
WESTPAC DEVELOPMENT, LLC
September 10, 2013
�% � ,�� 1��,� ��
; I�(�
�4% co . Watson, I.T.
� ff Enginee'
�F�. CA�,j�,
� op w�sy� ec�
r� `�' �c�`�
y � Z
, ��`il � ��'`v'� '
�NALE���
��.01 �''�
Kyle R. Campbell, P.E.
Principal
GEOTECHNICAL ENGINEERING STUDY
EAGLESTON
18851 120�'AVENUE SOUTHEAST
RENTON, WASHINGTON
ES-2971
Earth Solutions NW, LLC
1805— 136�' PI. Northeast, Suite 201
Bellevue, Washington 98005
Ph: 425-449-4704 Fax: 425-449-4711
Toll Free: 866-336-8710
II � I � I � II I
. . .
eo ec nica n ineerin e or
' I I f
6eotechrYcal Services Are Performed fa� • elevation,configuration,location,orientation,o�weight of the
S�dfIC PIII'pOSCS, P�i'S011S, and Projects proposed structure,
Geotechnical engineers str�cture their services to me�the specific needs of • composition of the design team,or
tlieir clients.A geotechnial engineering study conducted for a civil engi- • project ownership.
neer may not fulfill the needs of a construction contractor or even anotlier
civil engineer.Because each geotechnfcal engineering sh�dy is unique,ead� As a general rule,always inform your geotechnical engineer of project
geatechnical engineering report is unique,prepared solelyfor the client.No changes—�ven minor ones—and request an assessment of their impact.
one except you should rely on your geotechnical engineering�eport witliout Geotachnica!engin�rs cannof accept res,00nsibrliry or liability for problerns
first cor�ening with the geotechnical engineer ufio prepared it.And no one tl�at occur b�ause fheir reporis do not consider dev�lopments of which
—note�nyou—should apply the report for any purpose or project they were nof informed.
except ihe one originally cor�emplated.
S�surtsce Condrtions C� I�ange
R�� fldl R�101't A geotechnical engineering report is based an conditions that existed at
Serious problems have ocxurred because those relying on a geotechnical the time the study was performed.Do not rely on a geotechnicaf engineer-
engineering report did nat read it all.Do not rely on an executive summary. ing repodwhose adequacy may have been affected by:the passage of
Do not read seleded elements only. 6me;by man-made eveMs,such as construdion on or adjacent to ihe site; '
or by natural events,such as floods,earthquakes,or groundwater 6luctua-
A 6eotech�dc� 6�ineeri� R�ort Is Based on tions.Always contact the geotechnical engineer before applying the report
A Un"ique Set ol Pro�ect-$�16CIIIC f8Ct01'S to determine if it is still reliable.A minor amount of additional testing or I,
Geotechnical engineers consider a number of unique,project-specific fac- analysis could prevent major problems.
tors when establishing the scope of a study.Typical factors include:ihe
client's goals,oDjectives,and risk management preferences;the generai Most 6eotednical �indings Are Professlonal
natu�e of the structure invohred,its size,and configuration;the location of OpN110115
the structu�e on the site;and ot�er planned or existing site improvements, Site exploration iderrtifies subsurFace conditions only at those points where
such as access roads,parking lots,and underground utilities.Unless the subsurface tests are conducted or samples are�ken.Geotechnical engi-
geotechnical engineer who conducted the study specifically indicates oth- neers review field and laboratory data and then apply their�rofessional
erwise,do not rely on a geotechnical engineering report that was: judgment to render an opinion about subs�rface conditiuns throughout the
• not prepared for you, site.Actual subsurface conditions may differ�ometimes significaritly—
• not prepared for your project, fran those indicated in your reporL Retaining the geotechnical engineer
• not prepared for the specific site explored,or ufio developed your repo�t to provide construction observation is the
• completed before important project changes were made. most effective method of managing the risks associated with urian�cipated
conditions.
Typical changes that can erode me reliability of an existing geotechnical
engineering report include those that a�fect: A RCp01't's Reeommendations Are ll�ot F1nal
� the function of the proposed structure,as when it's changed from a Do not overrely on the consVuction recommendations included in your
pa�king garage to an office building,or from a light industrial plarrt report. Those resommendations are not final,because geoiechnical engi-
to a reirigerated warehouse, neers develop them principaliy from judgment and opinion.Geotechnical
engineers can finalize iheir recommendations only by observing actual
suhsurface conditions rev�led during construction, The geotechrrical have led io disappointments,claims,and disputes.To help reduce the risk
engineer who developed your repo�t cannof assume responsibility or of such outcomes,geotechnical engineers cammonty include a variety of
liability ior Ute reporYs recommendations if thaf enginaer does not perform explanatory provisions in their repor�s.Sometimes labeled 'lirnitations"
constructian observatron. many oi these prov9sions indicate where geotechnical engineers'responsi-
bilities begin and end,to help others recognize their own responsibilities
A 6eotec�lcal En�neering Report Is Su6ject to and risks.Read these prov►'sions dosely.Ask questions.Your geotechnical
III�SIII�1'pl'Ct8ti011 engineer should respond fully and frankly.
Other design team members'misinte�pretation of geotechnical engineering
reports has resulted in costly problems.�ower that risk by having your geo- seoenvironmental Concerns Are Ilrot Covered
technical engineer confer with appropriate members of the design team after 7he equipment,techniques,and personnel used to perform a geoenviron-
submitting the report.Also retain your geotechnical engineer to review perti- mental study differ significantly from thase used to perform a geofechnical
nent elsments of the design team's plans�d specifications.Contractors can study.For that reason,a geotechnical engineering report does not usually
also misinterpret a geotechnical engineering report.Redu�e that risk by relate any geoenvironmental findings,conclusions,or recommendations;
having your geotechnical engineer participate in prebid and preconstruction e.g.,about the likelihood of encountering underground storage tanks or
conferences,and by praviding construc�on ohservation. regufated contaminants. Unan6cipated environmenta!problems have/ed
to numerous project failures.If you have not yet obtained your own gecen-
Da Not Redraw ihe Engineer�S LOgS vironmental information,ask your geotechnical cansulhant for risk man-
Geotechnical engineers prepare final boring and testing logs based upon agement guidance. Do not re/y on an environmental report prepared for
their interprefation of field logs and laboratory data.To prevent errors or someone else.
omissions,the logs inclutled in a geotechnical engineering report should
neverbe redrawn for inclusion in architectural or other design drawings. �btaio Proiessional A�istance To Deal witl� Nbld
Only photographic or electronic reproduction is acceptable,butrecognize Diverse strategies can be applied during building design,construction,
thatseparating logs hom fhe report can eleuate risk. operatian,and maintenance to prevent significant amounts of mold from
growing on indoor surfaces.To be effective,all such s�ategies should be
�tive Co�ractors a Campletc Report and devised tor the e�rpress pur�ose of mold prevention,integrated into a com-
�t�11C@ prehensive plan,and executed with diligent aversight by a professional
Some owners and design professionals mistalcenly believe they can make mold prevention consultant.Because just a small amount of wrater or
co�tradors liable for ur�nticipated subsurface conditions by limiting what moisture can lead to the development af severe mold infestations,a num-
they provide for bid preparation.To help prevent cos�y problems,give con- ber of mold preven6on strategies focus on keeping building surfaces dry.
tractors the complete geotechnical engineering repo�,butpreface it with a While groundwater,water infiltration,and similar issues may have been
clearly written letter of transmittal. In that letter,advise co��actors that ihe addressed as part of the geotechnical engineering study whose findings
report was nat prepared for purposes of bid developme�and that the are conveyed ir�this report,the geotechnical engineer in charge of this
repo�t's accuracy is limited;encourage them to confer with the geotechnical praject is not a mold prevention consu�an�norte of the services per-
engineer who prepared the report{a modest fee rrray be required)and/or to formed irr connection with the geotechnica/engineers study
conduct addi6onal study to obhain the specific types oi information they were designed or sondocfed lor the purpose of mo/d preven-
need or prefer.A prebid conference can also be valuable.Be sure confrac- tion. Proper imp/ementation of fhe recommertdations conveyed
fas have su(ficierrt time to perform additional study.ONy then might you in this report wf11 nof of itsell be su�cieM to preveot mo/d hom
be in a position to give co�ractors the best information available to you, growing in or an the structure invo/vad.
while requiring them to at least share some of the 6rrancial responsibilities
stemming from unanticipated conditions. R81 y, on Your ASf�-Member 6eotechncl�
6iglneer tor Addi�onal Assistance
Read Responsipity P�rovlslo�s Cbsely Membership in ASFE/The Best People on Earth exposes geotechnical
Some clients,design professionals,and contractors do not recognize that engineers to a wide array af risk management techniques that an be of
geotechnical engineering is far less exact than other engineering disci- genuine benefit for everyone involved with a construction project.Confer
plines.This lack of understanding has created unrealisti�expectations that with you ASFE-member geotechnical engineer for more information.
ASFE
i�• isit ���/1� �� E�ftY
8811 Cole�ville Road/Suite G106,Silver Spring,MD 2D910
Telephone:301/565-2733 Facsimile:301/589-2017
e-mail:info@1as#e.org www.asie.org
Copyripht 2004 Dy ASFE,lnc.Duplica6ort,reproduction,or copying oJ thk documenf,in whole or in part by any means x�hatsoever,is stricUy proMbited,e�rcept with ASfFk
specftic writterr permission.ErcerptFnp,quotinp,or otRerwise eMrectinp wording lrom this document 1s permltted only with the racpress written permission of ASFE,arrd only for
purposes ol scholady researCh or book review.Only members of ASFE may use this docu+nent as a complement to o�as ar+elsment oi a geotechnicaf angineering repori.My other
lirm,individuaJ,or other entity that So uses this doCUment wlthout befng en ASfE member could be commitfing negfigent or intentiw�a!(irarMulerttJ misrepresenfation.
IIGER06045.OM
V
September 10, 2013 Earth Solutions NW ��c
ES-2971
• Geotechnical Engineering
• Construction Monitorin� '
• �nvironmental Sciences
WestPac Development
7449 West Mercer Way
Mercer Isiand, Washington 98040
Attention: Mr. Peter O'Kane
� I�
Dear Mr. O Kane: ,
Earth Solutions NW, LLC (ESNW) is pleased to present this report titled "Geotechnical
Engineering Study, Eagleston, 18851 120th Avenue Southeast, Renton, Washington". Based
on the results of the geotechnical investigation, the proposed residential development is
feasible from a geotechnical standpoint. Three to three ancf one half feet of fill was
encountered in the majority of the test pits. The native soiE underlying the site consists i
predominantly of native weathered and unweathered glacial till deposits. The proposed
residential structures can be supported on conventional foundations bearing on competent
native soifs, competent existing fill or structural fill placed as part of the site grading activities.
Recammendations for foundation design, earthwork, and other pertinent geotechnical
recommendations are provided in this report. A site plan was not available at the time of this
report.
If you have any questions regarding the content of this geotechnical engineering study, please
contact us.
Sincerely,
EARTH SOLUTIONS NW, LLC
�� ���,d ��e
�,�; cott . Watson, E. .
Staff gineer
1805 -136th Place N.E.,Suitc 201 • Believue,WA 98(}05 • 1425}449-4704 • FAX(425) 449-4711
I
TABLE OF CONTENTS
ES-297'!
PAGE
INTRODUCTION ........................................................................ 1
General .................................................... .......... ......
...... 1
Proiect Description ............. ................. 1
Surface. .......... ................................................................ 1
Subsurface....................................................................... 2
GeologicSetting....................................................... 2
Groundwater...................................................................... 2
DISCUSSION AND RECOMMENDATIONS....................................... 2
Gene ral............................................................................. 2
Site Preparation and Earthwork............................................ 3
Temporary Erosion Controi....................................... 3
In-situ Soils.............................................................. 3
Structural Fill Placement........................................... 4
Subgrade Preparation............................................... 4
Foundations..................................................................... 5
Slab-on-Grade Floors.. ..................................................... 5
Seismic Considerations......................... ................................ 6
Excavations and Slopes .................................................... 6
Utility Trench Backfill......................................................... 6
Drainaae........................................................................... 7
Pavement Sections............................................................ 7
LIMITATIONS.............................................................................. 8
Additional Services............................................................ 8
Earth Solutions NW, LLC
TABLE QF CONTENTS
Cont'd
ES-2971
GRAPHICS
Plate 1 Vicinity Map
Plate 2 Test Pit Location Plan
Plate 3 Typical Footing Drain Detail
APPENDICES
Appendix A Subsurface Exploration
Test Pit Logs
Appendix B Laboratory Test Results
Grain Size Distribution
�
r
� �
Earth Solutions NW,LLC
GEOTECHNICAL ENGINEERING STUDY
EAGLESTON
18851 120th AVENUE SOUTHEAST
RENTON, WASHINGTON
ES-2971
INTRODUCTION
General
This geotechnical engineering study was prepared for the proposed residential development to
be constructed off of 120th Avenue Southeast in Renton. Washington. The approximate
location of the subject property is illustrated on the Vicinity Map (Plate 1). The purpose of this
study was to develop geotechnical recommendations for the proposed project. The scope of
services for completing this geotechnical engineering study included the following:
• Subsurface exploration consisting of observing, logging and sampling five test pits
excavated within accessible areas of the development envelope;
• Engineering analysis; and,
• Preparation of this report.
Proiect Description I
The subject site is located northwest of the intersection Southeast 191 st Street and 120th
Avenue Southeast in Renton, Washington. The approximate limits of the property are illustrated
on the Test Pit Location Plan (Plate 2). The subject site consists of four adjoining tax parcels
totaling approximately 4.9 acres. Existing structures onsite include three houses, firvo detached
garages, and two tool shacks. A cursory review of an available geologic map indicates the site
is underlain by Vashon subglacial till (Qvt).
We understand that any existing structures will be removed and the site will be redeveloped into
residential lots, access roads and associated utility improvements.
Surface
The existing vegetation consists of tree cover concentrated near the south half of the site and
landscaped grass yards on the north half. Topography descends to the east at a gentle slope,
with approximately five feet of elevation change across the site.
Earth Solutions NW,LLC I,
WestPac Development ES-2971
September 10, 2013 Page 2
Subsurface
An ESNW representative observed, logged and sampled five test pits excavated at the site for
purposes of assessing soil and groundwater conditions. The approximate locations of the test
pits are illustrated on the Test Pit Location Plan (Plate 2). Please refer to the test pit logs
provided in Appendix A for a more detailed description of the subsurface conditions.
Topsoil was encountered to depths of approximately two to four inches. Fill was encountered at
test pit locations TP-1, TP-2, TP-3, and TP-5 and ranged in depth from about three feet to three
and one-half feet. Fill consisted primarily of loose to medium dense silty sand with varying
amounts of gravel (Unified Soil Classification SM). Isolated pockets of forest topsoil were
encountered at TP-1 at a depth of about two and one-half feet below existing grade.
Native soils underlying the topsoil and �II were comprised primarity of dense to very dense silty
sand with gravel (SM) associated with weathered and unweathered glacial deposits. Soil
relative density generally increased with depth. In general, dense conditions were encountered
at depths up to three and one-half feet below existing grades.
Geologic Setting
The geologic map of the area identifies glacial till (Qvt) deposits throughout the site and
surrounding area. Based on the results of the subsurface investigation, the native soils
vbserved at the test pit locations are generally consistent with the glacial till.
Groundwater
No seepage was observed at test pit locations (August 2013). However, groundwater seepage
should be expected in site excavations, given the observed soil conditions. Groundwater
seepage rates and elevations fluctuate depending on many factors, including precipitation
duration and intensity, the time of year, and soil conditions.
DISCUSSION AND RECOMMENDATIONS
General
Based on the results of our study, the residential development on the subject site is feasible
from a geotechnical standpoint. The proposed residential structures can be supported on
competent native soil, competent existing fill or structural fill placed as part of the site grading
activities. The existing fill may require removal and re-compaction within building footprints,
depending on the conditions exposed during grading. Where fi11 areas are proposed,
compaction of the existing fill soils to structural fill specifications described later in this study will
be necessary.
