Loading...
HomeMy WebLinkAboutORD 5779 CITY OF RENTON, WASHINGT4N ORQINANCE NO. 5779 AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SECTION 4-1-160 OF CHAPTER 1, ADMINI5TRATION AND ENFORCEMENT, OF TITI.E IV {DEVELOPMENT REGULATIONS) OF THE RENTON MUNICIPAL CODE, SETTING THE IMPACT FEE AT $4,635 PER NEW SINGI.E-FAMII.Y HOME ANQ $1,534 PER NEW IVIULTI-FANII�Y IN THE tSSAQUAH SCHOOl. DISTRICT; SETTING THE lMPACT FEE AT $4,990 PER NEW SINGI.E FAIVIII.Y HC?ME AND $2,163 PER NEW MUITt-FAMILY HONif IN THE KENT SCHOt?L DiSTRiCT; 5ETTING THE IMPACT FEE AT $5,643 PER NEW SING�E FAMI�Y HOME AND $1,385 PER NEW MUII'i- FAMI�Y HClME IN TNE RENTON 5CH8C}L DIS7RICT; AND ADt3PTING TNE CAPITAL FACICiTiES PtANS OF THf ISSAQUAH, KENT AND RENTON SCHt?OL DISTRICTS. WHEREAS, under Section 4-1-160 of Chapter 1, Administration and Enforcement, of Title IV (Development Regulationsj, of the Renton Municipal Cade, as amended, and the maps and reports adapted in conjunction therewith, the City of Renton has heretofore collected on behalf of the Issaquah Schoo! District an impact fee of$4,550 far each new single-family home and $1,458 for each new multi-family unit built within the Distric#'s baundaries; and WNEREAS, the Issaquah Schoal District requested that the City af Renton adopt the District's 2015 Capital Facilities Plan, which indudes an increase in the impact fee for new single-famiiy homes to $4,635 and an increase in the impact fee for new multi-family units ta $1,534; and WHEREAS, under Section 4-1-160 af Chapter 1, Administration and Enforcement, of i � Title IV (Development Regulations�, of the Renton Municipal Code, as amended, and the maps ; and reports adapted in conjunction therewith, the City of Renton has heretofore collected on behaff of the Kent 5chool District an impact fee of$5,486 for each new single-family hame and $3,3?8 far each new multi-family unit buil#within the District's boundaries; and 1 - � ORDINANCE NO. 5779 WHEREAS, the Kent School District requested that the City of Renton adopt the District's 2015/2016 — 2020/2021 Capital Facilities Plan, which requests a decrease in the impact fee for new single-family homes to $4,990 and a decrease in the impact fee for new multi-family units to $2,163; and WHEREAS, under Section 4-1-160 of Chapter 1, Administration and Enforcement, of Title IV (Development Regulations), of the Renton Municipal Code, as amended, and the maps and reports adopted in conjunction therewith, the City of Renton has heretofore collected on behalf of the Renton School District an impact fee of $5,541 for each new single-family home and $1,360 for each new multi-family unit built within the District's boundaries; and WHEREAS, the Renton School District requested that the City of Renton adopt the District's 2015-2021 Capital Facilities Plan, which includes an increase in the impact fee for new single-family homes to $5,643, and increase in the impact fee for multi-family units to $1,385; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Subsection 4-1-160.D.5 of subsection 4-1-160.D, Fee Calculations, of Chapter 1, Administration and Enforcement, of Title tV (Development Regulations) of the Renton Municipal Code, is hereby amended as follows: 5. The City Council may adjust the fee calculated under this subsection, as it sees fit to take into account local conditions such as, but not limited to, price differentials throughout each respective school district in the cost of new housing, school occupancy levels, and the percent of each school 2 ORDINANCE NO. 5779 district's Capital Facilities Budget, which will be expended locally. The City Council establishes the following fees: Single Family Fee Multi-Family and Accessory Amount Dwelling Unit Fee Amount Issaquah School District �A�- 4 635 c�,�� 1 534 Kent School District �;4S�A� 4 990 c�,�� 2 163 Renton School District c�,`�- ^� 5 643 c�,�9� 1 385 SECTION II. Subsection 4-1-160.J.1 of subsection 4-1-160.J, Adoption of Each School District's Capital Facilities Plan and Submission of the Annual Updates and Report and Data, of Chapter 1, Administration and Enforcement of Title IV (Development Regulations) of the Renton Municipal Code, is hereby amended as follows: 1. Renton adopts the following capital facilities plans by reference as part of the Capital Facilities Element of Renton's Comprehensive Plan: a. The Issaquah School District No. 411 �8�4 2015 Capital Facilities Plan; b. The Kent School District No. 415 ����A�� '^'��'^'^ 2015/2016—2020/2021 Capital Facilities Plan; and c. The Renton School District No. 403 ���4 --'�0 2015 — 2021 Capital Facilities Plan. 3 ORDINANCE NO. 5779 SECTION III. This ordinance shall be effective upon its passage, approval and five (5) days after its publication. PASSED BY THE CITY COUNCIL this 23rd day of November , 2015. �1`�l.`t ` �(% ' Jason A. �ieth, City'�lerk APPROVED BY THE MAYOR this 23rd day of November , 2015. � ' �� �� Denis�Law, Mayor ���a�»a��Ein�uiuutu;�rr�o Approved as to form: \\\.\`��\�y UF RE/��,0,,''�/i ; � � 2/= c���-�— �* SEAI, �_ � Lawrence J. Warren, City Attorney �� � � � � �% 6�`,�� Date of Publication: 11/27/2015 (summary) '�ii,,,,,,,,,, �ps������a`` '''��ryni}ui�����rC�, ORD:1892:10/20/15:scr 4 2015 Capítal tøcìlities Plan Issaquah School District No. 411 Issaquah, Washíngton Adopted August 12, 2015 Resolution Ì{o. 1057 The Issaquøh School Dßtrìct No. 411 hereby provídes thís Capital Facílìtíes Pløn documentìng present øndfuture schoolfacilíty requìrements of the District, The pløn contaìns all elements requìred by the Growth Manøgement Act and Kíng County Councíl Ordínance 21-A. TABLE OF CONTENTS EXECUTIVE SUMMARY STANDARD OF SERVICE TRIGGER OF CONSTRUCTION DEVELOPMENT TRACKING .,...,..... NEED FOR IMPACT FEES EXISTING AND FUTURE CAPACITY NEEDS ENROLLMENT METHODOLOGY TABLE #1: ACTUAL STUDENT COUNTS 2006-2007 - 2014-2015 AND E N RO LLM ENT PROJ ECTTONS 20 1 5-20 1 6 - 2029-2030 ...... TABLE #2: STUDENT FACTORS - SINGLE FAMILY TABLE #3: STUÐENT FACTORS - MULTI FAMILY INVENTORY AND EVALUATION OF CURRENT FACILITIES .......,........ SITE LOCATION MAP SIX.YEAR CONSTRUCTION PLAN TABLE #4: PROJECTED CAPACITY TO HOUSE STUDENTS SINGLE AND MULTI FAMILY IMPACT FEE CALCULATIONS BASIS FOR DATA USED IN SCHOOL ¡MPACT FEE CALCULATIONS .. APPENDIX A: 201 4-2015 ELEMENTARY CAPACITIES ......... APPENDIX B: 2014-2015 MIDDLE SCHOOL C4P4C1T18S ..................... APPENDIX C: 2014-2015 HIGH SCHOOL CAPACITIES ............... APPEN DIX D: 201 4-2015 TOTAL CAPACITI ES ................ APPENDIX E: SIX-YEAR FINANCE PLAN ........ I 10 1 2 3 4 5 6 7 I 11 EXECUTIVE SUMMARY This Six-Year Capital Facilities Plan (the "Plan") has been prepared by the lssaquah School District (the "district") as the districts primary facility planning document, in compliance with the requirements of Washington's Growth Management Act and King County Council Code Title 214. This Plan was prepared using data available in March, 2015. This Plan is an update of prior long-term Capital Facilities Plans adopted by the lssaquah School District. However, this Plan is not intended to be the sole Plan for all of the District's needs. The District may prepare interim and periodic Long Range Capital Facilities Plans consistent with board policies, taking into account a longer or a shorter time period, other factors and trends in the use of facilities, and other needs of the District as may be required. Any such plan or plans will be consistent with this Six-Year Capital Facilities Plan. ln June 1992, the District first submitted a request to King County to impose and to collect school impact fees on new developments in unincorporated King County. On November 16, 1992, the King County Council first adopted the District's Plan and a fee implementing ordinance. This Plan is the annual update of the Six-Year Plan. King County and the cities of lssaquah, Renton, Bellevue, Newcastle and Sammamish collect impact fees on behalf of the District. All of these jurisdictions provide exemptions from impact fees for senior housing and certain low-income housing. Pursuant to the requirements of the Growth Management Act, this Plan will be updated on an annual basis, and any charges in the fee schedule(s) adjusted accordingly. -1- STANDARD OF SERVICE School facility and student capacity needs are dictated by the types and amounts of space required to accommodate the District's adopted educational program. The educational program standards which typically drive facility space needs include grade confíguration, optimalfacility size, class size, educational program offerings, as well as classroom utilization and scheduling requirements and use of re-locatable classroom facilities (portables). Different class sizes are used depending on the grade level or programs offered such as special education or the gifted program. With the passage of lnitiative 728in November 2000, the lssaquah School Board established new class size standards for elementary grades K-5. The Board and District Administration will continue to keep class sizes near the levels provided by l-728; this will be done via local levy funds. There is also recently passed legislation that requires the State to fund Full-Day Kindergarten by 2018, those assumptions are not used in this analysis, but may be considered in future capital facility plans. A class size average of 20 for grades K-5 is now being used to calculate building capacities. A class size of 26 is used for grades 6-8 and 28 for grades 9-12. Special Education class size is based on 12 students per class. For the purpose of this analysis, rooms designated for special use, consistent with the provisions of King County Council Code Title 21A, are not considered classrooms. lnvariably, some classrooms will have student loads greater in number than this average level of service and some will be smaller. Program demands, state and federal requirements, collective bargaining agreements, and available funding may also affect this level of service in the years to come. Due to these variables, a utilization factor of g5% is used to adjust design capacities to what a building may actually accommodate. Portables used as classrooms are used to accommodate enrollment increases for interim purposes until permanent classrooms are available. When permanent facilities become available, the portable(s) is either moved to another schoolas an interim classroom or removed. Legislative proposals to reduce K-3 classroom ratios to 1711would have a significant impact on the standard of service. A review of all elementary schools shows that 65 additional classrooms would be needed to meet the proposed 1711ratio. Allsites are crowded, existing permanent facilities cannot house existing students and all but the most recent new school use portable classrooms to house existing students. Existing portable classrooms already burden building core facilities. Another legislative proposal would require Full-Day Kindergarten for all kindergarten students This proposalwould require an additional23 classrooms distributed among allelementary schools. Combined, these legislative proposals would require an additionalSS elementary school classrooms. The King County decision to no longer allow schools to be build outside the Urban Growth Boundary Line (UGBL) means District owned property planned for a new elementary schooland middle schoolcannot be used. The State does not provide funding for property purchases and the District does not have funding for any property purchases at this point in time. Approved Bond funding does not include new capacity projects to meet the additional housing needs of the Full Day Kindergarten or 17l1 classroom ratio legislative proposals, and only includes capacity for projected near term growth. -2- TRIGGER OF CONSTRUCTION The lssaquah School District Capital Facilities Plan proposes the rebuild/expansion of two elementary schools, adding classrooms to one high schooland a rebuild/expansion of lssaquah Middle School to meet the needs of elementary, middle school and high school capacity needs. Planning the need for new schools is triggered by comparing our enrollment forecasts with our permanent capacity figures. These forecasts are by grade level and, to the extent possible, by geography. The analysis provides a list of new construction needed by school year. The decision on when to construct a new facility involves factors other than verified need. Funding is the most serious consideration. Factors including the potential tax rate for our citizens, the availability of state funds and impact fees, the ability to acquire land, and the ability to pass bond issues determine when any new facility can be constructed. The planned facilities will be funded by a bond passed on April 17,2012, school impact fees and reserve funds held by the District. New school facilities are a response to new housing which the county or cities have approved for construction. The District's Six-Year Finance Plan is shown in Appendix E found on page 21. -3- DEVELOPMENT TRACKING ln order to increase the accuracy and validity of enrollment projections, a major emphasis has been placed on the collection and tracking data of known new housing developments. This data provides two useful pieces of planning information. First, it is used to determine the actual number of students that are generated from a single family or multi-family residence. lt also provides important information on the impact new housing developments will have on existing facilities andlor the need for additional facilities. Developments that have been completed or are still selling houses are used to forecast the number of students who will attend our school from future developments. District wide statistics show that new single-family homes currently generate 0.473 elementary student, 0.173 middle school student, 0.150 high school student, for a total of 0.795 school aged student per single- family residence (see Table 2). New multi-family housing units currently generate 0.156 elementary student, 0.051 middle school student, 0.049 high school student, for a total of 0.256 schoolaged student per residence (see Table 3). -4- NEED FOR IMPACT FEES lmpact fees and state matching funds have not been a reliable source of revenue. Because of this, the lssaquah School District asked its voters on February 7 ,2006 to fund the construction of an elementary school, one middle school, expand Maywood Middle School, expand Liberty High School, and rebuild lssaquah High School. District voters also approved on April 17,2012 ballot measure that provides funding to expand two elementary schools, rebuild/expand two additional elementary schools, add classrooms to one high school and rebuild/expand one middle school. Due to the high cost of land and the limited availability of a parcel large enough to accommodate a middle school program, the School Board reallocated the moneys designated to build the middle schoolto expand the capacity of lssaquah and Skyline high schools. As demonstrated in Appendix A, (page 17) the District currently has a permanent capacity (at 100o/o) to serve 7476 students at the elementary level, Appendix B, (page 18) shows a permanent capacity (at 100%) for 3954 students at the middle school level Appendix C (page 19) shows a permanent capacity (at f 00%) of 5400 students at the high school level. Current enrollment is identified on page L The District elementary projected Oct 2015 headcount is 9152. Adjusting permanent capacity by 95% leaves the District's elementary enrollment over permanent capacity at the elementary level by 1676 students (Appendix A). At the middle school level, the projected Oct 2015 headcount is 4612. This is 658 students over permanent capacity (Appendix B). At the high school level the district is over permanent capacity by 8 students (Appendix C). Based upon the District's student generation rates, the District expects that .795 student will be generated from each new single family home in the District and that .256 student will be generated from each new multi-family dwelling unit. Applying the enrollment projections contained on page 8 to the District's existing permanent capacity (Appendices A, B, and C) and if no capacity improvements are made by the year 2020- 21, and permanent capacity is adjusted to 95%, the District elementary population will be over its permanent capacity by 2055 students, at the middle school level by 855 students, and will be over its permanent capacity by 261 at the high school level. The District's enrollment projections are developed using two methods: first, the cohort survival- historical enrollment method is used to forecast enrollment growth based upon the progression of existing students in the District; then, the enrollment projections are modified to include students anticipated from new developments in the District. -5- To address existing and future capacity needs, the District's six-year construction plan includes the following capacity projects: Facility Exoansions Projected Comoletion LocationDate Additional Caoacitv PCMS Portables Clark Elementary Clark - Portables Sunny Hills El Newcastle El Portables 2015 2017 2015 20'16 2015 lssaquah lssaquah lssaquah Sammamish Newcastle lssaquah Renton lssaquah lssaquah Sammamish 56 244 80 248 40 332 156 120 1'12 112 lssaquah Middle 2016 Maywood Middle 2016 Tiger Mtn. Com. HS 2016 lssaquah HS Portables 2015 Skyline HS Portables 2015 Based upon the District's capacity data and enrollment pojections, as wellas the student generation data, the District has determined that a majority of its capacity improvements are necessary to serve students generated by new development. The school impact fee formula ensures that new development only pays for the cost of the facilities necessitated by new development. The fee calculations examine the costs of housing the students generated by each new single family dwelling unit or each new multi-family dwelling unit and then reduces that amount by the anticipated state match and future tax payments. The resulting impact fee is then discounted further. Thus, by applying the student generation factor to the school project costs, the fee formula only calculates the costs of providing capacity to serve each new dwelling unit. The formula does not require new development to contribute the costs of providing capacity to address existing needs. The King County Council and the City Councils of the Cities of Bellevue, lssaquah, Newcastle, Renton and Sammamish have created a framework for collecting school impact fees and the District can demonstrate that new developments will have an impact on the District. The impact fees will be used in a manner consistent with RCW 82.02.050 -.100 and the adopted local ordinances. Engrossed Senate Bill5923, enacted in the 2015 Legislative Session, requires that developers be provided an option to defer payment of impact fees to final inspection, certificate of occupancy, or closing, with no fees deferred longer than 18 months from building permit issuance. The District adopts the positions that: (1) no school impact fee should be collected later than the earlier of final inspection or 18 months from the time of building permit issuance; and (2) no developer applícant should be permitted to defer payment of school impact fees for more than 20 dwelling units in a single year. The District's recent and ongoing student growth, coupled with the need for the timely funding and construction of new facilities to serve this growth, requires strict adherence to this position. -6- 2 ENROLLMENT METHODOLOGY Two basic techniques are used, with the results compared, to establish the most likely range of anticipated student enrollment:1. The student 3-2-1 cohort survival method. Examine lssaquah School District enrollments for the last 5 years and determine the average cohort survival for the consecutive