Loading...
HomeMy WebLinkAbout03690 - Technical Information Report � 1 � ' ' � 1 • ' �, � Engineers a �. � �` ... � • � .. __: .. . . .,. a _ . � , _ � Surveyors � . ._... .�t . ._._ _:_ .� . _x, -- - �. j ' I 1 , � , ._ . . . � __ Landscape Architects � �, _ _ � � � � � Full Service En ine�rin Since � 981 9 9 � . . . , ... .. . _ �.. .. __.. . .. � .: _._ _ . . ... ,. .,. . � _ _ .r Technical Information Report (TIR} for Saddlebrook Div. II 13422 156"'Avenue SE, Renton,Washington R A� � 0 �� p wAsg f���j f C�,o2 � , � �� � � i452 2 ��� �R�F'Gi�"1'FyTt��v �IpNA � �� � I I i � DRS Project No. 13030 City of Renton File No. LUA 13-XXX OwneNApplrcant ACH Homes, LLC ': 9675 SE 36`h Street, Suite 105 � Mercer Island, Washington 98040 i Report Prepared by � / � D. R. STRONG Consulting Engineers, Inc. 620 7t''Avenue Kirkland WA 98033 ; (425) 827-3063 ' Report Issue Date � August 8, 2013 i m 2013 D.R.STRONG Consulting Engineers Inc. ' � �;�o �/t�? Technical Information Report (TIR) for Saddlebrook Div. II 13422 156`"Avenue SE, Renton,Washington l��R A� J jras � �'A��F XJ���j ��P C��� Y YC � ��� �232� .���I �SSIO�VaL �Cs DRS Project No. 13030 City of Renton File No. LUA 13-XXX OwneNApplicant ACH Homes, LLC 9675 SE 36�h Street, Suite 105 Mercer Island, Washington 98040 Report Prepared by � � D. R. STRONG Consulting Engineers, Inc. 620 7th Avenue Kirkland WA 98033 � _ (425) 827-3063 Report Issue Date August 8, 2013 RE�E� � ��r. .. y20•� �02013 D. R.STRONG Consulting Engineers Inc. ';��FR � I I- TECHNICAL INFORMATION REPORT - Saddlebrook Div. II TABLE OF CONTENTS SECTIONI.................................................................................................................................................... 1 II PROJECTOVERVIEW: ........................................................................................................................... 1 PREDEVELOPED SITE CONDITIONS:................................................................................................... 1 I DEVELOPED SITE CONDITIONS: .......................................................................................................... 1 NATURAL DRAINAGE SYSTEM FUNCTIONS:....................................................................................... 2 FIGURE 1. T!R WORKSHEET........................................................................................................... 3 FlGURE 2. VICINITY MAP..............................................................................................:................... 6 FIGURE 3. DRAlNAGE BASINS, SUBBASINS, AND SlTE CHARACTERISTICS............................ 7 F/GURE 4. SOILS............................................................................................................................... 8 SECTIONII................................................................................................................................................. 10 CONDITIONS AND REQUIREMENTS SUMMARY............................................................................... 10 SECTIONIII................................................................................................................................................ 12 OFF-SITE ANALYSIS............................................................................................................................. 12 SECTIONIV............................................................................................................................................... 13 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN.................................. 13 EXISTING SITE HYDROLOGY(PARTA}............................................................................................... 13 FIGURE 5. PREDEVELOPMENT AREA MAP.................................................................................. 94 DEVELOPED SITE HYDROLOGY(PART B)......................................................................................... 15 BYPASS AREA HYDROLOGY............................................................................................................... 17 FIGURE 6. POST DEVELOPMENT ARE,4 MAP.............................................................................. 18 PERFORMANCE STANDARDS(PART C)............................................................................................ 19 FLOW CONTROL SYSTEM(PART D) .................................................................................................. 19 FLOW CONTROL BMP SELECTION .................................................................................................... 19 FLOW CONTROL SYSTEM................................................................................................................... 20 WATER QUALITYTREATMENT(PART E).................................................:......................................... 28 FIGURE 7. DETENTION FAClLlTY DETAILS AND BAYFILTER SIZlNG........................................ 29 SECTIONV................................................................................................................................................ 30 CONVEYANCE SYSTEM ANALYSIS AND DESIGN ............................................................................. 30 DEVELOPED 15-MINUTE TIME SERIES.............................................................................................. 30 BACKWATERANALYSIS...................................................................................................................... 32 BACKWATER ANALYSIS MAP.............................................................................................................. 34 BACKWATER ANALYSIS RESULTS..................................................................................................... 35 SECTIONVI ............................................................................................................................................... 39 SPECIAL REPORTS AND STUDIES..................................................................................................... 39 SECTIONVII ..............................................................................................................................................40 OTHER PERMITS,VARIANCES AND ADJUSTMENTS ....................................................................... 40 SECTIONVIII ............................................................................................................................................. 41 ESC PLAN ANALYSIS AND DESIGN (PART A) .................................................................:.................. 41 SWPPS PLAN DESIGN(PART B} ......................................................................................................... 41 SECTIONIX...............................................................................................................................................43 BOND QUANTITIES, FACILITY SUMMARIES,AND DECLARATION OF COVENANT........................ 43 STORMWATER FACILITYSUMMARYSHEET..................................................................................... 44 SECTIONX ................................................................................................................................................46 �2013 D. R. STRONG Consulting Engineers Inc. Saddlebrook Div. II Technical Information Report Renton,Washington OPERATIONS AND MAINTENANCE MANUAL..................................................................................... 46 APPENDICES.............................................................................................................................................47 APPENDIX�,A„ LEGAL DESCRIPTION................................................................................................. 48 APPENDIX"B„ BOND QUANTITY WORKSHEET................................................................................ 49 APPENDIX"C" OPERATIONS AND MAINTENACE MANUAL ............................................................. 50 APPENDIX«p„ CSWPPP...................................................................................................................... 51 O 2013 D. R.STRONG Consulting Engineers Inc. Saddlebrook Div. II Technical Information Report Renton,Washington SECTION I PROJECT OVERVIEW: The Site is located at 13422 1�6th Avenue SE in Rent�n, Was►�ingtoi�, also known as King County Tax Parcel Number 366450-0250. The Project is the subdivision of this existing parcel zoned R4 (0.89 ac. total) into three single-family residential lots, per the City of Renton's (City) short plat process. The Site will utilize the detention facility within Saddlebrook Div. I to meet flow control requirements. The pond will be redesigned to Level Three Flow Control Standards. The Project will meet the drainage requirements of the 2009 King County Surface Water Design Manual (Manual), as adopted by the City. PREDEVELOPED SITE CONDITIONS: Total existing Site area is approximately 38,715 s.f. (0.89 ac). Total proposed Project area is 41,095 s.f. (0.94 ac) which includes 2,380 s.f. (0.05 ac) for the right-of-way , frontage improvements on 156th Avenue SE. The Parcel is currently developed with a i, single-family home, covered patio and a gravel driveway. The remainder of the Site is , lawn, landscaping, and scattered trees. The 0.89 acre parcel contains a single natural discharge point near the southwest � corner of the Site. The Site sheet flows towards the southwest corner of the Site and into the right-of-way. From there, it is collected into the conveyance system within 156t" ' Avenue and is conveyed south. For the purpose of hydrologic calculations, the entire Site is modeled as till forest. DEVELOPED SITE CONDITIONS: The applicant has gained approval to subdivide 0.89 acres into three single-family residential lots (Project), with lot sizes ranging from approximately 10,169 to 10,983 s.f. All existing improvements will be demolished or removed during plat construction. The proposed impervious surface area will include a new shared driveway tract with 16 feet of pavement. Impervious surface are will also include offsite half-street improvements along 156th Avenue SE. The proposed shared driveway improvements total approximately 4,411 s.f. The three single-family residences and their driveways combined will create approximately 10,875 s.f. of impervious area (reduced from maximum allowable, see next paragraph for details). Post-developed impervious areas including driveways, roofs, and site frontage improvements total approximately 17,666 s.f. (includes Bypass area). The remainder of the Project will be modeled as till grass totaling approximately 23,429 s.f. (See Section IV) Per the 2009 King County Surface Water Design Manual (Manual}, Appendix C, each lot within a new subdivision is required to mitigate for impervious surface area equal to 10% of the lot area. Per Figure C.1.3.A, Flow Control BMP Flowchart, the Project will utilize Basic Dispersion with the use of splash blocks. Two splash blocks mitigating a total of 1,400 s.f. of impervious area, will be installed with each residence. This shall mitigate for 12.75% to 13.77% of impervious area for each lot. Also, each lot will be restricted to an area less than 4,000 s.f. (see table below). Additionally, use of Basic �2013 D. R.STRONG Consulting Engineers Inc. 1 Saddlebrook Div. II Technical Information Report Renton,Washington Dispersion allows for a 50% flow control BMP sizing credit which was used in detention facility calculations. See table below for lot area, restricted impervious area per lot, and percent impervious mitigated per lot. ROOF AREA ROUTED TO RESTRICTED IMPERVIOUS TOTAL AREA PERCENT IMPERVIOUS LOT N0. LOTAREA(S.F.) SPLASH BLOCK(S.F.) AREA PER LOT MITIGATED MITIGATED 1 10169 1400 3505 1895 18.64 2 10983 1400 3485 1915 17.44 