Earth Solutions NW,LLC
__ _ �
WestPac Development ES-2971
September 1 Q, 2013 Page 3
This study has been prepared for the exclusive use of WestPac Development, and their '
representatives. No warranty, expressed o� implied, is made. This study has been prepared in '�
a manner consistent with the level of care and skill ordinarily exercised by other members of the �
profession currently practicing under similar conditions in this area.
Site Prepa�ation and Earthwork I
Site preparation activities will likely include removing the existing structure and associated '�
improvements from the development envelope, establishing clearing limits and installing 'i
temporary erosion control measures. 'll
The primary geotechnical considerations during the proposed site preparation and earthwork I
activities will involve the overall cu# and fill activities, re-working existing fill where necessary, '
structural fill placement and compaction, underground utility installations, and frnal building and
pavement area subgrade preparation. We anticipate the mass grading wil( utilize a balanced I
approach, with cut soils used as structural fill elsewhere on-site.
Temporary Erosion Control I
Temporary erosion control measures should include, at a minimum, silt fencing placed along �
the downsfope perimeter of the construction envelope, and a construction entrance consisting
of quarry spalls to minimize off-site soil tracking and to provide a firm surface. Surface water
must not be allowed to flow over, or collect above, temporary or permanent slopes. Interceptor
drains or swales should be considered for controlling surtace water flow patterns. ESNW shouid
observe the erosion control measures, and provide supplement recommendations for I
minimizing erosion during construction.
In-situ Soils
From a geotechnical standpoint, the silty sand deposits encountered at the test pit locations are
generally suitable for use as structural fill provided the soil moisture content at the time of
grading allows compaction to the levels specified below. The moisture sensitivity of the silty
sand deposits anticipated to be exposed du�ing grading activities can generaNy be
characterized as moderate to high. Due to the moisture sensitive nature of the silty sand soil,
successful use of the soil will largely be dictated by the moisture content at the time of
placement and compaction.
If the on-site soils cannot be successfully compacted, the use of an imported soil may be
necessary. Imported soil intended for use as structural fill should consist of a well graded
granular soil with a maximum aggregate grain size of six inches, and a moisture content that is
at or near the aptimum level. During wet weather conditions, imported soil intended for use as
structural fill should consist of a well graded granuiar soil with a fines content of 5 percent or
less defined as the percent passing the #200 sieve, based on the minus three-quarter inch
fraction.
Earth Solutio�s NV11,LLC
WestPac Developmen# ES-2971
September 10, 2013 Page 4
Structural Fill Placement
In general, areas to receive structural fill should be sufficiently stripped of organic matter and
other deleterious material. Overstripping of the site and proposed fill surfaces should be
avoided. ESNW should observe cleared and st�ipped areas of the site prior to structural fill
placement.
S#ructural fill is defined as compacted soil placed in foundation, slab-on-grade, and onsite
roadway areas. Fills placed to construct permanent slopes and throughout rockery, retaining
wall, and utility trench backfill areas are also considered structural fill. Soifs placed in structural
areas should be placed in maximum 12 inch lifts and compacted to a relative compaction of 90
percent, based on the maximum dry density as determined by the Modified Proctor Method
{ASTM D-1557-02). In pavement areas, the upper 12 inches of the structural fill shoufd be
compacted to a relative compaction of at least 95 percent. City, county, or other jurisdiction
compaction requirements may supercede the above recommendations in right-of-way areas.
Subgrade Preparation
Following site stripping and removal of the existing structural improvements, cuts and fi11s will
be completed to establish the proposed subgrade levels throughout the site. ESNW should
observe the subgrade and existing fill during the initial site preparation activities to confirm soil
conditions and to provide supplemental recommendations for subgrade preparation, if
necessary. The process of removing the existing building structure may produce voids where
the old foundations are removed, and where basement or crawl space areas may have been
present. Thorough restoration of voids from old foundation and basement areas must be
completed as part of the overall subgrade and building pad preparation activities. The following
guidelines for preparing the building subgrade areas should be incorporated into the final
design:
• Where voids and related demolition disturbances extend below the planned subgrade
level, restoration of these areas should be completed. Structural fill should be used to !
restore voids or unstable areas resulting from the existing building removal.
• Re-compact or overexcavate and replace areas of existing fill (if present) exposed at the
building subgrade eievation. ESNW should confirm subgrade conditions and the
required level of re-compaction or overexcavation and replacement during the site
preparation activities. Overexcavations shauld extend to competent (medium dense)
native soils and replaced with structural fill.
• ESNW should confirm overall suitability of the prepared subgrade areas following the site
work activities.
Earth Solutions NW,LLC
WestPac Development ES-2971
September 10, 2013 Page 5
Foundations
The proposed residential structures can be supported on conventional spread and continuous
footings bearing on competent native soil competent existing fill or structural fill. We anticipate
competent native soil suitable for support of foundations will generally be encountered at
depths of three and one-half feet below existing grades. The existing fill may require removal
and re-compaction within building footprints, depending on the conditions exposed during
grading. Building pad fill areas should be compacted to the specifications of structural fill
previously described in this report. Where loose or unsuitable soil conditions are encountered
at foundation subgrade elevations, compaction of the soils to the specifications of structural fill,
or overexcavation and replacement with structural fill may be necessary.
For design the following parameters can be used for the foundation design:
• Allowable soil bearing capacity 2,500 psf
• Passive earth pressure 350 pcf
• Coefficient of friction 0.40
The passive earth pressure vafue provided above assumes the foundations are backfilled with
structural �N. A factor-of-safety of 1.5 has been applied to these passive resistance and friction
vaiues.
For short term wind and seismic loading, a one-third increase in the allowable soil bearing
capacity can be assumed.
With structural loading as expected, total settlement in the range of one inch is anticipated, with
differential settlement of approximately one-half of an inch. The majority of the settlements
should occur during construction, as dead loads are applied.
Slab-On-Grade Floors
51ab-on-grade floors for residential structures should be supported on competent native soil or
structural fill. Unstable or yielding areas of the subgrade should be recompacted or
overexcavated and replaced with suitable structural fill prior to construction of the slab. A
capillary break consisting of a minimum of four inches of free draining crushed rock or gravel
should be placed below the s(ab. The free draining material should have a fines content of 5
percent or less (percent passing the #200 sieve, based on the minus three-quarter inch
fraction). In areas where slab moisture is undesirable, installation of a vapor barrier below the
slab should be considered. If a vapor barrier is used it should consist of a material specifically
designed for that use and be installed in accordance with the manufacturer's specifications.
Earth Sotutions NW,LLC
WestPac Development ES-2971
September 10, 2013 Page 6
Seismic Considerations
The 2009 International Building Code specifies several soil profiles that are used as a basis for
seismic design of structures. If the project will be permitted using the 2009 IBC, based on the
soil conditions observed at the test sites, Site Class D, from table 1613.5.2, should be used for
design.
The 2012 IBC recognizes ASCE for seismic site class definitions. If the project will be permitted
under the 2012 IBC, in accordance with Table 20.3-1 of ASCE, Minimum Design Loads for
Buildings and Other Structures, Site Class D, should be used for design.
In our opinion, liquefaction susceptibility at this site is low, The relative density of the site soils
and the absence of a uniform, shallow groundwater table is the primary basis for this
designation.
Excavations and Slopes
The Federal and state Occupation Safety and Health Administration (OSHAIWISHA) classifies
soils in terms of minimum safe slope inclinations. Based on the soil conditions encountered
during our fieidwork, fill, weathered native soil and where groundwater is exposed would be
classified by OSHANVISHA as Type C. Temporary slopes over four feet in height in Type C
soils should be sloped no steeper than 1.5H:1V (Harizontal:Vertical). Dense glacial till soils
wouid be classified by OSHA/WISHA as Type A. Temporary slopes over four feet in height in
Type A soils should be sloped no steeper than 0.75H:1 V (Horizontal:Vertical). Temporary
slopes steeper than the OSHA/WISHA guidelines detailed above may be acceptable depending
on the actual conditions exposed during grading activities.
ESNW should observe temporary and permanent slopes to confirm that the inclination is
appropriate for the soil type exposed, and to provide additional grading recommendations, as
necessary. If temporary slopes cannot be constructed in accordance with OSHA/WISHA
guidelines, temporary shoring may be necessary.
Permanent slopes should maintain a gradient of 2H:1V, or flatter, and should be planted with an
appropriate species of vegetation to enhance stability and to minimize erosion.
Utilitv Support and Trench Backfill
In our opinion, the soils observed at the test pit locations are generally suitable for support of
utilities. Excessively loose, organic, or otherwise unsuitable soils encountered in the trench
excavations should not be used for supporting utilities. In general, the on-site soils observed at
the test pit locations should be suitable for use as structural backfill in the utility trench
excavations, provided the soil is at or near the optimum moisture content at the time of
placement and compaction. Moisture conditioning of the soils may be necessary at some
locations prior to use as structural fill, Utility trench backfiil should be placed and compacted to
the specifications of structura! fill provided in this report, or to the applicable specifications of the
County or other applicable jurisdiction or agency.
Earth Solutions NW, LLC
WestPac Development ES-2971
September 10, 2013 Page 7
DrainaQe �
Groundwater seepage was not encountered at the time of our fieldwork (August 2013). ,
However, the presence of perched groundwater seepage should be anticipated during site �
excavations, particularly in the late fall, winter, spring and early summer months. Temporary
measures to control groundwater seepage and surface water runoff during construction will
likely involve interceptor trenches and sumps, as necessary. In our opinion, the proposed '
residential structures should incorporate footing drains around the outside perimeter of the
foundations. A typical footing drain detail is provided on Plate 3 of this report. Surface grades �'
adjacent to structures should slope away from the structures at a gradient of at least 2 percent. ,
Pavement Sections
The performance of site pavements is largely related to the condi#ion of the underlying '
subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and
unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in
pavement areas should be compacted to the specffications previously detailed in this report. It
is possible that soft, wet, or otherwise unsuitable subgrade areas may still exist after base
grading activities. Areas containing unsuitable or yielding subgrade conditions will require
remedial measures such as overexcavation and thicker crushed rock or structural fill sections
prior to pavement.
For lightly loaded pavement areas subjected primarily to passenger vehicles, the following
preliminary pavement sections can be considered:
• Two inches of hot mix asphalt (HMA) placed over four inches of crushed rock base
(CRB), or;
• Two inches of HMA placed over three inches of asphalt treated base (ATB).
For relatively high volume, heavily loaded pavements subjected to occasional truck traffic, the
#ollowing preliminary pavement sections can be considered:
• Three inches of HMA placed over six inches of CRB, or;
• Three inches of HMA placed over four inches of ATB.
The HMA, ATB and CRB materials should conform to WSDOT specifications. All soil base
material should be compacted to at least 95 percent of the maximum dry density. Final
pavement design recommendations can be provided once final traffic loading has been
determined. City of Renton road standards may supersede the recommendations provided in
this report.
Earth Solutions NW,LLC
WestPac Development ES-2971
September 10, 2013 Page 8
LIMITATIONS
The recommendations and conclusions provided in this geotechnical engineering study are
professional opinions consistent with the level of care and skill that is typicaf of other members
in the profession currently practicing under similar conditions in this area. A warranty is not
expressed or implied. Variations in the soil and groundwater conditions observed at the test
sites may exist, and may not become evident until construction. ESNW should reevaluate the
conclusions in this geotechnical engineering study if variations are encountered.
Additional Services
ESNW should have an opportunity to review the final design with respect to the geotechnical
recommendations provided in this report. ESNW should atso be retained to provide testing and
consultation services during constructiQn.
�,
I
Earth Solutions NW,LLC
� -, r. �. M ,,M
V, � 5'r'.:..�. l006[.1t[) . ^'G' • - v`�M:•S'
+ ��# JE�.RY i i .� t`.
_ � Sf'Ntw � ,Y„ TRA1 � . ,.r .».
�, SI - a !l �+stf]t , ...� ,t�. . f.•�, .
^G !e �4 1• .
. -�t7r +.'S . .
x + . Y.
; '�i' ' i �� i ```� ',
+�a � � }-t� iI_ litf- ri+?`p� S +y.-r��Il.pt* � ��yf:��Tr M ��� 'j.''�.
! _•R"r. ! } - stI`1= _ = e;4 � � ��'y �-rY'��
j ���St s��� tait��;.w i4_ .:,� � � t, s
�._2..'1I1 p � ' � ` � � �*{ .
�.�, i}Sl1 _,SL...� rJ: � � • � lZ fl r; � �1 ■{�� �."
+�
, a� �• ��. J•9 � � ri � � .,.
� �„n� ��,���� �� N' �:3 3f Tl 1�14�51 C.
IE '� �.jj �' -;�� 3�n`� i �}$_ � � I�yq'.G ;.{=
.��- AOLtfY+lAn�; �,�.}.�i��� 4'� � ',�',�y1=?:E.IltiT{��' ••• �, Rr�
� J ir ��
�LHH . �� A�EK �{.�� ��y�(� � •'AI.y�R.��, a.'1j .�r- Y il�'n�., :
S(y � . � 5��''' x' +f•Mq '1►M.h ��' �
y yl �-h : �`i"�.4ty �
1 I�11.,�iir� ��I S�[,IYI� _ '1 �7�
�SITE �' ��,�,,r � .,_�. �_� ,k _
��4 �[. i� �F�IH Y�,;; �lY1 S� S: �iAh+ G�
`I!'�1��"iqN- � �;,r M 'p,S'f+ji H �
�v` ri .yT.�- �r'. y ��ti
13JC' �'"�IM;•
�'^�.t 4 4;17'��,��'� �,,y z
- - - Ft s , � T } ��j i'.'
' •�i� y x "e! Ti'l��i
S: _� . _ -1l�:�- - �i 16H�� � f J•
vi_.�' : �'. n���t � 'e �� :l e'.�:4 �.
�,. , � -� � r r �isvrn � Vs�wi��~:ax�
- �" i :!'_ :st y � � ; v:kMGi
< '''�'� i ^i 4 � fi' !-'t 3� , rMit
�X .=�.t�2!{St_ � _ �'��� , `� 4 • aw.n ;��r�ttv;:.
g c �s��r� �Ixµ� '�t.
. ��(»�� "_' ' �' ��� R O 4 �` t1�'y� S i��M
;1 ii1H'.5 � � R r� * �*iRnz f' ��l:i�H �.. s 'S' .
!�IifIY'7� �,y
si 3 ��1� ,�,,,� � Y I� _... �� �� � � _'�'lr�r�� . .!. IYT� ' f���__x N_"+' � i
t'��4 �t`?K� � ➢�.( R �, �P� a�d ���ti �•n� �� �'Tii1H�l ,,. _ I
n
_ . �# lar4 SI .�.�'S!.:.. .rY.. ' . . �
'�' . `� :PT�t�ff ;M�'4 •�..�;� ���., •
� '� '2i1�{ a• _ Y�. •,
K�c s� S� �ina -�' ..i :t ;
:taFk if '� Y7m FL�d7 !�= �yl7�, ,,:�, =y ;.. 4
a ��.
�..��j S �2A�!�f+ j����.. � 'W'I� . w� �' . � • . �..
�`� e� ,k� � s r " . — 5 i
.. •e ,,,^��� , - - = � �c_ � � 4's• �c,,t �� '
_ : ;�;�';. =f � � -
• _=` _ ����rAc-.r :x1��'', v'�', : `
-� . � 2U �t�•�. � _ i
E � �K1r���1 � �t�:i'. �R ib�1s1�� .i � i� ZQST�� �r S i
?M1��� 4 i�lR' k nw�:Z '� �.w.�, .._i'.. . .. . , ..