five- year period. Because cohort survival does not consider students generated from new development it is a conservative projection of actual enrollment. For the same reason, these projections are also slow to react to actual growth. Based on information from King Gounty, realtors, developers, etc., seek to establish the number of new dwelling units that will be sold each year. The new dwelling units are converted to new students based on the following: a) The number of actual new students as a percentage of actual new dwellings for the past several years.b) Determine the actual distribution of new students by grade level for the past several years, i.e., 5o/o to kindergarten, 10Yo to first grade, 2o/o to 11th grade, etc.c) Based on an examination of the history shown by (a) and (b) above, establish the most likely factor to apply to the projected new dwellings. After determining the expected new students, the current actual student enrollments are moved forward from year to year with the arrived at additions. One of the challenges associated with all projection techniques is that they tend to always show growth because the number of houses and the general population always increases. Enrollments, however, can and do decrease even as the population increases. The reason is as the population matures, the number of kindergartners will go down as the number of 1Oth graders is still increasing. To adjust for this factor, the number of school age children per dwelling is examined. When this number exceeds expectations, it is probably because the District is still assuming kindergarten growth, while the main growth is actually moving into middle school. When this happens, a reduction factor is added to kindergarten to force it to decrease even though the general population continues to grow. A precise statisticalformula has not been developed to make this adjustment. After all of the projections have been made and examined, the most likely range is selected. An examination of past projections compared with actual enrollment indicates the cohorts tend to be more accurate over a ten-year time span while dwelling units tend to be more accurate over a shorter period. The probable reason is that over a ten-year period, the projections tend to average out even though there are major shifts both up and down within the period. Enrollment projections for the years 2015-2016 through 2029-2030 are shown in Table #1 Student generation factors are shown in Table #2 and#3. -7- IS S A Q U A H SC H O O L DI S T R I G T Ac t u a l St u d e n t Co u n t s 20 0 6 - 0 2 Th r o u g h ZO 1 4 - 1 5 En r o l l m e n t Pr o j e c t i o n s 20 1 5 - 1 6 Th r o u g h 20 2 9 - 3 0 Total 15,340 15,480 15,E07 16,138 16,563 17,147 t7,465 18,006 18,435 t8,759 19,120 19,328 19,560 19,831 20,t16 20,341 20,s49 20,805 24,945 21,08E 21,167 t2K-5 6-8 9-12 3 6889 7023 7lgt 7462 7565 7863 8058 8317 843 I 8492 8605 8592 8582 8593 8742 8901 9040 9195 9344 9336 9339 9344374538043840389240644t4843t6443546124742477148624924509950915071501050075023s17053 15 545644550915l 651 I65605362836t34707465364986604 To t a l 15 , 3 4 0 15 , 4 9 0 15 , 8 0 7 16 , 1 3 8 16 , 5 6 3 17 , 1 4 7 17 , 4 6 5 18 , 0 0 6 1E , 4 3 5 18 , 7 5 9 19 , 1 2 0 19 , 3 2 8 19 , 5 6 0 19 , 8 3 1 20 , 1 t 6 20 , 3 4 1 20 , 5 4 9 20 , 8 0 5 20 , 9 4 5 21 , 0 8 9 21 , 1 6 7 K 1S T 2N D 3R D 4T H sT H 6T H 7T H 8T H 9T H ll T H I2 T H 12 6 6 I 12 5 12 5 0 I 12 0 3 13 3 7 t3 1 9 13 9 0 13 9 6 13 6 1 14 8 9 14 9 4 15 6 0 14 9 2 14 7 7 l5 0 l 14 9 0 t4 9 3 t6 4 6 t6 3 6 16 3 4 16 4 5 16 4 5 16 3 8 t6 3 9 16 3 9 13 2 4 12 4 6 13 5l 13 5 5 14 2 3 14 6 7 t4 t 4 15 5 2 15 3 9 16 0 8 15 4 4 t5 2 5 15 4 7 15 3 8 t5 4 t r6 9 4 16 8 4 16 8 2 16 9 3 t6 9 3 16 8 7 16 8 7 12 2 7 13 4 5 12 9 9 13 8 5 t3 7 4 14 9 6 15 2 6 14 7 8 15 9 6 15 8 6 l6 6 l 15 9 3 t5 7 I 15 9 5 15 8 6 15 9 0 t7 4 3 17 3 2 17 3 0 t7 4 l 17 4 2 17 3 s 12 3 5 12 3 6 t3 7 t 13 1 9 t4 t 7 14 4 0 14 9 8 15 4 5 14 9 9 t6 1 9 16 0 8 t6 7 3 16 0 7 15 9 0 16 1 3 16 0 3 t6 0 6 17 6 0 t7 4 9 17 4 8 17 5 8 17 5 9 12 9 9 12 8 4 12 5 8 14 0 0 13 4 6 14 4 8 14 7 7 I )t 5 15 7 5 t5 3 2 16 5 2 t6 4 t t7 0 5 t6 4 0 16 2 3 16 4 6 16 3 6 16 3 9 t7 9 2 17 8 2 17 8 0 t7 9 t 12 7 6 t2 7 9 12 8 6 12 6 8 14 0 7 t3 6 2 14 6 2 t5 t 2 15 6 5 15 8 6 15 4 4 16 6 3 16 5 2 17 t ' t 16 5 1 16 3 4 16 5 7 16 4 7 16 5 0 18 0 3 t7 9 3 17 9 2 12 7 1 12 5 8 12 9 9 13 2 6 13 1 1 14 4 7 l3 9 l t4 9 t 15 4 2 15 9 5 t6 t 3 15 6 8 16 8 6 16 7 9 t7 4 3 t6 7 7 16 5 9 16 8 2 16 7 3 16 7 6 18 2 9 18 1 8 I 19 8 12 6 7 12 5 5 12 9 8 13 4 6 13 3 9 t4 6 3 14 3 2 15 0 5 15 6 1 16 1 3 16 3 0 15 8 6 17 0 3 t6 9 7 17 6 0 t6 9 4 16 7 7 17 0 0 16 9 t 16 9 3 18 4 6 12 5 2 12 l 5 13 2 6 t3 2 6 13 6 1 t4 t 2 13 4 4 14 9 5 t4 7 4 15 4 3 15 9 3 16 3 8 16 5 9 l6 l 9 l7 3 s t7 2 7 17 9 0 17 2 4 17 0 8 17 3 0 17 2 1 17 2 3 t3 2 t l2 2 s t1 7 1 13 3 3 13 1 9 13 5 3 14 0 4 13 5 2 14 8 6 14 6 5 15 3 3 15 8 2 16 2 7 t6 4 9 16 0 9 17 2 4 t7 t 6 17 8 0 t7 1 4 t6 9 7 t7 2 0 17 t l 1t 3 t 12 3 5 tt 3 2 11 1 0 t2 3 3 12 2 5 12 3 3 12 9 2 12 4 9 13 7 7 13 5 3 t4 t 7 14 6 7 15 ló ts 3 7 t4 9 5 l6 t t 16 0 3 16 6 7 16 0 1 15 8 4 16 0 7 60 1 57 4 59 3 61 3 60 9 65 1 65 4 69 4 66 2 ó5 5 66 4 66 0 66 1 73 8 73 3 73 2 73 7 73 7 73 4 73 4 73 4 73 5 t4 I 55 3 l3 8 l l0 2 t 1t llfi 4 10 1 ll l ll l tt 4 t 12 6 5 13 0 0 13 5 5 17 3 5 18 0 2 I 59 8 FT E En r o l l m e n t Ye a r 20 0 7 - 0 8 20 0 8 4 9 20 0 9 - 1 0 20 1 0 - 1 1 20 l t - 1 2 20 1 2 - 1 3 20 1 3 - 1 4 20 1 4 - 1 s 20 r 5 - 1 6 20 1 6 - t 7 20 1 7 - t E 20 1 8 - 1 9 20 1 9 - 2 0 20 2 0 - 2 t 20 2 1 - 2 2 20 2 2 - 2 3 20 2 3 - 2 4 20 2 4 - 2 5 20 2 5 4 6 20 2 6 - 2 7 20 2 7 - 2 8 20 2 8 - 2 9 6t 1 A 2 U 5 -8 - 611212015 2i12PM STUDENT GENERATION SINGLE FAMILY STUDENTS AVERAGE PER UNIT -o-b.4..9 27 82 49 38 91 26 88 86 1 * 27 44 49 33 51 26 147 22 () ç 5 19 27 10 28 4A 16 16 I 146 2 es qt' o)' 14 54 85 45 622o 38 27 00 (D ç 0.185 0A32 0.551 0.212 0.157 0.231 0.551 0.091 0.516 0.393 0.273 0.263 0.068 0.267 q) (cl 0.037 0.114 0.163 0.121 0.118 0.077 0.259 0.000 0.180 0.161 0.000 0.184 0102 0.133 s q: 0.148 0.091 0j02 0.152 0.039 0.000 0.184 0.000 0.156 0.232 0.000 0.053 0.136 0.233 ^rÞ0.370 0.636 0.816 0.485 0.314 0.308 0.993 0.091 0.852 0.786 0.273 0.500 0.305 0.633 ^9Single Family Development Belcara Belvedere Cavalia Chestnut Estates Claremont Delany Park Glencoe @ Trossachs Heritage Estates lssaquah Highlands Laurel Hill & Laurel Hills 2,3,4 Lawson Park Shorelane Vistas Talus; Bridges Tarmigan @ Pine Ridqe 1981 1817 937 327 2U 1548 56562291344 31113003 3838107219 64 59 4 6 I 18 3030 I 4 7 19 7 8 6 81 2 TOTALS SINGLE FA]I'IILY Elementary K - 5 Middle School6 - 8 High School9 - 12 TOTAL 2787 2410 1139 417 361 1917 0.473 0.173 0.150 0.795 0.473 0.173 0.150 0.795 These developments are currently under construction or have been completed within the past five years. TABLE 2 STUDENT G EN ERATION MU LTI-FAIUIILY Multi-Family Development .o,d STUDENTS a>aS ç e: ",'Alta at the Lake Condos 80 58 3 1 1 5Copperleaf282820O2 lssaquah Highlands 1392 1198 202 65 63 330 Lake Boren Townhomes 56 56 2 3 I 6 ^rt-^$-"sù. AVERAGE PER UNIT {f,ss ç 0.052 0.o71 0.169 0.036 (r' 0.017 0.000 0.054 0.054 o' o.017 0.000 0.053 0.018 0.073 0.107 0.288 0.091 Totals MULTI.FAMILY Elementary K-5 Middle School6-8 High School9-12 TOTAL 1556 13r'¡O 209 69 65 343 0.156 0.051 0.049 0.256 0.156 0.051 0.049 0.256 These developments are currently under construction or have been completed within the past five years. TABLE 3 -10- INVENTORY AND EVALUATION OF CURRENT FACILITIES Currently, using the 95% utilization factor, the District has the capacity to house 15,985 students in permanent facilities and 3,876 students in portables. The projected student enrollment for the 2015-2016 school year is expected to be 18,435 including K-5 headcount which leaves a permanent capacity deficit of 2450. Adding portable classrooms into the capacity calculations gives us a capacity of 19,861 with a surplus capacity of 1426 for the K-12 student population. Calculations of elementary, middle school and high school capacities are shown in Appendices A, B and C. Totals are shown in Appendix D. Below is a list of current facilities. These facility locations and sites are shown on the District Site Location Map on Page 12. EXISTING FACILITIES LOCATION GRADE SPAN K.5: Apollo Elementary Briarwood Elementary Cascade Ridge Elementary Challenger Elementary Clark Elementary Cougar Ridge Elementary Creekside Elementary Discovery Elementary Endeavour Elementary Grand Ridge Elementary lssaquah Valley Elementary Maple Hills Elementary Newcastle Elementary Sunny Hills Elementary Sunset Elementary GRADE SPAN 6.8: Beaver Lake Middle School lssaquah Middle School Maywood Middle School Pacific Cascade Middle School Pine Lake Middle School GRADE SPAN 9.I2: lssaquah High School Liberty High School Skyline High School Tiger Mountain Community H.S SUPPORT SERVIGES: Administration Building May Valley Service Center Transportation Center Transportation Satellite 15025 S.E. 117th Street, Renton 17020 S.E. 134th Street, Renton 2020 Trossachs Blvd. SE, Sammamish 25200 S.E. Klahanie Blvd., lssaquah 500 Second Ave. S.E., lssaquah 4630 167th Ave. S.E., Bellevue 20777 SE 16th Street, Sammamish 2300 228tn Ave. S. E., Sammamish 26205 SE lssaq.-FallCity Rd., lssaquah 1739 NE Park Drive, lssaquah 555 N.W. Holly Street, lssaquah 15644 204th Ave. S.8., lssaquah 8440 136th Ave SE, Newcastie 3200 lssaq. Pine Lake Rd. S.8., Sammamish 4229W. Lk. Samm. Pkwy. S.8., lssaquah 25025 S.E. 32nd Street, lssaquah 400 FirstAve. S.E., lssaquah M49A 168th Ave. S.E., Renton 24635 SE lssaquah FallCity Rd, lssaquah 3200 228th Ave. S. E., Sammamish 700 Second Ave. S.E., lssaquah 16655 S.E. 136th Street, Renton 11222281h Ave. S.E., Sammamish 355 S.E. Evans Lane, lssaquah 565 N.W. Holly Street, lssaquah 16404 S.E. May Valley Road, Renton 805 Second Avenue S.8., lssaquah 3402228 Ave S.E., Sammamish -11- IS S A Q U A I T rc H ( X ) L DT S T R I C T tt 4 t t {P School Districis O Schools I Undeveloped Site S Urban G¡owth Area Ri d g e [S @ rE S 5/ V 0 Q { ^ / Á ¿ A,ll F VA|.î_ËY .ç c È i o ü ¿ /ltsTfïtcr SA M M A M I S þ I BË L L Ë V U Ë 'it\Htlh4 f\SCl-irftfl ¿USlÂl{:T 0t 5 ¡ Ê / f I BE L I . E V U { , kc f f i c C¡ s c ¡ d e IS S A Q U A H t3 NE W C A S T L H Co m r n u n l t y H$ HS RE N i ' O N OA F o t b ÊS IS S A Q U / \ H sc f r a G L oi s r 8 t c r 8Ê Â l r Õ A , 4,'d . ¿. , Ë5 '4 , b¡ - ç m r r : ¡ t /, f ^ r, et \^uó J* 'ù at l a p l e ll l l l r ÉS KÉ f f T sc H û { ) i " Ð1 5 T ' t T / a r Å 2 I W. r THE ISSAQUAH SCHOOL DISTRICT'S SIX-YEAR CONSTRUCTION PLAN The District's Six-Year Finance Plan is shown in Appendix E. Shown in Table #4 (page 14) is the District's projected capacity to house students, which reflects the additional facilities as noted. Voters passed a $241.87 million bond in February 2006 to fund new school construction and schoolexpansion. Voters also approved $219 million in April 2012to fund school construction and expansion projects. The District will expand Liberty High Schooland Maywood Middle School and Apollo Elementary to accommodate growth experienced in the south end of the District. ln the lssaquah core area, the District will expand Clark Elementary, lssaquah Valley Elementary, lssaquah Middle Schooland Tiger Mountain Community High Schoolto accommodate growth. On the lssaquah Plateau, the District will expand Sunny Hills Elementary to accommodate growth. The District does not anticipate receiving State matching funds that would reduce future bond sale amounts or be applied to new K-12 construction projects included in this Plan. ïhe District also anticipates that it will receive $500,000 in impact fees and mitigation payments that will be applied to capital projects. The District projects 18,435 FTE students forthe 2015-2016 schoolyearand 19,831 FTE students in the 2020-2021 school year. Grourth will be accommodated by the planned facilities. Per the formula in the adopted school impact fee ordinance, half of this factor is assigned to impact fees and half is the local share. - 13- 20 1 9 - 2 A 17 9 3 0 17 0 3 4 38 7 6 20 9 1 0 19 5 6 0 -2 5 2 6 13 5 0 20 1 8 - 1 9 17 9 3 0 17 0 3 4 38 7 6 20 9 1 0 19 3 2 8 -2 2 9 4 15 8 2 20 1 7 - 1 8 17 6 8 6 24 4 17 0 3 / - 38 7 6 20 9 1 0 19 1 2 0 -2 0 8 6 17 9 0 20 1 6 - 1 7 16 8 3 0 12 0 48 8 24 8 16 8 0 2 38 7 6 20 6 7 8 18 7 5 9 -1 9 5 7 19 1 9 20 1 5 - 1 6 16 8 3 0 15 9 8 5 38 7 6 19 8 6 1 18 4 3 5 -2 4 5 0 14 2 6 20 1 4 - 1 5 16 3 7 8 21 6 32 0 16 0 6 8 33 4 0 19 4 0 8 17 7 4 0 16 7 2 16 6 8 Ye a r s "P e r m a n e n t Ca p a c ¡ t y Hi g h Sc h o o l Mi d d l e Sc h o o l El e m e n t a r y Sc h o o l Ut i l i z a t i o n Ra t e @ 95 % Su b t o t a l (S u m at 95 % Ut i l i z a t i o n Ra t e ) Po r t a b l e s @ 95 o / o To t a l Ca p a c i t y Pr o j e c t e d FT E En r o l l m e n t * * Pe r m a n e n t Ca p a c þ @) 95 % (s u r p l u s / d e f i c i t ) Pe r m a n e n t Oa p VP o r t a b l e s (s u m l u s / d e f i c i t ) Pr o j e c t e d Ca p a c i t y to Ho u s e St u d e n t s " Pe r m a n e n t Ca p a c i t y an d Ne w Co n s t r u c t i o n ca l c u l a t i o n s ar e ba s e d on th e 95 % ut i l i z a t i o n fa c t c Th e nu m b e r of pl a n n e d po r t a b l e s ma y be re d u c e d if pe r m a n e n t ca p a c i t y is in c r e a s e d by a fu t u r e bo n d is s u e . ** 20 1 4 - 1 5 Ac t u a l Oc t o b e r 1s t en r o l l m e n t co u n t s , ki n d e r g a r t e n st u d e n t s on l y co u n t e d as ha l f an FT E -1 4 - Table #3 SCHOOL IMPACT FEE CALCULATIONS DISTRICT lssaguah SD #411 YEAR 2015 School S¡te Acquisition Cost: (AcresxCost per Acre)/Facility Capacity)xstudent Generation Factor Student StudentFacility CosU Facility Factor Factor Acreage Acre Capacity SFR MFRElementary 0.00 $1,500,000 604 0.473 0.156 Middle/JR High 0.00 $1,500,000 338 0.173 0.051High 0.00 $1 ,500,000 I,500 0.150 0.049 TOTAL School Construction Cost: (Facility Cost/Facility Capacity)xStudent Generation Faclor)x(permanent/Total Sq Ft) Student Studento/oPerml Facility Facil¡ty Factor Factor Total Sq.Ft. Cost Capacity SFR MFRElementary 95.18% $20,350,000 604 0.473 0.156 Middle/JR High 95.18% $4,162,500 338 0.173 0.051High 95.18% $0 336 0.150 0.049 TOTAL Temporary Faclllty Coet: (Facility CoslFacility Capacity)xstudent Generation Factor)x(Temporary/Total Square Feet) Student Student %Temp/ Facility Facility Factor Factor Total Sq.Ft. Cost Size SFR MFRElementary 4.82o/o $175,000 80 0.473 0.156 Middle/JR H¡gh 4.82o/o $175,000 56 0.173 0.051High 4.82o/o $175,000 224 0.150 0.049 TOTAL State Matchlng Cr6d¡t: Area Cost Allowance X SPI Square Footage X District Match % X Student Factor Student Student Current Aréa SPI District Factor Factor Cost Allowance Footage Match % SFR MFRElementary $200.40 90 0.00% 0.473 0.156 Middle/JR High $200.40 115 0.007o 0.173 0.051 High School $200.40 130 0.00o/o 0.150 0.049 TOTAL Tax Payment Credit: Average Assessed Value Capital Bond lnterest Rate Net Present Value of Average Dwelling Years Amort¡zed Property Tax Levy Rate Present Value of Revenue Stream Fee Sumary: CosV MFR $0 $0 $0 $0 CosU SFR $0 $0 $0 $0 CosV SFR $1 5,156 $2,028 $0 $r7,184 CosU SFR SFR $610,085 3.88% $5,028,1 l3 10 $1.59 $7,995 CosU MFR $5,002 $604 $0 $5,605 Cosl MFR MFR $195,656 3.68% $1,612,530 10 9r.59 $2,564 $50 $26 $6 $82 CosU SFR $0 $0 $0 $0 $16 $8 $2 $2ô CosU MFR $0 $0 $0 $0 Site Acquistion Costs Permanent Facility Cost Temporary Facility Cost State Malch Credit Tax Payment Credit Single Famlly $0.00 $17,184.05 $81.53 $0.00 ($7,ee4.70) Mult¡- Family $0.00 $5,605.25 $26.03 $0.00 ($2,563.e2) FEE (AS CALCULATED)$9,270.88 $3,067.36 FEE (AS DISCOUNTED by 507o)$4,635.44 $1,533.68 FINAL FEE $4,635 $1,534 Each city or county sets and adopts the amount of the school ¡mpact fee. For the applicable fee schedule, please consu¡t with the permitting jurisdiction for the development pOect. '15 BASIS FOR DATA USED IN SCHOOL IMPACT FEE CALCULATIONS SCHOOL SITE ACQUISITION GOST: ¡ Elementary No new sites are planned for purchase. ¡ Middle School No new sites are planned for purchase. r High School No new sites are planned for purchase. SGHOOL CONSTRUCTION COST: o Elementary $20,350,000 is the proportional cost of the projects providing additional elementary capacity. ' M dd e Schoo i*::î"iÎ,ãå53H:iil'ïìi:i:üìilJi i.ifli:il3ï1ff:ffifil;., . High School No new high schools are planned. PERCENTAGE OF PERMANENT AND TEÍIIIPORARY SQUARE FOOTAGE TO TOTAL SQUARE FOOTAGE: TotalSquare Footage 2,498,894 Permanent Square Footage (OSPI) 2,336,270 Temporary Square Footage 162,624 STATE MATCH GREDIT: Current Area Cost Allowance 8200.44 42.10o/oPercentage of State Match -16- V xrpuaddv - L L - - s a l q e l o d u r p ê r u e s r u o q s s p l . J o J ê q u n u u n u ! Æ u ê r ¡ ¡ s n d f ¡ { c e d e ¡ } u ê u e u ê d ê q ¡ s â p n l c u t , { ¡ l a ? d E 9 u n u l x e u â ¡ _ ¡ 1 ' ^ ¡ ¡ J e d Ð u ô ¡ s s p o r ¡ r u ã s J o l â ^ a l s , 6 u l Þ l l n q ? q ¡ s ¡ ¡ a u a j , q r e d æ l u ? u e u J a d t æ w l t d u 3 t u n o . p e ê H s n u r y { 0 o p e l u o ¡ p z x l } n ) % ç 6 x ¡ u e u n q u 3 ¡ u n o ? p æ H s ñ u r h l o o p B ] u o t ¡ u x l l n ) % ç 6 x Á l c B d e C ç € Ê z : ! z - y 0 z : r J o l a ô J e l s o l l a J o e 6 a ã ^ V . . u n u x P l l i $ r l u a u B u a d . . ¡ o ^ s - ø l o * $ Q I p à ù * a F p - é ' - S J 6 . s s S r l t c v d v c - t o o H S s ^ u v l N 3 u u 3 - t 3 I t - þ r 0 2 , u r r t L I f i * r " f 3 8 n r n f I t r " r f ' r " r ' f ' 0 È F " r " r ' ! 2 , r r f I F r " ' r * f ' ; z - i l " - l * ' l o ' l ß r r f ' i t r f 6 e f t r ' ' f o ' r i l r , . ' l * n l " ¡ t - r " l r , ? r ' " r * f i 9 ø l ¿ ç 1 6 l 0 r r 8 0 ¿ W L 9 5 t t 0 9 9 f i l . 9 t 9 9 E ¿ 9 e 9 9 ¿ S 9 ¿ ¿ 0 g ¿ 9 4 9 9 ¿ 9 z L 9 D ¿ L 9 z Z O L 3 w l c 0 0 o l 0 0 0 0 0 8 0 ? 0 o a 0 8 2 l l ¡ 0 D 0 0 0 0 I ¿ 0 t t t t r ¡ r - P ' E 8 ¡ r " l r ¡ 2 9 r r " L a g r - r * $ 2 t r ' l P * t 8 t t r n ' l r " ' 9 9 9 r f l ' ¿ , t 0 9 r i l ' " ¿ r i l " ' l l * ' ¿ € ¿ r " r * j r ¿ i l * [ r ' E A t r " f ' m 9 r F ¡ G 5 ¡ l l 9 û l o l l 0 z 9 z ¡ 0 9 r - r " t 8 9 r " i l ' - L I I 0 t o ¿ I I 0 t 0 t 0 t z , , , % t 0 t 9 r r 9 9 9 r r ' t Í t r F t ¿ a r i l * 8 S t i l ' * l l o E 9 r , F ¿ È t r i l . ' z n r " r ' t J t t r * i l * ' 9 9 l l * f 0 6 t l l ' o l l * z r s r * r ' ? e 9 r f ' ¿ 5 U I I g L ' L l t g t 9 t t t r r e 6 Ê r " r , z e E E e 0 g E t I E ' 0 2 9 0 9 9 0 9 t 0 0 t 0 z Ê o z , o t 9 0 w 0 t þ l t g t 8 ç J 8 t 3 8 8 0 0 9 0 9 6 9 9 Z 8 Z ¿ a ) ¿ 9 t t ¿ L Z Z Z L Z 6 t v z 6 l 9 Z 8 t t o l l o d ! O O O M w l U € 3 9 0 t u S G V 3 S V C u t e N f - n v H 3 v u \ f t c 3 9 0 r u u v e n o c 3 0 t s v f 3 u c ^ u ã ^ o c s t c u n o \ Ë o N 3 3 3 € I Ë O N V U Ð ^ 3 t t v H V n O V S S t s f l t H t t d w 3 ' ì l s v c M S N s ï r H , ( N N n s L l s N N S l v l o t v K p u e d d v Ap p e n d i x B "E 20 1 4- 2 0 1 5 MI D D L E SC H O O L CA P A C I T I E S E o d o àa "s &o _$ o ^9 ' ùv ^6 \ \! þ q, S *M i n u s ex c l u d e d sp a æ s fo r sp e c ¡ a l pr o g E m re d s *' P e m a n e n t Ca p a c ¡ t y x 95 o / o (u t i l i z a t i o n fa c t o r ) Mi n u s He a d æ u n t En t o l l m e n t *" M a ¡ m u m Ca p a c i t y x 95 0 / 0 (u t i l ¡ z a t i o n fa c t o r ) M¡ n u s He a d @ u n t En r o f l m e n t Pe m a n e n t €p a c i t y ßf l e c t s th e bu ¡ l d ¡ n g ' s þv e l of se r y ¡ æ de s i g n €p a c i t y . Th e mã i m u m €p a c ¡ t y in c l u d e s th e pe r m a n e n t €p a c i t y pl u s th e ma x ¡ m u m nu m b e r of cl a s s r c o m s ær v e d in po r t a b l e s . 125 -l -tß -51 -t2t 4-121 -l¡ß -l¡!¡.f9s -31!35! 86 : 7A '1 o 7 3 99 ¡ as 7 46 1 2 10 10 3 8 a7 Ê 10 5 € 10 À 6 . 8' 1 6 44 3 4 o 0 52 0 1U 0 0 2 0 4 0â 6 78 1 lr ì ç â oa a na lo * 82 t 1l 1 a 99 ¡ aí a 26 ( 1*st 15 É )o 8 a3 a 10 6 2 €€ 73 S 61 ! l lf l o g 57 Á 37 4 7 f7 a 6â t 1æ 2 t: t ¡ ât t 8 39 5 4 'A 96 48 a4 28 r )I 4 7 24 75 4 57 2 1ñ 1 Á 75 4 57 2 ff i 2S 22 39 29 )t 14 1 BE A V E R LA K E IS S A Q U A H \4 I D Ð L E UA Y W O O D PA C I F I C CA S C A D E PI Ñ É I AK F TO T A L 18 - fupendix B Ap p e n d i x C 20 1 4 . 