3 10877 1400 3885 1515 13.93 All surface water runoff from impervious surfaces will be collected and conveyed to a storm detention pond located within Tract "A of Saddlebrook Div. I. From there, runoff will be conveyed through a BayFilter vault before entering the existing conveyance system within 156'h Avenue SE. NATURAL DRAINAGE SYSTEM FUNCTIONS: A review of the SCS soils map for the area (see Figure 4, Soils) indicates Alderwood gravelly sandy loam with 6 to 15 percent slopes (AgC). Per the Manual, this soil type is classified as "Till" material. The SCS Soil series descriptions follow Figure 4. In evaluating the upstream area, we reviewed the existing offsite analysis and King County IMAP aerial topography and imagery and conducted field reconnaissance and have concluded that upstream tributary area for the Site is negligible. ��2013 D. R. STRONG Consulting Engineers Ina 2 Saddlebrook Div. II Technical Information Report Renton,Washington l FIGURE 1. TIR WORKSHEET 'I King County Department of Development and Environmental Services I�' TECHNICAL INFORMATION REPORT (TIR) WORKSHEET I Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND PROJECT ENGINEER DESCRIPTION Project Owner: Project Name: ACH Homes, LLC Saddlebrook Div. II Address/Phone: Location: ' 9675 SE 36th Street, Suite 105 Township: 23 North ' Mercer Island, Washington 98040 Range: 05 East (206) 588-1147 Section: 14 Project Engineer: Maher A. Joudi, P.E. D. R. STRONG Consulting Engineers Inc. Address/Phone: 620 7th Avenue Kirkland WA 98033 (425) 827-3063 Part 3 TYPE OF PERMIT Part 4 OTHER REVIEWS AND PERMITS APPLICATION ❑ Subdivision ❑ DFW HPA ❑ Shoreline � Short Subdivision Management � Clearing and Grading ❑ COE 404 ❑ Rockery ❑ Commercial ❑ DOE Dam Safety ❑ Structural Vault ❑ Other: ❑ FEMA Floodplain ❑ Other: ❑ COE Wetlands Part 5 SITE COMMUNITY AND DRAINAGE BASIN Community: Newcastle Drainage Basin Lower Cedar River �<�2013 D.R.STRONG Consulting Engineers Inc. 3 Saddlebrook Div. II Technical Information Report Renton,Washington Part 6 SITE CHARACTERISTICS ❑River: ❑ Floodplain ❑ Wetlands ❑ Stream: ❑ Seeps/Springs ❑ Critical Stream Reach ❑ High Groundwater Table ❑ Depressions/Swales ❑ Groundwater Recharge ❑ Lake: ❑ Other: ❑ Stee Slo es Part 7 SOILS Soil Type: Slopes: Erosion Potential: Erosive Velocities: Alderwood 6-15% Moderate Slow to Medium (AgC) � Additional Sheets Attached: SCS Map and Soil Description, Figure 4 Part 8 DEVELOPMENT LIMITATIONS REFERENCE LIMITATION/SITE CONSTRAINT � Level 1 Downstream Analysis None � Geotechnical Engineering Study ❑ Environmentally Sensiti�e Areas ❑ Level 2 Off-Site Stormwater Analysis � Level I Traffic Impact Analysis ❑ Structural Report ❑ Additional Sheets Attached Part 9 ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION AFTER CONSTRUCTION � Sedimentation Facilities � Stabilize Exposed Surface � Stabilized Construction � Remove and Restore Temporary ESC Entrance Facilities � Perimeter Runoff Control � Clean and Remove All Silt and Debris � Clearing and Grading � Ensure Operation of Permanent Facilities Restrictions ❑ Flag Limits of SAO and open space � Cover Practices preservation areas � Construction Sequence ❑ Other ❑ Other O 2013 D. R.STRONG Consulting Engineers Inc. 4 Saddlebrook Div. II Technical Information Report Renton,Washington Part 10 SURFACE WATER SYSTEM ❑ Grass Lined ❑ Tank ❑ Infiltration Method of Analysis: Channel ❑ Vault ❑ Depression KCRTS � Pipe System ❑ Energy Dissipater ❑ Flow Dispersal Compensation/ ❑ Open Channel ❑ Wetland ❑ Waiver Mitigation of Eliminated � Dry Pond ❑ Stream ❑ Regional Site Storage ❑ Wet Pond Detention N/A Brief Description of System Operation: Runoff from impervious surFaces will be collected and conveyed to the detention pond in Tract A of Saddlebrook Div. I. From there it will be dischar ed to the existin conve ance s stem within 156th Avenue SE. J 9 Y Y � Facility Related Site Limitations: Reference Facility Limitation Part 11 STRUCTURAL ANALYSIS Part 12 EASEMENTS/TRACTS ❑ Cast in Place Vault � Drainage Easement ❑ Retaining Wall � Access Easement ❑ Rockery > 4' High ❑ Native Growth Protection Easement ❑ Structural on Steep Slope � Tracts ❑ Other: ❑ Other: Part 13 SIGNATURE OF PROFESSIONAL ENGINEER I or a civil engineer under my supervision have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attachments. To the best '� of my knowledge the information provided here is accurate. Si ned/Date �s 2013 D. R.STRONG Consulting Engineers Inc. 5 Saddlebrook Div. II Technical Information Report Renton,Washington FIGURE 2. VICINITY MAP KN, �g - il ��, Rd �-- F 9: ; ...�,c <. R� R� :��q ��.i . m�m,<. . � .z.c.nsr � . '' ' . ,� Ri I � M�� ; oe�." s, � � r ' ? - � � � � � , M . � � � ��� i�'.� . � -._ .c4Y r_' ' � � ��I ..._ .. ___ . - : � ` � . .� � _! , i i ; � . i ; � I .�.n>, a�„ � , _ ( ._ r� ¢bA _ ."_' � . . i Renton � �� d � �' �� � I � � o� � �_ .. ' ' � � s�R II , ,k..o,s..,. � ��� �^R-4 ; � . I - �� : : .. . . � . 4 a - � %911 The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties,express or implied,as to accuracy,completeness,timeliness, or rights to the use of such information.King County shall not be liable for any general,special, indirect, incidental,or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map.Any sale of this map or information on this map is prohibited except by written permission of King County. O 2013 D. R.STRONG Consulting Engineers Inc. 6 Saddlebrook Div. II Technical Information Report Renton,Washington FIGURE 3. DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS ', ?2013 D.R.STRoNG Consulting Engineers Ina 7 Saddlebrook Div. II Technical Information Report Renton,Washington � W 2 W o � I e „ 3 O � � ° " I � � N � � 2 W Y � O C�.i 2 # � ---�f i � � � � � ' ,I , � , :,� � :,. . � �- ` :... _ ..,. I � W ' -_ -. ,_.- .--_ ._ ��` : . . // �� , 4 , _ v V � � . . . - -- �..-- �'���. �' -- :,...-- ,., .� .:. � � 2 � . . . . , .... -- ..,.. - -- � .� : . ; O W � I I, � - lDA Q,89 A C. .- %<� _ r � � � � Z ,� `O 339 �F FRDA%1 FA�TNEST 3 � . � , A � i 'UPSTREAM END 0 = � , i DETENTION POND� _ `� � � � � �� __ � � '� � � .�, , ' _ I � , � It � - � ��_ � T \ � ;: � , ' � i � ��--- _ _ . � �' � I _ _ - _ _ , , ' i � -. ; . -_ � � -- : ; , i:- ' .. xu _ � ' _ i " " ; � �'.: � 1 � � i � i � , • ���o � ..- ..,, � � ` � -_ `: : . . - • � ' ' - EXISTING AND CONSTRUCTION - - . ' �� - . F� �— ! .: ._.,RUNOFF EXIT SlTE HERE': - - _ � � , I � ..- �, . , " �' � W I I - � � , � V ' �' , � �. - . � i I � � � I \;. ■ , , i �, � - _ _ _ \ O v � Z .. ��� � � � .� - - � - = - e ; , _ -- % , _ _ _ _ �. , : , _. , _ , ; �- � - -- , W o ._ - - - ... — - ----- � • � -- - __- --- _-_ ; ; _ _ . ---- _ __ _— � , ' (/� W I� II I •; - _ _ __; ,. _ - ---- -- _ _ _ - _--- � Z = ,. _ . � ; � , $ � _ , _ , . _-_ _ �, i . 0 . _ i . . , � x . � _ I � i - ,- - _ _ Q Q ,- - - �, s :-_ . - - -� � -- � " , z � $ � , , .. _ _ _ _ _____. , _ : -_ , � ; ; r - - - - ___— -__-- ---- =:- � , , .:�- � . , _ _ _ -_ � . _ - - _ _ _ _ ,_ � , ------ , ' . � ._ _ , � _ g �ti;�� - - — -- - -. ' ' \— m �, � . �C . : � � .- -. ---- _ ,,9 �— — � ' �! I � m N Z , , � _ - - - ��� - — f . , � e} �ll i'.. , �,,�' - �'' � � � ._ _ _ m � � i , - � r ' � � � � I �� �� �� , ��� � W Z �, � , �: - cn _ � , ii , �_. I` I , � ` Q Q — � �� — - - - �� ; � O W � - I . , � � _ . : � ,' _ � Q �. — _ � i , _ — — _ ` �A — — . Q , . �_� _ - .�. ; � 2 , � . � -_ . - � ,. � ; . � � _ _ -- - _ _ _. l ,., .. . '°s ,,, . : , I , , � � � O . , . ,, � , � . I � ' I � ', DEVELOPED RUNOFF ' - . s , � - � ' EXIT SI TE HERE � I _ . T _ . � NORTH I ` �-- - I GF�IPHIC SCALE � �� � I _.: f' 0 40 80 120 ' �d � ' 1 INCH = 80 FT. D,4AFT£D BY.� YLp � L EGEND DES�GN£D BY. ?ip PRO,.�CT ENGI,V�ER.� ,WJ S1TE BOUNDARY DATE: pI:3Q13 � � � BAS1N BOUNDARY PRO,fECT NO.: 13R'JO P.:\2013\0\13��_'0\3\Crcw'rSs\Bcse\Re�or- FIr;-'es\O1-3=1G373G�O.d�vg 5/i%2C13 "�:it23 A'J FCT FIGURE.� .3 �;7P�r�.;HTC 2012. ]&_ S7Pp`JG ��OP,I_l,L���.�� E''JGC-:_E=5 `!C_ I I i � FIGURE 4. SOILS �,. I . � ,�, �; �F� _ �~:f � .: , y ..., T . ., � � •...�•-;. .I' ��. . rt i ;X� IA _ )• � �_ y� , � ' . �� . ' � ' � ,�'_ " . . . .�: � 7: e.. t II i � :' �- '" . r. -�:._ , .Y.. . � ��4 .'� i�= �,�� ' •`�"' t•� . . ... . _ � � Yr.'- . .. ..—. - . , I £ King County Area,Washington AgC—Alderwood graveily sandy loam, 6 to 15 percent slopes ' Map Unit Setting SITE Elevation:50 to 800 feet Mean annual precipitation:25 to 60 inches Mean annual airtemperature:48 to 52 degrees F Frost-free period:180 to 220 days Map Unit Composition Alderwood and similar soils:95 percent I Minor components:5 percent � Description of Alderwood Setting I Landform:Moraines, till plains '� Parent material:Basal till with some volcanic ash I Properties and qualities � Slope:6 to 15 percent �� Depth to resfictive feature:24 to 40 inches to dense material �, Drainage class:Moderately well drained Capacity of the most limrting layer to transmit water(Ksat):Very low to moderately low(0.00 to 0.06 in/hr) Depth to wafer table:About 18 to 37 inches Frequency of flooding:None Frequency of ponding:None Available wafer capacity:Very low(about 2.5 inches) Interpretive groups Land capability(nonirrigated):4s Typical profile 0 to 12 inches:Gravelly sandy loam O 2013 D. R.STRONG Consulting Engineers Inc. 8 Saddlebrook Div. II Technical Information Report Renton,Washington 12 to 27 inches:Very gravelly sandy loam 27 to 60 inches:Very gravelly sandy loam Minor Components Norma Percent of map unit:1 percent Landform:Depressions Bellingham Percent of map unit: 1 percent Landform:Depressions Seattle Percent of map unrt: 1 percent Landform:Depressions Tukwila Percent of map unif: 1 percent Landform:Depressions Shalcar Percent of map unit: 1 percent Landform:Depressions O 2013 D.R. STRONG Consulting Engineers Inc. 9 Saddlebrook Div. II Technical Information Report Renton,Washington SECTION II CONDITIONS AND REQUIREMENTS SUMMARY The Project must comply with the following Core and Special Requirements: • C.R. #1 — Discharge at the Natural Location: The Site will discharge at its natural discharge location. • C.R. #2 — Offsite Analysis: An Offsite Analysis is included in Section III. The Analysis describes the Site's runoff patterns in detail. • C.R. #3 — Flow Control: The Project is required to adhere to Level 3 Flow Control Standards per Adjustment 2012-03 for Saddlebrook Div. I. A detention pond will provide flow control as required for both drainage basins within Saddlebrook Div. I as well as Saddlebrook Div. II. The Project is required to "match developed discharge durations to predeveloped durations for the range of predeveloped discharge rates from 50% of the two-year peak flow up to the full 50-year peak flow." (KCSWDM, Sec. 1.2) Also match developed peak discharge rates to predeveloped peak discharge rates for the 2, 10 and 100 year return periods. Furthermore, the Project must meet the Flow Control BMP requirements as specified in Section 1.2.3.3 of the Manual. The Project will utilize basic dispersion and restricted footprint to meet this requirement. • C.R. #4 — Conveyance System: New pipe systems and ditches/channels are required to be designed with sufficient capacity to convey and contain (at minimum) the 25-year peak flow, assuming developed conditions for onsite tributary areas and existing conditions for any offsite tributary areas. Pipe system structures and ditches/channels may overtop for runoff events that exceed the 25-year design capacity, provided the overflow from a 100-year runoff event does not create or aggravate a "severe flooding problem" or "severe erosion problem" as defined in C.R. #2. Any overflow occurring onsite for runoff events up to and including the 100-year event must discharge at the natural location for the project site. In residential subdivisions, such overflow must be contained within an onsite drainage