� �i .���.�x��2,YTi � {r
i[ i�r �_ "`rx.JCMn �+q� y,imr � 1� 4 .ti � I
gk��, ���,,,�;�,n,s ��;, 1,,,, - �,. �,��, ,
�
��'�'_ -�� � r� r Y)I.iH - � �
�n"� ��.��`';�ib,,,�]i.1�m! h si� u . :i:,� `
;'ru `
��t������_t1�#��s .l� �' � n x.ti�rH. I
- �M w� •�.�3� - ;, . �'S-71M'j �'+ .
=at�wN. �f ir �' u � � 2�e•H� a
q�� � �� „ '� J .. �,
f��'I�Sf��` i ? ^Nr+�S,.�•.t' �+'n� ;
�r � 7l�fE . :� x k`'
F74pK - '+�.jt ST � � s i .. iyt•.,--�7f . _ 5t :'!-f �i 1 i
� . � �`.�� .�� .11ii" � N^' �j�( '
'�� �� !�� yj!�
"""� � �,/t��R P 4��F'Ir p �``t ` rt �. � � L.�t•
:%S! 19 i. t+"��� A�p �a�� �' ���.., .�.• 7,� _ L :tF�;r �,1 ]IifH�,
s
�.igl�• ti :�f.�_ �- .�ER�3�I, 3 Y12T"�+ '
SI
r
�
Reference: NORTH � � Ax. ,, ,
�u:
King County, Washington c'`
Map 686
By the Thomas Guide Vicinity Map
Rand McNally Eagleston
32nd Edition
Renton, Washington
NOTE:This plate may contain areas of color.ESNW cannot be Drwn. GLS Date 08/29/2013 Proj. No. 2971
responsible for any subsequent misinterpretation of the information
' resulting from black&white reproductions of this plate. CheCked SCW Date Aug. 2013 Plate 1
� - - - - - �- - - - - - �
, �
� , �
I �6 � � �
TP-2� � i
i
� I
� I �
�
- - - - - - 1 - - - - - - - - - --_ --- _ ... _ -
, � � �` - - -I- - I � ; i
� I I I �TP-3
I I I '
—■—
� 8 I 7 I I q � 3 � 2 � 1 � S;orm I I'
� � � � � I � �
�- - - - - � 1 � � _ � �;
, � � � �
�I i i i — � - - - - i u� I
i � � � - � � - _ - - - - - - --
� 9 �\ �' �'1 - - - -L - - - 1 - - - � � i
� – - - - -- - - - -- - - i �
� - - - - - - � � '�
_ �
� - - �- - - � _ � ' � � ¢ �I
�TP-1� �o ;� � � TP-4� � i i ( �
' / �� - -� � i � � I � T
I' - - - - // I ?3 I 14 I 15 I 16 � 17 i �
12 I I I I
� 19 � I � I —■— I
� i _ — _ � �TP-5 , �
� - - - - - -�- - - - - -�- �- - - - -_ __ _ _ -- - - - - - - - - �
NORTH
LEGEND
TP-1—i—Approximate Location of
ESNW Test Pit, Proj. No.
ES-2971, Aug. 2013
0 50 100 200
i � Subject Site 1��=100'
� – — – Scale in Feet
, Proposed Lot Number
' 1
� i �
NOTE:The graphics shown on this plate are not intended for design �+�.` �
purposes or precise scale measurements,but only to illustrate the "!!
approximate test locations relative to the approximate locations of
existing and J or proposed site features.The information illustrated Test Pit Location Plan
is largely based on data provided by the client at the time of our
' study.ESNW cannoi be responsible for subsequent design changes Eagleston
or interpretation of the data by others. R@I1t011, Washington
NOTE:This plate may contain areas of color.ESNW cannot be p�n, GLS Date 08/29/2013 Proj. No. 2971
responsible for any subsequent misinterpretation of the information
resulting from black&white reproductions of this plate. Checked SCW Date Aug. 2013 Plate 2
Slope
��
�� ��8:':�AAiri�)::::::.
.ti.ti.ti.ti:ti: .
.r.r.r.f.r.r.r
ti•ti•ti•ti•ti•ti
.r.r.r.f.r.r.
.ti. ti.ti.
�rtir r�:
.f.r��
�
2" {Min.)
Perforated Rigid Drain Pipe
(Surround with 1" Rock)
NOTES:
• Do NOT tie roof downspouts
to Footing Drain.
SCHEMATIC ONLY- NOT TO SCALE
• Surface Seal to consist of NOTA CONSTRUCTION DRAWING
12" of less permeable, suitable
soil. Slope away from building.
LEGEND:
� Surface Seal; native soil or
other low permeability material.
I, I
ti•ti•ti•ti• i �
:�'r�r�r�
ti.ti.ti.ti. 1" Drain Rock :'.'S
:�r�f�r�
t•ti•ti•ti,
� �
FOOTING DRAIN DETAIL
Eagleston
Renton, Washington
Drwn. GLS Date 09/10/2013 Proj. No. 2971
Checked SCW Date Sept. 2013 Plate 3
Appendix A I,
Subsurface Exploration I
ES-2971
The subsurface conditions at the site were explored by excavating five test pits at the
approximate locations illustrated on Plate 2 of this report. The test pit logs are provided in this
Appendix. The subsurface exploration was completed in August 28, 2013. The final logs
represent the interpretations of the field logs and the results of laboratory analyses. The
stratification lines on the logs represent the approximate boundaries between soil types. In I
actuality, the transitions may be more gradual. �
EaRh Solutions NW, LLC
Earth Solutions NWLLC I
SOIL CLASSIFICATION CHART
SYMBOLS TYPICAL I
MAJOR DIVISIONS GRAPH LETTER DESCRIPTIONS �
.
CLEAN '� '�� WELL-GRADED GRAVELS,GRAVEL-
GRAVEL GRAVELS � �•� � GW �D MIXTURES,LITTLE OR NO
AND ��•� FINES
GRAVELLY ,Uo ,� POQRLY-GRADED GRAVELS,
SOILS �LITTLE OR NO FINES) o ODo O GP GRAVEL-SAND MIXTURES,UTTLE
�a o0 OR NO FINES
COARSE °
GRAINED GRAVELSWITH '� '° � SILTYGRAVELS,GRAVEL-SAND-
SOILS ��T�N 50°� FINES Q o fl GM SILT MIXTURES
OF COARSE
FRACTION
RETAINED ON NO.
4 SIEVE (APPRECIABLE �+`+ CIAYEY GRAVELS,GRAVEL-SAND-
AMOIJN'f OF FINES) CLAY MIXTURES
CLEAN SANDS SW WELL�RAQED SANDS,GRAVELIY
MORE THAN 50'A, SAND SANDS,LITfLE OR NO FlhlES
oF awTEwA�is AND
UIRGER THAN SANDY POpRLY�'aRADED SANDS.
No.Zoo s�� SOILS
g� (UTTLE OR NO FINES) SP GRAVELLY SAND,LCTTLE OR NO
FINES
SAN DS W ITH Si�TY Snt�wS,SAND-SILT
MORETHAN50% FINES `SM MDCfURES
OF COARSE
FRACTION
PASSING ON N0.
4 SIEVE (APPRECIABLE S.G. CLAYEY SANOS.SAND-CLAY
AAAOUNT OF FINES} MIXTURES
INORGANIC SILTS AND VERY FINE
ML SANDS,ROCK FLOUR,SILTY OR
CIAYEY FINE SANDS OR CIAYEY
SILTS WITH SUGHT PLAS7tCITY
SILT$ INORGANIC CLAYS OF LOW TO
FINE LIQUID UMIT A�DIUM PLASTtCITY,GRAVELLY
GRAINED CLAYS �ss n�nN so CL caYs,�c�invs s,si�rr
soi�s
- - - OL ORGANIC SILTS ANO ORGANIC
- - - SILTY CLAYS OF LOW PLASTICITY
MORE TFIAN 50°h INORGANIC SILTS,MICACEOUS OR
OF MATERIAL IS MH DIATOMACEOUS FINE SAND OR
SMALLER THAN SIITY SOILS
NO.260 SIEVE
S� SfLTS
UQUID L�MIT ^u INORGANIC CLAYS OF HIGH
CLAYS GREATERTFIAN50 vn PIASTICITY
OH ���CLAYS OF MEDIUM TO
HIGH PLASTICI7Y,ORGANIC SILTS
L — —
HIGHLY ORGANIC SOILS ' ��`' ���' ''—�' pT P�T,�MUS,SWAMP SOILS WITH
„ „ „ „ HtGH ORGANIC CONTENTS
DUAL SYMBOLS are used to indicate borderline soil Gassifications.
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
Earth Solutions NW TEST PIT NUMBER TP-1
� 1805 136th Place N.E.,Suite 201 PAGE 1 OF 1
Bellevue,Washington 98005
Te tepho ne: 425-2843300
CUENT _West Pac Development __________ _ _____ PROJECT NAME Eagleston
PROJECT NUMBER 2971 PROJECT LOCATION Renton,Washington
DATE STARTED 8/28/13 COMPLETED 8/28/13 GROUND ELEVATION 510 ft TEST PIT SIZE
EXCAVATION CONTRACTOR NW Excavatinq GROUND WATER LEVELS:
EXCAVATION AAETHOD AT TIME OF EXCAVATION —
LOGGED BY SCW CHECKED BY 5CW AT END OF EXCAVATiON —
NOTES �th of TOpsoil 8 5od 2":grass AFTER EXCAVATION —
w
_ �W y U
_
W� a j TESTS � �O MATERIAL DESCRIPTION
� Q Z � (7
N
0
Brown sitty SAND,medium dense,damp(Fill)
SM
-12"layer of dark brown topsoil
MC=46.20% 3 5 _root and wood debris �5
MC= 13.30% ----- —--- -- -- — — ----- -
Grey silty SAND,dense,moist
SM �
5 i 5.5 - -- - 504.5
--- _ _ — -
8rown silty SAND with gravel,dense,moist
MC=15.40%
SM
-becomes very dense
MC=11.10%
9.5 500_5
- - - - -- _ - _
Test pii terminated at 9.5 feet below existing grade.No groundwater encountered during
excavation.
Bottom of test pit at 9.5 feet.
�
�
�
0
c�
y
�
�
�
a
C7
n
N
J
�
a
�
x
m
�
w
z
w
c7
Earth Solutions NW TEST PIT NUMBER TP-2
1805 136th Place N.E.,Suite 201 PAGE 1 OF 1
Bellevue,Washington 98005
Telephone: 425-284-3300
CLIENT West Pac Devebpment ___ ____ PRWECT NAME _E�a leston.___
PROJECT NU611BER 2971 PROJECT LOCATION Renton.Washinqton
_— _ -- -- - - -- -- --
DATE 3TARTED 8/28/13 COIYFPLETED 8/28/13 OROUND ELEVATION 510 ft TEST PIT SIZE
EXCAVA710N CONTRACTOR NW Excavatina GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION —
LOGGED BY SCW CHECKED BY SCW AT END OF EXCAVATION —
NOTES Depth of Topsoil 8 Sod 3":9rass _ __ __ _ _ _ ____ AFTER EXCAVA710N —
W
_ �W N U
W� �g TESTS � �O MATERtAL DESCRIPTION
� �Z � C7
0
Brown silty SAND,loose,damp(Fill)
-scattered debris
S11A
-12"thick podcet of drain rodc on east side
3.5 "��mes molst 506.5
MC= 13.80°k -- - _---- - - -- ---- -
Gray siky SAND with gravel,dense,moist
SM
5 MC=10.40°�
5.5 -- _ ._.___ 504.5
- - -- - --- __ _
Test pit terrt+imated at 5.5 feet befow existing grade.No grourtdwater encountered during ,
excavation.
Bottom of test pit at 5.5 feet. �
m
�
0
v
V1
7
2
�
a'
�
A
�J
J
�
F
2
m
�
W
Z
W
U
Earth Solutions NW TEST PIT NUMBER TP-3
1805 136th Place N.E.,Suite 201 PAGE 1 OF 1
Belfevue,Washington 98005
Telephone: 425-284-3300
CLIENT West Pac Develooment _ ______ ___ _ PROJECT NAME Ea9leston_ .___
PRWECT NUTABER �q71 PROJECT LOCATION Renton,Washinqton
---- — __--- -- - --.__--
DATE STARTED 8/26/13 COMPLETED B/28/13 GROUND ELEVATION 507 ft TEST PIT SIZE
EXCAVATION CONTRACTOR NW EXCeyBtir� _____ _ GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION —
LOGGED BY SCW CFiECKED BY SCW AT END OF EXCAVATION —
NOTES Deoth of Topsoil_�Sod 3":grass AF7ER EXCAVATION --
w
�� U
= W � _
w� �� TESTS � �O MATERIAL DESCRIPTION
o a�
¢Z � C�
�
0
Brown sitty SAND,medium dense,damp(Fifl)
SM
MC=7.30°�
MC=10.8096 --- — -------
3- ---��_ 503.5
Gray silty SAND,dense,moist
5_
SM
-becomes very dense
AAC=8.70% 7.5 499.5
- _ _ _ _ --- -- —
Test pft terminated at 7.5 feet below e�sting grade. No groundwater encountered during
excavation.
Bottom of test pit at 7.5 feet.
�
e
�
0
t�
�
z
3
a'
�
�
J
J
�
a
�
= I
m
� i
Earth Solutions NW TEST PIT NUMBER TP-4
, _ 1805 136th Place N.E.,Suite 201 PAGE 1 OF 1
Belle�ue,Washington 98005
Telephone: 425-284-3300
CUENT West Pac Dev_elo�rr+ent ___ _ PROJECT NAME Ea leston_ __
9 -- - -- ---
PROJECT NUMBER 2971 PROJECT LOCATION Renton.Washinqton__ _
---__- ----- -__. -- -- _ - -- -
DATE STARTED 8/28/13 COMPLETED 8/28/13 GROUND ELEVATION 510 ft TEST PIT SIZE
EXCAVATION CONTRACTOR _NW F�ccavaUng _ GROUND WATER LEVELS:
EXCAVATION METHOD AT 71AIE OF EXCAVATION -
LOGGED BY SCW CIIECKED BY SCW AT END OF EXCAVATION -
NOTES DeQth of TODsOiI&SOd_4":forest duff____ AFTER EXCAVATION -
W
_ �� �; �
_
W� �� TESTS N �J MATERIAL DESCRIPTION
o a�
aZ � �
�
0
Brovm silty SAND with gravel,medium dense,damp
SM -��ered roots
20 -- ---.��- -- _�_ --- —___ - --- -- � 508.0
Gray silty SAND with gravel,dense,damp
MC=6.40%
-partially cemented
5 SM
-becomes very dense
-becomes moist
MC=9.20°k -- - - 7,5_ _ ----so2.5
Test pit terminated at 7.5 feet below existing grade.No groundwater encountered during
excavation.
Bottom of test pit at 7.5 feet.
�
�
0
c�
�
i
c�
a
(7
A
N
J
�
a
�
x
m
�
�
w
z
w
�
EaRh Solutions NW TEST PIT NUMBER TP-5
� 1805 136th Place N.E.,Suite 201 PAGE 1 OF 1
Bellevue,Washington 98005
Telephone: 425-284-3300
CLIENT West Pac,Development_ _ PROJECT NAME Ea leston
_ _ 9 - -- --_ _-- _
PROJECT NUMBER 2971 PROJECT LOCATION Renton,Washington
_ _----- ___– --- --
DATE STARTED 8128/13 COMPLETED 8/28f13 GROUND ELEVATION 510 R TEST PIT SIZE
EXCAVATION CONTRACTOR NW Excavating___ _ GROUND WATER LEVELS:
EXCAVATION METHOD AT T1ME OF EXCAVATION —
LOGGED BY SCW CHECKED BY SCW AT END OF EXCAVATION —
NOTES _De�th of T�oil 8�Sod_4":grass_ _ AFTER EXCAVATION —
W
S �� �/j V I
W =
W� a? TESTS � �O MATERIAL DESCRIPTION
� ¢Z � (�
N
0
Brown silty SAND with gravel,medium dense,damp(Fill)
-scattered roots
SM
3.0 507.0
__ -- ----------- -
_ _ _--- —_ _ ____ _
Gray siNy SAND with gravel,dense,damp
MC=13.00°k
-partially c�neMed
5
SM
-becomes very dense
MC=9.70% _ _. 7.5 _ - ----- - __------- 502.5
Test pit terminated at 7.5 feet below existing grade.No groundwater encouMered during I
ezcavation.