2 0 1 5 HI G H SC H O O L CA P A C I T I E S oc s9 oI-ñ d eê"--tta À e\ ' o1 -a " " øu J. _s o fg 6\ a- áÊ "9 " E \ø þd t ^È \ {! C) -o È - I e (r "" t " o( o< ,'28 t0t A toi 48:t(-lot 4 -212 t 20 4 2 1 18 f 4( 20 8 1 53 ø € 14 c € 24 3 2 15 3 2 84 23 0 ¿ 0 16 8 c c 1ô 8 0 6 o o 6 '3 1 ß l2 s ¡o 2t 8 S 6A t 6 ,¿ t t t3 a ¡ A/ ã¡ 0 ¡ al ¡ ¿ 22 4 72 4 c 5*7A t I 0 12 2û g t ta ! 80 ta ? d 6t 3 t 22 0 â t t¡ l ¡ 8¡ t* l 6¡ l 0 t 4t a¿3€ 19 2 2 4 7 3 16 21 4 4 1o 9 2 o 19 3 2 52 0 8 78 0 ô9 1A € IS S A Q U A H iI G H LI B Ë R r y HI G H TI G E R MT N SK Y L I N Ê HI G H TO T À L 'M ¡ n u s êx d u d e d sp a æ s fo r sp æ i a l pr o g É m ne e d s " He a d c o u n t En r o l l m e n t Co m p a r e d to Pe m a n e n t Ca p a c i t y x 95 0 / 6 (u t ¡ l ¡ z a t ¡ o n fa c t o r ) '* He a d c o u n t En r o l l m e n t Co m p a r e d to Ma x ¡ m u m Câ p æ i t y x 95 0 / 6 (ú t i l i z a t i o n fa c t o r ) Pe m a n e n t ca p a c i t y re f e c t s th e bu ¡ l d i n g ' s le v e l of se r v ¡ æ de s i g n ca p a c i t y . Th e m€ x ¡ m u m æp a c i t y in c l u d e s th e pe m a n e n t ca p a c i t y pl u s th e ma i m m nu m b e r of cl a s s r m m s se r u e d in po r t a b l e s . -1 9 - Appendix C Ap p e n d i x D 2U 4 - 2 A 1 5 Di s t r i c t To t a l Ga p a c i t y ^- S 6 ¿! ) r9 1 5 6 20 6 21 4 6 2 55 2 24 41 3 6 18 6 95 83 15 8 3 4 67 5 'P e r m a n e n t Ca p a c ¡ t y is th e to t a l Pe r m a n e n t Ca p a c i t y fr o m þp e n d i x A + To t a l Ca p a c i t y fr o m Ap p e n d i x B + To t a l Ca p a c í t y ft o m Ap p e n d i x C ,2 0 - Appendix D Ap p e n d i x E Si x - Y e a r Fi n a n c e Pl a n "N = Ne w C o n s t r u c t i o n M = Mo d e m i z a t i o n / R e b u i l d *T h e ls s a q u a h Sc h o o l Di s t r i c t , wi t h vo t e r ap p r o v a l , ha s fr o n t fu n d e d th e s e pr o j e c t s . *" " S c h o o l im p a c t fe e s ma y be ut i l i z e d to of f s e t fr o n t fu n d e d ex p e n d i t u r e s as s o c i a t e d wi t h th e co s t of ne v v fa c i l i t i e s . lm p a c t fe e s ar e cu n e n ¡ y co l l e c t e d fr o m Ki n g Co u n t y , Ci t y of Be l l e v u e , Ci t y of Ne w c a s t l e , Cí t y of Re n t o n , C¡ t y of Sa m m a m i s h an d th e Ci t y of ls s a q u a h fo r pr o j e c t s wi t h i n th e ls s a q . Sc h o o t Districi. fo r po r t a b l e pu r c h a s e s ma y co m e fr o m im p a c { fe e s , st a t e ma t c h i n g fu n d s , in t e r e s t ea m i n g s or fu t u r e bo n d sa l e el e c { i o n s . UNötr,UUKtsU LOCAL***s500.000 $500,ür0SECUREDLOCALISTATE*"$62,500,000 $2,000,000 $65,200,000 $16,662,000 $19,500,000 $3,925,000 $7,270,000 $8,4t¡5,000 $27,200,000 $3,150.000 $212,892,ü¡0 uo s t to Co m p l e t e $6 2 . 5 0 0 . 0 0 0 $2 , 0 0 0 , 0 0 0 $6 5 , 2 0 0 , 0 0 0 $l ô . 6 6 2 . 0 0 0 $2 2 , 5 0 0 , 0 0 0 $3 , 9 2 5 , 0 0 0 $7 , 2 7 0 , 0 0 0 $8 , 4 8 5 , 0 0 0 $2 7 , 2 0 0 , 0 0 0 $3 , 1 5 0 , 0 0 0 $2 ' 1 5 , 8 9 2 , 0 0 0 20 1 8 $2 . 7 0 0 . 0 0 0 $2 , 7 0 0 , ( x ¡ o 20 1 7 $4 , 0 0 0 , 0 0 0 $r . 2 5 0 . 0 0 0 $2 3 . 5 0 0 . 0 0 0 $2 8 , 7 5 { r , 0 0 0 20 1 6 $8 , 0 0 0 , 0 0 0 $1 0 , 2 5 0 , 0 0 0 $1 , 6 7 5 , 0 0 0 $1 , 0 0 0 , 0 0 0 $2 0 , 9 2 5 , 0 0 0 20 1 5 $3 5 . 0 0 0 . 0 0 0 s1 0 . 5 0 0 . 0 0 0 $4 . 1 6 2 . 0 0 0 $1 0 , 0 0 0 , 0 0 0 $2 . 0 0 0 . 0 0 0 $1 . 0 0 0 . 0 0 0 $r . 0 0 0 . 0 0 0 $6 3 , 6 6 2 , 0 0 0 20 1 4 $1 5 , 0 0 0 , 0 0 0 $3 0 . 5 0 0 . 0 0 0 $2 . 5 0 0 . 0 0 0 $1 . 0 0 0 . 0 0 0 $2 5 0 , 0 0 0 $6 . 0 2 0 , 0 0 0 $7 . 2 8 5 , 0 0 0 sô t , æ 5 , 0 0 0 20 1 3 $5 0 0 , 0 0 0 $2 , 0 0 0 , 0 0 0 $2 4 , 2 0 0 , 0 0 0 $1 0 , 0 0 0 . 0 0 0 $2 5 0 , 0 0 0 $2 0 0 , 0 0 0 $1 , 2 0 0 , 0 0 0 $3 8 , 3 5 0 , ü ' 0 NI M * M M M M M M M M M N BU I L D I N G ls s a q u a h Mi d d l e Sc h o o l ls s a q u a h Hi q h Sc h o o l Li b e r t y hi g h Sc h o o l Ma y w o o d Mi d d l e Sc h o o l Cl a r k El e m e n t a r y Ti q e r Mo u n û a i n Ap o l l o El e m e n t a r v ls s a q u a h Va l l e v Su n n y Hi l l s Po f l a b l e s * * * * TO T A L S -2 1 - Appendix E Kent School District Capital Facilities Plan 2015-2016 - 2020-2021 KENT SCHOOL DISTRICT ,dune 2015 SIX -YEAR CAPITAL FACILITIES PLAN 2015-2016 a 2020-2021 June 2015 Kent School District No. 415 12033 SE 256`h Street Kent, Washington 98030-6643 (253) 373-7295 BOARD of DIRECTORS Ms. Karen DeBruler, President Ms. Deborah Straus, Vice President Ms. Agda Burchard, Legislative Representative Mr. Russ Hanscom, Director Ms. Maya Vengadasalam, Director Dr. Calvin J. Watts Superintendent of Schools Dr. Richard A. Stedry, Chief Business Officer Ralph Fortunato, CSBS, Director of Fiscal Services Fred Long, Director of Facilities Services Kent School District Six -Year Capital Facilities Plan June 2015 Kent School District Sim Tear Capital Facilities Flan 2a6Ce of Contents Section Page Number I Executive Summary 2 11 Six -Year Enrollment Projection & History 4 III District Standard of Service 9 I V Inventory, Capacity & Maps of Existing Schools 12 V Six -Year Planning & Construction Plan — Site Map 15 V I Portable Classrooms 18 VII Projected Classroom Capacity 19 VIII Finance Plan, Cost Basis and Impact Fee Schedules 24 I X Summary of Changes to Previous Plan 32 X Appendixes 33 Kent School District Six -Year Capital Facilities Plan June 2015 Executive Summary This Six -Year Capital Facilities Plan (the "Plan") has been prepared by the Kent School District (the "District') as the organization's capital facilities planning document, in compliance with the requirements of Washington's Growth Management Act, King County Code K.C.C. 21A.43 and Cities of Kent, Covington, Renton, Auburn, Black Diamond, Maple Valley, and SeaTac. This annual Plan update was prepared using data available in the spring of 2015 for the 2014-2015 school year. This Plan is consistent with prior long-term capital facilities plans adopted by the Kent School District. This Plan is not intended to be the sole planning document for all of the District's needs. The District may prepare interim and periodic Long Range Capital Facilities Plans consistent with Board Policies, taking into account a longer or shorter time period, other factors and trends in the use of facilities, and other needs of the District as may be required. Prior Capital Facilities Plans of the Kent School Metropolitan King County Council and Cities of Renton and included in the Capital Facilities Plan Plans of each jurisdiction. This Plan has also be Diamond, Maple Valley, and SeaTac for their in Comprehensive Plans. District have been adopted by Kent, Covington, Auburn and element of the Comprehensive an submitted to cities of Black ormation and inclusion in their In order for impact fees to be collected in the unincorporated areas of Kent School District, the Metropolitan King County Council must adopt this Plan and a fee -implementing ordinance for the District. For impact fees to be collected in the incorporated portions of the District, the cities of Kent, Covington, Renton and Auburn must also adopt this Plan and their own school impact fee ordinances. This Capital Facilities Plan establishes a standard of service in order to ascertain current and future capacity. While the State Superintendent of Public Instruction establishes square footage guidelines for capacity, those guidelines do not account for local program needs in the District. The Growth Management Act, King County and City codes and ordinances authorize the District to make adjustments to the standard of service based on specific needs for students of the District. This Plan includes the standard of service as established by Kent School District. Program capacity is based on an average capacity and updated to reflect changes to special programs served in each building. Portables in the capacity calculation use the same standard of service as the permanent facilities. (continued) Kent School District Six -Year Capital Facilities Plan June 2015 Page 2 I Executive Summary (continued) The capacity of each school in the District is calculated based on the District standard of service and the existing inventory of permanent facilities. The District's program capacity of permanent facilities reflects program changes and the state's mandated reduction of class size to meet the standard of service for Kent School District. Portables provide additional transitional capacity. Kent School District is the fourth largest district in the state. Enrollment is electronically reported monthly to the Once of the Superintendent of Public Instruction ("OSPI") on Form P-223. Although funding apportionment is based on Annual Average Full Time Equivalent (AAFTE), enrollment on October 1 is a widely recognized "snapshot in time" that is used to report the District's enrollment for the year as reported to OSPI. The Board of Directors approved Full Day Kindergarten ("FDK") for all Elementary Schools in 2011-12 and FDK projections are used to forecast Kindergarten enrollment in future years. The District received authorization from the Office of Superintendent of Public Instruction to temporarily re -open the former Kent Elementary School at 317 Fourth Ave South in Kent. This facility will be used to house the kindergarten and early child education classes for both Kent and Neely -O'Brien Elementary Schools to alleviate overcrowding at those schools. This building re -opened in fall 2014 as the Kent Valley Early Learning Center. The District's standard of service, enrollment history and projections, and use of transitional facilities are reviewed in detail in various sections of this Plan. The District plans to continue to satisfy concurrency requirements through the transitional use of portables. A financing plan is included in Section VIII which demonstrates the District's ability to implement this Plan. Pursuant to the requirements of the Growth Management Act, this Plan will be updated annually with changes in the impact fee schedules adjusted accordingly. Kent School District Six -Year Capital Facilities Plan June 2015 Page 3 11 Six - Year Enrollment Projection For capital facilities planning, enrollment growth projections are based on cohort survival and student yield from documented residential construction projected over the next six years. (see Tabta 2, page s) The student generation factor is the basis for the growth projections from new developments. (see Page 5) King County live births and the District's relational percentage average were used to determine the number of kindergartners entering the system. (see rebte s, page 7) 8.98% of 24,514 King County live births in 2010 is projected for 2,202 students expected in Kindergarten for October 1, 2015. This is an decrease of 543 live births in King County over the previous year. (see Tabiez pagea) Full Day Kindergarten ("FDK") programs at all 28 elementary schools require an adjustment to the Kindergarten forecast for projecting FDK at 1.0 FTE for capital facilities planning. P-223 Reports will continue to include FDK students at 1.0 for twelve schools with FDK funded by state apportionment, and all other kindergarten students will be reported at .50 FTE for state funding in 2014-2015. Early Childhood Education students (also identified as "ECE°), "Preschool Inclusive Education ("IE") students are forecast and reported to OSPI separately on Form P -223H for Special Education Enrollment. Capacity is reserved to serve students in the ECE programs at elementary schools. The first grade population of Kent School District is traditionally 2-3% larger than the kindergarten population due to growth and transfers to the District from private kindergartens. Cohort survival method uses historical enrollment data to forecast the number of students projected for the following year. Projections for October 1, 2015-2020 are from OSPI Report 1049 — Determination of Projected Enrollments. Within practical limits, the District has kept abreast of proposed developments. The District will continue to track new development activity to determine impact to schools. Information on new residential developments and the completion of these proposed developments in all jurisdictions will be considered in the District's future analysis of growth projections. The Kent School District serves eight permitting jurisdictions: unincorporated King County, the cities of Kent, Covington, Renton, and Auburn and smaller portions of the cities of SeaTac, Black Diamond, and Maple Valley (Continued) Kent School District Six -Year Capital Facilities Plan June 2015 Page 4 11 Six - Year Enrollment Projection (continued) STUDENT GENERATION FACTOR "Student Factor" is defined by King County code as "the number derived by a school district to describe how many students of each grade span are expected to be generated by a dwelling unit' based on district records of average actual student generated rates for developments completed within the last ten years. Following these guidelines, the student generation rate for Kent School District is as follows: Single Family Elementary .257 Middle School .070 Senior High .138 Total .465 Multi -Family Elementary .111 Middle School .022 Senior High .039 Total .172 The student generation factor is based on a survey of 3,867 single family dwelling units and 966 multi -family dwelling units with no adjustment for occupancy rates. Please refer to Appendix E on Page 36 of the Capital Facilities Plan for details of the Student Generation Factor survey. In preparing the 2015-2016 to 2020-2021 Capital Facilities Plan the District contracted with Davis Demographics and Planning (DDP) of Riverside California, a noted expert: in demographic studies for school districts, to analyze and prepare the student generation factor. DDP used a larger sample of single family residences than the district did in previous plans and included both "garden" and "urban style" apartments in the calculation for multi -family residences. Urban style apartments typically have four stories, a central lobby and entrance, elevator access to all floors and have a central corridor with apartments on each side. These apartments have little or no surface street parking, with parking located beneath the building, retail may or may not be included with the building. If there is retail it will generally be located on the first floor. These apartments seldom have swimming pools and do not have playgrounds for children. (Continued) Kent School District Six -Year Capital Facilities Plan June 2015 Page 5 I I Six - Year Enrollment Projection (Continued) Garden style apartments will have very little studio apartments and will have more three bedroom apartments then the urban style and in theory generate more students enrolled in school. These apartments will also have lawns, club houses, swimming pools and places for children to play. The District felt that it is important to include both styles of apartments for the student generation factor. Though it is anticipated that few students will come from the urban style, they are now part of the mix in Kent and thus should be included in mix of mufti -family housing units. Kent School District Six -Year Capital Facilities Plan June 2018 Page 6 m W N W O h o w N N' N N N N N N N N N m W O N O N m V 0 0 0 0 O m v M N N w w � h O m O V N W MOp N � h to CW'1 M tOtl V O W O m N N � N N N N N n N N N N N ovi m co N M O O � n N N O 0 N m w O M W G M W O O M O O M N N Tc6 w v M tp h m h r h p r n 0 � W m W W O 0 O N O app O N N N c9 V W rD W c0 M O O O> W O O O ry O m O M n o to W M N M tm fp � N tD N h wcoN N W N N N N N N N N N N O O w M W M h h N O O r N C9 N N O W O h N O O O O O O P O N 0 N Op In N fp W tm N W N N N C6 N N N N N N N N N N N o o N W ttl h h M fm h W O O O ap nv N N N NN v ro W N N N N N m pp r NI N tV r N C12L N a a m R r N M c d a a B -°o a a v w v a v TO 'g a t6 m W � o TO w� G T 20 2 R T 2 E Y r Y 0 0 (D C9 CD 0 U' U' C9 C9 (9 C7 ~ } v KENT SCHOOL DISTRICT No. 415 SIX -YEAR ENROLLMENT PROJECTION Full Dav Kindergarten at all Elem LB in 200B LB in 2009 LB in 2010 Is in 2011 LB in 2012 LB Ed. 2013 LB Est 2n14 ACTUAL P R O J E C T 1 0 N 24,514 October 2014 2015 2016 2017 11 2018 2019 2020 -543 116 King County Live Births' 25,057 24,514 24,630 25,032 25,890 26,490 26,998 1 Increase / Decrease 323 -543 116 402 858 600 508 Kindergarten/ Birth % 2 8.34% 8.98% 9.160% 9.23% 9.13% 9.130/. 9.16% FD Kindergarten @ 1.0 2090 2,202 2,256 2,310 2,364 2,419 2,473 Grade 1 2127 2,139 2,253 2,309 2,364 2,419 2,475 Grade 2 2190 2,140 2,152 2,266 2,323 2,378 2,433 Grade 3 2070 2,229 2,178 2,190 2,306 2,364 2,420 Grade 4 1956 2,082 2,241 2,190 2,202 2,319 2,377 Grade 5 2116 1,977 2,104 2,265 2,213 2,225 2,343 Grade 6 2023 2,155 2,015 2,144 2,308 2,255 2,267 Grade 7 2104 2,030 2,163 2,022 2,152 2,317 2,263 Grade 8 2091 2,127 2,052 2,186 2,044 2,175 2,342 Grade 9 2428 2,401 2,442 2,356 2,510 2,347 2,497 Grade 10 2151 2,129 2,104 2,140 2,065 2,200 2,057 Grade 11 1802 1,911 1,891 1,869 1,901 1,835 1,954 Grade 12 1576 1,478 1,567 1,551 1,533 1,559 1,505 Total Enrollment Projection 3 26,724 27,000 27,418 27,798 28,285 28,812 29,406 Yearly Increase/Decrease 3 276 418 380 487 527 594 Yearly Increase/Decrease % 1.03% 1.55% 1.39% 1.750% 1.86% 2.06% Total Enrollment Projection 1 26,724 1 27,798 28,285 28,812 29,406 1 Kindergarten enrollment projection for 2015 is based on Kent SD percentage of live births in King County five years previous. 