easement, tract, covenant or public right-of-way. The proposed conveyance system was analyzed using the KCBW program, and is capable of conveying the 100-year peak storm without overtopping any structures or channels (see Section V). • C.R. #5 — Erosion and Sediment Control: The Project provides the nine minimum ESC measures. • C.R. #6 — Maintenance and Operations: Maintenance of the proposed storm drainage facility will be the responsibility of the City. An Operation and Maintenance Manual is included in Section X. • C.R. #7 — Financial Guarantees: Prior to commencing construction, the Applicant must post a drainage facilities restoration and site stabilization financial guarantee. For any constructed or modified drainage facilities to be maintained and operated by the City, the Applicant must: 1) Post a drainage defect and maintenance financial guarantee for a period of two years, and 2) Maintain the drainage facilities during the O 2013 D.R. STRONG Consulting Engineers Inc. 1 D Saddlebrook Div. II Technical Information Report Renton,Washington two-year period following posting of the drainage defect and maintenance financial guarantee. • C.R. #8 - The Project is located in the Basic Water Quality Treatment area. i Stormwater runoff will be collected in the detention pond and then conveyed through I a BayFilter vault which will accommodate water quality requirements. I • S.R. #1 — Other Adopted Area-Specific Requirements: Not applicable for this Project. ', • S.R. #2 — Floodplain/Floodway Delineation: Not applicable for this Project. • S.R. #3 — Flood Protection Facilities: Not applicable for this Project. • S.R. #4 — Source Control: Not applicable for this Project. O 2013 D. R. STRONG Consulting Engineers Inc. 11 Saddlebrook Div. II Technical Information Report Renton,Washington SECTION III OFF-SITE ANALYSIS A Level One Downstream Analysis was prepared by DR Strong Consulting Engineers. A copy has been included in this Section. O 2013 D. R. STRONG Consulting Engineers Inc. 12 Saddlebrook Div. II Technical Information Report Renton,Washington LEVEL ONE DOWNSTREAM ANALYSIS for SADDLEBROOK DIV. II Short Plat 13422 156`h Avenue SE, Renton,Washington i ��g, A. JO �Q.�oF wasy�N�jjf `��� c�°�2 , r ,� -�.� � � o,�,��s o�����ti DRS Project No. 13030 Renton File No. LUA 13-XXX Owner/Applicant ACH Homes, LLC 9675 SE 36t" Street, Suite 105 Mercer Island, WA 98040 Report Prepared by � � D. R. STRONG Consulting Engineers, Inc. 10604 N.E. 38th Place, Suite 232 Kirkland WA 98033 (425) 827-3063 Report Issue Date May 14, 2013 �2012 D. R. STRONG Consulting Engineers Inc. LEVEL ONE DOWNSTREAM ANALYSIS SADDLEBROOK DIV. II TABLE OF CONTENTS TASK 1 DEFINE AND MAP THE STUDY AREA .........................................................1 TASK 2 RESOURCE REVIEW.....................................................................................5 TASK 3 FIELD INSPECTION .....................................................................................15 Upstream Tributary Area............................................................................................ 15 General Onsite and Offsite Drainage Description ...................................................... 15 TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS...16 Drainage System Description..................................................................................... 16 DownstreamPath................................................................................................... 16 TASK 5 MITIGATION OF EXISTING OR POTENTIAL PROBLEMS.........................21 List of Figures Figure1 Vicinity Map.......................................................................................................2 Figure2 Site Map ............................................................................................................3 Figure 3 King County iMap Topography..........................................................................4 Figure 4 Streams and 100-Year Floodplains and Floodway............................................6 Figure 5 King County iMap Wetlands ..............................................................................7 Figure 6 King County iMap Erosion Hazard Areas ..........................................................8 Figure 7 King County iMap Landslide Hazard Areas.......................................................9 Figure 8 King County iMap Seismic Hazard Areas........................................................10 Figure 9 FEMA— Flood Insurance Rate Map ................................................................11 Figure 10 King County iMap Drainage Complaints........................................................12 Figure 11 USDA King County Soils Survey Map ...........................................................13 Figure 12 Downstream Map ..........................................................................................18 Figure 13 Downstream Table ........................................................................................19 02013 D. R.STRONG Consulting Engineers Inc. Page i of i Level One Downstream Analysis Saddlebrook Div.II Short Plat City of Renton TASK 1 DEFINE AND MAP THE STUDY AREA This Offsite Analysis was prepared in accordance with Core Requirement #2, Section 1.2.2 of the 2009 King County Surface Water Design Manual (Manual). The Site is located at 13422 156th Avenue SE in Renton, Washington. See Figure 1, Figure 2, and Figure 3 for maps of the study area. �2013 D.R.STRONG Consutting Engineers Inc. Page 1 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 1 VICINITY MAP SITE �, � < R-a �,�,nn � R-a � +� �»,n�„ ��n R-4 R� g1Td+p � R� ��v10 a I � SE�IRD tt � ��ITlD ST � ��� ISI �� p � ~� R� � FEISf0. . ME tyT S7 � � � � � ��. . ... 1 F ..."__,... �� . i ��� SEt]ffM5f � _+_� � ( ' 3 � { � rh�src. R-4 sasnsr + � _r bl � � -- y �. , . sc�sr �< � IA asaosr R�4 � Renton SE DA R ' :, g tmM �+ � ; { ..i;__i +',`s; i-1r �I '.i ��W � ,I �. � � i� '�_�. � a� d � m � . � ��ymsr � . . aExensr � ,��-I aEum,r� � Y 9 � _ < y{ a � � d � ; � �SE]i0R 36]TDR' ''� ' 0 B78R The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties,express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information.King County shall not be liable for any general,speciai, indirect, incidental, or consequential damages including, but not Iimited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map.Any sale of this map or information on this map is prohibited except by written permission of King County. 02013 D. R.STRONG Consulting Engineers Inc. Page 2 � Level One Downstream Analysis Saddlebrook Div.II Short Plat City of Renton � , FIGURE 2 �', SITE MAP ' �2013 D. R.STRONG Consulting Engineers Inc. Page 3 Level One Do�vnstream Analysis Saddlebrook Div. II Short Plat City of Renton � W 2 h Wo e � ' � 2 � � � i � • , ' � , y � � ' q i ���� ', ;, � O 2 Y � � ;) ji o � g � � ���� �: �!� ;��� /� � � a � -tc; � � ! II//11 W k Ii I. ��% � iE fY C-?t .,3 � \,_�._:l�I� � i . .. . � 2 � �;. � Y: 1 i, � 2 .. f C i _,� � �,�� ` ` W � � 3 G44"'� _, f � 1�.iI � ... _.� .�� i - P�iL - F-` --� � �� � �I �� ` .. J��A.l'� CQ� S;, 7 `, 1 � � �b�^ ( / � ��_ ... . \ '—__ ._. �\` .__�\.�—_ . \ _ . _-.. 1 -. ..-- - ; � . �:_ � -�r , - - -� - _ __ =__ - _ _ . _ ,. ,� � �, � � , ', �� - - . . _ �� : �_ ��_., , , _ - - _-�-_ x -- - - - - _ - -_ , . � _ , : � ',�- . � � J."��: :. � ��� P..o�a ��5 ��,. ,. ��- �__ X � - .__ ;_ � . . � 1 _-. �� ... f,_ _ { `_ /�� - - i.. - -�;�--------C--hJ -- � ._.__ � '"' ti i.E'E x 5Yi L �F�`�--_ - - c��_�� � I ' I.i '_ .� t'F74'.GC.ii,E.R P E-r � ^-, ��'l r : 1'. �� `'f'_ ,. ' I � � � , � I r ' �� a +`;i �- � c n..= i.= �Cy ` I �"� �-� e:.r_ �., _� � f � (�Y'�� i. _c,.�T � - . 's i\ .� — — i �\ � � ���\ .!` �� la'D `/l %�� — �, l ! � ,' c a 1 /� �!_'� � �...-. � i � �: „s � �2 ` � � i� �_ ��- � t � �� 2v� , �� � � , � , � �c. . �� ycus � � _-_ � . ` ; I W 1' ! � � i(� F�=stt.as `I •u7 ` I , i ^ � W t � �'� � � */`��'''��\� ��� � 1 _. � � � . �i I�I � �1 ' .'�,�J'r1 14 1H:1::ti ti D ' � , Z i I I,I�t ' \ e I�> � '~�-� ��,_��� d.. �i I� � , � 2s'F2^i"t?y,J_i:� '�� � ..u`o � � � ' Zti$1 ' � �� �� I � �;uy� ��! .�F r3`o �c'L L �� - � F _ ���.� .�` , � � � .� �` �a ` - O � A`� ;i ��� (�, � � ����� � �' � i:�.�.�C _ .. �, 'r .� _ �� 1 2f� .� — — j/e"''D \� � _ (n I � ��` � �� ��� � � � .2�� ��� �-- ��� 1 f ��_i �- �,- � � �'. I �: c CC F Ic ( � 22`Fg �`�— �_/ (� \ i \ \,1� � .'h'C�. P . ��.. rA�-t ! ` � �•� I I '� — i•.s�?SY. '1 �' � __,� Q l YC � t�� , Q \ �il ����_ � \ � k��5F20' � %�`� ���.^_Yi �'F � � �T rA � I r�- � � 7/ t`.� i tr?�(— � pap [ � O \ �. '',5� i I; � =`, ::� .Mr ;t��;c`� I� . r � � 1� h^ ll! ` , . ... _' __.�_ , C.: ;,!`Y'.l ` ,. . , - Ib _ � v1 � _� � il� ,1 t :'i , ( i--�I' �`` C.�` ._".�. .'_._' ,_ �_—.j .. . ! } 1� . ' . � . .. . . r�.7�_ C ..�.��,..- ; � �!� O � ; / , • �,I ; � � � � r F , . , / .� . ,. _ ---- c �.:. ''}� ,.�. c __.. � 0 f � ! r _s � t\ 1 ( , i I o` 1 ,' ----n - ',��. \ f I r ' � :c'u; ,5 3�3zi' ``�jJ ' _ '._:��5 . � . . _ -._._ � - . . __ .. _. . �.�n, I \ F �� %�i C. �� .coS !� � - - .. -- ,. -- - r . �. > I � j ..�:' ..�_.., . 9'�.. \ .. . _ .,. . �F= L.- - �.. __ . ;' .: : � .�....� ____'. ._.C. " - . _ _ .. r � „ ,� ,. - , _ __ � ,_. -, :—� „ ' ' ' _ _ �:, __ _. , - I� _ W _ ; �i � ,; J i . -_ _-� �', „ � � � �I � ; ,.�_, �� � � , - ; o � ��; . � ;��` � � , r:- ; �� , , ' ' �, ,�' � �`i ' � ; ,.,, I I � ', I ,° � � ��. . , NORTH GRAPHIC SCALE 0 20 40 60 ORAFIED BY.• w ��a� � o�cx£o er.• w , PRO.�CT OVGIN£ER: Y�I I 1 INCH =40 FT. Dn� �ts PRQECT NO.: �,�� R:\2G13\0\13030\3\Dra•.vings\Bcse\Report Figures\Ot-3DS_FlG2.tlwg 5/3/2D'3 2:39:30 PN PDT AGYlRf.• � COPYRI;HT QQ 2012, D.R. STRONG CONSULL^JG EVGINEERS INC. FIGURE 3 KING COUNTY IMAP TOPOGRAPHY ,` l-'�; - � �,�� R-a -,� I' �l� r� \ i � � �—`f �xo ��— ��` o� - ._. ��� �����'t 5f0 , '.. _.__...._ � /``---ti SITE ' ' Z� n �$� � ��i � ' � � �,� Re nto n � <� � Se F Legend � Highlighted Feature Highways � lakes and Large Rivers �_� Caunty Boundary Streets f�f 5treams X hbuntain Peaks Ngtiway Contours(5ft datic) � • Aaa;a�s ,�/ 100;500:1000 Lorsl !� ff ahQ Parcels 02013 D. R.STRONG Consulting Engineers Inc. Page 4 Level One Downstream Analysis Saddlebrook Div.II Short Plat City of Renton TASK 2 RESOURCE REVIEW • Adopted Basin Plans: May Creek Basin Action Plan was adopted in Apri!2001. • Floodplain/Floodway (FEMA) Map: No floodplains exisf on site, See Figure 9. • Other OfFsite Analysis Reports: Saddlebrook Div. 1 • Sensitive Areas Folio Maps: See Figures 4-8 for documentation of the distance downstream from the proposed project to the nearest critical areas. lncJuded, are sections of the King County Sensitive Areas Folio which indicate the following: �' • Figure 4 Streams and 100-Year Floodplains and Floodway: There is a Class 2 Stream within one mile of the Site along the downstream path. • Figure 5 Wetlands: There are no mapped Wetlands within one mile of the Site along the downstream path. • Figure 6 Erosion Hazard: There are mapped Erosion Hazard Areas within one mile of the Site along fhe downstream path. • Figure 7 Landslide Hazard: There are mapped Landslide Hazard Areas within one mile of the Site along the downstream path. • Figure 8 Seismic Hazard: There are mapped Seismic Nazard Areas within one mile of the Site along the downstream pafh. • DNRP Drainage Complaints and Studies: As shown in Figure 10,there are no drainage complaints, within the last �0 years, within 1 mile of the Site along the downstream path. • Road Drainage Problems: None noted. • USDA King County Soils Survey: See Figure 11. • Wetlands Inventory: Vol. 3South (9990) — The wetland inventory revealed no additional wetlands within the downstream path. • Migrating River Studies: None are applicable to the site. • Washington State Department of Ecology's latest published Clean Water Act Section 303d list of polluted waters: None listed along the downstream path. • King County Designated Water Quality Problems: None at this time. • Adopted Stormwater Compliance Plans: None applicable to this site. • Basin Reconnaissance Summary Reports: None available at this time 02013 D. R. STRONG Consulting Engineers Inc. Page 5 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 4 STREAMS AND 100-YEAR FLOODPLAINS AND FLOODWAY SITE �.