Bottom of test pit at 7.5 feet.
�
�
m
0
c�
�
�i
�
a'
�
Ap�
N
�
�
S
m
�Q
K
w
Z
W
(7
� '
� �
��
Appendix B
Laboratory Test Resuits
ES-2971
ii
I �
�� �
Earth Solutions NW, LLC
„ , Earth Soiutions NW GRAIN SIZE DISTRIBUTION
, , . , ,, . 1805-136th Place N.E.,Suite 201
Bellevue,WA 98005
Telephone: 425-284-3300 �
CLIENT WestPac Development LLC PROJECT NAME Ea9leston �
PROJECT NUMBER ES-2971 PROJECT LOCATION ReMon
U.S.SIEVE OPENING MI INCHES I U.S.SIEVE NUMBERS I HYDROMETER I
6 4 3 2 1 3/4 1I2 3 4 6 610 1416 20 30 4D Sp 60 1007�0200
100 � I
95 I � I
90 -
85 \
80 ,
75
70
� 65
x
C7 sp ,
W
� i
m 55 �
�
z 50 �
� 45 I
z Iw
� 40
w
a
35
30
i
25
�
20
15
10
5
0 �
100 10 1 0.1 0.01 0.001
GRAIN SIZE IN MILLiMETERS
COBBLES GRAVEL SAND SILT OR CLAY
cAarse flne warse medium fine
Specimen Identification Classification PI Cc Cu
� � TP-1 3.Oft. USDA:Dark B�own Sandy Loam.USCS: SM.
� � TP-2 S.Oft. USDA: Light Brown Graveily Sandy Loam.USCS: SM w Gravel.
� o TP-3 7.5ft. USOA:Light Brown Gravelly Sandy Loam.USCS: SM.
�
a
�
�
3 Specimen ldentification D100 D60 D30 D10 %Silt %Clay
-,
� O TP-1 3.Oft. 9.5 0.221 41.9
� � TP-2 S.Oft. 37.5 0.493 30.0
W o TP-3 7.5ft. 37.5 0.397 33.7
�
N
2a
d
�
I �
�
Distribution ',
ES-2971
� � I
�
EMAIL ONLY WestPac Development
7449 West Mercer Way �,
Mercer Island, Washington 98040 '
Attention: Mr. Peter O'Kane II
�
Earth Solutions NW,LLC
I '
( �
�
'�� �l
- 1 i
, �
;,
APPENDIX C
Wetland Reconnaissance Report
The Watershed Company
� ,- ,
� �
,
;-��
i
lj
��
L_�
� �
;—;
�
TECHNICAL MEMORANDUM � � �
WATERSHED
Date: September 30, 2013
To: Peter O'Kane
From: Mike Foster
Project Number:
Project Name: Renton Eagleston/Zemanek
Subject: Wetland Reconnaissance Report for the
Eagleston/Zemanek project area in the City of Renton
Introduction
On Thursday,July 18,2013, Watershed Company Ecologist, Mike Foster, visited
the four subject parcels to screen for jurisdictional wetlands and streams. The tax
identification numbers of the four subject parcels, all located in the City of
Renton, are 619840-0247,-0241, -0260, and-0280.
Methods
Public-domain information on the subject property was reviewed for this study.
These sources include USDA Natural Resources Conservation Service Soil maps,
U.S. Fish and Wildlife Service National Wetland Inventory maps, Washington
Department of Fish and Wildlife interactive mapping programs (PHS on the Web
and SalmonScape),King County's GIS mapping website(iMAP), and the City of
Renton Municipal Code Wetland Map(Figure 4-3-050Q5).
The study area was evaluated for wetlands using methodology from the Regional
Supplentent to the Corps of Erlgineers Wefland Delineation Manual: Western
Mountains, Valleys, and Coast Region Version 2.0(Regional Supplement) (US Army
Corps of Engineers [Corps] May 2010). The wetland boundaries were
determined on the basis of an examination of vegetation,soils, and hydrology.
Areas meeting the criteria set forth in the Regional Supplement were determined
to be wetland. Soil,vegetation, and hydrologic parameters were sampled at
several locations on the subject property to make the determination. Data points
on-site are marked with yellow- and black-striped flags. We recorded data at
two of these locations.
Findings
The site is generally situated on a topographic plateau with only very minor
variations in elevation. Four on-site houses and one auxiliary structure are
surrounded by landscaped lawn, shrubs and a few deciduous and evergreen
trees. The west half of the south parcel (number-0280)varies from the rest of the
750 Sixth Street South Kirkland.WA 98033
p 425.822.5242 f 425.827.8136 watershedco.com
The Watershed Company
Wetland Reconnaissance Report
September 30,2013
Page 2
subject area as it is a non-maintained forest characterized mostly by mature big
leaf maple (Acer macrophyllum, FACU), red alder(Alnus rubrn, FAC), Scouler's
willow(Salix scouleriana,FAC) and some Douglas fir trees. The understory
vegetation is mostly Himalayan blackberry (Rubus armeniacus, FACU),
salmonberry(Ruba�s spectabilis,FAC), vine maple (Acer circinatum, FAC), red
elderberry (Sambucus racemosa, FACU), and sword fern(Polystichum rnunitum,
FACU). Most of the vegetation found in the subject area is typical of non-
wetland areas.
An area along the south parcel boundary contains some wetland vegetation.
Douglas' spirea(Sqiraea douglasii, FACW), water birch(Betula occidentalis,
FACW), and black cottonwood (Populus balsarnifera, FAC) saplings dominate this
small area. Some soft rush (Juncus effusus, FACW)is growing in the understory.
The presence of algal mats,water stained leaves,and water marks on stems and
trunks are indicators that the area had been inundated with surface water
sometime in the last year. However, the bright color of the rooting zone soil
matrix(dark yellowish brown(lOYR 4/4)) along the south parcel boundary
shows the inundation has not occurred for long enough during the growing
season for wetland soils to develop(see DP-2). Despite the presence of wetland
plants and indicators of wetland hydrology, the area does not currently meet
jurisdictional wetland criteria.
The water marks on-site appear to be consistent with an area of surface water
(and possible former wetland conditions)noted on the neighboring parcel to the
south on recent historical aerial photography. The off-site parcel is currently �
being developed under a building permit, so the conditions observed are no
longer present.
No jurisdictional wetland or stream features are located �rithin the subject area.
1
I � � 750 Sixth Street South ''
WETLAND DETERMINATION DATA FORM Kirkland,Washington 98033
WAT E RS H E D yyestem Mountains,Valle (425)822-5242
ys,and Coast Supplement to the watershedco.com
l � 'i".i I` � ; 1987 COE Wetlands Delineation Manual D P- 1
Project Site: Renton Ea leston2emanek Sampling Date: 7/18/2013
ApplicanUOwner: Sampling Point: DP- 1
Irnestigator: Mike Foster Ciry/County: Renton/Kin
Sect.,Township,Range S 33 T 23N R 05E State: WA
Landtorm(hilislope,terrace,etc) TerrBce Slope(%) 0 Local relief(concave,convex,none) FIBt
Subregion(LRR) p Lat 47.43 Long -122.18 Datum
Soil Map Unit Name Aldervvood gravelly sandy loam,0 to 6 percent slopes NW I ciassification N/A
Are climatic/hydrologic conditions on the site typical tor this time of year? Yes No (N no,explain in remarks.)
Are"Normal Circumstances'present on the site? Yes No
Are Vegetation❑,Soil,❑,or Hydrology❑signiticantly disturbed?
Are Vegetation❑,Soil,❑,or Hydrology 0 naturally problematic? (It needed,explain any answers in Remarks.)
SUMMARY OF FINDINGS-Attach site ma showin sam lin oint locations,transects,im ortant features,etc.
Hydrophytic Vegetation Present7 Yes No Is this Sampling Point within a Wetland? � Yes � No
Hydric Soils Present? Yes No
Wetland Hydrology Present? � Yes No
Aemarks: Point taken at the north edge of the south parcN
VEGETATION-Use scientific names of lants.
Tree Stratum (Plot size Sm diam. ) Absolute% Dominant Indicaror pominanCe Test WOrksheet I
Cover S ecies? Status
� Acer macro h l/um 50 Y FACU Number ot Dominant Species
z, that are OBL,FACW,or FAC: 2
(A)
3. Total Number of Dominant
q, Species Across All Strata: 3 (B�
=Toia�Cove� Percent of Dominant Species
that are OBL,FACW.or FAC: ��)
Sapling/Shrub Stratum (Plot size 3m diam. )
� Rubus s ectabilis 45 Y FAC Prevalence Index Worksheet
2. Total%Cover ot M I i I
3. OBL species x 1 =
a. FACW species x 2=
5. FAC species x 3=
FACU species x 4= I
=Total Cover x 5=
Flerb Stratum (Plot size 1 m diam. ) Column totals (A) B
� Ranunculus re ns 100 Y FAC
2 Prevalence Index=B/A=
3.
4 H dro h ic Ve etation Indicators
5. Dominance test is>50%
6. Prevalence test is 5 3.0'
7. Morphological Adaptations'(provide supporting
e. data in remarks or on a separate sheet)
s. Wetland Non-Vascular Plants'
io. Problematic Hydrophytic Vegetation'(explain)
��.
=Totai Cover �Indicators of hydric soil and wetland hydrology must be
present,unless disturbed or problematic
Wood Vine Stratum Plot size
�.
2 Hydrophytic Vegetation
=7ota�Cove� Present? Yes � No �
%Bare Ground in Herb Stratum
Remarks:
US Army Corps o/Engineers Westem Mountains, Valleys,and Coast-Intenm Version
SOIL Sam lin Point-DP-1
Profile Descri tion: Describe to the de th needed to dxument the indicator or confirm the absence of indicators.
Depth Matrix Redox Features
inches Color moist % Color moist % T Loc Texture Remarks
�_12„ very dark brown �� _ _ _ - Sandy loam
10YR 2/2
12-16" brown(10YR 4/3) 98 dark yellowish 2 _ _ Sandy loam
brown 10YR 4/4
'Type:C=Concentration,D=Depletion,RM=Reduced Matrix,CS=Covered or Coated Sand Grains ZLoc:PL=Pore Lining,M=Matrix
H dric Soil Indicators:(Applicable to all LRRs,unless otherwise noted.) Indicators for Problematic Hydric Soils'
❑ Histosol(A1) ❑ Sandy Redox(S5) ❑ 2cm Muck(A10)
❑ Histic Epipedon(A2) ❑ Stripped Matrix(S6j ❑ Red Parent Material(TF2)
❑ Black Histic(A3) ❑ Loamy Mucky Mineral(F1)(except MLRA 1) � Other(explain in remarks)
❑ Hydrogen Sulfide(A4) ❑ Loamy Gleyed Matrix(F2) ❑
❑ Depleted Below Dark SuAace(A11) ❑ Depleted Matrix(F3)
❑ Thick Dark SuAace(Al2) ❑ Redox Dark Surtace(F6) 3 Indicators of hydrophytic vegetation and wetland hydrology must
❑ Sandy Mucky Mineral(S1) ❑ Depleted Dark Surface(F7) be present,unless disturbed or problematic
❑ Sandy Gleyed Matrix(S4) ❑ Redox Depressions(FS)
Restrictive Layer(if present):
T�' Yes No
Hydric soil present?
Depth(inches):
Remarks:
HYDROLOGY
Wetland Hydrology Indicators:
Primary lndicators(minimum ol one required:check a!1 that apply): Secondary lndicators(2 or more required):
❑ Surface water(A1j ❑ Sparsely Vegetated Concave Surface(B8) Water-Stained Leaves(B9)(MLRA 1,2,4A&46)
❑ High Water Table(A2) ❑ Water-Stained Leaves(except MLRA t,2,4A&46)(B9) Drainage Patterns(B10)
❑ Saturation(A3) ❑ Salt Crust(B11) Dry-Season Water Table(C2)
❑ Water Marks(81� ❑ Aquatic Invertebrates(B13) Saturation Visible on Aerial Imagery(C9)
❑ Sediment Deposits(B2) ❑ Hydrogen Sulfide Odor(C1) Geomorphic Position(D2)
❑ Drift Deposits(B3) ❑ Oxidized Rhizaspheres along Living Roots(C3) Shallow Aquitard(D3)
❑ Algal Mat or Crust(B4) ❑ Presence of Reduced Iron(C4) FAC-Neutral Test(D5)
❑ Iron Deposits(B5) O Recent Iron Reduction in Tilled Soils(C6) Raised Ant Mounds(D6)(LRR A)
❑ Surface Soil Cracks(B6) ❑ Stunted or Stressed Plants(D1)(LRR A) Frost-Heave Hummocks
❑ Inundation Visible on Aerial ❑ Other(explain in remarks)
Imagery(B7)
Field Observations I
Surface Water Present? ❑ Yes � No Depth(in):
Water Table Present? ❑ Yes � No Depth(in�: Wetland Hydrobgy Present? Yes � No �
Saturation Present? ❑ Yes � No Depth(in): -14"
(includes capillary fringe)
Describe Recorded Data(stream gauge,monitoring well,aerial photos,previous inspections),if available:
Remarks:
US Army Corps o(Engineers Westem Mountains. Valleys,and Coast-Interim Version
� j ; 750 Si�h Street South
WETLAND DETERMINATION DATA FORM Kirkland,Washington 98033
WATE RS H E D yye3tem Mountains,Valleys,and Coast Supplement to the (425)822-5242
`,.I\ 1 1987 COE Wetlands Delineation Manual pp_ 2 watershedco.com
Project Site: Renton Ea Ieston2emanek Sampling Date: 7/18/2013
ApplicanVOwner: Sampling Point: DP- 2
Investigator: Mike Foster City/County: Renton/Kin
Sect.,Township,Range S 33 T 23N R OSE State: WA
Landtorm(hillslope,terrace,etc) TerrBCe Slope(%� 0 Local relief(concave,convex,none) Flat
Subregion(LRR) A Lat 47.43 Long -122.18 Datum
Soii Map Unit Name Alderwood gravelly sandy loam,0 to 6 percent slopes NWi dassitication N!A
Are climatic/hydrologic conditions on the site typical for ihis time ot year? Yes No (If no,explain in remarks.)
Are"Nortnal Circumstances"present on the site? Yes No
Are Vegetation�,Soil,�,or Hydrology�significantly disturbed?
Are Vegetation❑,Soil,�,or Hydrology�naturally problematic? (If needed,explain any answers in Remarks.)
SUMMARY OF FINDINGS-Attach site ma showin sam lin oint locations,transects,im ortant features,etc.
Hydrophytic Vegetation Present? � Yes � No Is this Sampling Point within a Wetland? a Yes � No
Hydric Soils Present? Yes No
Wetland Hydrology Present? Yes No
Remarks:
VEGETATION-Use scientific names of lants.
Tree Stretum (Plot size 5m diam. ) Absolute% Dominant Indicator pominanCe Test Wo�ksheet
Cover S cies? Status
�. Number of Dominant Species
Z. that are OBL,FACW,or FAC: (A�
3. Total Number of Dominant
q, Species Across All Strata: �B�
=Totai Cover Percent oT Dominant Species
that are OBL,FACW,or FAC: (�B�
SaplinglShrub Stratum (Plot size 3m diam. )
� Po ulus bafsamiiera sa !in s 90 Y FAC Prevalence Index Worksheet
2 Rubus s ctabiJis 10 N FAC Total/Cover ot Multiolv bv
3 S iraea dou lasii 2 N FACW OBL species x 1 =
a. FACW species x 2=
5. FAC species x 3=
FACU species x 4=
=7otal Cover x 5=
Herb Stratum (Plot size 1 m diam. ) Column totals (A) B
� Juncus effusus 15 Y FACW
2 Carex dewe ana 5 N FACU Prevalence Index=B/A=
3.