2 Kindergarten projection is calculated by using the District's previous year percentage of King County births five years earlier compared to actual kindergarten enrollment in the previous year. (Excludes ECE - Early Childhood Education preschoolers) 3 Headcount Projections for 2015 - 2020 from OSPI Report 1049 - Determination of Projected Enrollments 4 Oct. 2014 P223 Headcount is 26,724 & FTE 25,888.84. Full Headcount with ECE Preschool & Running Start students = 28,090 G R O W T H P R O J E C T I O N S - Adjustments for current economic factors For facilities planning purposes, this six-year enrollment projection anticipates conservative enrollment growth from new development currently in some phase of planning or construction in the district. Kent School District Six -Year Capital Facilities Plan Table 2 June 2015 Page 8 III Current Kent School District "Standard of Service" In order to determine the capacity of facilities in a school district, King County Code 21A.06 references a "standard of service" that each school district must establish in order to ascertain its overall capacity. The standard of service identifies the program year, the class size, the number of classrooms, students and programs of special need, and other factors determined by the district which would best serve the student population. This Plan includes the standard of service as established by Kent School District. The District has identified schools with significant special needs programs as "impact" schools and the standard of service targets a lower class size at those facilities. Portables included in the capacity calculation use the same standard of service as the permanent facilities. (See Appendix A, e & c) The standard of service defined herein will continue to evolve in the future. Kent School District is continuing a long-term strategic planning process combined with review of changes to capacity and standard of service. This process will affect various aspects of the District's standard of service and future changes will be reflected in future capital facilities plans. Current Standards of Service for Elementary Students Class size for Kindergarten is planned for an average of 23 or fewer students. Class size for grades 1 - 3 is planned for an average of 23 or fewer students. Class size for grades 4 - 6 is planned for an average of 27 or fewer students. Class size for Kindergarten and grades 1 and 2, for schools that qualify for high poverty funding (18 elementary schools for 2015-16) is planned for an average of 20 or fewer students. All elementary schools meet the criteria required to provide full day kindergarten programs (FDK = Full Day Kindergarten) with the second half of the day funded by state apportionment or the Educational Programs and Operations Levy. Twelve schools with FDK Programs have state apportionment funding. Some special programs require specialized classroom space and the program capacity of some of the buildings housing these programs is reduced. Some students, for example, leave their regular classroom for a short period of time to receive instruction in special programs and space must be allocated to serve these programs. Some students have scheduled time in a computer lab. Students may also be provided music instruction and physical education in a separate classroom or facility. Kent School District Six -Year Capital Facilities Plan June 2015 Page 9 Some identified students will also be provided educational opportunities in classrooms for special programs such as those designated as follows: English Language Learners (E L L) Education for Disadvantaged Students (Title I) — Federal Program Learning Assisted Programs (LAP) — State Program Highly Capable Students -State Program Reading, Math or Science Labs Dual Language Programs in 4 elementary schools Inclusive Education Service for Elementary and Secondary students with disabilities may be provided in a separate or self-contained classroom sometimes with a capacity of 10-15 depending on the program: Early Childhood Education (ECE) -3-4 yr. old students with disabilities Tiered Intervention in Inclusive Education Support Center Programs Integrated Programs & Resource Rooms (for special remedial assistance) Self-contained Inclusive Education Support Center Programs (SC) School Adjustment Programs for students with behavioral disorders (SA) Adaptive Support Center for Mild, Moderate & Severe Disabilities (Asc-Do) Speech & Language Therapy & Programs for Hearing Impaired students Occupational & Physical Therapy Programs (OT/PT) The Outreach Program (TOP) for 18-21 year old secondary students Some newer buildings have been constructed to accommodate most of these programs; some older buildings have been modified, and in some circumstances, these modifications reduce the classroom capacity of the buildings. When programs change, program capacity is updated to reflect the change in program and capacity. Current Standards of Service for Secondary Students The standards of service outlined below reflect only those programs and educational opportunities provided to secondary students which directly affect the capacity of the school buildings. Class size for grades 7 — 8 is planned for an average of 28.6 or fewer students. Class size for grades 9 — 12 is planned for an average of 30.6 or fewer students. Similar to Inclusive Education Programs listed above, many other secondary programs require specialized classroom space which can reduce the program capacity of the permanent school buildings. Kent School District Six -Year Capital Facilities Plan June 2015 Page 10 Identified secondary students will also be provided other educational opportunities in classrooms for programs designated as follows: Computer, Multi -Media & Technology Labs & Programs Technology Academy at Kent -Meridian High School & Mill Creek Middle School Science Programs & Labs - Biology, Chemistry, Physics, Oceanography, Astronomy, Meteorology, Marine Biology, General Science, etc. English Language Learners (E L L) Music Programs - Band, Orchestra, Chorus, Jazz Band, etc. Art Programs - Painting, Design, Drawing, Ceramics, Pottery, Photography, etc. Theater Arts - Drama, Stage Tech, etc. Journalism and Yearbook Classes Highly Capable (Honors or Gifted) and Advanced Placement Programs International Baccalaureate (°I W) Program JROTC - Junior Reserve Officers Training Corps Career & Technical Education Programs (CTE - Vocational Education) Family & Consumer Science - Culinary Arts, Sewing, Careers w/ChildrentEduc., etc. Child Development Preschool and Daycare Programs Health & Human Services - Sports Medicine, Sign Language, Cosmetology, etc. Business Education - Word Processing, Accounting, Business Law & Math, Marketing, Economics, Web Design, DELA, FBLA (Future Business Leaders). Technical & Industry - Woodworking, Cabinet Making, Building Trades, Metals, Automotive & Manufacturing Technology, Welding, Drafting, Drawing, CAD (Computer-aided Design), Electronics, Engineering & Design, Aviation, ASL, etc. Graphic & Commercial Arts, Media, Photography, Theater & Stage, Ag & Horticulture. Kent Phoenix Academy - Performance Learning Center, Gateway, Virtual High School & Kent Success program with evening classes for credit retrieval. Space or Classroom Utilization As a result of scheduling conflicts for student programs, the need for specialized rooms for certain programs, and the need for teachers to have a work space during their planning periods, it is not possible to achieve 100% utilization of regular teaching stations at secondary schools. Based on the analysis of actual utilization of classrooms, the District has determined that the standard utilization rate is 85% for secondary schools. Program capacity at elementary schools reflects 100% utilization at the elementary level. Kent School District Six -Year Capital Facilities Plan June 2015 Page 11 Currently, the District has permanent program capacity to house 27,489 students and transitional (portable) capacity to house 2,539. This capacity is based on the Districts Standard of Service as set forth in Section I 11. Included in this Plan is an inventory of the District's schools by type, address and current capacity. (see Table 3 on Page 13). The ratio between permanent capacity and portable capacity is 96.6%-3.4%. The program capacity is periodically updated for changes in programs, additional classrooms and new schools. Program capacity has been updated in this Plan to reflect program changes implemented in the Fall of 2014. For the 2014-15 school year and beyond the state has mandated lower class sizes in 18 elementary schools that are classified as high poverty. The new class size in grades K-1 and 2 will be 20 students for every teacher. Calculation of Elementary, Middle School and Senior High School capacities are set forth in Appendices A, B and C. A map of existing schools is included on Page 14. For clarification, the following is a brief description of some of the non-traditional programs for students in Kent School District; Kent Mountain View Academy serves Grades 3 — 12 with transition, choice and home school assistance programs. It is located in the former Grandview School in the western part of the district in Des Moines. This school was originally designed as an elementary school and is included in the elementary capacity for this Plan. Kent Phoenix Academy is a non-traditional high school which opened in Fall 2007 in the renovated site and building that formerly served Sequoia Middle School. Kent Phoenix Academy has four special programs including the Performance Learning Center, Gateway, Virtual High School and Kent Success. iGrad - In partnership with Green River College, Kent School District has pioneered the Individualized Graduation and Degree Program or "iGrad". iGrad offers a second chance to students age 16-21 who have dropped out of high school and want to earn a high school diploma. iGrad is not included in this Capital Facilities Plan because it is served in leased space at the Kent Hill Plaza Shopping Center. Over the past two years, enrollment in the iGrad program has averaged over 300 students. Kent School District Six -Year Capital Facilities Plan June 2015 Page 12 KENT SCHOOL DISTRICT No. 415 INVENTORY and CAPACITY of EXISTING SCHOOLS Kent School District Six -Year Capital Facilities Plan Table 3 June 2015 Page 13 20142015 Year SCHOOL openad ABR ADDRESS Program Ca aci Carriage Crest Elementary 1990 CC 18235 -140th Avenue SE, Renton 98058 456 Cedar Valley Elementary 1971 CV 26500 Timbedane Way SE, Covington 98042 364 Covington Elementary 1961 CO 17070 SE Wax Road, Covington 98042 488 Crestwood Elementary 1980 CW 25225 -180th Avenue SE, Covington 98042 432 East Hill Elementary 1953 EH 9825 S 240th Street, Kent 98031 466 Emerald Park 1999 EP 11800 SE 216th Street, Kent 98031 484 Fairwood Elementary 1969 FW 16800 -148th Avenue SE, Renton 98058 408 George T. Daniel Elementary 1992 DE 11310 SE 248th Street, Kent 98030 428 Glenridge Elementary 1995 GR 19405 -120th Avenue SE, Renton 98058 436 Grass Lake Elementary 1971 GL 28700 -191 at Place BE, Kent 98042 438 Horizon Elementary 1990 HE 27641 -144th Avenue SE Kent 98042 477 Jenkins Creek Elementary 1987 JC 26915 - 186th Avenue SE, Covington 98042 459 Kent Elementary 1999 KE 24700 - 64th Avenue South, Kent 98032 460 Kent Valley Early Learning Center 2014 KV 317 —4th Ave S, Kent, WA 98032 336 Lake Youngs Elementary 1965 LY 19660 -142nd Avenue SE, Kent 98042 524 Martin Sortun Elementary 1987 MS 12711 SE 248th Street, Kent 98030 452 Meadow Ridge Elementary 1994 MR 27710 - 108th Avenue SE, Kent 98030 440 Meridian Elementary 1939 ME 25621 - 140th Avenue SE, Kent 98042 524 Millennium Elementary 2000 ML 11919 SE 270th Street, Kent 98030 484 Neely -O'Brien Elementary 1990 NO 6300 South 236th Street, Kent 98032 460 Panther Lake Elementary 2009 PL 20831 -108th Avenue SE, Kent 98031 504 Park Orchard Elementary 1963 PO 11010 BE 232nd Street, Kent 98031 476 Pine Tree Elementary 1967 PT 27825 -118th Avenue SE, Kent 98030 477 Ridgewood Elementary 1987 RW 18030 -162nd Place SE, Renton 98058 504 Sawyer Woods Elementary 1994 SW 31135 - 228th Ave SE, Black Diamond 98010 486 Scenic Hill Elementary 1960 SH 26025 Woodland Way South, Kent 98030 448 Soos Creek Elementary 1971 SC 12651 SE 218th Place, Kent 98031 342 Spdngbmok Elementary 1969 SB 20035 - 100th Avenue SE, Kent 98031 418 Sunrise Elementary 1992 SR 22300 -132nd Avenue BE, Kent 98042 543 Elementary TOTAL 13,214 Cedar Heights Middle School 1993 CH 19640 SE 272 Street, Covington 98042 895 Mattson Middle School 1981 MA 16400 SE 251 at Street, Covington 98042 787 Masker Middle School 1970 MK 12600 SE 192nd Street, Renton 98058 832 Meridian Middle School 1958 MM 23480 - 120th Avenue SE, Kent 98031 792 Mill Creek Middle School 2005 MC 620 North Central Avenue, Kent 98032 916 Northwood Middle School 1996 NW 17007 SE 184th Street, Renton 98058 926 Middle School TOTAL 8,148 Kent -Meridian High School 1951 KM 10020 SE 258th Street, Kent 98030 1,904 Kentlake Senior High School 1997 KL 21401 SE 300th Street, Kent 98042 1,957 Kentndge Senior High School 1968 KR 12430 SE 206th Street, Kent 98031 2,277 Kentwood Senior High School 1981 KW 25800 -164th Avenue SE, Covington 98042 2,159 Senior High TOTAL 8,297 Kent Mountain View Academy 1997 MV/LC 22420 Military Road, Des Moines 98196 414 Kent Phoenix Academy 2007 PH 11000 SE 264th Street, Kent 98030 416 DISTRICT TOTAL 27,489 Kent School District Six -Year Capital Facilities Plan Table 3 June 2015 Page 13 n oa g�® LLW 3S eAV m � N y u y® e a 22 .o E S Kent School District Six -Year Capital Facilities Plan June 2016 Page 14 a N a c mm m a)L � mt O L d �c y aa U2 mE a o � a 0.12 m m bs c� ®p ®U® 0� cm aE o CN E ®W �O am C\,3 3S eAV 94V9I ° c pro M C;4 to m m m Mai •P �v W C E CR 3S 3(iry' PUZQ I y 2 W 3S aAV PUFT I W 1 6 0 'aE a'o� m 2NW ®' Qc1 c ®� e E y VJ ay N / y 8_ £U aE®}-.W ®641 �}v� W 25 Y.a O 0 \� �/ V ®p CO O Cn ® ag �:.W 4i4Di O Cn7 O _® � ® C = a v am C C C s 'm c® mE M uiYY X co �� N Kent School District Six -Year Capital Facilities Plan June 2016 Page 14 V Six-YearPlarmnirg endi Construietto,n Pial PXt the til ne cif pr eparabon of this Plan in spring of 2015, the following projects to increase capacity are in the planning phase in Kent School District; a Planning is in progress for a replacement school for Covington Elementary School in 2018 or beyond. The project is pending satisfactory financial resources to fund the project. a Planning is in progress for additional classroom space for Neely -O'Brien Elementary School. This addition will add approximately 25% to building capacity and is expected to conte online in fall of 2019 pending satisfactory financial resources to fund the project. m Enrollment projections reflect future need for additional capacity at the elementary school level. Future facility and site needs are reflected in this Plan. Q Some funding for lease or purchase of additional portables may be provided by impact fees as needed. Sites are based on need for additional capacity. As a critical component of Capital facilities planning, county and city planners and decision -makers are encouraged to consider safe walking conditions for all students when reviewing applications and design plans for new roads and developments. This should include sidewalks for pedestrian safety to and from school and bus steps as wall as bus pull-outs and turn-arounds for school buses. Included in this Plan is an inventory of potential projects and sites identified by the District which are potentially acceptable site alternatives in the future. (see Table 4 or Page 16 & Site map on Rags 17) Doter approved bond issues have included funding for the purchase of sites for some of these and future schools, and the sites acquired to date are included in this Plan. Some funding is secured for purchase of additional sites but some may be funded with impact fees as needed. Not all undeveloped properties meet current school construction requirements and some property may be traded or sold to meet future facility needs. The Board of Directors has started the process to sell surplus property in the spring of 2015. 2006 voter approval of $106M bond issue for capital improvement included the construction funding for a new elementary school, replacement of Panther lake Elementary, and classroom additions to high schools. Some impact fees have been utilized for those projects. In March 2013 the Board of Directors reallocated the funding for the new elementary school to capital projects for safety and security. The Board will continue annual review of standard of service and those decisions will be reflected in the each update of the Capital Facilities Plan. Kent School District Six -Year Capital Facilities Plan ,June 2016 Page 15 KENT SCHOOL DISTRICT No. 415 Site Acquisitions and Projects Planned to Provide Additional Capacity SCHOOL 1 FACILITY / SITE I LOCATION T e Status ProjectedProjetYetl -A for Completion Program new Date Capacity Growth "^) ELEMENTARY I Replacement 5 Replacement for Covington Elementary (U) BE 256th Street & 154th Ave SE Elementary Planning 2018-19 600 16% Covington Elem - Capacity to be replaced 17070 SE Wax Road, Covington Elementary Utilized -504 Elementary Neely -O'Brien Elementary School - Addition (U) 6300 S 236th Street, Kent 98032 Addition Planning 2019.20 600 25% Classrooms added to provide New Capacity Current Capacity 480 + 120 New = 600 Planning MIDDLE SCHOOL & SENIOR HIGH No new projects required for Secondary Schools at this time & Secondary Schools are excluded from Impact Fee formula. TEMPORARY FACILITIES Additonal Capacity Portables' TBD - For placement as needed New Planning 2015+ m- 31 each 100% ..I s OTHER SITES ACQUIRED 4 Covington area North (Near Mattson MS) 5 Covington area West (Halleson-Wikstrom) 3 Ham Lake area (Pollard) 8 BE of Lake Morton area (West property) 2 Shady Lk area (Sowers, Blaine, Drahota, Famine) 1 So. King Co. Activity Center (former Nike site) 12 South Central site (Plemmons-Yah-Wma) BE 251 & 164 BE, Covington 98042 BE 256 & 154 SE, Covington 98042 16820 SE 240, Kent 98042 BE 332 & 204 BE, Kent 98042 17426 SE 192 Street, Renton 98058 BE 167 & 170 BE, Renton 98058 BE 286th St & 124th Ave BE, Auburn 98092 gena vac Land Use oasiartation Type Judsdiction Urban Elementary City of Covington Urban Elementary y of Covington Rural Elementary King County Rural Secondary King County Urban Elementary King County Rural TBD 2 King County Urban TBD' King County Notes: h Unfunded facility needs will be reviewed in the future. TBD - To be determined - Some sites are identified but placement, timing and/or configuration of portables has not been determined. a Numbers correspond to sites on Site Bank Map on Page 17. Other Map site locations are parcels Identified in Table 7 on Page 28. Kent School District Six -Year Capital Facilities Plan Table 4 June 2015 Page 16 � � -S17P4 d CA ! E -< /® / mom__ \ > � 7 \ \ \ E a k V Kent School DistrictSix-Year Capi_ Facilities_ June 2016 m,= ME o Cr 0 m o -S17P4 d CA ! E -< /® / mom__ \ > � 7 \ \ \ E a k V Kent School DistrictSix-Year Capi_ Facilities_ June 2016 m,= The Plan references use of portable as interim or transitional capacity and facilities. Currently, the District utilizes portables to house students in excess of permanent capacity and for program purposes at some school locations. (Please see Appendices A B C D) Based on enrollment projections, implementation of full day kindergarten programs, program capacity and the need for additional permanent capacity, the District anticipates the need to purchase or lease additional portables during the next six-year period. During the time period covered by this Plan, the District does not anticipate that all of the District's portables will be replaced by permanent facilities. During the useful life of some of the portables, the school-age population may decline in some communities and increase in others, and these portables provide the flexibility to accommodate the immediate needs of the community. Portables may be used as interim or transitional facilities: 1. To prevent overbuilding or overcrowding of permanent school facilities. 2. To cover the gap between the time of demand for increased capacity and completion of permanent school facilities to meet that demand. 3. To meet unique program requirements. Portables currently in the District's inventory are continually evaluated resulting in some being improved and some replaced. The Plan projects that the District will use portables to accommodate interim housing needs for the next six years and beyond. The use of portables, their impacts on permanent facilities, life cycle and operational costs, and the interrelationship between portables, emerging technologies and educational restructuring will continue to be examined. Kent School District Six -Year Capttal Facilities Plan June 2015 Page 18 VII Projected Six -Year Classroom Capacity As stated in Section IV, the program capacity study is periodically updated for changes in special programs and reflects class size fluctuations, grade level splits, etc. As shown in the Inventory and Capacity chart in Table 3 on Page 13, the program capacity is also reflected in the capacity and enrollment comparison charts. (See Tables 5 & 5 A -B -C on pages 20-23) Enrollment is electronically reported to OSPI on Form P-223 on a monthly basis and funding apportionment is based on Annual Average FTE (AAFTE). The first school day of October is widely recognized as the enrollment "snapshot in time" to report enrollment for the year. Kent School District continues to be the fourth largest district in the state of Washington. P-223 Headcount for October 2014 was 26,724 with kindergarten students counted at 1.0 and excluding ECE and college -only Running Start students. A full headcount of all students enrolled in October 2014 totals 28,090 which includes ECE and college -only Running Start students. In October there were 826 students in 11th and 12th grade participating in the Running Start program at different colleges and receiving credits toward both high school and college graduation. 