���. . �,n.n ;. � , .1 reGLnR • W ( q '� , � � ��.. � �:. �,a�� � .. 3 aEn�srn sE���srv��''S, �. ! . i �. Y rFx�si. . ='�.rrtansr '" d $ . xr�n `� . p , IS . � < . � � ��� d �Mcisrcw y .g� � � �. � sc-�aa�sHm.osr = . . . � � '��cr � � � . . ., � � � 3 � �n C f < < � Mti{0. iT g yqpyT . '. • � _ � � � � � hf�STST , SURHSf � .�. •� q I' �. dS1 � �J�' gn.nsr s[aan ;1 `i .3 sE�vr�sT � ��^-'_. -_sF_'�rrMsr � i._ . _ f __ � _ n ' � � z sxn�cr � .i ycyv� � �{ . ... . � '` � � ' i��E3��_ �� ,'S � I� .. -. �sE�ssrHsr Sg d �'. b b�: � j° sE�irtHst �. m �'. y � ., ' g .� ` � 5 , p1 "j ss�,ann1 { 7 g k � 4 { � � . � ... y p � �;. P .� . .. �,� � � � : .lr � y 1 �, � SEi�rtM0. �— ii�� �5 .sc�brwn Y - / � a � ../...�T�J �i�i..gtETe10. � 41Af110. ��. I•��g!ti�R is _ � _ � . J~ 1 : Y N M � � � � . . �MSR 3� y < � sc�arNw Y . i�rr,�sr � < se�n�s1 �. � g y � � a d � S45TR. � � \, � p �4� Y � 5 .-_-_�_..� _E .E _. -... .__.:i5E��1� �': �scnr�n b,oa '� sE�o',psr� • Y �' `-�� - b g � � � 4 �'�_\ �i ��.u:n :+ `� � d.' � � �,\ ' �� •E 1 0. � ' . b . : �.._� � I 4 N � � te� . 4 � i \\giumx :� IA�_bl ���q�Hsr ._ . � � � _ $ ,�.`�a �`Z �� r � � d ____ . sE�+snisi -. Qt: � � ._ �. � 5 . '�.,' 4f '� \l�� �? M � M d :_.\ �.,.fY� /,eE�� � ` K F � � � d .J� / `.�::�y ' '�.- ':� � _ � aEwrr�sr a � � .....�. .i 1� ;��� ��\�'q�csR . . j � . � .sFimnsi . . . '� � �-'� �� � �. �- '�� ' ' � l�,� I `~ � Cedar R�ve .�� M � j y .�. ., -- � � �' '„X„..'4� 1 d � . . � �� ��. 4 . � �. � �.a� �.. : . I : : .. � --�-��_� ��3 d ``.� �� �M J` ---�li=�-1 �- Ns �• : � f �-,t y �r :�� 1.� �/C--� . 'a°,� .' _ - \ l . _\ - ��i� �� �i 4 'riararr o `1� - ��. \ � /� �' /��/�\ \, �...1 �•I/ -r,,��w/tF tT e ���` .. ��V'�� f- -���C\, / � � `�~+--"/'/ ` I�y L� I � � �y a 'r.,,�!�.\`` R�ti : `��- ^ � � tF'sm'R � / -`� r� 1� t�r��~`~ � . _ yl � � S{'� . 6� .: �u1'H9I ".-..-- SERENT�NIAIJREV.LLLGYNO .. ." _ l y ,�,,, � t�, , .. . --�.. . _._. . . �� . � .� 'z"ra� �- � �' se�s,.,:. a_. .�, zeiin Lege nd � #iigh►ighted Feature SAO Stream i � County Boundary � ��� x Mountain Peaks � C�2 a�nnd #lighways � C�as2sa�no�,:d Streets fj c''�� tlphway ' . Undm�iod A�Q�h � Lakes and Large Rivers � 1.,.' Stream5 Parceis � 100 Year Floodplain I ' ��._� i !', � ', 02013 D. R.STRONG Consulting Engineers Inc. Page 6 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 5 KING COUNTY IMAP WETLANDS � SITE fDIDST ��.,'NE2r'�.Sf s t` ,� � �17tSTST SEI]tSTA \��y f' � 0 4� 'i NE� d c=i' r.e�srcq � � b' � �u.�sr iR �. . �uar� � � ��S � i �tt � w� � y � . sE-r,�a,n �x . �',. p 5E� �5r i> . 1� � . � o W Nf i5T Pl �� 3E t I � tJ < §, NEISTS� � ,. < y . vl � . Sfl]eTll Sf SE 1]1T - d . � y . _ Nsr .. � Y ,, �J sca+osr sszv.�sr � � -_ -- . -_ SE�a�t �. � ssxv�cr i sE ' � I' . y� ' � � z.,o � � � Q s� ' p I�I - bJl � d � � !SEIYTN3T . �� S�\ E ' � < < � s � '� s „ � �1�nn�sr � F � �� _ . � . � d ����a ��_ R I � k �� � � � sciierNSY � _ —_�� y�� � SE1�37)10. �! — <'' ".EI]7f�10. 3� ��'SESTNP_ � ��i _ � S � }N p � 51 i i . C � ss uarn a b � a.' s¢i�crn st � .' � � � d i �rnisr =� � � � _ , � � � _sEinsrct � $; � ` ,� H, A � ...:_:. � � . . . �a2N°?� gar��sr i� ; � � o d d � "'`� sE 'e'u a �� � sE�cw sr � � � � �� �i�TT � �' �� d'1 ti � � . � (� :'� � gt DR y' �� . . 2 „� � � oa �t�a� BE+�Typ� � G �' sswn�cz � d d sE.�arnsr-- -- _�- ,..�� -_ -:�-._�. . y � � � r � + SE H5T415f Sf�F � Li ?L 'F� ''y � bP y� 5� ,� �� � m � � � � � �y � ' ` sEi¢rHsr £` � � ) --�// ��\ �f � �^ �1�J.J �sF�sot !�� � p -_,nW � ����i� � � � ��5 3' �� � � . ,� .. i� Cedar River i� ..q� q � � . � �� . k' i � ����Fs� d f I �`t I i � �,� bl .�' �'moR - �; \\ � < ,�-� �� sE�yr p - - �� �� � i{ +`'� � " 4 hsr \ � '� yg�4 o Q �. / - '-- \ � �S\ i' ��� y,r � �. ! �` g � `��- =% �ItlWq �''<� � _e� .�,_`__- F � � /�. (. / 7�� 1� � .4� ae�sn"R 4(�Y,�) ,:_ _ � - - � ` y��`�. �� H$S ' �p � ''� SE�S�H� } - -�'-.. '....- SE RENTON I.tA/'LE V.�LLEY R� • 5E 1`hZ Q �� �T ` '2....� 5T y . . _ . .' 1+OtH q SE � � �` SE�9n�57 ' . l — �` ,0 287JH Legend � Highlighted Feature ,��,,,K �_� County Boundary � �o� X Mountain Peaks Parcels Highways f-1 Lakes and Large Ri�ers t—I Streets ;.J' Streams yqh,,,Qy � SAO WeUand (cant) �2013 D. R.STRONG Consulting Engineers Inc. Page 7 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 6 II KING COUNTY IMAP EROSION HAZARD AREAS �� SITE I�li cr � . . sEuorn;r �r,� �•� . =I ME9��t �w � . - ��� �I � � I w o Hsr+osr i w �' �I � sE���srsr scuisrw ' �', I� , o m �I � ��� w � d u neisrcw � � � Ii sc_�rausr a �� $'; ' � x�. z n : ¢��". 12 ' . �� '�. i t7 y ��llR Sf, iyt t' � � . �u dv La ME ISf R m Sf il%p �. � . < �. MEIST$7 �m � d �'.. 5� � < sE,�sr sf�xrHs� �, Y I � �J scansr sca+osr � � i �. . _ _ __���rHSr 3 � � �Mtt �� '. .�� i� �>`M g m � , � ' . . � > �\ j � � � M }�' � � d � � ���nTns7 � seissr 1 � � � � � kt I n � tl '', j. � sc i�an�c� � . �_ � � � ss�mrti s7 i i �, J N' � S": sei�niw. � . sEi�rnn �'`sEsrnx � a � � � � i;: bf M < N �� i � � .� 5E IrofN R � � <.�' . SE��OiM si ^ � � '� . Wi . SE 7fH 5T = M ���. _ � � .� .:�Ii15TR � � `�i' . � .�:�._.:�. �..�-� � .-_ �.. . �..�-�i/�i2�+D ` SF1�YtO5T ' I.� ' *.. . y{ � �. .... 4 s[afHsr 1. , � d � �-,"-�` I s ` .. e'+o a � _ �. sc i.wa sr� '. � � � _� . ! • � M �' b� �. - 5e�aaTHst- �� 0. � I _ �` - s � Se,� r� d \ �. se uar�ac �til bl -; - _ . . _ : . � . �-.- � � ��` `'R � �" y � d d � � � � - i-.... ..- �. - � � � 'sro .��• � � � � �siusrwsr � a}.y . . t � i 4+�' \ � h' � 5f � p� � � � � � � � k � l � �-"L"� �"� sE�arn sr ` � a � �� \ � . � G i �_, \�� � _ . �,� 8a i p ' " t� -- �ti.� � ss,m�sr �f� �' �,\ � ' � !ff ,r•`` /,.,' - Cedar River ' � �� �". � �'`S'`'Qy� d � t4 � � 3 � `�� � �1 �' � ��s�vo I z _ � g � �. '-�,� . R \ �-� y �-'--- o /(,l,f � `' ��xTHsr � o� - -.-��. \� � fj�Yj �\ - . ���� i�-, � � d � - \` -� �•���. ��i . � �����-��' 1�l r.- �� �� � �vG,J) . �'- SE��TMR . � ' \ � I':I,�'c�.�'��.�U^—'�7� : h`� .�p ' � `` . `ASN S� �� 7 ���51 �� - . _._..SE RENiON AIAPLE�VALLEYRD ._._.. . . o � � ..'... _ ._. . � �t ��RSE � �MS� 'p 287<R Le ge nd � Highlighted Feature ' p,ta;,y � � Cavnty Boundary �oca� x Mountain Peaks Parcels Highways i—I Lakes and Large Riv�rs l_� S#reets �;I 5treams ��ph,ray SAO Erosion (cont} 02013 D. R.STRONG Consulting Engineers Inc. Page 8 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 7 KING COUNTY IMAP LANDSLIDE HAZARD AREAS SITE 2 . >j ��C, � � SEI]15T5T \�_�� �' . � f, � a��r+asr � , �' � sfuisra. � �; o d c=i�; Nc isT ca � � b' � sE i�zyo q sw,nriosr � & � .. � �� � x 'J� d : sEiaa,4a_r`- � _� . � i c3 �vba 57'..�; �) ME tg(R � < $ �. NE15fy7 '�N �1]Y: d � Jy� greosr t2 ss�sm�sr sftMN� jm Q � � SEb'O5T a �. ' - -. . --SE 1347H Y z ..��541�"f. SEPJOCT . > � Q �I �. y� � SEAA p � i . Y � p � �` w a � � ,�,��n .��� � < � � la s. � a � �! � _ i� at o i� d sE nan�at �—` �i R ,' �Y // ��' �� . � � r'- � � � �E��fN N < . U. SE 174TH 0. � $E I.�il/PL ��5[STII R � �I . ri^I <� � � � _ < �', , � � cj < � � � SEttlTn0. }� I � �� ' . ' � � � }�f d ` � SElTNST =I ��pfMST � . .... � Q� ¢ SE 1115T PL z ,�,. . . 51 7� $I a� a � , . Q 6' _ ��'SE 62��P� SE ETN ST �o� � i � . Q . � � 4`~� ��l � - SEt/Yi05T `, �:OST• y � ���•.�� gt R � . � . � bJ ��, � sf �' bI �i � SEtddiHSf � ... ..__. - - �' � .f� d r i s�umr rt _.W �I � - _ - � 1 o ,1`" .'?/`_, �'"R r` � 6 ♦,�� C d --- -_ � 9y / � ��/� )'� .^. '� /� �i1 C 5£IiSiN yT .. '�Q�, /.� ��7�%�-�� //�j /iL� 4 , �.r� �� � ''A- +a 'h,�. / j��//j i�'". �' ✓ ',.�. ,i °.S M' �' y( � � // %� / .�� bl '� C i d � /' ���. //// % � R = � � It / /'/ �/// �;�.ItlTNS� K � � � ^ < ) I �>�J� ..G'\``�'/ / '/•��/���/C�i�j.'` ..''1 �., .v.,i � sF' ////� . ,� � . E t ! I f!-J�.� ��sR��/�/� ,�I � � _ � ^ J' � - ��� �'l`��j��"�:/ii�•'��f��%� ^�T,+ �.3r,�sr �� �, i -� .;,\ . � � . ,/ A � o � r7 'r W �! �_ �`,� �' /� %�/� rr:�%� '7/ :r/r �¢f jr��.^��iT:/ [eda�r River �; ��� �� //��//////j//////��// / /��%���j/ '� I 3 �' ��' � �K-��'�/ �," �1.:�[_.._ ��/�js�f " '-_.- - - /�\� �'ato I r ,�: � a � � -� -'.. - � �� R ' , � ,,°SS �' � '� ����Rrgs: � o .-_.R2 ,��1 \ � � , i� �� .\ . . . . . _�% J �j/ � .� -='--'� i � '�/ •` �\-� .� � (�� �=�f'-�-�i /%�� ��1�6,,, ��• 1�r V��"��? �;; � � . �j / � � . � . , ., r••`�'� �����.��/ � -�v j��i, // ��Sp-� � " ./i.. . . - '_SE REflTON 41A/'LE VALLEY RO + i/'"i /// r�R� ��t �jl �'�if/ .�i��.�� .�i, .�i/.!jj/////���i������//�i / ����� i'� i/'0 287�R /� � � Legend Highlighted Feature ' ��h �_� County Boundary � y� Mountain Peaks Parcels Highways f—I Lakes and Large Rivers L—I Streets �f 5ireams Hghw�y � SAO Lend5lide {cont) �:2013 D. R.STRONG Consulting Engineers Inc. Page 9 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 8 KING COUNTY �MAP SEISMIC HAZARD AREAS SITE � � 61 sE u,sr sr � ___�� ; � ss�a�sra ; Renton Z � �fy/� �, ;� W W `¢��$T �H. { � a �r . . ��p, I � `s2 . E z g � � c3 �" � SE����t SEtis� si�. ZJ :rD�rl N � - T4' � NE157R �'+ �yy ; NE15T5'( .yQ�.� �� � SE 17sTFt ST SE ISRN$} � �� sezyper � . S'v � �mosr �; H sE��3nrsr � . 1--�,— .,"_sE�3arH ! 5£2NOCT Qq �i� a � SFt15T�{yT . . . T * SF�jPL � �q '��F75TI t�'f/1Ai . �f S m � i � � � � .sE ixrH ST < a d � � ;. �1 tll � ;� � � �' sE�rrn�ct ; � d � sE�un�ct ; � �; � � 9 �sE,TM a > sE rierH sY � � � seibrna+. .i tl! I' - i '' �sniFt � j� _ � � 4 �, ��" sEimrHo� � � �� � se�eom cti y� d � se rra sr =� s�� g' SEI[i5T0. q :�. �I . g " � _ s � _ � 1`aurosr ��. �42� Q,i ssarnsr sEgro� '� I � o i 5 � � � F i.sE � i s � � SE 1r#2D R �.. . `i . Sf 74qp ST < � � . � . [ �t\ �� , . !: tS � /$ � � �- !:__ -.,'__ .'._.'_ SE�1d4iHST _,� 6� � SF� S� � \\ SE�s[THPL � �I � _.. ._'..., . � ._._..._.3 __..._.'". -._. F- __._�� - . �y� S� � +�. \ �', � � b� 1 . 8 - - .. _-._ '_' _ � - " � 7i �st, SEfa5THS7 ��`:. - �� � � � � � � ���� R��\ � t � d < � � �\ � �� . \\\ �iffifHST � � � � � � .J t� `\���,� � �.�� �,�, � ; - � - , � �� g\� � s�i�rH sr I`]i ; - � �`,,,_\,���,p\� c � �' �r� � � �Cerlar Rive\�� ,�,ti ���� � �r ; / �����`"; �� �,� \\\�\v,� �\�\�.�\:,:�\�\�\\�\` .\ ; � 3°�\�\\�r\� L�'=� ��\�\�'�'� i �\\y i \\ �\�"."'--�\.\�YiF�\'�-�• � . I` '$ . ,('\��\�\.��\? \4�.:��\� -\e\ �\��\\\� 1 �\ 1 �.�e,y ��f��`.\.\`.'� .\�'��,� � _ s�.�av�s •-. '� \ � \� .� �� ,!�- _:.� T�'lA„§P � � � �\r��� ��18NOAVE \\� ����' \\ \\ \\ ' . f. LeVAi�Rp�\�\�� \ \\•\,�\\\\� ��\o,'.\`:����� ''�\��C\�\����.����\� 2655 L�ge nd � Highlighted Feature :' ���� � � Gounty 6aundary �oc� x Mountairz Peaks Parcels Highways � Lakes and Larc�e Rivers Straet� �.,-/ Stfeams tl�ghway � SAfl Seismic (cont) ��2013 D. R. STRONG Consulting Engineers Inc. Page 10 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton - FIGURE 9 � FEMA - FL40D INSURANCE RATE MAP � � i - �: ��. 5,_�I�iFE.-.si �52:�9 s-r..r[r �y . -,� ,L Q zorve X 14 - 5���17:-.::.=7 t'sfiTl; Sir�iET �= � 1:73'f� i'l:.?:( LEGEND � snra:u.r�oc�n r�•iz�hu ,uie,�s inuho:cm:i> Gl'700-YF1.R PI.OQD ZONE 0. �._,l�i.�,il.�d..�.nx�n.�k-H�,n,i..��.. ZONE AE it�.Y i;..•:I rE�,.e:��,.�Ma�.m:M�l ZONE AH IY•.A�knh.x 7!�� t i„a•v::.�8r.� �a �na:eny,. I:au� IL�aI`�di.,ii>�-. ,w�.�rmnari. ZONf AO IG.-.I cti}eh�d i a.1 u. ..•�C: a�ri d�q,hG : �rago ��;r.'n ..,;rya.r.,�.:,.v�•,,�"as„�.n r,n n,.,s":. .r4ita. .�ti�d�trm�ui�.l .. ZONE A99 T•� F<- �u:n.<��-i fr•An It�i-.ca ib.�!{, (�-�k•r.i? fl<.v: i�nae�tirx� .�J�.n� � �.,ro.rit:1«x�.n�L+ax'��.^.alkn<�1rM-ini.*irl ZONE V G::d.d fl.xd u;d� »�ke;�r n.uuA �. .rzii�n,.u�Unc I:.KI i.6v.nrn SeYrrirtuwL ZONE VE (�.r.�al +1•v�J xdh .d�K�in hvari �, � .xfi.vi.: Srta• F�.rl ��6_•.Hbxu tirn•�mi�..L FLOOUI,4':\Y;\R[.L5 IN 70NE AE � OTHER(i_(X)D AREAS ZONE% .ir:m�h�SUIi.