4� H dro h ic Ve etation Indicators
5. Dominance test is>50%
s. Prevalence test is 5 3.0'
�. Morphological Adaptations'(provide supporting
e. data in remarks or on a separate sheet)
9. Wetland Non-Vascular Plants'
to. Problematic Hydrophytic Vegetation'(explain)
t�.
=Totai Cover 'Indicators of hydric soil and wetland hydrology must be
present,unless disturbed or problematic
Wood Vine Stratum Plot size
t.
2 Hydrophytic Vegetation
=Total Cover Present? Yes � No �
%Bare Ground in Herb Stratum
Remarks: Site deared in t6e last ten years. Hydro may have recenUy been altered. Near a large trench associated with neighboring development.
US Army Corps o(Engineers Westem Mountains. VaHeys,and Coast-lnterim Version
SOIL Sam lin Point-DP-2
Protile Descri tion: Describe to the de h needed to document the indicator or confirm the absence of indicators.
Depth Matrix Redox Features
inches Color moist % Color moist % T Loc Texture Remarks
0-14" dark yellowish 98 7.5YR 4/6 2 RM M Sandy Loam
brown 10YR 4/4
'Type:C=Concentration,D=Depletion,RM=Reduced Matrix.CS=Covered or Coated Sand Grains ZLoc:PL=Pore Lining,M=Matrix
H dric Soil Indicators:(Applicable to all LRRs,un�ess otherwise noted.) Indicators for Problematic Hydric Soils'
❑ Histosol(A1) ❑ Sandy Redox(S5) ❑ 2cm Mudc(A10)
❑ Histic Epipedon(A2) ❑ Stripped Matriz(S6) Q Red Parent Material(TF2)
❑ Black Histic(A3) ❑ Loamy Mucky Mineral(F1)(except MLRA 1) ❑ Other(explain in remarks)
❑ Hydrogen Sulfide(A4) ❑ Loamy Gleyed Matrix(F2) ❑
❑ Depleted Below Dark SuAace(A11) ❑ Depleted Matrix(F3)
❑ Thick Dark Surface(Al2) ❑ Redox Dark Surtace(F6) 3 Indicators of hydrophytic vegetation and wetland hydrology must
❑ Sandy Mucky Mineral(S1) ❑ Depleted Dark SuAace(F7) be present,unless disturbed or problematic
❑ Sandy Gleyed Matrix(S4) ❑ Redox Depressions(FS)
Restrictive Layer(it presentl:
Type:
Hydric soil preserttl Yes No
Depth(inches):
Remarks:
HYDROLOGY
Wetiand Hydrobgy Indicators:
Primary Indicators(minimum of one required:check all that apply): Secondary Indicators(2 or more required):
❑ SuAace water(A1) ❑ Sparsely Vegetated Concave Surface(BS) Water-Stained Leaves(B9)(MLRA 1,2,4A&4B)
❑ High Water Table(A2) ❑ Water-Stained Leaves(except MLRA 1,2,4A&46)(69) Drainage Patterns(B10)
Saturation(A3) ❑ Salt Crust(B11) Dry-Season Water Table(C2)
Water Marks(81) ❑ Aquatic Invertebrates(613) Saturation Visible on Aerial Imagery(C9)
Sediment Deposits(62) ❑ Hydrogen Sulfide Odor(C1) Geomorphic Position(D2)
Drift Deposits(B3) ❑ Oxidized Rhizospheres along Living Roots(C3) Shallow Aquitard(D3)
Algal Mat or Crust(B4) ❑ Presence of Reduced Iron(C4) FAC-Neutral Test(D5)
Iron Deposits(BS) ❑ Recent Iron Reduction in Tilled Soils(C6) Raised Ant Mourxls(D6)(LRR A)
Surface Soil Cracks(66) ❑ Stunted or Stressed Plants(D1)(LRR A) Frost-Heave Hummocks
Inundation Visible on Aerial ❑ Other(explain in remarks)
Imagery(B7)
Field Observations
SuAace Water Present? ❑ Yes � No Depth(in):
Water Table Present? ❑ Yes � No Depih(in): Wetland Hydrobgy Present? Yes � No �
Saturation Present? ❑ Yes � No Depih{in): -14"
(includes capillary fringe)
Describe Recorded Data(stream gauge,monitoring well,aerial photos,previous inspec[ions),if available:
Remarres:
US Army Corps o(Engineers Westem Mountains. Valleys.and Coast-lnterim Version
V
APPENDIX D
Operations and Maintenance Manual
�
KING COUNTY", 1�1'ASHINGTOn, SURFACE 1� ATER DESIGV A9AN[1.AL
APPENDIX A
MAINTENANCE REQUIREMENTS FOR FLOW
CONTROL, CONVEYANCE, AND WQ FACILITIES
N0. 1 - DETENTION PONDS
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
General Trash&Debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet(this is about equal to the
amount of iresh it would take to fiil up one
standard size office garbage can). In general,
there should be no visuai evidence of dumping.
Poisonous Vegetation Any poisonous or nuisance vegetation which may No danger of poisonous vegetation
or Noxious Weeds constitute a hazard to County personnel or the where County personnel or the
public. public might normally be.
Coordination with Seattle-King
County Health Department
Contaminants and Oil,gasoline,or other contaminants of one gallon No contaminants present other than
Pollution or more,or any amount found that could: a surface film. (Coordination with
1)cause damage to plant,animal,or marine life; Seattle/King County Health
2)constitute a fire hazard;or 3)be flushed Department)
downstream during rain storms.
Unmowed if facility is located in private residential area, When mowing is needed,
Grass/Ground Cover mowing is needed when grass exceeds 18 grass/ground cover should be
inches in height. In other areas,the general mowed to 2 inches in height.
policy is to make the pond site match adjacent Mowing of selected higher use areas
ground cover and terrain as long as there is no rather than the entire slope may be
interference with the function of the facility. acceptable for some situations.
Rodent Holes Any evidence of rodent holes if facility is acting Rodents destroyed and dam or berm
as a dam or berm,or any evidence of water repaired. (Coordination with
piping through dam or berm via rodent holes or Seattle/King County Health
other causes. Department)
Insects When insects such as wasps and homets Insects destroyed or removed from
interfere with maintenance activities. Mosquito site. Mosquito control: Swallow
complaints accompanied by presence of high nesting boxes or approved larvicide
mosquito larvae concentrations{aquatic phase). applied.
Tree Growth Tree growth threatens integrity of berms acting Trees do not hinder maintenance
as dams,dces not allow maintenance access,or activities. Harvested trees should
interferes with maintenance activity(i.e.,slope be recycled into mulch or other
mowing,silt removal,vactoring,or equipment beneficial uses(e.g.,alders for
movements). If trees are a threat to berm firewood).
integrity or not interfering with access,leave
trees alone.
2005 Surface WaterDesign Manual—Appendix A l;'?4r'005
A-I
APPE1�Dla A MAIVTEI�ANCE REQUIREMEVTS FLOV�'CONTROL,C01�VE�'ANCE,ArD W'Q FACILITIES
NO. 1 -DETENTION PONDS
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
Side Slopes of Pond Erosion Eroded damage over 2 inches deep where cause Slopes should be stabilized by using
of damage is still present or where there is appropriate erosion control
potential for continued erosion. measure(s);e.g.,rock
reinforcement,planting of grass,
Any erosion observed on a compacted berm compaction.
embankment.
If erosion is occurring on compacted
bertns a licensed civil engineer
should be consutted to resoNe
source of erosion.
Storage Area Sediment Accumulated sediment that exceeds 10%of the Sediment cleaned out to designed
designed pond depth. pond shape and depth;pond
reseeded if necessary lo control
erosion.
Liner Damage Liner is visible and has more than three Y,-inch Liner repaired or replaced.
(If Applicable) holes in it.
Pond Berms(Dikes) SetUement Any part of berm that has settled 4 inches lower Dike should be built back to the
than the design elevation. Settling can be an design elevation.
indication of more severe problems with the berm
or outlet works. A licensed civil engineer should
be consulted to determine the source of the
settlement.
Emergency Tree Growth Tree growth on emergency spillways create Trees should be removed. If root
Overflow/Spillway blockage problems and may cause failure of the system is small(base less than 4
and Bertns over 4 bertn due to uncontrolled overtopping. inches)the root system may be left
feet in height. in place. Otherwise the roots should
Tree growth on berms over 4 feet in height may �removed and the berm restored.
lead to piping through the berm which could lead A licensed civil engineer should be
to failure of the berm. consulted for proper berm/spillway
restoration.
Emergency Rock Missing Only one layer of rock exists above native soil in Replace rocks to design standards.
Overflow/Spillway area five square feet or larger,or any exposure
of native soil at the top of out flow path of
spiltway. Rip-rap on inside slopes need not be
replaced.
]/24/2005 ?005 Surface\�'ater Design'�lanual—Appendix A
A-2
APPENDIa A M.AINTEVAVCt REQUIRE�IEN7S FOR FLOVI'CON"IROL,COVVEY'ANCE,AND WQ FACILITIES
NO.4-CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
General Trash and Debris Distance between debris build-up and bottom of All trash and debris removed.
(Includes Sediment) orifice plate is less than 1.5 feet.
Structural Damage Structure is not securely attached to manhole Structure securety attached to wall
wall and outlet pipe structure should support at and outlet pipe.
least 1,000 Ibs of up or down pressure.
Structure is not in upright position(allow up to Structure in correct position.
10%from plumb).
Connections to outlet pipe are not watertight and Connections to outlet pipe are water
show signs of rust. tight;structure repaired or replaced
and works as designed.
Any holes�ther than designed holes—in the Structure has no holes other than
structure. designed holes.
Cleanout Gate Damaged or Missing Cleanout gate is not watertight or is missing. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one Gate moves up and down easily and
maintenance person. is watertight.
ChaiNrod leading to gate is missing or damaged. Chain is in place and works as
designed.
Gate is rusted over 50%of its surface area. Gate is repaired or replaced to meet
design standards.
Orifice Plate Damaged or Missing Control device is not working properly due to Plate is in place and works as
missing,out of place,or bent orifice plate. designed.
Obstructions Any trash,debris,sediment,or vegetation Plate is free oi all obstructions and
blocking the plate. works as designed.
OverFlow Pipe Obstructions Any trash or debris blocking(or having the Pipe is free of all obstructions and
potential of blocking)the overflow pipe. works as designed.
Manhole See"Detention Tanks See"Detention Tanks and Vaults"Table No.3 See"Detention Tanks and Vaults"
and Vaults" Table No. 3
20�5 Surtace V4'ater Design'�9anual–Appendix A 1/24/2005 '
A-5 '
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL.CONVEYANCE.AND WQ FACILITIES
NO. 5-CATCH BASINS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is performed
General Trash&Debris Trash or debris of more than Y�cubic foot which No Trash or debris located
(Includes Sediment) is located immediately in front of the catch basin immediately in front of catch basin
opening or is blocking capacity of the basin by opening.
more than 10%.
Trash or debris(in the basin)that exceeds'/3 the No trash or debris in the catch
depth irom the bottom of basin to invert the basin.
lowest pipe into or out of the basin.
Trash or debris in any inlet or outlet pipe blocking Inlet and outlet pipes free of trash or
more than'!s of its height. debris.
Dead animals or vegetation that could generate No dead animals or vegetation
odors that could cause complaints or dangerous present within the catch basin.
gases(e.g.,methane).
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Structure Damage to Comer of frame extends more than'/.inch past Frame is even with curb.
Frame and/or Top curb face into the street(If applicable).
Slab
Top slab has holes larger than 2 square inches Top slab is free of holes and cracks.
or cracks wider than Y.inch(intent is to make
sure all material is running into basin).
Frame not sitting flush on top slab,i.e., Frame is sitting flush on top slab.
separation of more than'/,inch of the frame from
the top slab.
Cracks in Basin Cracks wider than Y2 inch and longer than 3 feet, Basin replaced or repaired to design
Walls/Bottom any evidence of soil particles entering catch standards.
basin through cracks,or maintenance person
judges that structure is unsound.
Cracks wider than Yz inch and longer than 1 foot No cracks more than'/4 inch wide at
at the joint of any inleUoutlet pipe or any the joint of inleUoutlet pipe.
evidence of soil particles entering catch basin
through cracks.
SettlemenU Basin has settled more than 1 inch or has rotated Basin replaced or repaired to design
Misalignment more than 2 inches out of alignment. standards.
Fire Hazard Presence of chemicals such as natural gas,oil No flammable chemicals present.
and gasoline.
Vegetation Vegetation growing across and blocking more No vegetation blocking opening to
than 10%of the basin opening. basin.
Vegetation growing in inleUoutlet pipe joints that No vegetation or root growth
is more than 6 inches tall and less than 6 inches present.
apart.
Pollution Nonflammable chemicals of more than'h cubic No pollution present other than
foot per three feet of basin length. surface film.
Catch Basin Cover Cover Not in Place Cover is missing or only partially in place.Any Catch basin cover is closed
open catch basin requires maintenance.
Locking Mechanism Mechanism cannot be opened by on Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts into
frame have less than'h inch of thread.
Cover Difficult to One maintenance person cannot remove lid after Cover can be removed by one
Remove applying 80 Ibs. of lift;intent is keep cover from maintenance person.
sealing off access to maintenance.
Ladder Ladder Rungs Unsafe Ladder is unsafe due to missing rungs, Ladder meets design standards and
misalignment,rust,cracks,or sharp edges. allows maintenance person safe
access.
1!24!2005 2005 Surface Water Design Manual—Appendix A
A-6
- -�
APPENDIX A MA[NTENANCE REQUIREMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES I
NO. 5-CATCH BASINS ',
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is pertormed
Metal Grates Unsafe Grate Grate with opening wider than�/e inch. Grate opening meets design
(If Applicable) Opening standards.
Trash and Debris Trash and debris that is blocking more than 20°� Grate free of trash and debris.
of grate surface.
Damaged or Missing. Grate missing or broken member(s)of the grate. Grate is in place and meets design
standards.
NO. 6-DEBRIS BARRIERS (E.G.,TRASH RACKS)
Maintenance Defect or Problem Condkion When Maintenance is Needed Results Expected When
Component Maintenance is Performed.
General Trash and Debris Trash or debris that is plugging more than 20°k Barrier clear to receive capacity
of the openings in the baRier. flow.
Metal Damaged/Missing Bars are bent out of shape more than 3 inches. Bars in place with no bends more
Bars. than'/.inch.
Bars are missing or entire barrier missing. Bars in place according to design.
Bars are loose and rust is causing 50% Repair or replace barrier to design
deterioration to any part of barrier. standards.
NO. 7- ENERGY DISSIPATERS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Pertormed.
External:
Rock Pad Missing or Moved Only one layer of rock exists above native soil in Replace rocks to design standards.
Rock area five square feet or larger,or any e�osure
of native soil.
Dispersion Trench Pipe Plugged with Accumulated sediment that exceeds 20%of the Pipe cleaned/flushed so that it
Sediment design depth. matches design.
Not Discharging Visual evidence of water discharging at Trench must be redesigned or
Water Properly concentrated points along trench(normai rebuilt to standards.
condition is a"sheet flov✓'of water along trench).
Intent is to prevent erosion damage.
Perforations Plugged. Over Y�of perforations in pipe are plugged with Clean or replace perforated pipe.
debris and sediment.
Water Flows Out Top Maintenance person observes water flowing out Facility must be rebuilt or
of"Distributo�'Catch during any storm less than the design storm or redesigned to standards.
Basin. its causing or appears likely to cause damage.
Receiving Area Over- Water in receiving area is causing or has No danger of landslides.
Saturated potential of causing landslide problems.
Internal:
Manhole/Chamber Wom or Damaged Structure dissipating flow deteriorates to%or Replace structure to design
Post.Baffles.Side of original size or any concentrated wom spot standards.
Chamber exceeding one square foot which would make
structure unsound.