459 of these students attended classes only at the college ("college -only') and are excluded from FTE and headcount for capacity and enrollment comparisons. Kent School District has one of the highest Running Start program participation rates in the state. Based on the enrollment forecasts, permanent facility inventory and capacity, current standard of service, portable capacity, and future additional classroom space, the District plans to continue to satisfy concurrency requirements through the transitional use of portables. (see Table 5 and Tables 5A -B -C on Pages 20-23) This does not mean that some schools will not experience overcrowding. There may be a need for additional portables and/or new schools to accommodate growth within the District. New schools may be designed to accommodate placement of future portables. School attendance area changes, limited and costly movement of relocatables, zoning changes, market conditions, and educational restructuring will all play a major role in addressing overcrowding and underutilization of facilities in different parts of the District. Kent School District Sic -Year Capital Facilities Pian June 2015 Page 19 KENT SCHOOL DISTRICT No. 415 PROJECTED ENROLLMENT and CAPACITY Permanent Program Capacity' 1 27,489 Changes to Permanent Capacity 1 Capacity Increase (F) Replacement school with projected increase in capacity: Covington Elementary Replacement (u) 2 To Replace current Covington Elementary capacity 27,489 27,489 27,489 27,489 27,585 27,705 Neely -O'Brien Elementary Addition - Capacity Increase (u) 3 600 -504 120 Permanent Program Capacity Subtotal 27,489 27,489 27,489 27,489 27,585 27,705 27,705 Interim Portable Capacity 4 Elementary Portable Capacity Required 936 1;632 1,896 2,376 2,688 2,856 3,264 Middle School Portable Capacty Required 7 0 0 0 SCHOOL YEAR 0 2014-155:[2015-18 Senior High School Portable Capacity Required r 0 2016-17 1 2017-18 1 2018-19 1 2019-20 1 2020-21 936 1,632 Actual I P R O J E C T E D Permanent Program Capacity' 1 27,489 Changes to Permanent Capacity 1 Capacity Increase (F) Replacement school with projected increase in capacity: Covington Elementary Replacement (u) 2 To Replace current Covington Elementary capacity 27,489 27,489 27,489 27,489 27,585 27,705 Neely -O'Brien Elementary Addition - Capacity Increase (u) 3 600 -504 120 Permanent Program Capacity Subtotal 27,489 27,489 27,489 27,489 27,585 27,705 27,705 Interim Portable Capacity 4 Elementary Portable Capacity Required 936 1;632 1,896 2,376 2,688 2,856 3,264 Middle School Portable Capacty Required 7 0 0 0 0 0 0 0 Senior High School Portable Capacity Required r 0 0 0 0 0 0 0 936 1,632 1,896 2,376 2,688 2,856 3,264 TOTAL CAPACITY ' TOTAL ENROLLMENT/ PROJECTION s 26,566 27,000 27,418 27,798 28,285 28,812 29,406 DISTRICT AVAILABLE CAPACITY 1,859 2,121 1,967 2,067 1,988 1,749 1,563 ' Capacity is based on standard of service for programs provided and is updated periodically to reflect program changes s Replacement school for Covington Elementary will increase capacity and will be built on a different existing urban site. 3 Addition to Neely -O'Brien Elementary will increase capacity approximately 25%. 4 2014-15 total classroomortable capacity p p Ity is 936. Some additional relocatables used for program purposes. 5 Actual October Headcount Enrollment with Projections from OSPI Report 1049 - Determination of Projected Enrollments. Enrollment counts and projections have been adjusted for Full Day Kindergarten at all Elementary Schools. 6 School capacity meets concurrency requirements and no impact fees are proposed for secondary schools. Kent School District Six -Year Capital Facilities Plan Table 5 June 2016 Page 20 KENT SCHOOL DISTRICT No. 415 PROJECTED ENROLLMENT and CAPACITY SCHOOL YEAR 2014-15 2015-16 1 2016-17 1 2017-18 1 2018-1e 1 2019-20 2020-21 Actual P R O J E C T E D Elementary Permanent Capacity 113,214 13,286 13,286 13,286 13,286 13,382 13,502 Kent Mountain View Academy 2 414 Changes to Elementary Capacity Kent Valley Early Learning Center Capacity Increase (F) Covington Elementary Replacement (u) 3 600 Will replace current Covington Elementary capacity -504 Neely -O'Brien Elementary Addition Capacity Increase tu) 4 Subtotal 13,628 Portable Capacity Required' 936 120 13,286 13,286 13,286 13,382 13,502 13,502 1632 1896 2376 2688 2,856 3,264 Adjusted for FULL Day Kindergarten Headcount ENROLLMENT/ PROJECTION 14,572 14,924 15199 15,674 16,080 16.379 16.788 NUmber of Portables Required 39 68 79 99 112 119 136 125 Classroom Portables required in 2019-20. Some additional portables used for program purposes. 1 Capacity is based on standard of service for programs provided and is updated periodically to reflect program changes. 2 Kent Mountain View Academy is a special program at the former Grandview School serving students in Grades 3 - 12. The school building (formerly Kent Learning Center & Grandview Elem.) was designed as an elementary school. a Replacement school for Covington Elementarywill increase capacity and is planned for a different existing urban site - 4 Addition to Neely -O'Brien Elementary will increase capacity approximately 26%. ' Actual October Headcount Enrollment with Projections from OSPI Report 1049 - Determination of Projected Enrollments. Enrollment & Projections reflect FULL Day Kindergarten at ALL Elementary schools Q 1.0 & exclude ECE Preschoolers. Kent School District Six -Year Capital Facilities Plan Table 6 A June 2015 Page 21 KENT SCHOOL DISTRICT No. 415 PROJECTED ENROLLMENT and CAPACITY MIDDLE SCHOOL ® Grades 7 e 8 Middle School Permanent Capacity' 5,148 5,148 5,148 5,148 5,148 5,148 5,148 No Changes to Middle Sehool Capacity Subtotal 5,148 5,148 5,148 5,148 5,148 5,148 5,148 Portable Capacity Required' 0 SCHOOL YEAR 201495 2015-15 1 2016.17 2017-18 201819 2019-20 1 2020-21 Aauai P R O J E C T E D 5,148 5,148 5,148 Middle School Permanent Capacity' 5,148 5,148 5,148 5,148 5,148 5,148 5,148 No Changes to Middle Sehool Capacity Subtotal 5,148 5,148 5,148 5,148 5,148 5,148 5,148 Portable Capacity Required' 0 0 0 0 0 0 0 TOTAL CAPACITY '13 5,148 5,148 5,148 5,148 5,148 5,148 5,148 ENROLLMENT/ PROJECTION z 1 4,195 4.157 196 SURPLUS (DEFICIT) CAPACITY ° 1 953 991 933 940 952 656 543 Number of Portables Required 0 0 0 0 0 0 0 No Classroom Portables required at middle schools at this time. Some Portables used for classroom and program purposes. ' Capacity is based on standard of service for programs provided and is updated periodically to reflect program changes. 2 Actual October Headcount Enrollment with Projections from OSPI Report 1049 - Determination of Projected Enrollments. 9 Surplus capacity due to grade level reconfiguration - All 9th grade students moved to the high schools in Fall 2004. Middle School capacity meets concurrency requirements and no impact fees are collected for middle schools Kent School District Six -Year Capital Facilities Plan Table 5 13 June 2015 Page 22 KENT SCHOOL DISTRICT No. 415 PROJECTED ENROLLMENT and CAPACITY SENIOR HIGH ® Grades 9 ®1 2 Senior High Permanent Capacity' 8,713 8,713 8,713 8,713 8,713 8,713 8,713 Includes Kent Phoenix Academy Z No Changes to High School Capacity Subtotal 8,713 8,713 8,713 8,713 8,713 8,713 8,713 Portables Capacity Required 1 0 0 0 0 0 0 0 SCHOOL YEAR 2014-15 2015-16 1 2016-17 1 2017-18 2018-19 2019-20 2020-21 Actual P R O J E C T E D Senior High Permanent Capacity' 8,713 8,713 8,713 8,713 8,713 8,713 8,713 Includes Kent Phoenix Academy Z No Changes to High School Capacity Subtotal 8,713 8,713 8,713 8,713 8,713 8,713 8,713 Portables Capacity Required 1 0 0 0 0 0 0 0 TOTAL CAPACITY ' 8,713 8,713 8,713 8,713 8.713 8.713 8.713 ENROLLMENT / PROJECTION 3 1 7,958 7,919 8.004 7 VAL&lil SURPLUS (DEFICIT) CAPACITY 1 755 794 709 797 704 772 701 Number of Portables Required 0 0 0 0 0 0 0 No Classroom Portables required at this time. Some Portables used for classroom and program purposes. ' Capacity is based on standard of service for programs provided and is updated periodically to reflect program changes. 2 Kent Phoenix Academyo in Fall 2007 serving opened p g grades 9 - 12 with four special programs. 3 Actual October Enrollment with Projections from OSPI Report 1049 - Determination of Projected Enrollments. ` High School capacity meets concurrency requirements and no impact fees are collected for high schools Kent School District Six -Year Capital Facilities Plan Tattle 5 C June 2015 Page 23 VIII Finance Pian The finance plan shown on Table 6 demonstrates how the Kent School District plans to finance improvements for the years 2015-16 through 2020-21. The financing components include secured and unsecured funding and impact fees. The plan is based on voter approval of future bond issues, collection of impact fees under the State Growth Management Act and voluntary mitigation fees paid pursuant to State Environmental Policy Act. In February 2006, voters approved a $106 million bond issue that included funds for replacement of Panther Lake Elementary School with increased capacity, as well as construction of a new Elementary School to accommodate growth. The new Panther Lake Elementary School replaced the previous Panther Lake Elementary in Fall of 2009. The bond issue also funded Phase II of the renovation for Mill Creek Middle School and renovation of Sequoia Middle School for reconfiguration as a non-traditional high school, Kent Phoenix Academy, which opened in September 2007. 2006 construction funding also provided for additional classrooms at Kentlake High School and two projects at Kent -Meridian HS. The projects at Kent -Meridian provide additional capacity with several new classrooms and gymnasium space. The projects at K -M are completed and the new Main Gym added capacity for two more PE classrooms. Some impact fees were utilized for new construction that increased capacity. Originally, the district designated $16 million of the 2006 bond authorization toward the construction of an additional elementary school, identified as Elementary #31 in previous Plans. Due to a change in circumstances, the Board of Directors reallocated the $16 million for capital projects for safety and security. Replacement of Covington Elementary School in 2016-19 or beyond will increase capacity of ther current school by approximately 16%. Some impact fees will be utilized as part of the Finance Plan. A building addition is also planned to provide approximately 25% additional classroom capacity at Neely -O'Brien Elementary School in 2019-20. Some impact fees will be utilized as part of the Finance Plan. The Finance Plan includes new portables to be purchased or leased to provide additional capacity and some may be funded from impact fees. Enrollment projections reflect future need for additional capacity at the elementary level and unfunded facility needs will be reviewed in the future and reported in annual updates Kent School District Six -Year Capital Facilities Plan June 2015 Page 24 VIII Finance Plan of the Capital Facilities Plan. No impact fees are requested for secondary schools in this Plan. For the Six -Year Finance Plan, costs of future schools are based on estimates from Kent School District Facilities Department. Please see pages 26-27 for a summary of the cost basis. Kent School District Six -Year Capital Facilities Plan June 2015 Page 25 `i L � o o uni r n o n m m m E m m m E a - ui ai M Ni - LL W F9 f9 m® a a o 0 d o 0 0 m m O f9 a R m y U N _meq O O J Q N O m mM O M r F 04 fR r M b> N m 4 M r M O N a N E WCt a o m ri M O O M O N W C q m Y d d 6 N r c C6 w m d v m o o a o o a 0 3 0'm MO o m 0 N m g m d c o s -0 » a q a 2 E E m a w c `w U U w 1[J 9q m C pm $ Q C L N p tJ O C N Om d mm S J N � N m Yf th y� LL m � a c O a ro N rz 'dLu rq u 8 t U Q d c a Q R CL M m m m R m B 0O W m O Z mcr _ fn ❑ d y'j Q W cUry W W c g W $ LL c F gu n ami � a8a�� lQ F m Fr ii U LL > LL O r n Y Y Z `i Vill Finance Plan - Cost Basis Summam For impact fee calculations, construction costs are based on cost of the last elementary school, adjusted for inflation, and projected cost of the next elementary school. Elementary School Cost Projected Cost Cost of Panther Lake Elementary $26,700,000 Replacement (Opened in Fall 2009) Projected cost - Covington Elementary $35,025,000 Replacement (Projected to open in 2018) I Projected cost of Neely -O'Brien Addition $15,500,000 (Projected to open in 2018) Elementary Cost based on $35,025,000 Covington Elementary Replacement Site Acquisition Cost The site acquisition cost is based on an average cost of sites purchased or built on within the last ten years. Please see Table 7 on page 28 for a list of site acquisition costs and averages. Kent School District Six -Year Capital Facilities Plan June 2015 Page 27 N a 0 O M R ® R O ti z N ¢ OD Cam(ppo w W 2 N � M m4O V r M00 co m P r O co N h P CD t0 M O M O W W W O O O O 0) ° 00 m^ et O O_ a M U V O In co I M M H `a n 05 O M m N N M 0 444 R N m W `o W a m to N W W i fq fry N (Wry d CN N O m m O O O N m On N N N 00 A W W W W W ONi W N ¢ R O Y CCC O 6 E z ... O o W to v L C Q `m emi m to (Yp S y y a w = d s w m N 0 12 T �p E ? z ~ h z n m uto g Po N v N N a 0 KENT SCHOOL DISTRICT FACTORS FOR ESTIMATED IMPACT FEE CALCULATIONS Student Generation Factors - Single Family Elementary (Grades K - 6) 0.257 Middle School (Grades 7 - 8) 0.070 Senior High (Grades 9 - 12) 0.138 Total 0.465 Projected Increased Student Capacity Elementary 1632 Middle School 0 Senior High Addition 0 Required Site Acreage per Facility Elementary (required) 11 Middle School (required) 21 Senior High (required) 32 New Facility Construction Cost Elementary' $35,025,000 Middle School $0 Senior High ' $0 " See cost basis on Pg. 26 Temporary Facility Square Footage Elementary 85,615 Middle School 8,064 Senior High 20,400 Total 3.4% 114,079 Permanent Facility Square Footage Elementary (Includes KMVA) 1,470,543 Middle School 660,904 Senior High 1,110,415 Total 96.6% 3,241,862 Total Facilities Square Footage Elementary 1,556,158 Middle School 667,829 Senior High 1,130,815 Total 3,354,802 Developer Provided Sites / Facilities Value 0 Dwelling Units 0 Student Generation Factors - Multi -Family Elementary 0.111 Middle School 0.022 Senior High 0.039 Total 0.172 1111111, Y_: Ilf.". - .- , I - Elementary 90 Middle School 117 Senior High 130 Special Education 144 Average Site Cost / Acre Elementary $287,573 Middle School $0 Senior High $0 Temporary Facility Capacity & Cost Elementary @ 24 $200,000 Middle School @ 29 $0 Senior High @ 31 $0 State Funding Assistance Credit (sa many staerescm°) District Funding Assistance Percentage 57.47% CCA - Cost/Sq, Ft. (Effective July 2014) $200.40 District Average Assessed Value Single Family Residence $288,605 District Average Assessed Value Multi -Family Residence $114,153 Bond Levy Tax Rate/$1,000 Current / $1,000 Tax Rate (1.6842) $1.41 General Obligation Bond Interest Rate Current Bond Interest Rate 3.68% Kent School District Six -Year Capital Facilities Plan June 2015 Page 29 KENT SCHOOL DISTRICT IMPACT FEE CALCULATION fcr SINGLE FAMILY RESIDENCE Site Acquisition Cost per Single Family Residence Formula: ((Acres x cost per Acre) / Facility Capacity) x Student Generation Factor A 1 (Elementary) 11 $287,573 600 0.257 $1,354.95 A2 (Middle School) 21 $0 1,065 0.070 $o A3 (Senior High) 32 $0 1,000 0.138 $0 0.465 A$1,354.95 Permanent Facility Construction Cost per Single Family Residence Formula: ((Facility Cost / Facility Capacity) x Student Factor) x (Permanent/Total Square Footaae Ratio) B 1 (Elementary) $35,025,000 600 0.257 0.966 $14,492.29 B 2 (Middle School) $0 900 0.070 0.966 $0 B 3 (Senior High) $0 1,600 0.138 0.966 $0 0.465 $ 41 $14,492.29 Temporary Facility Cost per Single Family Residence Formula: ((Facility Cost / Facility Capacity) x Student Factor) x (Temporary /Total Sauafe Footaae Ratio) C 1 (Elementary) $200,000 24 0.257 0.034 $72.82 C 2 (Middle School) $0 29 0.070 0.034 $0 C 3 (Senior High) $0 31 0.138 0.034 $o 0.465 C b $72.82 State Funding Assistance Credit per Single Family Residence (formerly "State Match') D `y Formula: Area Cost Allowance x SPI Square Feet per student x Funding Assistance % x Student Factor Tax Credit per Single Family Residence D 1 (Elementary) $200.40 90 0.5747 0.257 $2,663.88 D 2 (Middle School) $200.40 117 0 0.070 $0 D 3 (Senior High) $200.40 130 00.138 $0 D `y $2,663.88 Tax Credit per Single Family Residence Average SF Residential Assessed Value $288,605 Current Debt Service Rate! $1,000 $1.41 Current Bond Interest Rate 3.68% Years Amortized (10 Years) 10 TC b $3,276.08 Developer Provided Facility Credit Facility / Site Value Dweliin Units 0 0 FC b 0 Fee Recap A = Site Acquisition per SF Residence B = Permanent Facility Cost per Residence C = Temporary Facility Cost per Residence Subtotal D = State Match Credit per Residence TC = Tax Credit per Residence Subtotal $1,354.95 $14,492.29 $72.82 $15,920.06 $2,663.88 $3,276.08 $5,939.96 Total Unfunded Need $9,980.10 50% Developer Fee Obligation $4,990 FC = Facility Credit (if applicable) 0 Net Fee Obligation per Residence - Single Family $4,990 Kent School District Six -Year Capital Facilities Plan June 2015 Page 30 KENT SCHOOL DISTRICT IMPACT FEE CALCULATION for MULTI -FAMILY RESIDENCE Site Acquisition Cost per Multi -Family Residence Unit Formula: ((Acres x Cost per Acre)/ Facility Capacity) x Student( I Required Site Acreage I Average Site Co A 1 (Elementary) 11 $287,573 A2 (MiddleSchool) 21 $0 A 3 (Senior High) 32 $0 Permanent Facility Construction Cost per Multi -Family Residence Unit Formula: ((Facility Cost / Facility Capacity) x Student Factor) x (Permanen' 600 0.111 $585.21 1,065 0.022 $0 1,000 0.039 $0 $0 0.172 0.022 0.964 A 4, $58531 B 1 (Elementary) $35,025,000 600 0.111 0.964 $6,246.36 B 2 (Middle School) $0 1,065 0.022 0.964 $0 B 3 (Senior High) $0 1,600 0.039 0.964 $0 Tax Credit per Mufti -Family Residence Unit 0.172 B 41 $6,246.36 Temporary Facility Cost per Multi -Family Residence Unit Current Debt Service Rate 1$1,000 $1.41 Formula: ((Facility Cost/ Facility Capa ' ) x Student Factor) x (temporary 1 Total Square Footage Ratio) 3.68% Fedltty Gust FatlRty Gapadty Studerrt Factor Footage Ratio Developer Provided Facility Credit Facility / Site Value C 1 (Elementary) $200,000 24 0.111 0.034 $31.45 C 2 (Middle School) $0 29 0.022 0.034 $0 C 3 (Senior High) $0 31 0.039 0.034 $0 0.172 C: $31.45 State Funding Assistance Credit per Multi -Family Residence (formerly "State Match') Formula: Area Cost Allowance x SPI Square Fast per student x Funding Assistance % x Student Factor I Area Coat Allowance I SPI Sq. Ft / Student I Equalization % I Student Factor D 1 (Elementary) $200.40 90 0.5747 0.111 $1150.55 D 2 (Middle School) $200.40 117 0 D.022 $0 D 3 (Senior High) $200.40 130 0 0.039 $0 D b $1,150.55 Tax Credit per Mufti -Family Residence Unit Average MF Residential Assessed Value $114,153 Current Debt Service Rate 1$1,000 $1.41 Current Bond Interest Rate 3.68% Years Amortized (10 Years) 10 TC b $1,386.90 Developer Provided Facility Credit Facility / Site Value DwePo Units 0 0 FC b 0 Fee Recap A = Site Acquisition per Multi -Family Unit B = Permanent Facility Cost per MF Unit C - Temporary Facility Cost per MF Unit Subtotal D = State Match Credit per MF Unit TC = Tax Credit per MF Unit Subtotal $585.21 $6,246.36 $31.45 $6,663.02 $1,150.55 $1,386.90 $2,537.45 Total Unfunded Need $4,325.57 50% Developer Fee Obligation $2,163 FC - Facility Credit (if applicable) 0 Net Fee Obligation per Residential Unit - Multi -family $2,163 Kent School District Six -Year Capital Facilities Plan April 2015 Page 31 The Capital Facilities Plan (the "Plan") is updated annually based on previous Pians in effect since 1993. The primary changes from the April 2014 Plan are summarized here. Changes to capacity continue to reflect fluctuations in class size as well as program changes. Changes in portables or transitional capacity reflect use, lease or purchase, sale, surplus and/or movement between facilities. The student headcount enrollment forecast