�N,Ikud:.veu��f H.�)..yr.r !4uii �rilh s�•r.� d�'F'ah> �9 I.z. 4:,�� I 4xq < <:il�duib.yt� .� , k.s tiu:n � wi�,-.rt•F m;N: ...t . �p,n.rxd 1�� U�:�=:,(n.m x.'rnzor 8id � or�+ea,�ie[ns ZONE X v., dcle�m:md tn M os;�i�u:•}y.:a i4,.:l�wm. ZONE D , ..h.l. iiir:d ha;.w�d+ ,.. w+,k��nn mal. 02013 D. R.STRONG Consulting Engineers Inc. Page 11 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 10 KING COUNTY IMAP DRAINAGE COMPLAINTS SITE . �e ', ' ' sr sF��is7R � V '� Renton = � � �* ���.o-s, _ �' 4 ,��a�`— , _ ( 2W tl ��OCi SE1 ST �^� � . � � �`,W ��-.. hE�STFt �ii �. N � � '; Nf IST ST .� � �. � SE IyT1 ST SE 11nN S� g � � ' - SE 1]diM Si SENOCT � C�� i �arosr N.. � �asr�,sr �� s��ssrMsr I - SE31DCT Q � S£3+OST� 1liT��F� �. LSr- � � SF A�0 0. �: � . � _ � M . .. ._ �.SE t7ATN ST `� � � 5 d � � F � � - �»?n�a� y� M M .. �S � ? ��� n � 5E�]�n�vt '�.sEm�tt ' � Sfri Msi G 9 � SE��TI R 1� SE S7N R � �� ! N FF 4 N�u < S 5£ItlTMPi }� � <�-... SE 1�OTN ST' � ����R � 6� < g7fN5T $) � I d sE,nsTct ��aa i - - _�. � - � SE 7a7UO5i � OP � SEdT��sr 5 M � -_—� '�'�'sE`caN 'F,�,o� ,! - ►�s;r ' sE�mw d � � �. sE i�o sr � bl f ,�W\''y � � _ se u�an at 1` : d y� q - � �� se t�urH sr a � �: � se, � � �,.�R ai a� �, � -_�- �- - �"R �' ;.. � � i d _ ��Ff� SE,as,;�sT ^ ; Y -- � n �� � � � � � d i.a f ���'JN57. � ` w � � � � !H �� � s d � d � �` � �' SE I,SfN ST � � � � � ,.,� � / � � q � ���� - i���• �. 7 � � S 1 .; g', .l� P sE u9tH sr i • ,` qy�,JR ,f' �,_ � 1 � . _ Cedar River � �7 1 Y i�y� } , �r+ .:�\ �` .! � y=C� � ��.� %� ix �,'� � —-- _tjj; �,� � * 1 4 d � � � ��,�s'4o � �! � sE�sa� ;... '^:rrT�, � �' \�. �' �uv���sc _ +�fAP���+(l£y'2p y� � 0 ^\^ 2855R Legu nd (� Sol�ctod P�rcol• ��qnM+r �j County 8oundary �neu�, x Mounfaln P�ake �Oa HlgAways Percols �j Incorparatud Area U Lakos md Largo Rivon 5treets �i Streams (cont) Ora:napo Comp'alnts ��2013 D. R.STRONG Consulting Engineers Inc. Page 12 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 11 I USDA KING COUNTY SOILS SURVEY MAP I � _ �� � � � �; _�. �= ���' :: , . � .. r . _ , , up :_ , _ � , ._ �. ._ , , , ,,;t ' 4',' yl �� f �". :�.: � �s. ��£. , ��x,� � X.:. � � w .� I k; .�_ ; .�,: +....« ' �. _. _.�_. s , � . ..' �� �f � ..�` ..: I -�. '£�.--_ �� . .. . .. ,�'-. `¢ , ,,. .� ...-... . _ .:a:... . , �. ':$ ' AgC—Alderwood gravelly sandy loam, 6 to 15 percent slopes Map Unit Setting • Elevation: 50 to 800 feet • Mean annual precipitation: 25 to 60 inches • Mean annual air temperature: 48 to 52 degrees F • Frost-free period: 180 to 220 days Map Unit Composition • Alderwood and similar soils: 95 percent • Minor components: 5 percent Description of Alderwood Setting • Landform: Moraines, till plains • Parent material: Basal till with some volcanic ash • Properties and qualities • Slope: 6 to 15 percent • Depth to restrictive feature: 24 to 40 inches to dense material � Drainage class: Moderately well drained • Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 in/hr) <J2013 D. R. STRONG Consulting Engineers Inc. Page 13 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton • Depth to water table: About 18 to 37 inches • Frequency of flooding: None • Frequency of ponding: None � Available water capacity: Very low (about 2.5 inches) Interpretive groups • Land capability (nonirrigated): 4s ' Typical profile • 0 to 12 inches: Gravelly sandy loam • 12 to 27 inches: Very gravelly sandy loam • 27 to 60 inches: Very gravelly sandy loam Minor Components Norma • Percent of map unit: 1 percent • Landform: Depressions Bellingham • Percent of map unit: 1 percent � � Landform: Depressions Seattle • Percent of map unit: 1 percent • Landform: Depressions Tukwila • Percent of map unit: 1 percent • Landform: Depressions Shalcar • Percent of map unit: 1 percent • Landform: Depressions 02013 D.R.STRONG Consulting Engineers Inc. Page 14 Level One Downstream Analysis Saddlebrook Div.II Short Plat City of Renton TASK 3 FIELD INSPECTION UPSTREAM TRIBUTARY AREA In evaluating the upstream area, we reviewed King County IMAP aerial topography and imagery and conducted field reconnaissance and have concluded that upstream tributary area for the Site is negligible. The upstream properties developed portions drain in southeasterly and southwesterly directions almost directly to the respective rights of way. GENERAL ONSITE AND OFFSITE DRAINAGE DESCRIPTION The 0.89 acre parcel contains a single natural discharge point near the southwest corner of the Site. The Site sheet flows towards the southwest corner of the Site and into the right-of-way. From there, it is collected into the conveyance system within 156tn Avenue and is conveyed south. Runoff from the developed Site will be collected and conveyed by a typical catch basin/ pipe network to a detention pond in the southwest corner of Saddlebrook Div. I. The pond will discharge to the conveyance system in 156t" Avenue SE. 02013 D. R.STRONG Consulting Engineers Inc. Page 15 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS DRAINAGE SYSTEM DESCRIPTION The downstream analysis is further illustrated and detailed in the Downstream Map and Downstream Table located in Appendix A. The downstream area is located within the Cedar River; more specifically the Lower Cedar River sub basin. The downstream area was evaluated by reviewing available resources, and by conducting a field reconnaissance on July 12, 2012 under overcast conditions. Downstream Path Point "A" is the natural discharge point of the Site. Runoff exits the Site as sheet flow to the southwest. From Point "A" to Point "B", runoff heads southwest as sheet flow and into a Type 1 Catch Basin located along the east side of 156th Avenue SE. (0' - ±50') From Point "B" to Point "C", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 1 CB with a storm manhole lid. (±50'-±350') From Point "C" to Point "D", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 1 Catch Basin. (±350' — ±440') From Point "D" to Point "E", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 1 Catch Basin. (±440' — ±665') From Point "E" to Point "F", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 2 Catch Basin. (±665' — ±680') From Point "F" to Point "G", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 2 Catch Basin. (±680' — ±695') From Point "G" to Point "H", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 2 Catch Basin. (±695' — ±770') From Point "H" to Point "I", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 2 Catch Basin. (±770' — ±815') From Point "I" to Point "J", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 2 Catch Basin. (±815' — ±890') From Point "J" to Point "K", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 2 Catch Basin. (±890' — ±930') From Point "K" to Point "L", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 1 Catch Basin. (±930' — ±945') From Point "L" to Point "M", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 1 Catch Basin. (±945' — ±1,085') From Point "M" to Point "N", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 1 Catch Basin. (±1,085' —±1,185') 02013 D. R. STRONG Consulting Engineers Inc. Page 16 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton From Point "N" to Point "O", runoff continues south as pipe flow via a 12-inch PVC Pipe. The pipe connects to a Type 1 Catch Basin. (±1,185' — ±1,260') From Point "O" to Point "P", runoff continues south as pipe flaw via a 12-inch PVC Pipe. The pipe connects to a Type 1 Catch Basin. (±1,260' — ±1,360') Qualitative Analysis of the downstream path continued along 156th Avenue SE. The analysis was concluded at the intersection of 156th Avenue SE and SE 144t" Street. ��2013 D. R.STRONG Consulting Engineers Inc. Page 17 Level One Do�vnstream Analysis Saddlebrook Div. II Short Plat City of Renton FIGURE 12 DOWNSTREAM MAP , , ; - , , . I �'� I ! � � �- � 02013 D.R.STRONG Consulting Engineers Inc. Page 18 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton � W 2 W o � . I --1 O ~ � o � y v�j q � a ,� �' � o ? Y � ,' . `:1 � � �I O U Z � -=, -_. �- J � \� - - � � � � � � W � � � 2 O i - . O W � '� � �- � i� _ � � , — ; � � - .., :, _ . =_ - _ '_ � _ ;:, - . : . -_ ___ _ _ _ . � ,. . : _ ., _ - _ � _ ' =. „�: , ���=: , ._ _ �_ i - - 1;;I ,.- . ;- { �'x'¢, , C . � -.�'r --��'""���= _. , i'� .. �. � � �: _ � � � -� ������ ._ � ; - _� _ _ _ _._ _ _ ,- __ : , �, � . : �, � . _ , _ � � = .r_, � . . a _ � ,� � o � � Qy . � . � , � � `, � J . . — — — . O � Q � �— W � ti � H � � � O �` i '' O °o 0 � � � J u � o � � � � � � � � N ' � � NORTH �I � � GRAPHIC SCALE ' PO �OO ZOO 4OO DRAFTED 8Y.• y(p `� Df51GNf6 BY.� YLp PRQIECT ENClN£ER: AfAJ 1 INCH = 200 FT. oATe o+,.�ar3 '', PROJ£CT ND.: �,3p,3p � R:\2013\0\73030\3\Drawirgs\Ea=_e\Re�o-t �ig�rzs\01-3D5_°�.G12dwg 5/3/2G13 2:45:17 ?t� FCT F.�G'JRE: 12 �I co=r�ic�r Ci zci2, aR. s�o�.� cousu�rinc =r.ci��EE=.s ir<c. '� FIGURE 13 DOWNSTREAM TABLE Basin: Cedar River Subbasin Name: Lower Cedar River Subbasin Number: N/A Symbol Drainage Drainage Component Slope Distance Existing Potential Observations of field inspector Component Type, Description From site Problems Problems resource reviewer, or resident Name, and Size Dischar e Type: sheet flow, Constrictions, under capacity, ponding, tributary area, likelihood of probiem, See map swale, Stream, drainage basin,vegetation,cover, % 1/4 mi=1,320 ft overtopping,flooding, habitat or organism overflow pathways,potential impacts. channel, pipe, depth,type of sensitive area,volume destruction, scouring, bank sloughing, Pond;Size:diameter sedimentation, incision, other erosion Surface area A Natural Discharge Sheet flow across southwest property ±0' None Observed None Anticipated Point corner A-B Southwesterly Sheet Sheet flow into a Type 1 CB t50' None Observed None Anticipated Flow B-C Southerly Pipe Flow 12"PVC to a Type 1 CB ±350' None Observed None Anticipated Trickle Fiow C-D Southerly Pipe Flow 12"PVC to a Type 1 CB ±440' None Observed None Anticipated Trickle Flow D-E Southerly Pipe Flow 12"PVC to a Type 1 CB ±665' None Observed None Anticipated Trickle Flow E-F Southerly Pipe Flow 12"PVC to a Type 2 CB ±680' None Observed None Anticipated Trickle Flow F-G Southerly Pipe Flow 12"PVC to a Type 2 CB 1695' None Observed None Anticipated Trickle Flow G-H Southerly Pipe Flow 12"PVC to a Type 2 CB t770' None Obsenred None Anticipated Trickle Flow H-I Southerly Pipe Flow 12"PVC to a Type 2 CB ±815' None Observed None Anticipated No Flow I-J Southerly Pipe Flow 12"PVC to a Type 2 CB ±890' None Observed None Anticipated No Flow J-K Southerly Pipe Flow 12"PVC to a Type 2 CB t930' None Observed None Anticipated No Flow c�2013 D. R. STRONG Consulting Engineers Inc. Page 19 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton K-L Southerly Pipe Flow 12"PVC to a Type 1 CB ±945' None Observed None Anticipated No Flow L-M Southerly Pipe Flow 12"PVC to a Type 1 CB t1,085' None Observed None Anticipated No Flow M-N Southerly Pipe Flow 12"PVC to a Type 1 CB ±1,185' None Observed None Anticipated No Flow N-O Southerly Pipe Flow 12"PVC to a Type 1 CB t1,260' None Observed None Anticipated No Flow O-P Southeriy Pipe Flow 12"PVC to a Type 1 CB ±1,360' None Observed None Anticipated No Flow c�-�2013 D. R. STRONG Consulting Engineers Inc. Page 20 Level One Downstream Analysis Saddlebrook Div.II Short Plat City of Renton TASK 5 MITIGATION OF EXISTING OR POTENTIAL PROBLEMS A review of the King County Water and Land Resources Division — Drainage Services Section Documented Drainage Complaints within one mile of the downstream flow paths revealed no complaints within the last ten years. The project should not create any problems as specified in Section 1.2.2.1 of the Manual and therefore is not required to provide Drainage Problem Impact Mitigation subject to the requirements of Section 1.2.2.2. Project runoff will be collected and released per the Manual's requirements to accommodate Level 3 Flood Problem Flow Control and Basic Water Quality requirements. During construction, standard sediment and erosion control methods will be utilized. This will include the use of a stabilized construction entrance, perimeter silt fencing, and other necessary measures to minimize soil erosion during construction. R:1201310\13030131Documents\ReportslPreliminarylLevel 1 DS 13030.docx 02013 D. R.STRONG Consulting Engineers Inc. � Page 21 Level One Downstream Analysis Saddlebrook Div. II Short Plat City of Renton SECTION IV FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN As previously stated, Saddlebrook Div. II will utilize the detention facility within Saddlebrook Div. I to meet flow control requirements. For purposes of facility sizing, Divisions I and II will be analyzed as one project. EXISTING SITE HYDROLOGY (PARTA) KCRTS was used to model the peak runoff from the Site. Per Table 3.2.2.b of the Manual the soil type is modeled as "Till" for the Alderwood gravelly sandy loam SCS classification as shown in Figure 4. Soils. The entire Site is modeled as "Forest." Results of the KCRTS analysis are included in this section. Modeling input Land cover Entire Site Till forest(ac) 5.544 Till Grass (ac) 0.000 Wetland (ac) 0.000 Impervious (ac) 0.000 Scale Factor: 1.00 Time Step: Hourly Data Type: Reduced Project location: Seatac Total Area: 5.544 Table 1 Pre-Developed KCRTS Modeling Input Modeling results Entire Site �1c.,: �re��en�y :_r.a=,;-s-s Time Series File:prede:-.