2005 Surfacc Water Design Manual—Appendix A ]12412005
A-7
APPENDIX A MAINTEI�ANCE REQl11REMENTS FOR FLOVI'CONTROL.CONVEYANCE.AND W'Q FACILITIES
N0. 10-CONVEYANCE PIPES AND DITCHES
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When �
Component Maintenance is Performed
Pipes Sediment&Debris Accumulated sediment that exceeds 20°k of the Pipe cleaned of all sediment and
diameter of the pipe. debris.
Vegetation Vegetation that reduces free movement of water All vegetation removed so water
through pipes. flows freely through pipes.
Damaged Protective coating is damaged;rust is causing Pipe repaired or replaced.
more than 50%deterioration to any part of pipe.
Any dent that decreases the cross section area Pipe repaired or replaced.
of pipe by more than 20°k. '
Open Ditches Trash&Debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from
square feet of ditch and slopes. ditches.
Sediment Accumulated sediment that exceeds 20%of the Ditch cleanedfflushed of all
design depth. sediment and debris so that it
matches design.
Vegetation Vegetation that reduces free movement of water Water flows freely through ditches.
through ditches.
Erosion Damage to See"Detention Ponds"Table No. 1 See"Detention Ponds"Table No. 1
Slopes
Rock Lining Out of Maintenance person can see native soil beneath Replace rocks to design standards.
Place or Missing(If the rock lining.
Applicable).
N0. 11 -GROUNDS (LANDSCAPING)
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Pertortned
General Weeds Weeds growing in more than 20%of the Weeds present in less than 59�0 of
(Nonpoisonous,not landscaped area(trees and shrubs only). the landscaped area.
noxious) �
Safety Hazard Any presence of poison ivy or other poisonous No poisonous vegetation present in
vegetation. landscaped area.
Trash or Litter Paper,cans,bottles,totaling more than 1 cubic Area Gear of litter.
foot within a landscaped area(trees and shrubs
only)of 1,000 square feet.
Trees and Shrubs Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5%
broken which affect more than 25°�of the total of total foliage with split or broken
foliage of the tree or shrub. limbs.
Trees or shrubs that have been blown down or Tree or shrub in place free of injury.
knocked over.
Trees or shrubs which are not adequately Tree or shrub in place and
supported or are leaning over,causing exposure adequatety supported;remove any
of the roots. dead or diseased trees.
2005 Surface\6 ater Design A4anual—Appendix.4 1/24/2005
A-9
APPENDIX A 'vIA1NTET�ANCE REQUIREMEI�TS FLOVv COI�TROL,CONVEYANCE,AND Vb`Q FACILITIES
N0. 12-ACCESS ROADS
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
General Trash and Debris Trash and debris exceeds 1 cubic foot per 1,000 Roadway free of debris which could
square feet(i.e.,trash and debris would fill up damage tires.
one standards size garbage can).
Blocked Roadway Debris which could damage vehicle tires(glass Roadway free of debris which could
or metal). damage tires.
Any obstrudion which reduces Gearance above Roadway overhead clear to 14 feet
road surface to less than 14 feet. high.
Any obstruction restricting the access to a 10-to Obstruction removed to allow at
12-foot width for a distance of more than 12 feet least a 12-foot access.
or any point restricting access to less than a 10-
foot width.
Road Surface Settlement,Potholes, When any surface defect exceeds 6 inches in Road surface uniformly smooth with
Mush Spots, Ruts depth and 6 square feet in area. In general, any no evidence of settlement,potholes,
surface defect which hinders or prevents mush spots,or ruts.
maintenance access.
Vegetation in Road Weeds growing in the road surface that are more Road surface free of weeds taller
Surface than 6 inches tall and less than 6 inches tall and than 2 inches.
less than 6 inches apart within a 400-square foot
area.
Modular Grid Build-up of sediment mildly contaminated with Removal of sediment and disposal
Pavement petroleum hydrocarbons. in keeping with Health Department
recommendations for mildly
contaminated soils or catch basin
sediments.
Shoulders and Erosion Damage Erosion within 1 foot of the roadway more than 8 Shoulder free of erosion and
Ditches inches wide and 6 inches deep. matching the surrounding road.
Weeds and Brush Weeds and brush exceed 18 inches in height or Weeds and brush cut to 2 inches in
hinder maintenance access. height or cleared in such a way as to
allow maintenance access.
�
l;'24 2005 2005 Surface Water Design Manual—Appendix A
A-10
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND W'Q FACILITIES
NO. 24-CATCHBASIN INSERT
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Pertormed
Catch Basin Inspection Inspection of inedia insert is required. Effluent water from media insert is
free of oils and has no visible sheen.
Sediment When sediment forms a cap over the insert No sediment cap on the insert
Accumulation media of the insert and/or unit. media and its unit.
Trash and Debris Trash and debris accumulates on insert unit Trash and debris removed from
Accumulation creating a blockage/restriction. insert unit.Runoff freety flows into
catch basin.
Media lnsert Water Saturated Catch basin insert is saturated with water,which Remove and replace media insert
no longer has the capacity to absorb.
Oil Saturated Media oil saturated due to petroleum spill that Remove and replace media insert.
drains inlo catch basin.
Service Life Exceeded Regular interval replacement due to typical Remove and replace media at
average life of inedia insert product. regular intervals,depending on
insert product.
1/24/2005 2005 Surface W'ater Design Manual—Appendix A
A-20
APPENDIX E
Conveyance Analysis
StormSHED 3G Output
I
'1-�['� t
� �
0
•.�+
o� �C�
t1-ii ^
G C�
C
p��9 �
r�-o» ��+o i 2 �
N-o i �
N-014 p-012 O
P.017 N-015 P-01q U
P-015
v �
� +-+
� W
0 9 (n
4 b tJ- 13 C
o� O
r�-o s
N- 15
CB Total Area Lot Area 45% Impervious ROW Area 75% Impervious Total Basin Acres
Number sf Total Impervious Pervious Total Impervious Pervious Impervious Pervious Impervious Pervious
11 991.79 0.00 0.00 0.00 991.79 743.84 247.95 743.84 247.95 0.02 0.01
12 1,442.51 0.00 0.00 0.00 1,442.51 1,081.88 360.63 1,081.88 360.63 0.02 0.01
13 22,061.77 19,713.92 8,871.26 10,842.66 2,347.85 1,760.89 586.96 10,632.15 11,429.62 0.24 0.26
14 1,637.56 0.00 0.00 0.00 1,637.56 1,228.17 409.39 1,228.17 409.39 0.03 0.01
15 29,950.72 26,640.90 11,988.41 14,652.50 3,309.82 2,482.37 827.46 14,470.77 15,479.95 0.33 0.36
16 31,315.65 26,249.42 11,812.24 14,437.18 5,066.23 3,799.67 1,266.56 15,611.91 15,703.74 0.36 0.36
17 2,554.64 0.00 0.00 0.00 2,554.64 1,915.98 638.66 1,915.98 638.66 0.04 0.01
18 41,748.40 36,612.21 16,475.49 20,136.72 5,136.19 3,852.14 1,284.05 20,327.64 21,420.76 0.47 0.49
19 57,065.84 54,030.05 24,313.52 29,716.53 3,035.79 2,276.84 758.95 26,590.37 30,475.48 0.61 0.70
20 3,015.50 0.00 0.00 0.00 3,015.50 2,261.63 753.88 2,261.63 753.88 0.05 0.02
The above bolded areas
are what is used in
conveyance calculations
in StormSHED 3G
Appended on: Friday,August 15,2014 3:57:14 PM
Layout Report: Rylee
Event �Precip (in)
2yr 24hr ', 2.50
�25 year �' 3.40
100 year� 3.90
Reach Records
Record Id: P-011
- - - -- _ __ _ _ _
SecNon Shape: I Circular �
Uniform Flow Method: � Manning's Coefficient: I 0.009 �
. -- ------ --------�--
Routing Method: Travel Time Shift Contributing Hyd
------ - _ _ _ - ---- �------
DnNode N-010 UpNode N-011
Material ; unspecified Size � 18 in Diam
Ent Losses � Groove End w/Headwall �'
- ---_ _ . _ _ -�—
Length �-63.00 ft Slope I 3.25/o
Up Invert � 500.55 ft Dn Invert � 498.50 ft
_ _. _ _
Conduit Constraints I
I Min Vel � Max Vel Min Slope Max Slope � Min Cover �'I
__ _ _ _._ __ _ -- _ _ — -- --I
2.00 ft/s 15.00 ft/s 0.50% 2.00% � 3.00 ft
Drop across MH � 0.00 ft Eac/Infil Rate 0.00 in/hr ''
_ _ __ '
Record Id: P-012
Section Shape: I Circular '
Uniform Flow Method: � Manning's Coefficient: 0.009
Routing Method: Travel Time Shift Contributing Hyd
DnNode N-011 'UpNode N-012 '
---- _ _ ._ _ _--- ___ _ _----_ _--_ - ---- __ __ _ — --..
�
Material unspecified Size 12 in Diam
Ent Losses � Groove End w/Headwall
_ _ - -- - --
Length 91.00 ft Slope �0.49%
Up Invert � 501.50 ft Dn Invert �501.05 ft
__ _-----___ —
Conduit Constraints
_ _ __ _ _ __ __ , _ ___
' Min Vel Max Vel i Min Slope Max Slope � Min Cover
.-- - _ _ - ____-------- _ _---- -
, 2.00 ft/s 15.00 ft/s � 0.50°/a � 2.00% 3.00 ft
;
'__ _ _ __ _ _ _-_ _ _ —_
_ --- - -
Drop across MH 0.00 ft �x/Infil Rate � 0.00 in/hr
Record Id: P-013
---_ _ __ - -- -- ---__
� �Section Shape: � Circular
�'�Uniform Flow Method: Manning's Coefficient: 0.009
_ _ __ -- -
;Routing Method: Travel Time Shift �Contributing Hyd �— �
-- -__
_ ---- ----
'DnNode � N-012 �pNode �-013 �
-- --- r---- — ----__ ..___-
�� �aterial I unspecified Size 12 in Diam �
�- --- _ .___ _ --- .-----_ ___-- (
_ _ - -- - ---
Ent Losses j Groove End w/Headwall
; ,Length � 18.00 ft 'Slope -� 0.50% '
- - ---- _---
� IUp Invert � 501.59 ft �Dn Invert � 501.50 ft ��
�- - - - - - -- _ _ - _-_ ___ i
� Conduit Constraints i
___
- Min Vel �
Max Vel Min Slope ' Max Slope Min Cover
--
2.00 ft/s 15.00 ft/s 0.50% , 2.00% 3.00 ft i
_ _ _— - ------�
Drop across MH �- 0.00 ft Eae/Infil Rate 0.00 in/hr I
Record Id: P-014
. __ __ - -
__. ____ _----- ---- --_ _ _____.
Sec6on Shape: � Circular
---._
Uniform Flow Method: � Manning's Coefficient: 0.009
-- _ _ --- - _____ _ _____—
Routing Method: �; Travel Time Shift ContribuNng H,yd
- -- - - _- ---
DnNode N-011 UpNode �—N-014
Material unspecified Size 18 in Diam
_ ---- __--- _ _ _ _ _ _ _
Ent Losses Groove End w/Headwall
' --- --
Length �--82.00 ft �Slope 1.78%
,Up Invert � 502.01 ft �Dn Invert ' S00.55 ft
� _ _ _ _ _ _ ._._ . ---
r -_ __
I _ - ---
Conduit Constraints
-- --_ ._ _ -- _
i�Min Vel Max Vel Min Slope Max Slope ' Min Cover
2.00 ft,'s 15.00 ft/s j 0.50% 2.00% I 3.00 ft
--
_ --- -
Drop across MH r— 0.00 ft Ex/Infil Rate � 0.00 in/hr
Record Id: P-015
-------
SecNon Shape: Circular
Uniform Flow Method: ' Manning's Coefficient: 0.009
Routing Method: Travel Time Shift !Contributing Hyd �
— --- _ ---- --- ---- _ —
�--
DnNode j N-014 iUpNode N-015
Material unspecified ISize 18 in Diam ;
Ent Losses � Groove End w/Headwall
_ r— __-- --- - -:
Length 79.00 ft Slope 0 51% �
___ _ , _
Up Invert 502.41 ft ;Dn Invert ! 502.01 ft '
_ - _ _ _ __ __ . __
_ __ _ --- ---- -- ____ --- --�
Conduit Constraints i
Min Vel Max Vel � Min Slope � Max Slope � Min Cover
;_. _
2.00 ft/s 15.00 ft/s 0.50% 2.00% � 3.00 ft
-- -- - ____�
_-- - --_ —_ ___ _ --- _
�-----
Drop across MH 0.00 ft Ea`/Infil Rate ! 0.00 in/hr '
Record Id: P-016
Section Shape: Circular '
_ -___ _
Uniform Flow Method: Manning's Coefficient: � 0.009
— - _
Routing Method: , Travel Time Shift Contributing Hyd
_ —_ . _ -- - --- -
DnNode � N-015 UpNode � N-016
Material � unspecified Size 12 in Diam
Ent Losses � Groove End w/Headwall
Length r 20.00 ft Slope �0.50%
------ --- --_- ___ -- - - -- - _---- _ _ -- _ , --
Up Invert 503.01 ft Dn Invert ' S02.91 ft
---
-_ ---
Conduit Constraints
Min Vel Max Vel � Min Slope Max Slope � Min Cover i
2.00 ft/s 15.00 ft/s � 0.50% 2.00% � 3.00 ft
_— - __, _ ,
Drop across MH 0.00 ft iEar/Infil Rate 0.00 in/hr
Record Id: P-017
Section Shape: � Circular
Uniform Flow Method: � Manning's jCoefficient: � 0.009
Routing Method: Travel Time Shift ontributing Hyd
--_ _ - - _ _ __
DnNode N-015 UpNode N-017
- — ---------_____-- - - �----- --
Material unspecified Size �, 12 in Diam
_ _ --- _ _ ---- - -
Ent Losses i Groove End w/Headwall �
Length � 62.00 ft Slope �0.97%0
Up Iovert 503.51 ft Dn Invert 502.91 ft , I
__--__ : _ , I
Conduit Constraints I !,
- -- - -_ —� .- --- - --
Min Vel Max Vel Min Slope Max Slope , NLn Cover ',
-- -- ____- -- ---- _ _ . ---- --
2.00 ft/s 15.00 ft/s � 0.50% 2.00% ' 3.00 ft i', '
--- - __ _ -- ---__ __
-- _ --- r----- - ---r-- -
Drop across MH 0.00 ft E�Infil Rate 0.00 in/hr
Record Id: P-018
Section Shape: � Circular ;
__ — _ _ — — --I
Uniform Flow Method: Manning's Coefficient: � 0.009
__ — -__- -_
Routing Method: Travel Time Shift Contributing Hyd
DnNode ' N-017 UpNode � N-018 �
__ -
Material � unspecified Size � 12 in Diam
__- -- _---
Ent Losses � Groove End w/Headwall �
;_---
Length 27.00 ft Slope i 0.52%
---- - -_ _ _- ----
Up Invert 503.65 ft Dn Invert ! 503.51 ft
--
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope r Min Cover ;
2.00 ft/s 15.00 ft/s 0.50% 2.00% ' 3.00 ft '
_, __ _ _
�
Drop across MH ' 0.00 ft Ex/Infil Rate 0.00 in/hr
Record Id: P-019
_ ---_ _ __ ;
Section Shape: � Circular ;
--
Uniform Flow Method: �Manning's Coefficient: � 0.009 �
_ __ --- _ _- - -__ _ ___
Routing Method: ; Travel Time Shift �Contributing Hyd � �
DnNode ' N-017 UpNode �-019
Material ���� unspecified j5ize 12 in Diam
_ --------
Ent Losses ' Groove End w/Headwall
Length 62.00 ft Slope j 1.48%
Up Invert 504.43 ft Dn Invert � 503.51 ft
- - --
Conduit Constraints
_ - _ --- _ _ ---------- ---
�; Min Vel '�, Max Vel Min Slope Max Slope �Min Cover
2.00 ft/s 15.00 ft/s I 0.50% ; 2.00% 3.00 ft
_ _ - - -- _ _ - - -----
- -- - -
Drop across MH � 0.00 ft �E�Infil Rate �00 in/hr
Record Id: P-020
Section Shape: Circular
Uniform Flow Method: j Manning's Coefficient: 0.009
Routing Method: j Travel Time Shift Contributing Hyd �
DnNode �N-019 UpNode N-020
____ __ _ -_ _ ----- -
Material unspecified Size 12 in Diam
Ent Losses � Groove End w/Headwall
,_ ___ -- - -
Length 23.00 ft Slope 2.00%
- _----
Up Invert j 504.89 ft Dn Invert 504.43 ft
_ _ - _ _- _ - - - _ _----- __ __ ;
'i Conduit Constraints '
" r Min Vel Max Vel �' Min Slope Max Slope � Min Cover
' 2.00 fUs 15.00 ft/s r 0.50% 2.00°/a � 3.00 ft '
�
;'
_ --- — _ __
_ -- — -- ----__ --- -
Drop across MH ' 0.00 ft �E�Infil Rate 0 0 i0 n/hr
Node Records
Record Id: N-010
Descrip: Prototype Record Increment 0.10 ft
—-- - -- -- - ---- - - ----_ _�
Start El. 498.50 ft Max El. 500.00 ft
_—_ _ _r— _ _
Void Ratio 100.00 :
Condition Existing Structure Type Dummy
�En� i,Groove End w/Headwall(ke=0.20)iChannelization No Special Shape '
- --_ __ _ ,—_ _-
'Ca ch '0.00 ft Bottom Area 0.00 sf
- -_ ___ - -- ------
MH/CB Type Node '
Record Id: N-011
- -------- ------ ---_ -- --_ --- ___ - -------
Descrip: Prototype Record Increment 0.10 ft
_ -- - ---
Start El. 500.55 ft 'Max EL 509.56 ft '
--_ __ _ . _ _ _- , _-- i
Void Ratio 100.00 ,
,Condition Existing ',�Structure Type ICB-TYPE 2-48 I
,Ent Ke �Groove End w/Headwall(ke=0.20) ',Channelization No Special Shape
-- - - -- _ __ ___---------- _ _ _ - ---- -
Catch �00 ft �Bottom Area �12.5664 sf
�MH/CB Type Node ----- ---------------�
Record Id: N-012
Descrip: �Prototype Record ;Increment '0.10 ft
- __---- _ __ ___ ________ __ __ _ - - . ._-__ _
Start El. 501.50 ft !Max EL 506.50 ft
- ----- _ ' _ ___
Void Ratio'100.00 ; ; �'�
_ -----__ _--
Condition Existing 'Structure Type jCB-TYPE 1 I,
- - _ _ __ , _ -- - --- . ._ _
Ent Ke Groove End w/Headwall(ke=0 20) ;Channelization�No Special Shape ,
. --------- - -
- - -
jCatch ;0.00 ft ,Bottom Area 3.97 sf ',
,MH/CB Type Node ----- -----_ ,,
Record Id: N-013 �
Descrip: Prototype Record Increment 0.10 ft 'I
_ _ ---
Start El. 501.59 ft Max EL 506.50 ft
- _ __
Void Ratio 100.00 i �
_ _ I__ _ _ _ __ _- -
Condition Existing �Structure Type CB-TYPE 1
--- ----___r-__
Ent Ke Groove End w/Headwall(ke=0.20) 'Channelization;No Special Shape
__ _ __ _ _ __ _ ___ _
Catch 0.00 ft 'Bottom Area 3.97 sf
---- -- -----—----
___ _ - ___ _ - --_ _ ____ __
_ __ _ _ __
MH/CB Type Node
i�
� !