is updated annually. All Elementary schools now have Full Day Kindergarten so six-year Kindergarten projections were previously modified to meet the requirements for Full Day Kindergarten programs at all Elementary schools. The district expects to receive some State Funding Assistance (formerly called "state matching funds") for projects in this Plan and tax credit factors are updated annually. Unfunded site and facility needs will be reviewed in the future. Due to the decrease in the student generation factor for both single family and multi- family housing the District is reducing the impact fees for both classes. For single family housing the fee will be $4,990 from $5,486 a decrease of $496 or 9%. For multi -family the fee will be $2,163 from $3,378 a decrease of $1,215 or 36%. Changes to Impact Fee Calculation Factors include: Student Generation Factor Elam 0.484 0.257 Single Family (SF) MS 0.129 0.070 SH 0.249 0.138 Total 0.866 0.465 -.401 Student Generation Factor Elam 0.324 0.111 Multi -Family (MF) MS 0.066 0.022 SH 0.118 0.039 Total 0.522 0.172 -.350 State Funding Assistance Ratios Mtata Match') 58.14% 57.47% Per OSPI website Area Cost Allowance (former Boeckh Index) $200.40 $200.40 Per DSPI website Average Assessed Valuation (AV) SF $245,871 $288,605 Puget Sound ESD AV - Average of Condominiums & Apts. MF $87,880 $114,153 Puget Sound ESD Debt Service Capital Levy Rate / $1000 $1.68 $1.41 Per King Co. Assessor Report General Obligation Bond Interest Rate 4.04% 4.68% Bloomberg Bond Buyer Index Impact Fee - Single Family SF $5,486 $4,990 Decrease of $496 or 9% Impact Fee - Multi -Family MF $3,378 $2,163 Decrease of $1,215 or 36% Kent School District Six -Year Capital Facilities Plan June 2015 Page 32 U) J N V Q Z O (L 50 U 'p 5O r J Z O > U , f/J r _ W U Y a U I„ E mO c w e U R w Q� O D a C Z Y m N 6 N m � C q O N N � m 2 m M o N LL U d o a r w � W Y � a LL O U) d b m N C U Q a 2 E X v o 0, o Z v 3 N W Q 7 a m Y Q N d N ti m � IL To n 'm y O N N R c m mm U m y a O R n m t Y c > oLL == a s L c m = L C R R O a N y, C m Y o � u m m O � � m o a r m m m > a O m LL m L L n `C U R m N U m R O Edi, } X d m m m w W Fj R v in C 0 O L m VI m Y z T} z} T z T} z} Z Y T z T} z}}}}} z z T T T z 2 S p a p 0O w o C N N w n m W o O 0 b o O e O o b 0 0 m O o e M W O o O 0 O 0 O 0 0 b O 0 N o O e O e O e O o O M W O A o O 0 W o O W N o l7 ro N p W C o F m N LL E M Q m m N N p C@ m N OaI r m W m W M Q Q m O W M N y O ,fl M1 O O m p p N a w ai m T $ m N m O Q O W m W W Q Q p N O N O O N W f0 W p V 0 W C W O O MW WpJ N T � U O N o i/, m - R U O LL E m a a° n E N Q W N W Q W W W O N W M W A 0) M A O b M p N N O b y N gg O y O W A A A R M O m gg N W M m m Q O� p M N Y a U N W W Q b N M W Q p N M1 M O r M b M M W b M1 p � N b Q p N M N a w U m n R U � m a m U VV V Q p Q p p M N p M Yl Q Q Q Q V p M M Q m M aj m b m m � Z a N U U U W W S Y Y 2 6 S¢ N Q U U O U -Ui F N N N U E a r E C ❑ H O W R Y W m 0 T N G N m T ; y E W b Y E $ Y Y N C w U e a 6 m Y Wi E m L¢ w E rO aa° 3om= yao re m E ° ` m $mE , W U N N No OW Y E mO c w e U R w Q� O D a C Z Y m N 6 N m � C q O N N � m 2 m M o N LL U d o a r w � W Y � a LL O U) d b m N C U Q a 2 E X v o 0, o Z v 3 N W Q 7 a m Y Q N d N ti m � IL To n 'm y O N N R c m mm U m y a O R n m t Y c > oLL == a s L c m = L C R R O a N y, C m Y o � u m m O � � m o a r m m m > a O m LL m L L n `C U R m N U m R O Edi, } X d m m m w W Fj R v in C 0 O L m VI m Y W 2 O LU h }:3 Ld ul Q Z 4 G w UA f LL O IL W U3 O Q PI eA7 O Q 7 N O N p 0 � O O fh O O OJ O (0 6i ISl Q 6J 6 N y c mm Q � c m E O O d C I W Q � t Q F N 4. a W m w m N Y N bd � U m O V O Ol l W [0 O E m V N m D a N O r O s N O Q C W m d E m p� 4 j N N N O V O O a` a° �O N e O M O ro p N m N P U [0 atyy W N N P � W `ry N 0 p� m0 a om m m $' m E w a U M .- Q cn a o E o a Q W � n O 2? m M T O N W W V /O M 4 N 4i N O c7 m Q W N M M a V a 11 3 U Z a C�'a T a R o � a O O a {S.m4 to m S h PI eA7 O O E N y c mm Q � t E Y N o U O V O Ol l W [0 O V p ry Q N c (V N ri C W �O N e O M O ro p N m N Ti T [0 atyy W N lV P r W `ry N m N m � V m n O 2? ,tLL,Q T O N M N U O a a a � Q E W IZ 4 5 E a UUmm r r0 N h L O 6 Q R N M Q Q N CN �p V o € w 'w o v m u ® N Ez m _ O E N N N m N N ¢ m N J 2 E L m 2 LD w L y h m x m g a o o NcN c C mem Ym 1m ¢ N p 5 Y Y Y O O E N f 1 0 k , ° ,CL — /ON _ ! § § ) ^ ( ! 0 / 46) � _CL � E\f Elk � Z5ƒ • ) a / — a } , \ % § ) { f } } | ƒ ® | t - _ f 1 :+gpQm C5 000So25 0 N o d o o 0 06od88 j6+od6 o0 d o d o d _ pp pp SS 88 pppp pppp pppp 11pp 88 OpOp SS pp�� pp pp pppp SS pppp pp pp SS SS pppp 88 G O N O p O O p p O N O V 0 0 0 0 0 0 0 O 0 0 S O 0 M 0 0 p p O 0 0 p 0 0 0 0 O d O d d d C d C O d d 0 0 0 0 0 0 d O 0 0 0 0 0 G Ci 0 0 0 0 0 0 0 0 0 d C 0 0 g mbo SRR S o Al QQ8 m Y g 25 �m oso 25 ry O o o £ dgo dgo $^$ § dnm 0N c o o d d d d d o d d o d d o 0 d O a o d O o p o o 0 o o d a w Q gg g QQ Q gg a o m 25 In g o g m$ g N $N. urvi, v g$$ N a e 25 w o g o 3$$ r 0 F N H_ E a W N m 0 F c e a c Z a 0 � 0 a o O � 2 E d nn o > a¢ m c5� u a a L L L g 0 u u u u v u 8 8 3 u� I A, O O a O a a M R N 4 S 8 0 0 0 N O ee M O N N O - - O- N O O N§§ O O O ti O N O O G O G C o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ci C C O O Ci O Ci 0 0 0 0 0 C G C C C 0 x O O O N N O 0 M O S O O S y� O O O �M-1 0 0 0 0 0 en -1 p OO O O O O O O O O O O O O C O C O O O O C O O O O O O O O G Ci Ci 0 0 0 G O G O 0 0 0 O 0 0 0 6 6 0 0 0 0 0 8 S pp app S oy p Af S 8 �p S S p p 8 pp S S E O O O O O O O O O O O 4 a o 0 o c o o c c o o a c c o o c d c o c o 0 0 o c c o o o o o c c o 0 0 0 0 0 0 a w g gg 44 gg q Nqgg 3 g a g si $ o g r a v o g g %g .tDc, a3 n4Oj w 25 Y N 25 2-M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F N N e1 N_ 0 0 0 0 0 0 aY ill N„< O O O O H O M es O N e+ O O O O O O O O O O O O O O O M Lp W '1 M 0 0 0 0 0 o m o 0 o a in N I(1 E d W +R O F ti M M e'1 N N W If1 O 0 y n N g n N N N M e'I N N N N N N p e1 � p N M C C C d M O 6 � q O m N �' M 2 N N M A' 3A 3C Gry O wry^, D O LL d Z y Z Z ZAt L t d d N d Z d O d M i Q x �i .� L - AP N A u Wy S C Q1 p>p U U U '3y� V 'j 9 'i a E N �,hh flr C C y L L L :'� a d C VI y VI i �p N N V. Ca L V E E E E E E L° c c c c c d O LL LO oC OY e0 = 0 0 0 r L ryry Yd Y W W W W LL LL LL LL LL LL IL 4 fY LL I•J V• (J V” U� S S S S S= S S x�� Y Y Y Y Y X y d I A, m .•� o 0 0 0 � 8 g g$ o �sj `d'. g g'^. N `$ n n w m o O O N O O O 0• O O O O O O Ooo O O O O O p G O O OH O 0• G O C O O O O O o O Ci O Cop O w O S S S S O S O en• 81 S O S S O O S 8 8 S W O O O O g O S O O N O 0 0 m ti S O O y O O O O ttmj O O O O O e-� o 0 0 o d 0 0 0 0 0 c 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a c o 0 0 0 � 88 S 8 pp 88 SS 8 pp C pp 88 p pp a Cod wa{ 88 pp p O N O N O M Q O w S pp S d O O O O 'i 0 0 Ci 0 0 0 0 G O O Ci G G O O Ci G G G G C O C Ci O Ci ro 0 0 0 0 O Ci 0 0 0 C O O G 0 8 a o S 8 n D N O� n O? O O O S m p m N $$ M QQ gg M O N O O O M l5� O N O Q R m 8 n$$ S n 2i o ry m R g 25 o o m o 0 0 0 o d 0 d o 0 0 0 0 c o 0 0 0 0 0 0 .. ry o 0 0 0 0 0 0 0 0 o d 0 d u, x ve o000o m.-� mN o o 0 00.. o o.-� o o.+v a oo ro.•�.�o a omo 0 o.a o N N d w w O r M ei ei N .-1 N ei H S N N V i} N ei N C d o d • -O -NO � fj C � Vp�I � > 3o OD• � w � y .� y � iry d LL S S C V=1 i L L r 00 d J Y C U d 0 00 W 3 d D Q ^2 0 ul ap m L Y g! m Ldu n> a Z 3a N N m N N d IS C d N b p C c c EY m =I N 0 C E V L O d d d d d d a L y C¢ g 9 2 m w> j p O D O O O 66° C C za° A n m $ O N N N S$ N$ N O O$ N O O O e! O O O O O O$ O O$ O O O O d O O O H O uOj O a aa a 0 0 a 0 0 0 0 o p o 0 0 0 0 0 0 0 o d a o 0 0 0 0 0 0 0 0 o p a 0 p d d x 0 6 g r o o ti$.ai. u o o g o w g g$ o o$$ m$$ N 5 .'._ g$$ S o o$ v❑i $ p 0 a o 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 O a 0 a 0 0 0 0 0 0 0 a o d o d 0 a d a a � Q ss yy gg QQ QQ 55�� v w qqpp88 88��yy 8 pppp 88' 88 88 88 aa 8888 SS 88 0 0 o N 0 O n N 6 6 n d 6 M N N 0$ m$ M N N q O O O O 0 0 0 0< O O lal1 O G OO O O O d O O O O O O 6 O O C O O O a O C O O O O G O a O O C OO H O a O O O N 0 O F N x M 0m m —4-0 m .y d N N N !1 d Ya � O O N� cp T 0 a VI Vl T O„ O ry O m o '1 O W ti o p O W o w H o O n a o W d o Yf ro m 0 r CC N N VI M N M N M � N C J C v E a v o 0 v _ y � >. y 2 � m �- � z❑ a °' � �❑ s F r m r� cy E E s o o❑ `m LL E c a' ''R '^ 3 x i o f w V 2 ti W N i N ?�jj m ro Od0 m W L S a R$ � qC_ p p 1 6 Q C 6 [G K LG 6 K W K CC W VI N Vf m N N 3 X Z Q N d S 1p mM S tMp 8 S pp N M O N p� R 8 O O O O O O O O O O O O O O ® O O O O O O O O G C O O e8Y O M A= p QQ 8 8 S 8 �ppOpp 8 S 88O O O O eNi O O O O p O H S y ,Q O O S S �y y p O� O� 0 0O O Cl 0 0 Ci Ci O Ci Ci C 0 0 0 L O Yj O O O O O O u1 a 0 O. LL M p O O Ci 0 0 0 0 0 0 Ci 0 0 F 'Sj O ti O O S O F N (V O O N n ry S N E N d eWi o o p o c o N 17 O O O O N O O O of ei y a H c a c w y ry ry .mi, .Ni .wi O S V m O N N T n m dy pf S S S o n� ti � Mp S m N N M Vf o O O V F � G F- G µ a ti O d N O O YI O M O M d O N N M O O M N O O N N 1� ei N O m M h 11q Itl •y [11 2 M 2 O O •+ .i 0 0 0 ap .-i O O O O N O b� N m 0 0 0 0 0 r d M .-� .y O M e4 !V N 2 = W W N ~ N M w w a w N M M M PI M 1O Po d rvd w- m n n '-� � e ti .�• �n N .Ni a�� m .� ry O ti ry a r� m� H� tQ � .i� w i y� vi v F h w o r E O LL p Da a a > O w !, ,`, vii N a o c a mm a E79 F y a w w U G `• O L' W A C _ IL H OaY O 0 C C n c 1 p! O c 0 'O V O U a II a II 2 O a m N �. W 1'e a v a X Z Q SIX-YEAR CAPITAL FACILITIES PLAN 2015-2021 Renton School District No. 403 Board of Directors Pam Teal, President Denise Eider, Vice President Lynn Desmarais Todd Franceschina Al Talley Sheryl Moore, Acting Superintendent May 27, 2015 SIX-YEAR CAPITAL FACILITIES PLAN 2015-2021 Renton School District No. 403 Board of Directors Pam Teal, President Denise Eider, Vice President Lynn Desmarais Todd Franceschina Al Talley Sheryl Moore, Acting Superintendent The Renton School District Capital Facilities Plan was prepared with the help of the following organizations and individuals: Renton School District Staff John Knutson, Assistant Superintendent, Finance and Operations Richard Stracke, Executive Director, Facilities and Planning Stewart Shusterman, Facilities Project Manager The 2015 – 2021 Capital Facilities Plan was approved by the Renton School District Board of Directors on May 27, 2015 May 27, 2015 SIX-YEAR CAPITAL FACILITIES PLAN 2015-2021 TABLE OF CONTENTS I. EXECUTIVE SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. CAPACITY METHODOLOGY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 III. INVENTORY AND CAPACITY OF FACILTIES . . . . . . . . . . . . . . . . . . . 5 IV. ENROLLMENT PROJECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 V. ENROLLMENT DRIVEN FACILITY NEEDS . . . . . . . . . . . . . . . . . . . . 13 VI. SIX-YEAR FINANCE PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 VII. IMPACT FEES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 VIII. APPENDICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 1 - I. EXECUTIVE SUMMARY This Six-Year Capital Facilities Plan (the “Plan”) was prepared by Renton School District (the “District”) in compliance with the requirements of the Washington State Growth Management Act (GMA, the Act), King County Code Title 21A.43, and applicable ordinances of the cities of Renton, Newcastle and Bellevue. It is the intent of the District that the Plan be adopted by King County and the cities of Bellevue, Newcastle and Renton as a sub-element of the Capital Facilities Plan element of their respective Comprehensive Plans, so that those municipalities may assess and collect school impact fees on behalf of the District, as empowered by the GMA. However, this Plan is not intended to be the sole planning instrument developed by the District to determine its capital facility needs. The GMA was adopted by the State legislature in 1990 in response to rapidly increasing development; most notably in King County and the surrounding central Puget Sound area. The Act requires state and local governments to manage Washington’s growth by developing and implementing comprehensive land-use and transportation plans, by designating Urban Growth Areas, and by protecting natural resources and environmentally critical areas. One element of the Comprehensive Plan required of county and city governments is the Capital Facilities Plan. It is this element that addresses existing public facility capacities, forecasts future public facility needs, presents a plan for expanding existing facilities or constructing new facilities to meet those needs, and indicates how those public facility improvements are to be financed. The GMA empowers jurisdictions to assess and collect impact fees as one means of financing new public facilities necessitated by private development. This Capital Facilities Plan addresses the impact of growth on public school facilities by examining: 1. anticipated growth of the District’s student population over the next six years; 2. the ability of existing and proposed classroom facilities to adequately house those students based on the District’s current Standard of Service; 3. the need for additional enrollment driven capital facilities; 4. the method of financing those capital improvements; and 5. calculation of school impact fees based on, among other variables, the number of students generated by recent residential development (student generation factors). This plan is updated annually and submitted to local governments for inclusion as a sub- element in their Capital Facilities Plans. Past Plans have been adopted by King County and the Cities of Bellevue, Newcastle and Renton. The District is currently engaged in Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 2 - dialogue with the City of Tukwila regarding implementation of impact fees within their jurisdiction. Enrollment Projections: Enrollment projections provided by the Office of Superintendent of Public Instruction (OSPI), as adjusted by Renton School District, indicate a 14.7% increase in K-12 student enrollment over the next six years, with the highest growth rate, 20.0%, occurring at the K- 5 level. Projected K-12 enrollment for the 2020-2021 school year is 17,104, an increase of 2,186 over the actual October 1, 2014 headcount of 14,327. Current Capacity: Student capacity of current permanent K-12 facilities, excluding designated special education classrooms and facilities housing special programs, is 15,092. Based on current enrollment (October 1 headcount), the District is showing a deficit of permanent facilities at both the Elementary and Middle School levels, while high school facilities enjoy a comfortable surplus. Current capacity deficits are overcome by the use of relocatable classrooms (portables), which are not included in the permanent facility inventory. Relocatable classrooms are used to address enrollment fluctuations and to house students on a temporary basis until permanent facilities can be constructed. They are not considered a long-term solution for housing students. Enrollment Projections/Future Capacity: Based on the District’s enrollment projections, significant increases are anticipated at all grade levels over the next six years. Existing surplus capacity at High School facilities appears sufficient to cover projected student growth at that level. However, growth at the elementary and middle school levels requires construction of new permanent facilities, as well as the reallocation of existing, or acquisition of new, relocatable classrooms. With the passage of the 2012 Bond Measure in April 2012, funding was secured for the design and construction of the new Middle School No. 4, scheduled to open Fall 2016. With a student capacity of 850, the new facility will result in a surplus middle school capacity of 187 in the fall of 2020, based on current enrollment projections,. Those same enrollment projections indicate that there will be a deficit in the capacity of elementary school facilities of 2,147 by the year 2020. While the 2012 bond measure does address the acquisition of property for future development, funding for design and construction of one or more new elementary schools will require passage of a future bond initiative. Until such time, current and future deficits at the elementary level will be accommodated by use of relocatable classrooms. Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 3 - Capital Construction Plan: For the next six years, the District’s highest priority will be the construction of new school facilities to accommodate past and projected growth. This includes; construction of the new Middle School No. 4, currently in progress and funded by the 2012 bond measure; the design and construction of two new elementary schools, the focus of a 2016 bond initiative currently in its early planning stage; acquisition of land for future development; and the purchase of new portable classrooms. Other high priority capital improvements fall into five major categories; safety and security, energy conservation, roofing upgrades, facility enhancements and site improvements. Improvements will occur district-wide, affecting nearly all District facilities, achieving and maintaining the level of service necessary to provide safe, healthy, and nurturing learning environments for all our students. The majority of these projects are not enrollment driven. A list summarizing projects covered under the 2012 bond measure is included in the Appendix. Information on the proposed 2016 bond will become available as the program develops. Finance Plan: The primary funding sources for capital facilities projects over the next six years are the remaining bond monies from the 2012 and 2008 bond measures, school impact fees currently being collected by King County and the cities of Bellevue, Newcastle and Renton, state funding available through the Office of Superintendent of Public Instruction, and a future bond initiative. Impact Fees: Impact fees were calculated in conformance with King County Council Ordinance 11621, Attachment A. Both single and multi-family impact fees have increased over last year’s, primarily as a result of the re-evaluation of the District’s elementary and middle school cost models. Equally significant are factors beyond the District’s control that determine the fee, such as interest rates, assessed values of housing, and the number of students generated by new residential development. For the past several years the District has voluntarily limited fee increases to the previous year’s rate of inflation, as reported by the King County Office of Economic and Financial Analysis. The rate of inflation for last year, based on the Seattle Consumer Price Index (CPI-U), was 1.84%. A comparison of current and previous year’s fees is as follows: Previous Year Current Year Change Single-Family $5,541 $5,643 $102 Multi-Family $1,360 $1,385 $25 Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 4 - Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 5 - II. CAPACITY METHODOLOGY STANDARD OF SERVICE The Renton School District Standard of Service is the standard adopted by the District that identifies the program year, school organizational structure, student/teacher ratios by grade level (taking into account the requirements of students with special needs), daily class schedule, types of facilities and other factors identified by the District to be beneficial in supporting its educational programs and objectives. The Standard of Service is the major determining factor, together with the number of classrooms or teaching stations, in calculating facility capacity. The District has adopted a traditional elementary/middle/high school organizational structure that houses kindergarten through Grade 5 in elementary schools, Grades 6 through 8 in middle schools and Grades 9 through 12 in high schools. The school-year calendar adopted by the District is also traditional, beginning in early September and ending in mid - June, as is the daily schedule, with classes beginning between 7:20 and 9:30 a.m. and ending between 2:03 and 3:10 p.m., dependent on grade level. The District and the Renton Education Association recognize that reasonable class size is necessary for optimum learning, and have established the following student/teacher ratios: Primary (K-3) 24:1 Intermediate (4-5) 29:1 Secondary (6-12) 29:1 The 29:1 ratio at the secondary level applies to all Language Arts, Social Studies, Science, Math, World Languages, World Language Exploratory and Health classes. Other ratios apply as follows: Band/Orchestra 40:1 Choir 50:1 Middle School PE 35:1 High School PE 40:1 All other classes 31:1 Student /teacher ratios for special education classes held in self-contained classrooms are not addressed in this Plan. Similarly, educational facilities dedicated solely to special education programs or alternative learning experiences are excluded from these capacity calculations, as are associated student headcounts. Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 6 - Above student/teacher ratios are applicable to both permanent and relocatable classrooms. However, inasmuch as relocatable facilities do not generally allow for the full range of educational activities promoted by the District, they are generally viewed as temporary or interim housing, necessary to accommodate enrollment fluctuations and development driven enrollment increases, but only until such time as permanent facilities can be financed and constructed. They are not viewed as a long-term solution to rising enrollment or deficit facility capacity. For those reasons, capacities of relocatable classrooms are calculated, but not used to determine future facility needs. PRACTICAL CAPACITY MODEL The Practical Capacity Model calculates building capacity based on limitations that existing facilities place on enrollment due to existing educational programs, operating policy and contractual restrictions. The calculation is made by reviewing the use of each room in each facility. For every room housing students, a calculation is made assigning a maximum number of students per room. Sometimes core facilities, such as size of cafeteria or size of gym, number of restrooms or size and number of specialty areas such as shops, limit enrollment to levels below that expected by room occupancy levels. Capacity at the secondary school level is further limited by scheduling limitations and student course selection. If rooms are utilized by staff for their planning period in a six period day, capacity is limited to 83% (5/6) of the theoretical capacity. Since secondary schools offer a number of elective courses, many courses will not attract a full classroom of students. Another factor that has influenced facility capacity at the elementary school level is the change from half-day to full-day kindergarten. Beginning with the current school year, all kindergarten classes throughout the District are full-day. This change alone created the need for 7 additional kindergarten classrooms in 2014-15, effectively decreasing overall permanent elementary school facility capacity by 168. Beyond full-day kindergarten, reduced student/teacher ratios as prescribed by the McCleary Act would significantly reduce building capacity if fully implemented. A complete inventory of District facilities, including capacities, is provided in Section III. Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 7 - III. INVENTORY AND CAPACITY OF FACILITIES Renton School District’s capital facilities include both permanent structures and relocatable (portable) classrooms. Permanent facilities are further categorized as either K-12 (traditional elementary, middle and high school configurations), Special Instructional Use or Non-instructional Support Facilities. The District maintains a total of 30 permanent and 49 relocatable facilities serving a total student population of 15,057. The District’s K-12 facilities include 14 elementary schools, 3 middle schools, 3 high schools and a Secondary Learning Center. Four Special Instructional Use facilities house the District’s early childhood, special education and alternative educational programs. Support facilities include Kohlwes Education Center (admin.), Transportation Center, Facilities Operations and Maintenance Center, Nutrition Services/Warehouse, Renton Memorial Stadium and the Lindbergh Swimming Pool. Total permanent facilities encompass 2,421,229 square feet, with 2,243,813 square feet (93%) devoted to K-12 and instructional special use. See Appendix A for District Maps. Relocatable facilities are used primarily to address enrollment fluctuations and to house students on a temporary basis until permanent facilities can be constructed. For those reasons they are not considered a long-term solution for housing students and are not acknowledged in the calculation of the capacity of K-12 facilities. Of the 49 relocatable facilities in the District’s inventory, 30 are “double portables” containing two classrooms, providing the district with a total of 79 relocatable classrooms encompassing 70,784 square feet of additional instructional space. Table 1 below summarizes existing K-12 facility capacity. A complete inventory of District facilities, including undeveloped property, follows. Facility capacity worksheets may be found in Appendix B. Type Elementary Schools Middle Schools High Schools Total Permanent 6,816 3,120 5,156 15,092 Relocatable 1,104 598 144 1,846 Total 7,920 3,718 5,300 16,938 EXISTING FACILITY CAPACITY Table 1 Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 8 - INVENTORY AND CAPACITY OF PERMANENT FACILITIES NAME LOCATION AREA (sq. ft.)CAPACITY Benson Hill 18665 - 116TH Ave. SE, Renton, WA 98058 67,533 520 Bryn Mawr 8212 S 118th St., Seattle, WA 98178 49,157 424 Campbell Hill 6418 S 124th St., Seattle, WA 98178 57,072 400 Cascade 16022 - 116th Ave. SE, Renton, WA 98058 59,164 494 Hazelwood 7100 - 116th Ave. SE, Newcastle, WA 98056 66161 542 Highlands 2727 NE 7th St., Renton, WA 98056 60,000 542 Honey Dew 800 Union Ave. NE, Renton, WA 98059 54,620 398 Kennydale 1700 NE 28th st., Renton, WA 98056 65,169 568 Lakeridge 7400 S 115th St., Seattle, WA 98178 52,958 426 Maplewood Heights 130 Jericho Ave., Renton, WA 98059 56,220 516 Renton Park 16828 - 128th Ave. SE, Renton, WA 98058 65,955 546 Sierra Heights 2501 Union Ave. NE, Renton, WA 98058 53,992 540 Talbot Hill 2300 Talbot Road, Renton, WA 98055 57,844 474 Tiffany Park 1601 Lake Youngs Way, Renton, WA 98058 58,758 426 Total Grades K-5 Capacity 824,603 6,816 Dimmitt 12320 - 80th Ave. S, Seattle 98178 109,070 1,066 McKnight 2600 NE 12th St., Renton, WA 98056 126,706 1,066 Nelsen 2403 Jones Ave. S, Renton, WA 98055 124,234 988 Total Grades 6-8 Capacity 360,010 3,120 Hazen 1101 Hoquiam Ave. NE, Renton, WA 98059 327,395 1,632 Lindbergh 16426 - 128th Ave. SE, Renton, WA 98058 242,662 1,296 Renton 400 S 2nd St., Renton, WA 98057 278,373 1,752 Secondary Learning Center 7800 S 132nd St, Renton, WA 98178 70,831 476 Total Grades 9-12 Capacity 919,261 5,156 Total Grade Levels K-12 2,103,874 15,092 Meadow Crest ECC 1800 Index Ave. NE, Renton, WA 98056 68,752 464 Sartori Education Center 315 Garden Ave. N, Renton, WA 98057 39,345 310 HOME Program - Spring Glen 2607 Jones Ave. S, Renton, WA 98055 7,005 147 Renton Academy - Spring Glen 2607 Jones Ave. S, Renton, WA 98055 24,837 50 Total Instructional Special Use 139,939 971 Total Instructional Facilities 2,243,813 16,063 Facilities Operations Center 7812 S 124th St., Seattle, WA 98178 21,894 Kohlwes Educational Center 300 SW 7th St., Renton, WA 98055 57,000 Lindbergh Pool 16740 - 128th Ave. SE, Renton, WA 98058 13,600 Nutrition Services/Warehouse 409 S Tobin St., Renton, WA 98057 27,466 Renton Memorial Stadium 405 Logan Ave. N, Renton, WA 98055 37,213 Transportation Center 420 Park Ave. N, Renton, WA 98057 20,243 Total Support Services 177,416 Total All Permanent Facilities 2,421,229 MI D D L E SC H O O L S EL E M E N T A T Y S C H O O L S HI G H S C H O O L S IN S T R U C T I O N A L SP E C I A L U S E SU P P O R T S E R V I C E S Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 9 - BLDG. ID LOCATION NUMBER OF CLASSROOMS AREA (sq.ft.) STUDENT CAPACITY 16 Maplewood Heights Elementary 1 896 24 19 Maplewood Heights Elementary 1 896 24 20 Lindbergh High 1 896 24 34 Maplewood Heights Elementary 1 896 24 53 McKnight Middle 2 1,792 52 54 Nelsen Middle 2 1,792 52 55 Nelsen Middle 2 1,792 52 56 Nelsen Middle 2 1,792 52 57 Nelsen Middle 2 1,792 52 58 Maplewood Heights Elementary 1 896 24 59 Lindbergh High 1 896 24 60 Lindbergh High 1 896 24 61 Lindbergh High 1 896 24 62 Talbot Hill Elementary 1 896 24 63 Cascade Elementary 1 896 24 64 Talbot Hill Elementary 1 896 24 65 Dimmitt Middle 1 896 26 66 Dimmitt Middle 1 896 26 68 Sierra Heights Elementary 1 896 24 69 Honey Dew Elementary 2 1,792 48 70 Talbot Hill Elementary 1 896 24 71 Sierra Heights Elementary 1 896 24 72 McKnight Middle 2 1,792 52 73 Lakeridge Elementary 2 1,792 48 74 Sierra Heights Elementary 2 1,792 48 77 McKnight Middle 2 1,792 52 78 McKnight Middle 2 1,792 52 79 Dimmitt Middle 2 1,792 52 80 Honey Dew Elementary 2 1,792 48 81 Cascade Elementary 2 1,792 48 82 Sierra Heights Elementary 2 1,792 48 83 Lindbergh High 2 1,792 48 84 Maplewood Heights Elementary 2 1,792 48 85 Dimmitt Middle 1 896 26 86 Dimmitt Middle 1 896 26 87 Dimmitt Middle 1 896 26 88 Bryn Mawr Elementary 2 1,792 48 89 Bryn Mawr Elementary 2 1,792 48 90 Honey Dew Elementary 2 1,792 48 91 Honey Dew Elementary 2 1,792 48 92 Tiffany Park Elementary 2 1,792 48 93 Spring Glen/H.O.M.E. Program 2 1,792 48 94 Spring Glen/H.O.M.E. Program 2 1,792 48 95 Campbell Hill Elementary 2 1,792 48 96 Campbell Hill Elementary 2 1,792 48 97 Cascade Elementary 2 1,792 48 98 Cascade Elementary 2 1,792 48 99 Lakeridge Elementary 2 1,792 48 100 Lakeridge Elementary 2 1,792 48 Totals 79 70,784 1,942 INVENTORY AND CAPACITY OF RELOCATABLE CLASSROOMS Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 10 - LOCATION ADDRESS RELOCATABLE FACILITY ID AREA (sq. ft.)CAPACITY ELEMENTARY SCHOOLS Bryn Mawr 8212 S 118th St., Seattle 98178 88, 89 3,584 96 Campbell Hill 6418 S 124th St., Seattle, WA 98178 95, 96 3,584 96 Cascade 16022 116th Ave. SE, Renton 98058 63, 81, 97, 98 6,272 168 Honeydew 800 Union Ave. NE, Renton 98059 69, 80, 90, 91 7,168 192 Lakeridge 7400 S 115th St., Seattle 98178 73, 99, 100 5,376 144 Maplewood Heights 130 Jericho Ave. SE, Renton 98059 16, 19, 34, 58, 84 5,376 144 Sierra Heights 2501 Union Ave. NE, Renton 98059 68, 71, 74, 82 5,376 144 Talbot Hill 2300 Talbot Rd. S, Renton 98055 62, 64, 70 2,688 72 Tiffany Park 1601 Lake Youngs Way, Renton, 98058 92 1,792 48 Elementary School Total 41,216 1,104 MIDDLE SCHOOLS Dimmitt 12320 80th Ave. S, Seattle 98078 65, 66, 79, 85, 86, 87 6,272 182 McKnight 1200 Edmonds Ave. NE, Renton 98056 53, 72, 77, 78 7,168 208 Nelsen 2403 Jones Ave. S, Renton 98055 54, 55, 56, 57 7,168 208 Middle School Total 20,608 598 HIGH SCHOOLS Lindbergh 16426 128th Ave. SE, Renton 98058 20, 59, 60, 61, 83 5,376 144 High School Total 5,376 144 SPECIAL EDUCATION Spring Glen 2706 Jones Ave. S, Renton 98055 93, 94 3,584 96 Special Education Total 3,584 96 TOTAL ALL RELOCATABLE CLASSROOMS 70,784 1,942 RELOCATABLE FACILITY CAPACITY BY SITE UNDEVELOPED PROPERTY Skyway Site 4.18 acres NW corner S Langston Rd. & 76th Ave. S Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 11 - IV. ENROLLMENT PROJECTIONS Renton School District six-year enrollment projections through the 2019-20 school year are based on data published by the Office of the Superintendent of Public Instruction (OSPI). OSPI utilizes the cohort survival method to forecast student enrollment projections for a six-year period based on actual student headcounts documented for the previous six years. Enrollment reports prepared by the District are submitted to OSPI on an annual basis. The District’s October 1, 2013 Enrollment Report and OSPI Report No. 1049 are included in Appendix C. Renton School District six-year enrollment projections, found on the following page, reflect adjustments to OSPI’s report based on the following: 1. Report structure has been modified to reflect middle school versus junior high school grade level configuration. 2. Headcount includes only K-12 students attending comprehensive instructional facilities and excludes students attending special education facilities or facilities accommodating alternative learning experiences. Current projections indicate significant increased enrollment over the next six years, especially at the elementary and middle school grade levels, with only minor growth at the high school grade levels (Table 2). By the school year 2020-2021, the District expects an overall student enrollment increase of 14.7%, with a 20.0% increase at the elementary school level, a 17.9% increase at the middle school level and a 2.8 % increase at the high school level. ` 2014 Headcount 2020-21 Projection Student Increase % Increase Elementary 7,469 8,963 1,494 20.0 Middle 3,210 3,783 573 17.9 High 4,239 4,358 119 2.8 Total 14,918 17,104 2,186 14.7 PROJECTED ENROLLMENT GROWTH Table 2 Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 12 - - - HEADCOUNT - -AVE. % 2014 SURVIVAL 2015 2016 2017 2018 2019 2020 Kindergarten 1,327 1,385 1,424 1,463 1,502 1,541 1,581 Grade 1 1,335 101.96 1,353 1,412 1,452 1,492 1,531 1,571 Grade 2 1,318 100.17 1,337 1,355 1,415 1,454 1,494 1,534 Grade 3 1,232 98.98 1,305 1,324 1,341 1,400 1,440 1,479 Grade 4 1,168 98.74 1,216 1,288 1,307 1,325 1,382 1,421 Grade 5 1,089 99.56 1,163 1,211 1,282 1,301 1,319 1,376 Total K - 5 7,469 7,759 8,014 8,260 8,474 8,707 8,963 Grade 6 1,064 96.71 1,053 1,125 1,171 1,240 1,258 1,275 Grade7 1,044 100.58 1,070 1,059 1,131 1,178 1,247 1,266 Grade 8 1,102 99.56 1,039 1,065 1,055 1,126 1,173 1,242 Total 6 - 8 3,210 3,163 3,249 3,357 3,544 3,679 3,783 Grade 9 1,110 112.87 1,244 1,173 1,203 1,190 1,271 1,324 Grade 10 1,114 89.65 995 1,115 1,052 1,078 1,067 1,140 Grade 11 973 90.06 1,003 896 1,004 947 971 961 Grade 12 1,042 96.12 935 964 861 965 910 933 Total 9 - 12 4,239 4,177 4,149 4,120 4,181 4,220 4,358 Total K -12 14,918 15,099 15,412 15,737 16,199 16,606 17,104 - - - - PROJECTED ENROLLMENTS - - - - ENROLLMENT PROJECTIONS BY COHORT SURVIVAL* (KK Linear Projection) RENTON SCHOOL DISTRICT No. 403 * Information adapted from OSPI Report No. 1049, December 30, 2014. Headcount and projections do not include enrollment at Special Use facilities. Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 13 - V. ENROLLMENT DRIVEN FACILITY NEEDS Table 3 compares the current capacity of Renton School District facilities to current and projected enrollment. For the school year 2020-2021, the table indicates a significant deficit of 2,147 at the elementary level and a much less imposing deficit of 663 at the middle school level. Only at the high school level is the current capacity adequate to handle projected 2020 -2021 enrollment. It is clear that the need for additional elementary and middle school facilities is driven by increased enrollment, past and projected. Facility Type Enrollment Permanent Capacity Surplus/(Deficit)2020-21 Enrollment 2020-21 Surplus/(Deficit) Elementary 7,469 6,816 (653)8,963 (2,147) Middle School 3,210 3,120 (90)3,783 (663) High School 4,239 5,156 917 4,358 798 Total 14,918 15,092 174 17,104 (2,012) planning, design or construction phase. CURRENT AND PROJECTED CAPACITY NEEDS CURRENT PROJECTED1 Table 3 1. Projected surplus/deficit based on current permanent facilities and does not include facilities in the The 2012 Bond Measure, approved by District voters in April 2012, included several provisions specifically targeting these deficits, including a new middle school and the acquisition of land for future development. A summary of the 2012 Bond Measure can be found in Appendix D. Middle School No. 4, currently under construction and scheduled to open in Fall 2016, will provide the necessary capacity to handle projected enrollment up to and beyond the six-year period addressed by this Plan. The new middle school is located near the northern District boundary, in the City of Newcastle, on the site of the recently demolished Renton Academy/Old Hazelwood Elementary, and adjacent to the new Hazelwood Elementary. At the elementary school level, the 2012 Bond Measure provided for the acquisition of property for future development, but did not include necessary funding for construction of new elementary facilities. Passage of another bond measure is essential to mitigating the current and projected elementary school deficit, and the District is currently planning on putting a new bond measure before the voters in February 2016. Until such time that funds are available, deficits at the elementary school level will have to be addressed temporarily by the use of relocatable classrooms; either new or relocated from other facilities. These costs must also be included in the Six-Year Finance Plan. The Construction Plan/Capacity Matrix on the following page illustrates current capacities and proposed increased capacities in response to projected enrollment increases. Projected capacity surpluses and deficits are tracked for each year of the six -year period covered by this Plan, and are calculated both with and without the inclusion of relocatable classrooms. Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 14 - CONTRUCTION PLAN/CAPACITY MATRIX ELEMENTARY SCHOOL: GRADES K-5 ACTUAL PROJECTED PLAN YEAR 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Permanent Capacity 6816 6816 6816 6816 6816 6816 7366 New Construction 550 550 Total Permanent Capacity 6816 6816 6816 6816 6816 7366 7916 Relocatable Capacity 1104 1104 1344 1464 1584 1680 1680 New/Relocated Capacity 240 120 120 96 Total Relocatable Capacity 1104 1344 1464 1584 1680 1680 1680 Enrollment 7469 7759 8014 8260 8474 8707 8963 Surplus/(Deficit) Permanent only (653)(943)(1198)(1444)(1658)(1341)(1047) Surplus/(Deficit) Permanent & Relocatable 451 401 266 140 22 339 633 MIDDLE SCHOOL: GRADES 6-8 ACTUAL PROJECTED PLAN YEAR 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Permanent Capacity 3120 3120 3120 3970 3970 3970 3970 New Construction 850 Total Permanent Capacity 3120 3120 3970 3970 3970 3970 3970 Relocatable Capacity 598 598 598 338 78 78 78 New/Relocated Capacity (260)(260) Total Relocatable Capacity 598 598 338 78 78 78 78 Enrollment 3210 3163 3249 3357 3544 3679 3783 Surplus/(Deficit) Permanent only (90)(43)721 613 426 291 187 Surplus/(Deficit) Permanent & Relocatable 508 555 1059 691 504 369 265 HIGH SCHOOL: GRADES 9-12 ACTUAL PROJECTED PLAN YEAR 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Permanent Capacity 4710 4710 4710 4710 4710 4710 4710 New Construction Total Permanent Capacity 4710 4710 4710 4710 4710 4710 4710 Relocatable Capacity 150 150 150 150 150 150 150 New/Relocated Capacity Total Relocatable Capacity 150 150 150 150 150 150 150 Enrollment 4239 4177 4149 4120 4181 4220 4358 Surplus/(Deficit) Permanent only 471 533 561 590 529 490 352 Surplus/(Deficit) Permanent & Relocatable 621 683 711 740 679 640 502 Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 15 - VI. SIX-YEAR FINANCE PLAN Capital facilities capacity improvements referenced in this Plan will be funded by 2012 bond monies, remaining 2008 bond funds, impact fees and a possible special levy or future bond initiative. The District may also be eligible for OSPI school construction assistance. Recently completed Meadow Crest Early Childhood Learning Center represents the final major project to be completed under the 2008 bond initiative. The major capacity-driven project to be funded by the 2012 bond is the new middle school (Middle School No. 4) currently in the final planning stage and scheduled to open Fall of 2016. Other capacity related projects to be funded by the 2012 Bond Measure include land acquisition and replacement/relocation/upgrade of portable classrooms. Funding for a new elementary school is as yet unsecured. The District intends to structure its capital improvement program so as to maintain a constant level of construction throughout the program period, in order to optimally utilize its management capabilities. Estimated expenditures for capacity improvement projects over the duration of the Plan are indicated in the Table 4 below. SIX-YEAR FINANCE PLAN Capacity Improvement Projects PROJECT 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Secured2 Unsecured3 Middle School No. 4 15,400 23,200 2,900 41,500 41,500 Relocatable Classrooms 1,200 1,000 800 400 3,400 1,750 1,650 Land Acquisition 2,500 2,500 2,500 2,250 2,250 12,000 5,000 7,000 New Elementary Schools 7,200 5,900 18,900 32,800 22,500 87,300 87,300 Total 19,100 33,900 12,100 21,550 35,050 22,500 144,200 48,250 95,950 1. Estimated expenditures based on total project cost including hard and soft costs. 