��f Project Location:Sea-T=,c ---Annual Peak Flow Rates-- ---Flow �reque��y ;r_�alysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prc� (CFS} (CFS) Period 0.350 2 2/09/Ol 18:00 0.447 1 100.00 0. 990 0.095 7 1/06/02 3:00 0.350 2 25.00 0. 960 0.259 4 2/28/03 3:00 0.268 3 10.00 0. 900 0.009 8 3/24/04 20:00 0.259 4 5.00 0.800 0.154 6 1/05/05 8:00 0.226 5 3.00 0. 667 0.268 3 1/18/06 21:00 0. 154 6 2.00 0.50G 0.226 5 11/24/06 4 :00 0.095 7 1.30 0.231 0.447 1 1/09/08 9:00 0.009 8 1.10 0.091 Ccmputed Fea'.rs 0. !15 5C.0^ 0, 930 O 2013 D.R.STRONG Consulting Engineers Inc. 13 Saddlebrook Div. II Technical Information Report Renton,Washington FIGURE 5. PREDEVELOPMEN`f AREA MAP �2013 D. R. STRONG Consuiting Engineers Inc. 14 Saddlebrook Div. ii Technical Information Report Renton,Washington � . , w . _ z � � - ,'" y ; W o � _ : _... -__ -: � „ .., _- : _ � �. _—_`' '_ ., _ ' i ;� o � � ° � ___ _ , ,_ - : _- -- � � ___ -- - ------ I - � 2 � Y � . _ ____..—__._—— —__. —_._._, ' ' W 4 � � ' i . � � � � � � 2 o�i � , �, _ � O U s � � - i '.:�; j a � w � : /lV� /�JJ � � � F '� " 2 W � �I ' ♦ 2 O _ - �'{ . . '' � 2 g , . ,���.�, �� . . , . , \ O W � ��. � �. ; �� � 8 I _ .._' . � '- � ' ' � � ' - -- , ;� _ _, __.. i, ' � �;: _ . , ; � - � � � ; � , � � .__�, , � , - � , ', � , � . � j .i '��. _ " -. . _ ., .'.':.... . ` .:--�t - '. ��. . , � .. _ .-. ...._ .� '.,_ . , - . ;, 1,°;, - ,. _ �,_ _ _�.; ;. . : , . - _ - _— ,, _ _ . _ � �:__ � � : ,�: � ; _ _ � . �- _ ; � _ , ;, , , � ._ . � . _ � , _ , ,;: _ _ ., . _ ._ , _� ., , � �. : _ _ _ _ . �_ ,` , _ --- ' � - - � --— ;_ � �. :_ . , _ - - _ � ; � o � o .. , G ; , _ :; - ; � 4 ow � ' � - _ - - � C� . _ ._ � ' � � - _ _ - =. ; , � - O � � Z � ; ,�. - . , , , = v� ; -�_ - , I, - - : _ _ _ _ � � � � �� _ __ W `� � � � �� _ ' �I 2 cV � I , � ti � W , ; �' � , ; _ . k , , , r `. . , .' , � _ Q W , ; ._ - - _ . ,_ ,:_ , _ ,. . ; . : _ _ - � , ' ! � _ , � ' , € .i . _ � _ _ ..� . . , i ;-; ; �_-- , 1 ; - i II , 'G ,., � � ,. � i A REA BREA KD O WN L EGEND � � � PROJECT BDUNDARY TOTAL EXlSTING SITE AREA: 228,512 S.F. (5.25 ACRES) NORTH TOTAL PROJECT AREA: 241,515 S.F. (5.54 ACRES) � TILL FOREST GRAPHIC SCALE DR^FT�o er. rca TOTAL PROJECT DEl/ELOPMENT AREA: 241,515 S.F. (5.54 AC) 0 40 80 120 oEs,�cN�a ar. rcP PROJECT ENGINE£R: MAJ MODELED AS TILL FOREST �� oA�: os.3o.�3 , 1 INCH - 80 FT. ��o�ecrrro.: rsoso , R:\2D'�3\p\130?C\3\Crawirg=_\Base\Report Figures\01-3FIG5"3030.�wg S/7/2013 7:'�.2:44 ?'.' PD? r;Gi,',4_F: Jr ��� CGFYF.:GHT�2012, C.P.. STRO�.G CONSU'_-RJG E'JGINEE4S It.�. '� DEVELOPED SITE HYDROLOGY (PART B) Soil type � The soil types are unchanged from pre-developed conditions. ' Land covers KCRTS was used to model the developed peak runoff from the Site. The portions of the Site within the proposed clearing limits tributary to the proposed detention pond were modeled as "Till Grass" and Impervious as appropriate. Results of the KCRTS analysis are included in this section. Modeling input Land cover Entire Site Till forest (ac) 0.000 Till Grass (ac) 2.540 Wetland (ac) 0.000 Impervious (ac) 2.857 Scale Factor: 1.00 Time Step: Hourly Data Type: Reduced Project location: Seatac Total Area: 5.397 Table 2 Developed KCRTS Modeling Input Detailed Impervious Area Breakdown: TOTAL LOT AREA= 169295 S.F. IMPERVIOUS=70278 S.F. PERVIOUS= 99017 S.F. TOTAL R.O.W.AREA=39688 S.F. 100%IMPERVIOUS=39688 S.F. 0% PERVIOUS TRACT A AREA(DIV. I)=20130 S.F. 50%IMPERVIOUS=10065 S.F. 50%a PERVIOUS= 10065 S.F. TRACT A AREA(DIV. II)=4412 S.F. IMPERVIOUS=4412 S.F. PERVIOUS=0 S.F. TRACT B AREA(DIV. II) =1554 IMPERVIOUS=0 S.F. PERVIOUS= 1,554 S.F. :�2013 D.R.STRONG Consulting Engineers Inc. 15 Saddlebrook Div. II Technical Information Report Renton,Washington Modeling Results Saddlebrook Div. I and Div. II rlow Frequency Analysis Time Series File:rdin.tsf Froject Location:Sea-Tac ---Annual Peak Flow Rates--- -----F1ow Frequency Analysis------- Flow Rate Rank Ti.ne of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0. 920 6 2/09/Ol 2:00 1. 89 1 100. 00 0.990 0.726 8 1/05/02 16:00 1.11 2 25.00 0.960 1.11 3 2/27/03 7:00 1.10 3 10.00 0.900 0.759 7 8/26/04 2:00 0. 973 4 5.00 0.800 0.920 5 10/28/04 16:00 0. 920 5 3.00 0.667 0. 973 4 1/18/06 16:00 0.920 6 2.00 0.500 1.10 2 10/26/06 0:00 0.759 7 1.30 0.231 89 1 1/09/08 6:00 0.726 8 1.10 0.091 Co puted Peaks 1. 63 50.00 0.980 'j , O 2013 D. R.STRONG Consulting Engineers Inc. 16 Saddlebrook Div. II Technical Information Report Renton,Washington BYPASS AREA HYDROLOGY Modeling input Land cover Entire Site Till forest(ac) 0.000 Till Grass (ac) 0.053 Wetland (ac) 0.000 Impervious (ac) 0.095 Scale Factor: 1.00 Time Step: Hourly Data Type: Reduced Project location: Seatac Total Area: 0.148 Table 3 Bypass KCRTS Modeling Input Modeling results Bypass Flow �requency �ralys-s Tine Series File:bypass.tsf Project Location:Sea-Tac ---Annual Peak F1ow Rates--- -----Flcw Frequency Analysis------- Flcw Rate Rar.k Time of Peak - - Peaks - - Rank Returz ?rob (CFS) (CFS) Period 0.028 5 2/09/Ol 2:00 0.056 1 100.00 0. 990 0.023 8 1/05/02 16:00 0.036 2 25.00 0. 960 0.034 2 2/27/03 7:00 0.034 3 10.00 0. 900 0.025 7 8/26/04 2:00 0.030 4 5.00 0.800 0.029 6 10/28/04 16:00 0.029 5 3.00 0.667 0.030 4 1/18/06 16:00 0.028 6 2.00 0.500 0. 036 3 10/26/06 0:00 0.025 7 1.30 0.231 0.056 1 1/09/08 6: 00 0.023 8 1.1G 0.091 Computed Peaks G.C�'_9 �� . 00 �. 980 The flow control facility is designed to compensate for uncontrolled bypass. The 100- year discharge from the bypass areas is 0.056 cfs, which is less than the 0.4 cfs threshold. There should be no adverse downstream impacts to the downstream drainage system created by the runoff from the bypass. There is a bypass area associated with each TDA of Saddlebrook Div. I. For purposes of detention calculations, both bypass areas were used as the approved drainage adjustment calls for a combination of the TDA's. The onsite bypass areas satisfy all the requirements set forth in the Manual, Section 1.2 with the exception of TDA East (Saddlebrook Div. I) as it pertains to convergence with the downstream path of the facility within a quarter mile. This is further detailed in the following section. G 2013 D. R. STRONG Consulting Engineers Inc. 17 Saddlebrook Div. II Technical Information Report Renton,Washington FIGURE 6. POST DEVELOPMENT AREA MAP G 2013 D. R.STRONG Consulting Engineers Inc. 18 Saddlebrook Div. II , Technical Information Report Renton,Washington ' �i � �_�-i 3 _- i , a�< �Z � ��l t-�._._ - 9 �321�J1j 1Cd rv,y Z!:bl�t £'LOZ�L�B 6.r.P0£Cii9✓;�z—:0�1sa�n5�� 7,ora�'�ascb'�s5��,no�p�F�O£'C�C�O�,£:QZ�t�X � I I I 'l� 08 = H�NI L I O�FI �'ON 1J3fOdd £1 i7£"i0 �31 YO !WlY �N33NI�N31�3f0?!d QZ� 0g �i7' � � dZ( �.18 03N9l530 3�`d�S �IHdV21�J � � � m � T m � dZt ;�s o31�va�o � "" "" "" " � "' T " '�,h H��ION T "� T "� TmTm � mT � " T a , � '$�� m � ,. T T T T .. T '"`' . � � ,. � - T T y ���. m � 1 0 ,. T T.d.�c�►� ,. T ��� , `� T T TmT T T T � T ��� � T T -�� T T T T T T T � T T T T T T �h. T T T T T T ^ � �> I '" -- _.'" . . . . .. _._ . _ -..' _� � � � � � m ^ � ^ � ^ ^ � ^ � T T �- ._ _. ... _ _." . . _I � - .. _ '. .. ._.�- ._ � -_ .. _ l _" ._ . . . . .. .__ _. . . '.. � -� ._... ._.. ;..-:�� . O y ..__ " __ . .. . . ._.- .. . _ -. .. - _ I O ' `i -._ � _ ' : .. _. . .. _ _ ...._.�' �._ ..:__ ' - _ - �.-.... rV � � O n = � w �i � � a � m � .ta r 2 � 0 � m � � m . y � � m � � m � � = m = � _ o � � m � t/� � T T T o � o z � . � � T � � � z m � � �/1� � � y � � � � y I ; I i J ( (�d �so�o) �sz z �ssd�� ��il ! (�d sso�o> ��i`� �sno�nt�3dwi � � (�e svc�o) s��`s �ssdd,ca , ��e s�o�o� �s �ss`� �ssd�� ���1 � , (�d �oc�o> ��s z«`� �sno�n�3dwi (�t/ Lf'l'0) �'S 996`5' � 031�3770� b'3Z/b' ll i110 8 t/ 1�b211 � (�b' I£'Z'0) �"S S'90b1 =Sn01�N3dWl � a i � (�b' Z9b'0) �'S 0�'1"OZ � 031�3770� t/3b'b' I ill0 b' l�dZll � � � A (� n 0 �SSb'2/� 77I1 ; y `UJ V (�e �c s�o> ��S 889`s� �snoi���dw� � � r � (�b' L l6'0) ��S S89`6f� 031�3770� b32!b' MON � � 2 2 ',��o (�b' £'LZ'Z) �'S LLO`66 =SSb'b'� 77/1 N A a, c y (�b' £'l9'L) �'S 8LZ`OL �S�101i1Z13d1N1 � � � � ; o (�b' 988'£') �'S S6Z`69l � Q31�3770� b'3�lb' 107 A � � � � � (S32/�t/ t5"S) �'S S'I S'`1 f�Z =b'3�/b' 1�3/'ONd 7 b'1 Ol � y 2 .(Nb'aNl708 1�31'021d � � � (S32/�b' S'Z'S') �S ZLS'`SZZ �b'32/b' 311S �Nl1SlX3 7b'101 � ON���7 NM OOyf b'��-J8 b'3�l b' y PERFORMANCE STANDARDS (PART C) The Project is required to meet the Level 3 Flow Control and Basic Water Quality Treatment requirements. The Level 3 performance requires the developed condition discharge rates to match the predeveloped rates ranging from 50% of the two-year peak up to the 50-year peak. Also match developed peak discharge rates to ! predeveloped peak discharge rates for the 2-, 10- and 100-year return periods. The Basic Water Quality Treatment goal is to remove 80% of TSS for flows or volumes up to and including the WQ design flow or volume. � Conve ance criteria for the Pro'ect re uire that all new i es be desi ned to conve Y 1 q pp 9 Y and contain (at minimum) the 25-year peak flow. i FLOW CONTROL SYSTEM (PART D) , Both Saddlebrook Div. I and Div. II will utilize a detention pond meeting the Level 3 Flow Control Criteria. The King County Runoff Time Series (KCRTS) software was used to size the detention facility. The detention pond design information is included in � this section. FLOW CONTROL BMP SELECTION Subdivision projects are required to mitigate for impervious surface equal to a minimum of 10% of each lot area by use of Flow Control Best Management Practices (BMP's). i Projects are required to first analyze the feasibility of dispersal and infiltration before choosing another method. The Site will utilize basic dispersion with the use of splash blocks. Two splash blocks mitigating a total of 1,400 s.f. of impervious area, will be installed with each residence. This shall mitigate for 12.75% to 13.77% of impervious area for each lot. Also, each lot will be restricted to an area less than 4,000 s.f. (see table below). ROOF AREA ROUTED TO RESTRICTED IMPERVIOUS TOTAL AREA PERCENT IMPERVIOUS II LOT N0. LOT AREA(S.F.) SPLASH BLOCK(S.F.) AREA PER LOT MITIGATED MITIGATED I 1 10169 1400 3505 1895 18.64 I 2 10983 1400 3485 1915 17.44 � 3 10877 1400 3885 1515 13.93 :�2013 D. R.STRONG Consulting Engineers Inc. 19 Saddlebrook Div. II Technical Information Report Renton,Washington FLOW CONTROL SYSTEM The Project will utilize one detention pond to meet Level Three Flow Control criteria for the Site. The King County KCRTS software was used to size the detention facility. Saddlebrook Div. I and Sadd/ebrook Div. Il Retention/Detention Facility Type of Facility: Detention Pond Side Slope: 3.00 H:1V Pond Bottom Leng�h: 71.50 ft Pond Bottom Width: 71.50 ft Pond Bottom Area: 5112. sq. ft Top Area at 1 ft. FB: '_4496. sq. ft 0. 