`__ I
Record Id: N-014
_ -- - ----------r--- ------�--- ---
'�Descrip: �Prototype Record iIncrement ii0.10 ft
--_ -
Start El. 502.01 ft �Max El. 508.75 ft
Void Ratio i 100.00 �
Condition 'Existing 'Structure Type CB-TYPE 2-48
En-_ ___ _ _____------ __ - _-- ----- --
Ke �Groove End w/Headwall (ke=0.20) Channelization�o Special Shape ',
-- ------ —_ _ _ _-- -_ - -- --------- - --- _
'Catch %0.00 ft Bottom Area �2.5664 sf '
r-------------- __------ -------- -----
IMH/CB Type Node
Record Id: N-015
-- --- -
�Descrip: ;Prototype Record ',Increment ,0.10 ft
Start El. I502.41 ft �Max El. 507.90 ft
,Void Ratio 100.00 � � �
_ __ ---
Condition ,Existing Struc�ture Type CB-TYPE 2-48 �
Ent Ke ''Groove End w/Headwall(ke=0.20) 'Channelization;No Special Shape
.----------- ---
Catch 0.00 ft Bottom Area 12.5664 sf
_ _ _ _ _
�- MH/CB Type Node
_ _ _ _
Record Id: N-016
-- -- --- _ _ __ _ ____:
IDescrip: jPrototype Record '�Increment �0.10 ft
Start El. 503.01 ft �Max El. 507.90 ft
- -- - -�---- -- --- ----
�oid Ratio�100.00 � (
,Condition ��Existing �tructure Type 'CB-TYPE 1
Ent Ke 'Groove End w/Headwall(ke=0.20) Channelization No Special"`Shape
�Catch 0.00 ft ;B�ottom Area � 3.97 sf I '�
__------------ _� -- ------- I
MH/CB Type Node ,
Record Id: N-017
_ ---__ __ _ _ __ --
Descrip: Prototype Record Increment I0.10 ft �
Start El. 503.51 ft Max El. r508.56 ft
�Void Ratio 100.00
�Condition iExisting Structure Type �CB-TYPE 2-48
Ent Ke IGroove End w/Headwall(ke=0.20) Channelization�o Special Shape
- - --- -----------_ _
�Catch �0.00 ft Bottom Area 12.5664 sf
MH/CB Type Node
Record Id: N-018
�IDescrip: �Prototype Record Increment 0.10 ft
r---
'Start El. i503.65 ft 'Max El. 508.46 ft
'�Void Ratio�i 100.00 ---- --- --� -
Condition �E t ng �Structure Type jCB-TYPE 1
Ent Ke Groove End w/Headwall(ke=0.20) ;Channelization�N So pecial Shape
_---- - -- _ - ----
Catch ,�00 ft 'Bottom Area 3.97 sf
MH/CB Type Node
Record Id: N-019
Descrip: Prototype Record Increment ;0.10 ft
- _ _ --- - �------- -
iStart El. 504.43 ft Max El. I509.43 ft
___ ___ __ ___
Void Ratio 100.00 '
� ��,Condition �isting �tructure Type '�CB-TYPE 1
Ent� Ke ,Groove End w/Headwall(ke=0.20) ;�Channelization,1 o Special Shape
Catch '0 00 ft �Bottom Area .3.97 sf
_— __ - - - - -
MH/CB Type Node
Record Id: N-020
Descrip: Prototype Record Increment 0.10 ft
Start El. 504.89 ft 'Max El. 509.89 ft
___ —
Void Ratio',100.00 '
; _
—_ __ _ _
Condition ',Existing Structure Type CB-TYPE 1
- ------- --- _--
(Ent Ke 'Groove End w/Headwall (ke=0.20) Channelization No Special Shape
Cat�- 0.00 ft Bottom Area '3.97 sf
--__ ------------- ----
MH/CB Type Node
Contributing Drainage Areas
Record Id: B-011
� ,SeattleRecord Id: B-012
Design Method Rational IDF Table: I
;
�� ' - - --_ - - - __ _ _ __ _ -
�--___------ -- -�------__ . _ _- -__--- _ __ .._ ___ --- -
' SeattleRecord Id: B-013
', Design Method �I Rational IDF Table:
. ---- _ _ --- -- - _ _ _
' SeattleRecord Id: B-014
� Design Method Rational IDF Table:
I �
� - - _ _ - - _ - -- --
' SeattleRecord Id: B-015
Design Method , Rational IDF Table:
�
I
� y __ ,_ . _ _ _-- _
� ��� ', SeattleRecord Id: B-016
Design Method I Rational � IDF Table:
' _
i - _
' SeattleRecord Id: B-017
, ' Design Method Rational IDF Table:
, �� �
_ ___ _ _- - -----
_ _ _ . _ - -__
'� ' SeattleRecord Id: B-018
Design Method ��, Rational IDF Table:
, � ,
� �� ,
_ _ _ _ -- _
_-- - --- -- _ � __--- -__ _ -- � __
- - _
' � SeattleRecord Id: B-019
Design Method j Rational �, IDF Table:
- , I SeattleRecord Id: B-020
' Design Method I� Rational � IDF Table: �
' � I '
�----__ .. . _---- -- _ - --- - ----- -- ,—
' ' i Seattle '
Design Method Rational IDF Table: ',- '
_ _ _
�I Licensed to: Engenious Systems, Inc. ,
ROUTEHYD [] THRU [Rylee] USING [100 yr] AND [Seattle] NOTZERO RELATIVE RATIONAL
Rational Method analysis
Reach ID Area(ac) TC(min) i(in/hr) Flow(cfs) ��fS4 Full ratio n;ftp�th Size nVel (ft/s) fVel (ft/s) CArea
12 in
P-020 0.07 6.3 3.209 0.1604 7.2975 0.022 0.1025 Diam 3.7845 9.2915 B-020
12 in
P-019 1.38 6.4013 3.1812 2.4623 6.2776 0.3922 0.4354 Diam 7.5002 7.9928 8-019
12 in
P-018 0.96 6.3 3.209 1.7505 3.721 0.4704 0.4827 Diam 4.6631 4.7377 B-018
12 in
P-017 2.39 6.5391 3.1445 4.2702 5.0821 0.8402 0.7024 Diam 7.2444 6.4708 B-017
12 in
P-016 0.72 6.3 3.209 1.3285 3.6488 0.3641 0.4174 Diam 4.2788 4.6457 B-016
18 in
P-015 3.8 6.6817 3.1077 6.7096 10.8648 0.6176 0.8528 Diam 6.4687 6.1482 B-015
18 in
P-014 3.84 6.8852 3.0573 6.691 20.2977 0.3296 0.5887 Diam 10.3972 11.4861 B-014
12 in
P-013 0.5 6.3 3.209 0.9017 3.6488 0.2471 0.3386 Diam 3.8516 4.6457 B-013
12 in
P-012 0.53 6.3779 3.1876 0.9611 3.6286 0.2649 0.3513 Diam 3.9039 4.6201 B-012
18 in
P-011 4.4 7.0167 3.026 7.5967 27.427 0.277 0.5398 Diam 13.2718 15.5205 B-011
�
HGL Analysis
From Junct Loss Adjusted
Node To Node HG EI (ft) App(ft) Bend(ft) �ft) HG EI (ft) Max EI(ft)
505.25
N-011 N-010 505.7539 0.2226 0.1874 0.0252 505.7439 509.56
N-014 N-011 506.17 0.2239 0.0018 ------ 505.9479 508.75
No approach losses at node N-017 because inverts and/or crowns are offset.
N-015 N-014 506.3673 0.459 0.0263 0.1038 506.0383 507.9
N-017 N-015 507.0122 0.1526 0.0171 0.0667 506.9434 508.56
N-019 N-017 507.27 0.0006 0.0008 ------ 507.2702 509.43
N-020 N-019 507.2712 ------ ------ ------ 507.2712 509.89
N-018 N-017 507.0666 ------ ------ ------ 507.0666 508.46
N-016 N-015 506.1049 ------ ------ ------ 506.1049 507.9
N-012 N-011 505.8033 0.0205 0.0231 ------ 505.8059 506.5
N-013 N-012 505.836 ------ ------ ------ 505.836 506.5
Conduit Notes
Reach HW Depth HW/D Q�cfs) �Depth Dc(ft) Dn(ft) Comment
(ft) ratio (ft)
P-011 7.2514 4.8343 7.6 6.75 1.0681 0.5398 Outlet Control
P-014 5.6196 3.7464 6.69 5.1939 1.0013 0.5887 Outlet Control
P-015 4.3602 2.9068 6.71 3.9379 1.0027 0.8528 Outlet Control
P-017 4.1036 4.1036 4.27 3.1283 0.8699 0.7024 Outlet Control
P-019 3.7576 3.7576 2.46 3.4334 0.6724 0.4354 Outlet Control
P-020 2.8412 2.8412 0.16 2.8402 0.1638 0.1025 Outlet Control
P-018 3.557 3.557 1.75 3.4334 0.5632 0.4827 Outlet Controi
P-016 3.1949 3.1949 1.33 3.1283 0.4873 0.4174 Outlet Control
P-012 4.7533 4.7533 0.96 4.6939 0.4115 0.3513 Outlet Control
P-013 4.336 4.336 0.9 4.3059 0.3981 0.3386 Outlet Control
(
� I
r�-oos PJ-007A
P-008
-o
��
S
007
�J JL�
�
0
o ^
� g
d
A
�°0S r� a
A
��r -003
�
b
0
w
FJ- 2
�
b
0
�
i
t1 C.B-E�
■
Pond Outfall
CB Total Area Lot Area 45% Impervious ROW Area 75%Impervious Total Basin Acres
Number sf Total Impervious Pervious Total Impervious Pervious Impervious Pervious Impervious Pervious
3 3,703.29 0.00 0.00 0.00 3,703.29 2,777.47 925.82 2,777.47 925.82 0.06 0.02
4 3,054.72 0.00 0.00 0.00 3,054.72 2,291.04 763.68 2,291.04 763.68 0.05 0.02
5 1,421.19 0.00 0.00 0.00 1,421.19 1,065.89 355.30 1,065.89 355.30 0.02 0.01
6 1,416.43 0.00 0.00 0.00 1,416.43 1,062.32 354.11 1,062.32 354.11 0.02 0.01
7 3,016.40 0.00 0.00 0.00 3,016.40 2,262.30 754.10 2,262.30 754.10 0.05 0.02
g 2.23 2.63
The above bolded areas
are what is used in
conveyance calculations
in StormSHED 3G
Appended on: Friday,July 25,2014 3:40:17 PM
Layout Report: Outfall
Event IPrecip (in)
---- - _.