3. Unsecured funds include OSPI School Construction Assistance, future school impact fees and future bond initiatives. Funding ($1,000s)Estimated Expenditures1 ($1,000s) 2. Secured funding includes 2012 bond monies, previously collected school impact fees, and proceeds from sale of surplus properties. Table 4 Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 16 - Capital Facilities Plan 2015 - 2021 Renton School District No. 403 - 17 - VII. IMPACT FEES Each jurisdiction that imposes school impact fees requires that developers pay these fees to help cover a share of the impact that new housing developments have on school facilities. To determine an equitable fee throughout unincorporated King County, a formula was established. This formula can be found in King County code 21A and was substantially adopted by the cities of Bellevue, Newcastle and Renton. The formula requires the District to establish a “Student Generation Factor” that estimates how many students will be added to a school district by each new single or multi-family unit constructed, and to establish several standard construction costs which are unique to that district. Refer to Appendix G for substantiating documentation on Student Generation Factors. Site Acquisition Cost is the estimated cost per acre to purchase property. Building Acquisition Cost is the estimated cost to construct facilities unique to the district. New Facility Cost Models are provided in Appendix G. Temporary Facility Cost is the estimated cost per classroom to purchase and install a relocatable classroom. State Funding Assistance Credit is the amount of funding provided by the State, subject to District eligibility, based on a construction cost allocation and funding assistance percentage established by the State. In response to declining economic conditions over the past several years, and the slow recovery, Renton School District has inserted a Voluntary District Adjustment component into the prescribed impact fee formula. The intent of this adjustment is to limit any increase in impact fees to a percentage equal to the local rate of inflation (CPU-U-Sea) as reported by the King County Office of Economic and Financial Analysis. While both single and multi-family impact fees show an increase over last year’s fees, the final fees reflect a reduction of $3,503 and $1,704 respectively, as a result of the limiting 1.84% rate of inflation for the year 2013. Based on the Growth Management Act and King County Code 21A, impact fees for the plan year 2015 are: Single-Family Units $ 5,643 Multi-Family Units $ 1,385 Single-Family and Multi-Family Fee Calculation spreadsheets follow. Capital Facilities Plan 2015 – 2021 Renton School District No. 403 - 18 - ((1 + i)t - 1 i (1 + i)t SITE ACQUISITION COST FACILITY SITE AREA COST PER ACRE STUDENTS STUDENT FACTOR COST A1 Elementary 10 450,000 550 0.361 $2,954 A2 Middle 20 450,000 850 0.133 $1,408 A3 N / A 40 450,000 1250 0.139 $0 A Total 0.633 $4,362 BUILDING ACQUISITION COST COST IN 2015 $ STUDENTS STUDENT FACTOR COST B1 Elementary 95.24%26,148,500 550 0.361 $16,346 B2 Middle 94.59%38,234,860 850 0.133 $5,659 B3 N / A 99.42%0 1250 0.139 $0 B Total 96.75%0.633 $22,005 TEMPORARY BUILDING ACQUISITION COST COST PER CLASS STUDENTS STUDENT FACTOR COST C1 Elementary 4.76%165,000 24 0.361 $118 C2 Middle 5.41%165,000 26 0.133 $46 C3 N / A 0.58%165,000 26 0.139 $0 C Total 3.25%0.633 $164 STATE FUNDING ASSISTANCE CREDIT COST INDEX SPI SQ FT MATCH %STUDENT FACTOR CREDIT D1 200.4 90 0.399 0.361 ($2,598) D2 200.4 117 0.399 0.133 ($1,244) D3 200.4 130 0.399 0.139 $0 D Total 0.633 ($3,842) TAX CREDIT (TC) * AVERAGE ASSESSED VALUE (AAV)311,174 INTEREST RATE FOR BONDS (i)3.68% TERM (t = MAXIMUM 10)10 TAX RATE (r)0.00171412 TC Total ($4,396.02)($4,396) FACILITY CREDIT $0 TOTAL FEE $18,292 50% DEVELOPER FEE OBLIGATION $9,146 IMPACT FEE $9,146 PREVIOUS YEAR'S IMPACT FEE $5,541 VOLUNTARY MAX. IMPACT FEE INCREASE (previous year's fee X 0.0184)$102 VOLUNTARY IMPACT FEE ADJUSTMENT $3,503 ADJUSTED IMPACT FEE $5,643 SINGLE-FAMILY RESIDENCE FEE CALCULATION * TAX CREDIT (TC) = NPV (net present value) x AAV x r where: NPV = AAV = Average Assessed Value r = Tax Rate i = Bond Interest Rate as of 12/27/12 t = Bond Term Capital Facilities Plan 2015 – 2021 Renton School District No. 403 - 19 - ((1 + i)t - 1 i (1 + i)t SITE ACQUISITION COST FACILITY SITE AREA COST PER ACRE STUDENTS STUDENT FACTOR COST A1 Elementary 10 450,000 550 0.170 $1,391 A2 Middle 20 450,000 850 0.050 $529 A3 High N/A 40 450,000 1250 0.061 $0 A Total 0.281 $1,920 BUILDING ACQUISITION COST COST IN 2014 $ STUDENTS STUDENT FACTOR COST B1 Elementary 95.24%18,293,275 550 0.170 $5,385 B2 Middle 94.59%35,047,880 850 0.050 $1,950 B3 High N/A 99.42%0 1250 0.061 $0 B Total 96.75%0.281 $7,335 TEMPORARY BUILDING ACQUISITION COST COST PER CLASS STUDENTS STUDENT FACTOR COST C1 Elementary 4.76%165,000 24 0.170 $56 C2 Middle 5.41%165,000 26 0.050 $17 C3 High N/A 0.58%165,000 26 0.061 $0 C Total 3.25%0.281 $73 STATE FUNDING ASSISTANCE CREDIT COST INDEX SPI SQ FT MATCH %STUDENT FACTOR CREDIT D1 200.4 90 0.399 0.170 ($1,223) D2 200.4 117 0.399 0.050 ($468) D3 200.4 130 0.399 0.061 $0 D Total 0.281 ($1,691) TAX CREDIT (TC) * AVERAGE ASSESSED VALUE (AAS)103,325 INTEREST RATE FOR BONDS (i)3.68% TERM (MAXIMUM 10)10 TAX RATE (r)0.00171412 TC Total ($1,459.69)($1,460) FACILITY CREDIT $0 FEE $6,178 50% DEVELOPER FEE OBLIGATION $3,089 IMPACT FEE $3,089 PREVIOUS YEAR'S IMPACT FEE $1,360 VOLUNTARY MAX. IMPACT FEE INCREASE (previous year's fee X 0.0184)$25 VOLUNTARY IMPACT FEE ADJUSTMENT $1,704 ADJUSTED IMPACT FEE $1,385 MULTI-FAMILY RESIDENCE FEE CALCULATION * TAX CREDIT (TC) = NPV (net present value) x AAV x r where: NPV = AAV = Average Assessed Value r = Tax Rate i = Bond Interest Rate as of 12/27/12 t = Bond Term Capital Facilities Plan 2015 – 2021 Renton School District No. 403 - 20 - Capital Facilities Plan 2015 – 2021 Renton School District No. 403 - 21 - XIII. APPENDICES APPENDIX A: DISTRICT MAPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 APPENDIX B: CAPACITY WORKSHEETS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 APPENDIX C: HEADCOUNT & PROJECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . .29 APPENDIX D: 2012 BOND MEASURE SUMMARY . . . . . . . . . . . . . . . . . . . . . . . .31 APPENDIX E: 2016 BOND MEASURE PROPOSAL . . . . . . . . . . . . . . . . . . . . . . . 33 APPENDIX F: STUDENT GENERATION FACTORS . . . . . . . . . . . . . . . . . . . . . . .37 APPENDIX G: SCHOOL COST MODELS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 APPENDIX H: CHANGES FROM PREVIOUS PLAN . . . . . . . . . . . . . . . . . . . . . . . 43 Capital Facilities Plan 2015 – 2021 Renton School District No. 403 - 22 - Capital Facilities Plan 2015 – 2021 Renton School District No. 403 APPENDIX A - 23 - RSD BOUNDARY MAP - MUNICIPALITY OVERLAY RENTON SCHOOL DISTRICT Capital Facilities Plan 2015 – 2021 Renton School District No. 403 APPENDIX A - 24 - Capital Facilities Plan 2015 – 2021 Renton School District No. 403 APPENDIX A - 25 - Capital Facilities Plan 2015 – 2021 Renton School District No. 403 APPENDIX A - 26 - Capital Facilities Plan 2015 – 2021 Renton School District No. 403 APPENDIX B - 27 - ASSUMPTIONS Average class size:Class size:K 24 Kindergarten 24.00 1 24 Grades 1 - 5 26.00 2 24 FTE variation from 10 / 1:0.98 3 24 Scheduling efficiency:0.92 4 29 5 29 FTE FTE CLASSROOMS GENERAL KINDER SPEC ED SPEC USE CAPACITY PORT USE ADD SPEC CAPACITY W/ PORTS SCHOOL BENSON HILL 18 4 3 3 520 0 0 520 BRYN MAWR 14 4 1 3 424 4 0 520 CAMPBELL HILL 13 4 3 3 400 4 0 496 CASCADE 16 5 3 3 494 7 0 662 HAZELWOOD 18 5 3 3 542 0 0 542 HIGHLANDS 18 5 3 3 542 0 0 542 HONEY DEW 12 5 2 1 398 8 0 590 KENNYDALE 20 4 1 3 568 0 0 568 LAKERIDGE 15 3 3 3 426 6 0 570 MAPLEWOOD HEIGHTS 16 6 1 2 516 6 0 660 RENTON PARK 20 3 3 3 546 0 0 546 SIERRA HEIGHTS 17 6 1 2 540 6 0 684 TALBOT HILL 17 3 1 3 474 3 0 546 TIFFANY PARK 15 3 3 3 426 2 0 474 TOTAL 229 60 31 38 6816 46 0 7,920 ELEMENTARY SCHOOL CAPACITY ASSUMPTIONS Average class size 29 Class size 6 29 FTE variation from 10 / 1 0.98 7 29 Scheduling efficiency 0.92 8 29 #FTE TEACHING SPEC SPEC FTE PORT SPEC CAPACITY CLASSROOMS STATIONS GENERAL SCI PE DRAMACOMP CTE ART MUSIC ED USE CAPACITY USE USE W/ PORTS SCHOOL DIMMITT 43 26 2 4 1 1 4 1 2 2 0 1066 7 1248 McKNIGHT 47 20 8 4 1 2 2 1 3 6 0 1066 8 1274 NELSEN 47 18 8 3 1 3 2 1 2 9 0 988 8 1196 TOTAL 137 17 0 3120 23 3718 MIDDLE SCHOOL CAPACITY Capital Facilities Plan 2015 – 2021 Renton School District No. 403 APPENDIX B - 28 - ASSUMPTIONS Average class size 29 Class size 9 29 FTE variation from 10/1 0.98 10 29 Scheduling efficiency 0.85 11 29 12 29 #FTE TEACHING SPEC SPEC FTE PORT SPEC CAPACITY CLASSROOMS STATIONS GENERAL SCI GYM HE COMPSHOP ART MUSIC ED USE CAPACITY USE USE W/ PORTS SCHOOL HAZEN 77 48 6 5 3 6 4 3 2 9 0 1632 0 0 1632 LINDBERGH 59 34 4 4 4 4 3 3 3 5 0 1296 1 0 1320 RENTON 78 44 6 5 6 7 5 3 2 5 0 1752 0 0 1752 SLC 27 20 1 1 1 2 1 1 0 0 5 476 0 0 476 TOTAL 214 19 5 5156 1 5180 HIGH SCHOOL CAPACITY ASSUMPTIONS Average class size Varies All facilities used for special programs FTE variation from 10/1 0.98 Scheduling efficiency 0.94 FTE FTE CLASSROOMS GENERAL SPEC ED SPEC USE CAPACITY PORT USE ADD SPEC CAPACITY W/ PORTS SCHOOL RENTON ACADEMY 24 0 3 243 0 0 243 MEADOW CREST 21 0 0 464 0 0 464 SARTORI 14 0 3 310 0 0 310 SPRING GLEN 14 0 1 310 4 0 398 TOTAL 73 0 7 1327 4 0 1415 SPECIAL EDUCATIONAL FACILITY CAPACITY Capital Facilities Plan 2015- 2021 Renton School District No. 403 APPENDIX C - 29 - Capital Facilities Plan 2015– 2021 Renton School District No. 403 APPENDIX C - 30 - Capital Facilities Plan 2015- 2021 Renton School District No. 403 APPENDIX D - 31 - 2012 BOND MEASURE SUMMARY NEW FACILITIES New Middle School 119,000 sf Located at Renton Academy site EXISTING FACILITIES UPGRADES Lindbergh Pool Upgrades SITE RELATED UPGRADES Parking Lot and Sidewalk Upgrades Elementary Field Upgrades SAFETY AND SECURITY Add Emergency Generators Fire Alarm and Smoke Detector Upgrades Security System Upgrades ENERGY CONSERVATION Boiler Upgrades Parking Lot Lighting and Controls Heating Systems Upgrades BUILDING UPGRADES Exterior Upgrades Roofing Replacements Replace Gutters and Downspouts Interior Upgrades Upgrade/Replace Interior Finishes and Materials Electrical – Replace/Upgrade System Components Plumbing – Replace/Upgrade System Components Mechanical – Replace/Upgrade System Components Portables Replace Aging Portables LAND ACQUISITION For Future Planning Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX D - 32 - Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX E - 33 - Proposal For Capital Facilities Plan 2014– 2020 Renton School District No. 403 APPENDIX E - 34 - Proposal for 2016 Bond Measure Capital Facilities Plan 2014– 2020 Renton School District No. 403 APPENDIX E - 35 - Proposal for 2016 Bond Measure Capital Facilities Plan 2014– 2020 Renton School District No. 403 APPENDIX E - 36 - Proposal for 2016 Bond Measure Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX F - 37 - STUDENT GENERATION FACTORS The formula for determining school impact fees, as established by King County Council Ordinance 11621, Attachment A, requires that school districts provide “student factors based on district records of average actual student generation rates for new developments constructed over a period of not more than five years prior to the date of the fee calculation.” The Ordinance also provides that, in the event this information is not available in the District, “data from adjacent districts, districts with similar demographics, or county-wide averages must be used.” King County currently assesses and collects impact fees on behalf of twelve school districts, including Renton School District. Of those twelve districts, only five conduct their own surveys to develop their unique student generation factors based on district records and actual development data. The remaining seven districts, including Renton, rely on averages of student factors developed by other districts. In accordance with King County Ordinance 11621, Attachment A, the District has chosen to use a county-wide average based on all districts that have performed their own student generation factor surveys as well as those that have similarly relied on county-wide data. The Student Generation Factors in Table 5 below represent an average of the student rates calculated by the other eleven school districts. STUDENT GENERATION FACTORS ELEMENTARY (K-5) MIDDLE SCHOOL (6-8) HIGH SCHOOL (9-12)TOTAL SINGLE-FAMILY 0.361 0.133 0.139 0.633 MULTI-FAMILY 0.170 0.050 0.061 0.281 Table 5 Table 6 on the following page details the student generation factors developed by the Districts referenced above, and the averages used in this Plan’s impact fee calculations. Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX F - 38 - DISTRICT K-5 6-8 9-12 TOTAL K-5 6-8 9-12 TOTAL Auburn 0.165 0.076 0.089 0.330 0.223 0.091 0.092 0.406 Enumclaw 0.378 0.127 0.146 0.651 0.192 0.057 0.068 0.317 Federal Way 0.332 0.166 0.210 0.707 0.148 0.042 0.059 0.249 Fife 0.235 0.157 0.000 0.392 0.000 0.000 0.000 0.000 Highline 0.378 0.127 0.146 0.651 0.192 0.057 0.068 0.317 Issaquah 0.471 0.170 0.145 0.786 0.165 0.052 0.051 0.268 Kent 0.484 0.129 0.249 0.862 0.324 0.066 0.118 0.508 Lake Washington 0.393 0.131 0.103 0.627 0.055 0.017 0.012 0.084 Tahoma 0.378 0.127 0.146 0.651 0.192 0.057 0.068 0.317 Riverview 0.378 0.127 0.146 0.651 0.192 0.057 0.068 0.317 Snoqualmie Valley 0.378 0.127 0.146 0.651 0.192 0.057 0.068 0.317 TOTAL 3.970 1.464 1.526 6.959 1.875 0.553 0.672 3.100 AVERAGE 0.361 0.133 0.139 0.633 0.170 0.050 0.061 0.282 SINGLE-FAMILY MULTI-FAMILY COUNTY-WIDE STUDENT GENERATION FACTORS Table 6 Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX G - 39 - FACILITY COST MODELS Facility cost models are a calculation of the cost to construct educational facilities unique to the District. This is accomplished by utilizing both District specific data as well as information available from OSPI. OSPI constants are factors established by OSPI as part of its School Construction Assistance Program. State Funding Assistance Percentages are unique to individual school districts while the Construction Cost Allocation (per square foot of construction) is constant throughout the state. The State Area Allocation (per student) is used solely by OSPI to determine a District’s eligibility for state funding. It is not meant to represent or reflect the unique spatial needs of a District necessary to provide its adopted programs and standard of service. The District Area Allocation utilized in the cost models reflects historical data from previously constructed facilities, or facilities currently under construction, adjusted to reflect current programs, anticipated funding and other topical issues. The applied Cost per Square Foot is an average of recently bid school projects of similar grade levels in the Puget Sound Region, as reported by OSPI. Elementary and Middle School Cost Models follow. Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX G - 40 - ELEMENTARY SCHOOL COST MODEL FACILITY INFORMATION Building Site Work Student capacity 550 Area (acres)7 SF per student 126 Cost per acre $425,000 Generic classrooms 27 Right-of-way LF 2,200 Gym and cafeteria Separate Right-of-way cost per LF $350 Building area (SF)69,500 Utility improvements $350,000 Cost per SF $308 Demolition Site Preparation Area (SF)43,750 Area (acres)7 Cost per SF $10 Cost per acre $30,000 CONSTRUCTION COST Demolition $437,500 Site prep $210,000 Building $21,406,000 Site work $2,975,000 Right-of-way improvements $770,000 Off-site utility improvements $350,000 Subtotal $26,148,500 Cost per SF $376 SOFT COSTS Professional fees 12%$3,137,820 Sales tax 10%$2,614,850 Change Order Contingency 7%$1,830,395 Permits 1%$261,485 Special inspections 1%$261,485 Art 1%$261,485 Work by separate contract 1%$261,485 Temporary Facilities 1%$261,485 Moving and Storage 1%$261,485 Furniture, fixtures & equipment 6%$1,568,910 Project management 3%$784,455 District administration 1%$261,485 Mitigation 3%$784,455 Project contingency 7%$1,830,395 Subtotal $14,381,675 CONSTRUCTION COSTS + SOFT COSTS $40,530,175 ESCALATION Year Inflation Rate Amount 2015 0.93%$40,907,106 Bond 2016 2.32%$41,856,150 Bid 2017 2.62%$42,952,782 PROJECT COSTS Midpoint 2018 2.73%$44,125,393 2019 2.66%$45,299,128 2020 2.90%$46,612,803 Note: Amounts do not include property acquisition Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX G - 41 - MIDDLE SCHOOL COST MODEL FACILITY INFORMATION Building Site Work Student capacity 850 Area (acres)11 SF per student 140 Cost per acre $400,000 Generic classrooms 31 Right-of-way LF 1,000 Building area (SF)119,000 Right-of-way cost per LF $350 Cost per SF $270 Utility improvements $231,000 Demolition/Abatement Site Preparation Area (SF)52,924 Area (acres)11 Cost per SF $15 Cost per acre $30,000 CONSTRUCTION COST Demolition $793,860 Site prep $330,000 Building $32,130,000 Site work $4,400,000 Right-of-way improvements $350,000 Off-site utility improvements $231,000 Subtotal $38,234,860 Cost per SF $321 SOFT COSTS Professional fees 12%$4,588,183 Sales tax 10%$3,632,312 Change Order Contingency 7%$1,830,395 Permits 1%$261,485 Special inspections 1%$130,743 Art 1%$130,743 Work by separate contract 1%$261,485 Temporary Facilities 1%$130,743 Moving and Storage 1%$130,743 Furniture, fixtures & equipment 6%$1,568,910 Project management 2%$522,970 District administration 1%$130,743 Mitigation 2%$522,970 Project contingency 7%$2,676,440 Subtotal $16,518,863 CONSTRUCTION COSTS + SOFT COSTS (BID 02/26/2015)$54,753,723 ESCALATION Year Inflation Rate Amount 2015 0.93% 2016 2.32% 2017 2.62% 2018 2.73% 2019 2.66% 2020 2.90% Note: Amounts do not include property acquisition Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX G - 42 - Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX H - 43 - CHANGES FROM PREVIOUS PLAN PERMANENT FACILITY CAPACITY 2014-2020 2015-2021 CHANGE Elementary 7,251 6816 -435 Middle 3,138 3120 -18 High 4,710 5156 446 Total 15,099 15,092 -7 ACTUAL STUDENT ENROLLMENT (October headcount) 2014 2015 CHANGE Elementary 7,226 7469 243 Middle 3,169 3210 41 High 3,932 4239 307 Total 14,327 14918 591 IMPACT FEES 2014-2020 2015-2021 CHANGE SINGLE-FAMILY FEE 5,541 5,643 102 Student Generation Factors Elementary 0.380 0.361 -0.019 Middle 0.144 0.133 0.011 High 0.149 0.139 -0.010 Total 0.673 0.633 -0.040 MULTI-FAMILY FEE 1,360 1,385 25 Student Generation Factors Elementary 0.139 0.170 0.031 Middle 0.039 0.050 0.011 High 0.055 0.061 0.006 Total 0.233 0.281 0.048 IMPACT FEE FACTORS Cost per Acre 450,000 400,000 -50,000 Temp. Bldg. Acquisition 165,000 165,000 0 State Match Percentage 0.3930 0.3990 0.0060 Ave. Assessed Value - Single 219,000 311,174 92,174 Ave. Assessed Value - Multi 93,092 103,325 10,233 Bond Interest Rate 4.46% 3.68% -0.78% Tax Rate 2.30546/1000 1.71412/1000 -0.59134/1000 Capital Facilities Plan 2015 - 2021 Renton School District No. 403 APPENDIX G *