333 ac�es Eftective Storage �epth: 7.15 ft I Stage 0 Elevation: 488. 35 ft I �torace Volume: 62868. cu. ft 'I 1. 443 ac-ft '' R.iser Head: 7. 1� ft R;_ser Diar-te�er: 1�. �0 inches `:�rr,�e-- ct crifi��s: 3 ' �ull Head Pipe C�ific� '� �ei,rt Diari�ter Discharge Diameter (rt) ;in) (CFS) (in) ' "- 0.00 1.11 0.090 2 4.95 2.14 0.185 6.0 3 6.37 2.54 0.155 6.0 Top Notch Weir: None Cutflow Rating Curve: none Stage Elevation Storage Discharge Percolation Surr Area (�t) (ft) (cu. ft) (ac-ft) (cfs) (cfs) (sq. ft) J .00 488.35 0. 0.000 0.000 0.00 5112. 7 .01 488.36 51. 0.001 0.004 0.00 5121. � .02 488.37 102. 0.002 0.005 0.00 5129. ;; .03 488.38 154. 0.004 0.006 0.00 5138. .' .05 488.40 257. 0.006 0.007 0.00 5155. " .06 488.41 308. 0.007 0.008 0.00 5i64. C .07 488.42 360. 0.008 0.009 0.00 5172. � .08 488.43 412. 0.009 0.010 0.00 5181. ; .09 488.44 464. 0.011 0.010 0.00 5189. C . 10 488.45 516. 0.012 0.011 0.00 5198. C .24 488.59 1252. 0.029 0.017 0.00 5320. C .38 488.73 2005. 0.046 0.021 0.00 5443. C .53 488.88 2832. 0.065 0.024 0.00 5577. C. 67 489.02 3621. 0.083 0.027 0.00 5703. C.81 489.16 4429. 0.102 0.030 0.00 5831. C. 95 489.30 5254 . 0.121 0.033 0.00 5959. 1.09 489.44 6097. 0.140 0.035 0.00 6090. 1.23 489.58 6959. 0.160 0.037 0.00 6222. 1.37 489.72 7839. 0. 180 0.039 0.00 6355. , 1.51 489.86 8739. 0.201 0.041 0.00 6490. �2013 D. R. STR�NG Consulting Engineers Inc. 20 Saddlebrook Div. II '� Technical Information Report Renton,Washington I 1.65 490.00 9657. 0.222 0.043 0.00 6626. 1.79 490.14 10594. 0.243 0.045 0.00 6763. 1. 93 490.28 11550. 0.265 0.047 0.00 6902. . 2.07 490.42 12526. 0.288 0.048 0.00 7042. 2.21 490.56 13522. 0.310 0.050 0.00 7184 . 2.35 490.70 14538. 0.334 0.052 0.00 7327 . 2.49 490.84 15574. 0.358 0.053 0.00 7471. 2.63 490.98 16630. 0.382 0.055 0.00 7617. 2.77 491.12 17707. 0.406 0.056 0.00 7765. 2. 91 491.26 18804. 0.432 0.057 0.00 7913. 3.05 491.40 19923. 0.457 0.059 0.00 8064 . 3.19 991.54 21062. 0.484 0.060 0.00 8215. 3.33 991.68 22223. 0.510 0.061 0.00 8368. 3.47 491.82 23405. 0.537 0.063 0.00 8523. 3.61 491.96 24609. 0.565 0.064 0.00 8678. 3.75 492.10 2583�. 0.593 0.065 0.00 8836. 3.89 492.24 27083. 0.622 0.066 0.00 8994. 4.03 492.38 28354. 0.651 0.068 0.00 9159 . 4.17 492.52 29647. 0.681 0.069 0.00 9316. 4.31 492.66 30962. 0.711 0.070 0.00 9479. 4.45 492.80 32301. 0.742 0.071 0.00 9643. 4.59 492.94 33662. 0.773 0.072 0.00 9808. 4.73 493.08 35047. 0.805 0.073 0.00 9976. 4.87 493.22 36455. 0.837 0.074 0.00 10144 . 4.95 493.30 37271. 0.856 0.075 0.00 10241. 4 .97 493.32 37476. 0.860 0.076 0.00 10265. ' 4 . 99 493.34 37681. 0.865 0.080 0.00 10290. 5.02 493.37 37991. 0.872 0.086 0.00 10326. 5.04 493.39 38197. 0.877 0.094 0.00 10351. 5.06 493.41 38405. 0.882 0.105 0.00 10375. 5.08 493.43 38612. 0.886 0.117 0.00 10399. 5.11 493.46 38925. 0.894 0.125 0.00 10436. 5.13 493.48 39134. 0.898 0.129 0.00 10461. 5.27 493.62 40610. 0. 932 0.148 0.00 10633. 5.41 493.76 42111. 0. 967 0.163 0.00 10807. 5.55 493.90 43637. 1.002 0.176 0.00 10983. 5. 69 494.04 45186. 1.037 0.188 0.00 11159. 5.83 494.18 46761. 1.073 0.198 0.00 11338. 5.97 494.32 48361. 1. 110 0.208 0.00 11517. 6.11 494.46 49986. 1. 148 0.218 0.00 11698. 6.25 494. 60 51637. 1.185 0.226 0.00 11881. 6.37 494.72 53072. 1.218 0.234 0.00 12038 . 6.40 494.75 53433. 1.227 0.237 0.00 12078. 6.42 494.77 53675. 1.232 0.243 0.00 12104. 6.45 494.80 54039. 1.241 0.253 0.00 12144 . 6.48 494.83 54404. 1.249 0.266 0.00 12183. 6.50 494.85 54648. 1.255 0.281 0.00 12210. 6.53 494.88 55015. 1.263 0.300 0.00 12250. 6.56 494.91 55383. 1.271 0.320 0.00 12289. 6.58 494.93 55629. 1.277 0.326 0.00 12316. 6.61 494.96 55999. 1.286 0.333 0.00 12356. 6.75 495.10 57742. 1.326 0.362 0.00 12544. 6.89 495.24 59511. 1.366 0.388 0.00 12732. 7.03 495.38 61307. 1.407 0.411 0.00 12923. O 2013 D. R.STRONG Consulting Engineers Inc. 21 Saddlebrook Div. II Technical Information Report Renton,Washington 7. 15 49�. �0 62868. 1.�43 0.430 O.CO 13087 . 7.25 495. 60 6u183. 1.473 0. 906 0.00 13224 . 7.35 495.70 65512. 1.504 1.760 0.00 13363. 7.45 495.80 66856. 1.535 2.870 0.00 13502 . 7.55 495. 90 68213. 1.566 4 .180 0.00 1364� . 7. 65 496.00 69584. 1.597 5. 660 0.00 13782. 7.75 496.10 70969. 1. 629 7.100 0.00 1392�. 7.85 496.20 72369. 1. 661 7.640 0.00 14005. 7. 95 496.30 73782. 1.694 8.140 0.00 1420� . 8.05 496.90 75210. 1.727 8.620 0.00 1435� . 8 . 15 496.50 76653. 1.760 9.060 0.00 14496. 8.25 496. 60 78110. 1.793 9.490 0.00 14640. 8.35 496.70 79581. 1.827 9.900 0.00 1478��. 8.45 496.80 81067. 1.861 10.290 0.00 14932. 8.55 496.90 82567. 1.895 10.660 0.00 15079. 8.65 497.00 84083. 1.930 11.030 0.00 1522� . 8.75 497.10 85613. 1.965 11.380 0.00 1537�. 8.85 497.20 87158. 2.001 11.720 0.00 1552�. 8.95 497.30 88718. 2.037 12.050 0.00 15674 . 9.05 497.40 90293. 2.073 12.370 0. 00 1582�. Hyd Inflow Outflow Peak Storage Stage Elev (Cu-Ft) ,__�-�'tl 1 1.89 0.43 7.15 495.50 62870. 1.44.� 2 0.92 0.35 6.69 495.04 56962. 1.3C8 3 1. 11 0.22 6.16 494.51 50523. 1.160 4 0. 92 0.21 6.04 494 .39 49188. 1. 129 5 0. 97 0.15 5.32 493. 67 41150. 0. 945 6 0.57 0.08 4.95 493.30 37295. 0.85'0 7 0.73 0.07 4.27 492.62 30617. 0.703 8 0.76 0.06 3.02 491.37 19659. �. ��1 Hyd R/D Facility Tribu�ary Reservoir PCC Outflc.�� Outflow Inflow Inflow Tar et Ca-_c 9 1 0.43 0.06 ******** 0.45 0.44 2 0.35 0.03 ******** ******* 0.36 3 0.22 0.03 ******** ******* 0.23 4 0.21 0.03 ******** ******* 0.22 5 0. 15 0.03 ******** ******* 0. 16 6 0. 08 0.02 ******** ******* 0.0� 7 0.07 0.02 ******** ******* 0.03 8 0.06 0.02 **��***F ****�*� ^ ^� �. .�o ---------------------------------- Route Time Series through Facili-,� Inflow Time Series File:rdir.-sf Outflow Time Series File:rdoLt POC Time Series File:dso>>t Inflow/Outflow Analysis Peak Inflow Discharge: 1.89 CFS at 6: :10 0=, Jar. 9 ia `'e3r 8 Peak Outflow Discharge: 0.932 CFS at 11 : C0 0� �ar � i-� �'ear 8 Peak Reservoir Stage: 7.15 Ft Peak Reservoir Elev: 995.50 Ft O 2013 D. R.STRONG Consulting Engineers Inc. 22 Saddlebrook Div. II Technical Information Report Renton,Washington � ____ _ i Peak Reservoir Storage: 62870. Cu-Ft . 1.943 Ac-Ft Add Time Series:bypass.tsf Peak Suruned Discharge: 0.444 CFS at 11:00 on Jan 9 in Year 8 Point of Compliance File:dsout.tsf Flow Frequency Analysis Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flo�,r Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) (ft) Period 0.353 2 2/09/Ol 20:00 0.432 7.15 1 100.00 0. 990 0.070 7 1/07/02 4:00 0.353 6.70 2 25.00 0.960 0.221 3 3/06/03 22:00 0.221 6.16 3 10.00 0.900 0. 059 8 8/26/04 7:00 0.213 6.09 4 5.00 0.800 0.075 6 1/08/05 5:00 0. 153 5.32 5 3.00 0. 667 0. 153 5 1/19/06 2:00 0.075 4.95 6 2.00 0.500 0.213 4 11/24/06 9:00 0.070 4 .27 7 1.30 0.231 0.432 1 1/09/08 11:00 0.059 3.02 8 1. 10 0. 091 Ccmputed Peaks 0.405 7.00 50.00 0. 980 Flow Frequency Analysis Time Series File:dsout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- �-o?�� Rate Rank Time of Peak - - Peaks - - Rank Return Prob (�FS) (CFS) Period ii. 361 2 2/09/Ol 20:00 0. 444 1 100.00 0.990 �i.081 7 1/05/02 16:00 0.361 2 25.00 0. 960 i:�, 228 3 3/06/03 21:00 0.228 3 10.00 0. 900 0. 077 8 8/26/04 2:00 0.220 4 5.00 0.800 � 0. 083 6 1/05/05 8:00 0.157 5 3.00 0.667 I� C!. 157 5 1/19/06 1:00 0.083 6 2.00 0.500 :i.220 4 11/24/06 7:00 0.081 7 1.30 0.231 ) . 444 1 1/09/08 11:00 0.077 8 1.10 0.091 ��:-.�uted Peaks 0.416 50.00 0.980 , F1ow Duration from Time Series File:rdout.tsf Cs�o=f Count Frequency CDF Exceedence Probability �FS °s $ o C�. 005 33549 54.711 59.711 45.289 0.453E+00 0,015 6223 10.148 69.860 35.140 0.351E+00 0.025 5918 9.651 79.511 25.489 0.255E+00 0.035 9748 7.743 82.254 17.746 0.177E+00 I ��.045 9536 7.397 89.651 10.349 0.103E+00 �.055 2455 4.004 93. 655 6.345 0.635E-01 :, .064 2006 3.271 96.926 3.074 0.307E-01 .074 1439 2.347 99.273 0.727 0.727E-02 � . 084 110 0.179 99.452 0.548 0.548E-02 C . 094 23 0.038 99.490 0.510 0.510E-02 0. 104 14 0.023 99.512 0.488 0.488E-02 0. 114 11 0.018 99.530 0.470 0.470E-02 � 2013 D. R.STRONG Consulting Engineers Inc. 23 Saddlebrook Div. II Technical Information Report Renton,Washington 0. 124 26 0.042 99.573 0.427 0.427E-02 0. 134 29 0.047 99.620 0.380 0.380E-02 0. 144 38 0.062 99.682 0.318 0.318E-02 0. 154 35 0.057 99.739 0.261 0.261E-02 0. 163 19 0.031 99.770 0.230 0.230E-02 0. 173 25 0.041 99.811 0.189 0. 189E-02 0. 183 16 0.026 99.837 0.163 0. 163E-02 U. 193 15 0.029 99.861 0.139 0. 139E-02 �.203 18 0.029 99.891 0.109 0. 109E-02 C.213 19 0.031 99.922 0.078 0.783E-03 C.223 19 0.031 99.953 0.047 0.473E-03 0.233 14 0.023 99.976 0.024 0.245E-03 G.243 2 0.003 99.979 0.021 0.212E-03 G.253 2 0.003 99.982 0.018 0.179E-03 u.263 1 0.002 99.984 0.016 0.163E-03 0.272 0 0.000 99. 984 0.016 0.163E-03 '� 0.282 1 0.002 99.985 0.015 0.147E-03 ' 0.292 0 0.000 99.985 0.015 0.147E-03 0. 302 1 0.002 99.987 0.013 0.130E-03 ��. 312 1 0.002 99.989 0.011 0.114E-03 ��.322 0 0.000 99.989 0.011 0.114E-03 �.332 2 0.003 99.992 0. 008 0.815E-04 �.342 1 0.002 99.993 0.007 0. 652E-04 �:.352 3 0.005 99.998 0.002 0.163E-04 Fl�w Duration from Time Series File:dsout.tsf Cu�off Count Frequency CDF Exceedence Probability CFS ° ° ° - 0 o a C.005 33512 54. 651 54. 651 45.349 0.453E+00 C.015 6220 10.149 64.79� 35.205 0.352E+00 O.C25 5951 9.705 74.499 25.501 0.255E+00 0. 036 4709 7.679 82.179 17.821 0.178E+00 0.046 4486 7.316 89.494 10.506 0.105E+00 0. 056 2578 4.209 93.699 6.301 0.630E-01 0.066 1922 3.139 96.833 3.167 0.317E-01 0. 076 1411 2.301 99.134 0.866 0.866E-02 0. 086 175 0.285 99.419 0.581 0.581E-02 0. 096 36 0.059 99.478 0.522 0.522E-02 0. 106 22 0.036 99.514 0.486 0. 486E-02 0. 117 11 0.018 99.532 0.468 0.468E-02 0. 127 25 0.041 99.573 0.427 0.427E-02 0. 137 26 0.042 99.615 0.385 0.385E-02 0. 147 34 0.055 99.671 0.329 0.329E-02 0. 157 43 0.070 99.741 0.259 0.259E-02 �. 167 19 0.031 99.772 0.228 0.228E-02 ,';. 177 24 0.039 99.811 0. 189 0.189E-02 C . 188 16 0.026 99.837 0. 163 0.163E-02 ;' . 198 15 0.024 99.861 0.139 0.139E-02 � .208 18 0.029 99.891 0.109 0.109E-02 C .2].8 18 0.029 99. 920 0.080 0.799E-03 C .228 18 0.029 99. 949 0.051 0.506E-03 G.238 14 0.023 99. 972 0.028 0.277E-03 0.248 3 0.005 99. 977 0.023 0.228E-03 0.258 2 0.003 99. 980 0.020 0.196E-O:s s 2013 D. R.STRONG Consulting Engineers Inc. 24 Saddlebrook Div. I! Technical Information Report Renton,Washingtor 0.269 2 0.003 99.984 0.016 0.163E-03 0.279 0 0.000 99. 984 0.016 0.163E-03 0.289 1 0.002 99. 985 0.015 0.147E-03 0.299 0 0.000 99.985 0.015 0.147E-03 0.309 0 0.000 99.985 0.015 0. 147E-03 0.319 2 0.003 99.989 0.011 0. 114E-03 0.329 0 0.000 99.989 0.011 0. 114E-03 0.340 1 0.002 99.990 0.010 0. 978E-04 0.350 3 0.005 99.995 0.005 0.489E-04 ', 0.360 1 0.002 99. 997 0.003 0.326E-04 I Duration Comparison Anaylsis �� Base File: predev.tsf i� New File: dsout.tsf '� C�a�cLf Jnits: Discharge in CrS ' -----Fraction of Time----- ---------Check of Tolerance------- �utoff Base New oChange Probability Base New oChange C.077 � 0.95E-02 0.81E-02 -19 .6 � 0.95E-02 0.077 0.075 -1.8 C.098 I 0. 63E-02 0.52E-02 -18.3 � 0. 63E-02 0.098 0.082 -15.8 Q. 119 I 0.50E-02 0.46E-02 -6.3 � 0.50E-02 0.119 0.104 -12.7 G. 140 � 0.37E-02 0.37E-02 -0.9 I 0.37E-02 0.140 0.139 -0.2 G. 1'ol � 0.29E-02 0.25E-02 -14 .2 � 0.29E-02 0.161 0.154 -4.2 0. 182 � 0.22E-02 0.18E-02 -17.8 I 0.22E-02 0.182 0.169 -6. 9 �i.203 I 0. 15E-02 0.13E-02 -13.3 I 0. 15E-02 0.203 0.194 -4 . 0 �i.224 I O.10E-02 0.65E-03 -36.5 � 0.10E-02 0.224 0.211 -5. 6 'J.245 I 0. 62E-03 0.23E-03 -63.2 � 0. 