,2yr 24hr 2.50
�25 year I 3.40 '
�00 year 3.90
Reach Records
Record Id: P-001
Section Shape: � Circular
Uniform Flow Method: Manning's �Coefficient: � 0.009
�---- -
Routing Method: � Travel Time Shift jContributing Hyd �
_ _ _ _ . _
DnNode �, N-CB-EX ',UpNode N-001
. - _ _ _-- _ _ _ -
Material i unspecified Size 18 in Diam
--- - -- --
Ent Losses � Groove End w/Headwall
__ - - -. __ ..___ _ --
Length 25.00 ft Slope 1.32%
Up Invert 495.81 ft Dn Invert 495.48 ft
� - -- - - _------- - --- -- -- - ---
I Conduit Constraints
_ ---- --
� Min Vel Max Vel � Min Slope Max Slope Min Cover I
- -- - _ _-- -- --- -- -- - -- �
2.00 ft/s I5.00 ft/s �--0.50% � 2.00% �.00 ft
_ _ - _ ---
-- --- —- _- _ _
'Drop across MH 0.00 ft Ea�/Infil Rate � 0.00 in/hr
_ _ _ _ - - --- '
Record Id: P-002
'Section Shape: � Circular
._ _. -- -- --- __ -- -
---- --_
Uniform Flow Method: Manning's Coefficient: 0.009
Routing Method: Travel Time Shift Contributing Hyd
_ _ _ _
iDnNode N-001 UpNode N-002
- - --------- —------- - __�____ _——-- - - --�--
Material unspecified Size 18 in Diam
- - -- ' _ ----------- - ---
Ent Losses � Groove End w/Headwall
_— - - - - -- -_ _
Length 189.00 ft Slope 0.50%
Up Invert 496.75 ft Dn Invert 495.81 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
------ . �- -- �- _— ----- -- --
2.00 ft/s 15.00 ft/s 0.50% '� 2.00% j 3.00 ft
--- - - -- -._ _ _ ---
- - - - -- --
Drop across MH 0.00 ft ��Infil Rate 0.00 in/hr
Record Id: P-003
_ , -
Section Shape: � Circular �
----- -- ---- —
Uniform Flow Method: Manning's Coefficient: 0.009
_ Routing Method: Travel Time Shift Contributing Hyd
DnNode � N-002 UpNode N-003
Material ' unspecified ;Size 18 in Diam
- - � - ----- -- -- _ -- ---- - ---_ ----_
Ent Losses j Groove End w/Headwall
— - _ _-- - - _
Length 192.00 ft Slope 0.50%
Up Invert � 497.71 ft Dn Invert 496.75 ft
_ - --- -- __ - _---- —
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope '� Min Cover
-- _ ---_
2.00 ft/s 15.00 ft/s � 0.50% 2.00% j 3.00 ft ',
— - ---_ _
Drop across MH �—� 0.00 ft Ex/Infil Rate � 0.00 in/hr �
Record Id: P-004
- - . _ _- - __ _ ___ �
Section Shape: '� Circular �
Uniform Flow Method: �Manning's rCoefficient: ' 0.009
_---- ---_. _. _ -- -_ _ -----_ ___ _ -_ __ _
Routing Method: T lerav Time Shift Contributing Hyd �
DnNode N-003 UpNode r N-004 '
Material unspecified Size 18 in Diam
, _ _ - - __
Ent Losses � Groove End w/Headwall
Length � 26.00 ft Slope � 0.50% ,
Up Invert � 497.84 ft Dn Invert 497.71 fr '
Conduit Constraints
- -- -
Min Vel Max Vel , Min Slope Max Slope Min Cover
2.00 ft/s 15.00 fUs 0.50% , 2.00% I 3.00 ft �
- — ------ __ ----- - — ----------------
- _ _ �.
Drop across MH 0.00 ft 'Ex/Infil Rate ', 0.00 in/hr
Record Id: P-005
-------- . -- -----_ -_
Section Shape: Circular
:, _- - ----
-_ ___
Uniform Flow Method: � Manning's iCoefficient: 0.009
Routing Method: Travel Time Shift �Contributing Hyd �
---- - - _ _- --
DnNode j N-004 jUpNode � N-005
Material � unspecified �Size 12 in Diam
- -- --- - - _ _
Ent Losses � Groove End w/Headwall I
Length � 42.00 ft 'Slope 1.60% '
- - __ _ _ _ , _ - - - -- - _ _---
Up Invert 499.01 ft �IDn Invert 498.34 ft
- -- ---- -- - - -- _ _ _ --- -- --- -- -—
Conduit Constraints
---—
_
Min Vel Max Vel j Min Slope ; Max Slope � Min Cover
2.00 ft/s 15.00 ft/s �----0.50% � 2.00% -
3.00 ft
--. _ ._ _--- - _- ---------- .-. ___ ----- _ _
Drop across MH 0.00 ft ,E�Infil Rate ', 0.00 in/hr '
Record Id: P-006
I
Secdon Shape: � Circular '
__ �_ ___ _ _ _ __ _
Uniform Flow Method: Manning's Coefficient: � 0.009
Routing Method: Travel Time Shift ContribuNng Hyd �
DnNode � N-005 UpNode � N-006 � �',
Material � unspecified Size � 12 in Diam ' �
_--_ _ —
Ent Losses Groove End w/Headwall
Length r 20.00 ft Slope I 0.50%
_ _ _ ----- - - -
Up Invert 499.11 ft Dn Invert 499.01 ft '
_ _ _ _ _ --
_------ - _ _ __ - _ __ ,
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope � Min Cover i
2.00 ft/s 15.00 ft/s 0.50% 2.00°/a � 3.00 ft
Drop across MH 0.00 ft E�Infil Rate 0.00 in/hr
Record Id: P-007
- -- - _ -— ------ �- --- -—----
Section Shape: � Circular �
- - ---- • -
Uniform Flow Method: Manning's Coefficient• 0.009
-------- -- __ _ _ ____ __._
RouNng Method: Travel Time Shift ContribuNng Hyd
DnNode �—N-004 'UpNode ' N-007 �
__ - - - - -- � -- -- -_ - - - -----
Material � unspecified ;Size 18 in Diam I
_ ----- -
Ent Losses j Groove End w/Headwall
Len th 69.00 ft Slo e 0.49%
g P
� �
Up Invert � 498.18 ft Dn Invert I 497.84 ft
_ __-
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope �Min Cover
- , --
-- -- ----_.
2.00 ftls 15.00 ft/s ' 0.50% 2.00% 3.00 ft
_ _-- - -
_ - - -
Drop across MH ', 0.00 ft Ea�/Infil Rate 0.00 in/hr
Record Id: P-007A
Section Shape: r Circular
_ ---
— _- - - -- ____ -----
Uniform Flow Method: Manning's Coefficient: 0.009
Routing Method: � Travel Time Shift Contributing Hyd
DnNode � N-007 UpNode j N-007A �
Material � unspecified Size 18 in Diam
Ent Losses � Groove End w/Headwall
Length � 37.00 ft Slope , 0.51%
Up Invert 498.37 ft 'Dn Invert � 498.18 ft
_ - - ----
Conduit Constraints
Min Vel Max Vel �, Min Slope Max Slope ; Min Cover
2.00 ft/s 15.00 ft/s I 0.50% 2.00% i 3.00 ft
_ _ __ -
Drop across MH 0.00 ft E�Infil Rate 0.00 in/hr
Record Id: P-008
Section Shape: j Circular ,
Uniform Flow Method: � Manning's Coefficient: 0.009 �,
Routing Method: Tr�me Shift Contributing Hyd
DnNode N-007A UpNode ! N-008
Material � unspecified Size � 18 in Diam
iEnt Losses � Groove End w/Headwall
�--- —
�Length � 10.00 ft jSlope 1.30%
;Up Invert 498.50 ft Dn Invert 49837 fi
� Conduit Constraints
Min Vel Max Vel i Min Slope � Max Slope Min'Cover
2.00 ft/s 15.00 ft/s 0.50% � 2.00% � 3.00 ft ',
_ __ _--- _,
Drop across MH � 0.00 ft �Ea�/Infil Rate �00 in/hr
Node Records
Record Id: N-001
�escrip: rPrototype Record IIncrement 0.10 ft
' - -- Start El. '�495.81 ft �Max El. 504.40 ft I
Void Ratio 100.00 � �I
� - _ �-__ - - __ ___
'Condition !Existing Structure Type CB-TYPE 2-48 '
,. __ _ --- _ _ ---
Ent Ke 'Groove End w/Headwall(ke=0.20) iChannelization No Special Shape
Catch �0.00 ft �Bottom Area 12.5664 sf
- - ----------- - _
MH/CB Type Node
Record Id: N-002
- __._. __
,Descrip: iPrototype Record 'Increment 0.10 ft
_ - - - _ --- (
Start El. ;496.75 ft Max El. 505.51 ft
Void Ratio i,100.00 �
Condition Existing '�Structure Type CB-TYPE 2-48
-- ------ -- _ '
Ent Ke Groove End w/Headwall (ke=0.20) ,�Channelization No Special Shape :
_------ _ _ ;_-- _ __—- -- _
Catch �0.00 ft Bottom Area 12.5664 sf
_ -- - _ _ _ _
MH/CB Type Node '',
Record Id: N-003
Descrip: Prototype Record Increment �0.10 ft
Start E1. 497.71 ft Max El. 505.11 ft
- - -- -- ------ _ __
Void Ratio 100.00
Condition 'Existing �,Structure Type CB-TYPE 2-48
_ .__ _ _ _ -- ----
Ent Ke 'Groove End w/Headwall(ke=0.20) Channelization No Special Shape
---' -- --- ----- ---
Catch 0.00 ft Bottom Area 12.5664 sf
- �------ -
- - - - -- ------
MH/CB Type Node
Record Id: N-004
._ - __ -- - - ---- ---- - --__. _ _ .
Descrip: !Prototype Record jlncrement 0.10 ft
Start El. 497.84 ft �ax El. 504.96 ft
Void Ratio 100.00 �
Condition ;Existing �tructure Type CB-TYPE 2-48
— -- -- - --- - - ---- - -- - — ----
Ent Ke 'Groove End w/Headwall(ke=0.20) �Channelization No Special Shape �
- -- _- -
Catch ,�0.00 ft �Bottom Area 12.5664 sf ;
MH/CB Type Node '
Record Id: N-005
Descrip: Prototype Record Increment 0.10 ft
--- - -- - (
Start EI. �499.01 ft Max El. 504.01 ft
Void Ratio�100.00 � f
Condition Exi tin - I
� s g Structure Type �CB TYPE 1
-- i
Ent Ke Groove End w/Headwall (ke=0.20) Channelization No Special Shape �
Catch '0.00 ft IBottom Area I,3.97 sf
MH/CB Type Node
Record Id: N-006
i _ _ _ _ ___ -
Descnp: Prototype Record �Increment 0.10 ft
_ __ _ _ i ---- —
Start El. 499.11 ft IMax EL 504.01 ft
Void Ratio 100.00 Ir � f
I
Condition 'Existing �Structure Type 'CB-TYPE 1
Ent Ke 'Groove End w/Headwall(ke=0.20) Channelization o Special Shape �
Catch 0.00 ft ',Bottom Area 3.97 sf
_ ___ __ �
MH/CB Type Node
Record Id: N-007
-_ _ --— - --- -- -- -— _ I
Descrip: Prototype Record _ ',Increment 0.10 ft _ i '
Start El. 498.18 ft ;Max El. r504.38 ft �
Void Ratio '100.00 . � �, - :r I
�Condition rExisting �tructure Type ICB-TYPE 2-48
jEnt Ke IGroove End w/Headwall(ke=0.20) Channelization iN So pecial Shape ',,
- -----_ _ --- — — --- _ _ �
Catch j0.00 ft �ottom Area �12.5664 sf
�H/CB Type Node
Record Id: N-007A
--- - - - . _— ---
Descrip: Prototype Record !Increment 0.10 ft ;
� - ---- ,--- - ----- � '
Start El. 498.37 ft IMax EL 505.25 ft �
Void Ratio 100.00 �1
Condition Existing ',Structure Type ICB-TYPE 2-48 ,
---- --- _ , ,
,Ent Ke Groove End w/Headwall(ke=0.20) !Channelization,No Special Shape ',
------- ' ___ _ _ � � _
�Catch 0.00 ft 'Bottom Area 12.5664 sf '
MH/CB Type Node
Record Id: N-008
'Descrip: Prototype Record jIncrement 0.10 ft
Start El. 498.50 fi �ax El. 504.00 ft
Void Ratio 100.00 j (
Condition Existing Structure Type �C-TYPE 2-54
Ent Ke Groove End w/Headwall (ke=0.20) Channelization No Special Shape
'Catch 0.00 ft Bottom Area '15.904 sf
— - -- -- --__ --- __ ___ __ _ .---
MH/CB Type Node
--------- -- - '
;
Record Id: N-CB-EX
Descrip: ��Prototype Record lncrement 0.10 ft
�Start EL �495.48 ft i�Max El. 502.20 ft '
_ - -- ,
�oid Ratio�100.00 ' '
Condition jExisting jStructure Type 'CB-TYPE 1-54
r---
',Ent Ke �Groove End w/Headwall (ke=0.20) IChannelization'No Special Shape
,_ - --_ . _
Catch '0.00 ft �'�Bottom Area 15.9043 sf
MH/CB Type Node
Contributing Drainage Areas
Record Id: B-003
_ -- .
SeattleRecord Id: B-005
Design Method ' Rational ', IDF Table:
__ ___
' SeattleRecord Id: B-006
Design Method Rational IDF Table:
---- --- --------------- _ _ -------_ . _ ___-
SeattleRecord Id: B-007 '
Design Method Rational ; IDF Table:
i
. ' SeattleRecord Id: B-008
, Design Method Rational j IDF Table:
- �-
I �
, �- Seattle
Design Method Rational IDF Table:
' Licensed to: Engenious Systems, Inc.
-
ROUTEHYD [] THRU [Outfall] USING [100 yr] AND [Seattle] NOTZERO RELATIVE RATIONAL
Rational Method analysis
Reach ID Area (ac) TC(min) i(in/hr) Flow(cfs) �cfs) Full ratio n�ft�th Size nVel (ft/s) fVel (ft/s) CArea
12 in
P-006 0.03 6.3 3.209 0.0658 3.6488 0.018 0.0932 Diam 1.7841 4.6457 B-006
12 in
P-005 0.06 6.4868 3.1583 0.1295 6.5271 0.0198 0.0976 Diam 3.2847 8.3106 B-005
18 in
P-008 4.86 6.3 3.209 8.5503 17.3464 0.4929 0.7439 Diam 9.7787 9.816 B-008
18 in
P-007A 4.86 6.317 3.2043 8.5378 10.8648 0.7858 1.002 Diam 6.8069 6.1482
18 in
P-007 4.93 6.4076 3.1795 8.6307 10.6496 0.8104 1.0248 Diam 6.7095 6.0265 8-007
18 in
P-004 4.99 6.7 3.1031 8.5507 10.7578 0.7948 1.0102 Diam 6.7545 6.0876
18 in
P-003 5.07 6.7641 3.087 8.6885 10.7578 0.8076 1.0222 Diam 6.7735 6.0876 B-003
18 in
P-002 5.07 7.2365 2.9755 8.3746 10.7578 0.7785 0.9955 Diam 6.726 6.0876
18 in
P-001 5.07 7.7049 2.8756 8.0932 17.4793 0.463 0.7174 Diam 9.6961 9.8913
HGL Analysis
From Junct Loss Adjusted
Node To Node HG EI (ft) App(ft) Bend(ft) (ft) HG EI(ft) Max EI(ft)
496.5827
N-001 N-CB-EX 497.5687 ------ 0.1835 ------ 497.7521 504.4
N-002 N-001 498.5531 ------ 0.0028 ------ 498.556 505.51
N-003 N-002 499.5311 ------ 0.1167 ------ 499.6478 505.11
N-004 N-003 500.1662 0.3704 0.1351 0.0047 499.9355 504.96
N-005 N-004 499.9343 0.0494 0.0373 ------ 499.9222 504.01
�
�
N-006 N-005 499.9815 ------ ------ ------ 499.9815 504.01
N-007 N-004 500.6039 0.3625 0.0995 ------ 500.3409 504.38
N-007A N-007 500.8937 0.3635 0.1847 ------ 500.7149 505.25
N-008 N-007A 501.1827 ------ ------ ------ 501.1827 504
Conduit Notes
HW Depth HW/D TW Depth
Reach Q(cfs) Dc(ft) Dn(ft) Comment
(ft) ratio (ft)
P-001 1.7587 1.1724 8.09 1.1027 1.1027 0.7174 SuperCrit flow, Intet end controls
P-002 1.8031 1.2021 8.37 1.9421 1.1212 0.9955 SuperCrit flow, Inlet end controls
P-003 1.8211 1.2141 8.69 1.806 1.1416 1.0222 SuperCrit flow, Inlet end controls
P-004 2.4562 1.6374 8.55 1.9378 1.1327 1.0102 Outlet Control
P-005 1.5963 1.5963 0.13 1.5955 0.1453 0.0976 Outlet Control
P-006 0.8715 0.8715 0.07 0.9122 0.1041 0.0932 Outlet Control M1 Backwater
P-007 2.762 1.8413 8.63 2.0955 1.1379 1.0248 Outlet Control
P-007A 2.7124 1.8083 8.54 2.1609 1.1319 1.002 Outlet Control
P-008 2.8127 1.8751 8.55 2.3449 1.1327 0.7439 Outlet Control
�
I