62E-03 0.245 0.225 -8.0 C.266 I 0.34E-03 0.18E-03 -47 . 6 � 0.34E-03 0.266 0.235 -11.4 C .287 � 0.21E-03 0.15E-03 -30.8 � 0.21E-03 0.287 0.251 -12.2 C.308 � 0.16E-03 0.15E-03 -10.0 � 0.16E-03 0.308 0.285 -7. 5 0.32R I 0. 98E-�4 C.11E-03 16.7 � 0. 98E-04 0.328 0.340 3.4 0. 3=9 C . 15�-�� C .-�'E-0� 200.0 � 0.16E-04 0.349 0.361 3.2 _>1G_s-m�� �osit-�,.. �._�ur�-cr = C.022 cfs ( 6.40) cccsrr-n:� w� 0.�38 �-� ��� �_�� Base Cata:predev.tsf ��id at , . �rr __s ��=, -re _.�„ Ca�a:��c,_:t. tsi [�la_=_i-n�am �egati�.-e �._����si���n = Q.C20 c-s ,-18 . =��) occurring at C.107 cfs or tre Base Data:predev.tsf an� at 0.087 cfs on the Ne��r Data:dsout.ts= O 2013 D. R.STRONG Consulting Engineers Inc. 25 Saddlebrook Div. II III Technical Information Report Renton,Washington I Peaks Plot Retum Penod 2 5 10 20 50 100 � rdo�t.pks in Sea-T�c ♦ dsout.pks o prec'ev Gl:; R ae w coo � ° �� � o � 10�� • i a oa 0 tA o LL U m rn `m u N � ��2 O 103 1 2 5 i0 20 30 40 50 60 70 80 90 95 98 99 Cumulative Probability Duration Curve � 0 rdout.dur o dsout.dur ♦ �� target dur c M �'� O \ L �� ���a„ [n 000 ��_1�' LL �\ U ` � N �;i\\' O � ��� U \\(:1 N �y Q Y � �ti � I �S1 ' , o ,��c 00 '�\� i ��t ._.. �4�-���'�_�._� �`�� o �_��� � ° � , � �o� �o' io�' �o-2 �o-' �o' Prohabili Ezceedence �i O 2013 D. R. STRONG Consulting Engineers Inc. 26 Saddlebrook Div. II Technical Information Report Renton,Washington FLOW CONTROL PRIMARY OVERFLOW ' Using standard orifice equation to determine stand pipe diameter in control structure Ref. KCSWDM '09 Figure 5.3.4.H Q�oo= 100-Year Peak Storm calculated using KCRTS 15-Minute Time Steps Qioo= 4.65 cfs HMAx= Maximum available head in feet measured from crest of weir HM,�= 0.75 ft. D= Riser Diameter D= �Q�oo/(3.782 * HMAX .5`�0.5 i D= 1.19 ft. (min. diameter) round up to nearest standard pipe diameter use D = 18 in. or 1.5 ft. Calculate actual height above the weir expected during the 100-year peak storm . H = Actual head above weir achieved with Q�oo H = (Q�oo/(9.739* D))^0.67 H = 0.47 ft. JAILHOUSE SECONDARY OVERFLOW Using standard weir equation to determine length of window opening in control structure Ref. KCSWDM '09 Figure 5.3.4.E D= Control structure diameter I D= 60 in. Q�oo= 100-Year Peak Storm calculated using KCRTS 15-Minute Time Steps Qioo= 4.65 cfs HMAx= Head above weir achieved with Q�oo HM�= 0.47 ft. '� P= Height of overflow above outlet invert elevation � P= 7.15 ft. c= Constant c= 3.27+0.4*HMAx/P C= 3.30 ft. L= Arc length of the jailhouse window as necessary but not to exceed 50% of the control structure's internal circumference L= �Q100�1C*HMAX1.5)1�.O.Z*HMAX 1 L= 4.47 ft. (min. length) C= Control Structure Circumference C= 16 ft. Calculate corrected L due to vertical bars in window. Lad�= adjusted arc length of the jail-house window Lad�= L+0.083*(L/0.33) ` L 5.60 ft. I adj= ' O 2013 D.R.STRONG Consulting Engineers Inc. 27 Saddlebrook Div. II Technical Information Report Renton,Washington BIRDCAGE EMERGENCY OVERFLOW SPILLWAY Using sharp crested weir equation to determine stand pipe diameter in control structure Ref. KCSWDM '09 Figure 5.3.4.E Q�oo= 100-Year Peak Storm calculated using KCRTS 15-Minute Time Steps Qioo= 4.65 cfs P= Height of primary overflow above outlet invert elevation P= 7.62 ft. D= Control structure diameter D= 60 in. L= Control structure circumference L= 15.71 ft. C= 3.27+0.4H/P (ft) use... Q�oo= 3.27+0.4HlP(L-0.2H)H^1.5 H= Emergency overflow water surface elevation H= 0.20 ft. WATER QUALITY TREATMENT (PART E) The Project is located in the Basic Water Quality (WQ) Treatment area. The Project will utilize a BayFilter vault meeting Basic Water Quality treatment criteria. See Figure 7 for details. � � ��2013 D. R.STRONG Consulting Engineers Inc. 28 Saddlebrook Div. II Technical Information Report Renton,Washington FIGURE 7. DETENTION FACILITY DETAILS AND BAYFILTER SIZING I ' ' �2013 D. R.STRONG Consulting Engineers Inc. 29 Saddlebrook Div. II Technical Information Report Renton,Washington SE 1/4 SE OF SECTION 32, TOWNSHIP 23N, RANGE 5E, W.M. �a 5 1 SADDLEBROOK I e e f'/NlE7 Ci4/FIfF 5' I IB'ARE7 RUBBER SQUD 70P 4"A.'�.f7 11• BO�� R/M�496C0 OR�f'CE OURfl sam rcw � � NE'R WA� RM=49G00 � Y a Q z B � � PLAN VIEW om � . � ' . �iR27rres�- sro R�;---- � . _ ___.. . .... : ---- ---- -. .. ..___.---- . .__.....I........... .. .___ . . ...._ ..._ . -� -----,,.. '. J � p ' i 1 I QC.c.ST-18fl1 O __ ___ _CNAM'LWK£ _ , ' � _—_" � � ]B"AYET PIPE 1 - _ --__ __ j . '. -� I � INbFRi-188Y7 _ I ' .. -� � - " ' : I � I � 18"Y ' : ; ' -___,_ . , , : ' p/1 : ' ROCKERY YAXlYUM `` '.'_____'_FX GRAOE � � . • -______'� �:6'CHAMCINX FENCE i _ . . "_______'_'_'_'__`-._.. _.._ . .: .X�f��- _�. X f ' .��• ' .. .: . . . �.. _ . . _ . . I '� ,_ r7"OURET P/PE NJl£R7-4BS9 �"OR/f)C£TO - - •.. �. . ---_ f/L 1ER5 LYKRT- NOTE.-lMET ANO �� � � � : 1 . � � • . • �86.17 OUR£7 P1PE NOT CVIR£7 WV. �. ��. . � j . �. 1"p/71ET PlPf SHOtkY fOR ELE'✓._ '�. �:' � I . NJKRT-�95.97 CIARITY 48197 . OES�CN W.S FCfVA7/ON 49i50 - � � _________ _____ _ ____________ _____ ....___ _.. __. I.. ..... ....... . ....._._ _._.. __ _ .___._._ �........... . __-_ ._..... .......__ ...... . .. ...-. I. . ... . I . .. _... .. . .. ... SECTION A A SECTION B B � �i � h,� ..... .. 1. 7.15�LF£STGPAC£ . . . YRELWNARY 921Nf SUIMARY irlE BAYF/L1ER SI0,44WA7ER NANAGcdfENi SYSIEN IS A � ; � � - �. ' _ 5� BAYFLLTER 57CYtNIVA7FR JRfATNEN7 SYSTFA/ 5T?PYWA7fR ftt7RA7KMl�£VCE D£SGn'ED TO R£uOt£ !�_ I�__' _ . .______ ______"_ '_____.� FLV£SED„NENT$YEAW NETl,CS.F.VJ Pti05PMORUS � - �� - �� -- - � QS'SED/A�ENT STA4AGf �:� -� � I Rlf BAYFN7ER SYSTEY REL'ES 0.Y A S?✓7AL'FWND . � � TGP�SEDIMENT STORAGE Fl. iBB75- � � ' F,4q�EC7 SAODLEBROCW Y£D/A flL7ER CAR1RlLGF WITH AFPROXMATcZY�J � � PO%JD 80770N ELEVAApJ i87.85 --------�-"---------- ---------------------- ' SOUARf fFf7 OF F¢T?ATl0.4 AREA RiE FH7ER � ' � � LOG710N R£NTLW, W� CAR7R'�J.;fS AR£HOVS£0 M A GONG7ETt 57Rf/C7!/RE � � i R!AT Eb£MY OlSTRIBU7E5 Rif FLCw B£iw£EN - � � ''�� ��� � � - w�rt�e ouwn rzaw o.a�s crs cs.ernmurs rxr srsTru rs crru.vr:wn��H SECT/ON A-A i G.4AiNACE AR£A 5397 AC. EX7FRNAL B1PA55 THAT ROU7F5 Hl,^,H INIENS17Y � � GR4PHIC SCALE STORd/5 AP.WA'0 1HE SY57FH 7F1£11LT£R CAR7R/OGES D 5 10 15 CAr?iRNJG£U[Sir.N fLOW.9/1F I JO CP.N P=uCt£PIXLU:AN75 fRCY RJ4'GFF 9Y F2TRARON ` � (�:4'!'EPP.^i.��AiTACYN�Ni�/fN F.75M.�il,^..V � � 0 1INCH=tOF7. y?F!£IL?£R CAFTP,Ca�S ��2(SASG A'!AlA55 LCA:.'NGJ �'. h _ _ g � �I `i HORIZONTAL � 0 2.5 5 7S � ADS BAYFlLTER DETAILS, PER ADVANCED DRA/NAGE SYSTEMS, lNC. OfOO °'�?O °•+o °'60 °'°° "`" '*�D "`O 11NCH=5FT. VER7ICAL 'RlP RAP PAD SPECIFICATIONS SECTION A-A PN'RAP$NALl BE RfA50NABLY{YcLL GRAO£D N97N GRADAACW AS ?F^ •r a'A,�',F VCLLVE Cf fOtLOws 510 ... 5 CNU 4 P .'P V1 - !T �.... ... �.P/L . 'f � 5 6 UAXIYVI!57DNE SIZE: 74 1,4LHf5(NOIIWAL OUIIf7FR) � 1 I tTAR I 7 7 5 NEDIAN 570Nf SZE.� 16/NCIi£S � � '� AR 1 6 2 '�� N:M4UY$TOWE SIIE: 9 MCNfS • � - � e ° ' �� ' i ___"-i__"--'__-___ , � YF� I . : —'_I _� _-�--6_CHA �. YE�4 I * � T��cs '� RI?RAP 9ZN�IG GOL£RNm BY 5Df SYOPES CYJ OURET CHANNEL 15 �� � ' � ' - ' ASSUN£O 7D BE MPROXHIATELY 3:1 . . I . � � � . DETEN770N SUMMARY SNEET - ---- — --- '" -" - - - � I � �' > B, ' i ; i -- Iun,xrrucc -- ------ 6'CN I IM1NK fFNCE ' � . � I . ..�. �. - i CON7ROL STRf/CTUR£. �, _ _________ ___'_�_____ _________- _____ ; ' .. '. � .. �: .:�' �. . :"" ."� .... SEE A25Nf 11-- _-__ j � . _ . . - . .�. .� .. ..:., .. __- '-.. � __ ___ _.._ .."— ""....___... __ _____ � —____"" .� ...� : ..��.:..:.'. . . ,5pp��_ ___'" ._-__-__._._ _ R _ -}- : �1( LttAD ( „' . o� . . - . . . . ... � ��. I _.-_ ', � ° � i ' I I � � �. -� ___ o-�p� . _ -� . , . � � ROCXERY IfAXLVUM : I� ..�. � -� � _ a�,. o-- ___-- ', ��, '.� fIEMJ[ 1 �, � � � -� -___ 7LW Of 6'MIDE B£RY EL 486.15-' ' - � � . � '� .'•' ' � ,n ---\ DESiGN W 5._fLEV,1TIGY 495_50_ � - ' I __ ' � .... � - �a ♦ . _ ___________________________ ________________ . .. ____ ___ ___--_����_�_ � I� . .� �~ �Pq'92 _ '• � � � � �..� 1-- . ' i . . .,� ' 9`p ---_. I ' �. . i 7.15'LIYE 57ORAGE � � . . k � 11EIGHT 9-fFET lYP.I I� F� e� - ,�� � � ' � 18'CVR£71E 4833i ]8"WLE71F 48E35 � �� � � ROLKERY MAX/IMIN ! �' I �� OEBRlS BARRIER I I � . :. �i. n I6'CA7ENITil1-B'I �4 ' :.II I�s� R��SP� I I �90_--._.- � � __...... . . . OS'�SEOrvENT-570.4AGE .....- . . ' . ;____ ....._I..__ - __ :. � __—.__ . ._...._ _.__ _._._. � BAri717ER VAULT � B � � . I � �I88J3 I �] .�_�.. .�I. - �-_ ______ _TOP OF SEDIAfENT 570RAGE EL 488.J5_ � ON 98785 �.. � �i \ SNWGlNG SEK�� I i 4PA�RAP PAD E/15 dEN I I ----------- --- --- --'------- I . O POND BOTTOA!ELEVA71 � TH6 9IfET � � i - I � i i i sEcnoa e-a I � 5£E 0£TAN.SfiEf7 Cl� . � I ENERGENCY OYFRfLON BLFDCAGE � � I � �� '__�-- -,_____ I � I �°) . _ ti n . c v� I � $ � ,on ^' c � a a. � 0 0 o . .. . . a � n r. ' I � r � 6'O'IAINLINKFfNCE I �.� ::. �_ � NORTH wco wao ato orso weo r�oo r+ao rrso �ico PER 6'S00TS7A P ::' % �------ -----�o--- GRAPHICSCALE SECAON B-B L-72]o-07 7YP£3 s�,����?� / 0=5�`5 RECOMN,ENDED FOR APPOVAL xwcwc secncwsi � t iNCH=3o Fr. BY: Date: � � DE7ENAON POND PLAN VIEW BY: Date: BY: Date: �t ca:�✓oGo BY: Date: ;c" �.�f 1 pTY COYMEIITS�ATED JANUMY 1Q 2013 YLP OI.28.13 NAJ - ,, D.R.STRONG Z ,,,,,� � Q,.,�.,, y�� � ��AS NOTED ''" �n . ,.} CITY GF SADDLEBROOK y>>-�+-72 cowsucn�vcavcx�E�rs a.,e.,a YAJ �Y� "'� - Cel 2 Workug Days Befc(e You Dig �F J�y� � 3 P�"""'""�� °AJ � R E N TC���. DETENTION POND DETAILS � ''� � �s������ 4 PIAN dIM1Cf t 1LP 04.29.1 YAJ � 1-800-424-5555 �F�::�`=���� � � ��,��,�r�,��,�, '°�-_'"." �� am,W K _ UhlaiesUuler�andLocationCenter '�CNAL OstSan.sab9P�c�a�f �� ?orr.�n�/Building/Putlic W'o-�<s JepL ��,C73 (D.LfT.rD,ORWN .wyceae�ara� V0. =E'.SI�N EY Da.TE APP� - �"``'°"",• - _ uN � 13�17 A-NNNNAA SE 1/4 SE OF SECTION 32, TOWNSHIP 23N, RANGE 5E, W.M. SADDLEBROOK ; � ,a..���..� n�....��, ; ; � ��� E •i�E �«oM�rccs � E � � rw���evuanwn •••�••• � � m�ucuov�xsnaurz � � M - �c�orF�t o.o,a.� 5/\ �� ma�.a - �..r^wv �orz� � F arFcsaao � . \ � R`wvro m.� QY � ' .m;� �,.�.�. �..��sma.� Z O �i ,� - W � . ,��:m.�,r� .,o,.�� .�,� w��...�,�., ( .�,,,��no. a . & w .�..��,.,.oN�,�..�.p �_� � i..� a , o�.n � f�e^ '@� �....w\�. � � ..�e i Q �y. � y�� . T : �.m� ^ . ;T . : ...._ Q i.�.+a.odu.rumr..,n�. eo.����. ac.s'a.se v S•� � � �L' I 4k �"'°'. : .a.wrR, (n e�a" secno«.�e..�a�a�s�obwa.�u.as�p.u�,•a> � I � JJ� I' 3� n.v� w.�,nn.we.mrt.,�waouw�..�,a�.o�maa �.�:+�+�.a rsw......ss. ��. eieeiqi°an�ewsEsec��"iow.�'0w.��^^�a,M.+�'i,u�e.�"y.'�aati�me � �/ x k -� �1J .... . � k� ��V... I w..o�mwe. I x in.amw�m�.�..e��ae.c�.vr.,m.�,oawuar �r a..� � ... � n.....rua�.eerr�ea.a,au•m.s�..,��„wr.�s• •L �+w�woe.n�,ne�mn�r.a�wm.dircbd o�a au�ua0 �w�i5cti�6adn�imsa�il�W1� Maxab�a� " BISEEEcmN i oo�n�� �O 1�nv3r��xx+ro�n.�e�eaw�.mrb.rcC.�n � r.Iloer�a xorrs EeS. neui uo-var l 1Mtam�rd Yr+b mei E�MfieG v�M YnP Jar� �-M W�m�YYMn�CmMw'vi Y�kiNV E�cm��Mri clalafq Yy cM:Jk�m b fe a1G Cdn.See BECl10N A MceasTs�gas�wx uoi[s i MCFentlm�dMF��MHoctlRayvayYWY�V�- •ie.i+u,w e..s.a.e�r'.»,Awe.a m..�au..ar� �:,c.;cH a:siti suu xc,- r�i„�..,sw..tn.cme�r��u w�.a`+.wa e..�.er..�r.ei�a.ra+. � � �«_cs�Ex�a�a.'�c MMiEGFi��+�'�'E_�-G�ELI�._fN�:l al• �d IMEWlsalu�.woWailNa/0+ R.JRCH.OR Fr»a Thv meCub bYY�iS Me Sa(W Pi/Deb4 CWtl Pc! l TI�nP�YNMnrrnEtiv�bCalm�pqYGu�lm F��:�, "�.:�-i awursruart ��9: T�u Y. N , 'V�9a TIrW ].NWWIWWM f/a1MOrW�Mb�n SJEwAU(I�W�-iORia'>BE�IACFL-.0.5BEEV wmrocwT'� P�Hoat�Y'n TnHcaER Yd�Ceotll idu 44uC. � _ l NO+a��PNWq�Jv�Gv[YnaWF�v�a�A G^1RBLi5ME_.N:=��LL=_av�,ciC�.T�ERajN C sr,aras NOTES nr�• �sr�_�.a.��rz-�caan�-�enr,^a� drewmR.ryMoawe..coesn v�eas �ixi.c_c;.av Ew�rHs nn�ce�:wr�: 1 AbchNlboOblsfv��wMIs9N'�ZMMMEtlb.nW. � �.HOYe�a��eSie4Ma�1+5yM'sCnla p��� 2 BWYSSII.LLI+iLi?EUS�'OScTFW:�ETCGqfipE W a�aa�rM�v M�zbf Ai Y�e M�Ms�bPW I I � �seorswusswaa3-=�. �jg'.."'...,'l�.�.�� aaa..ua.ns.oa.uban iTeW'vna'Mpo�otAbaY�'y'bYOD�1bf�tl�i'6 NONiM9w1EEft SiET.•.EENA6f'JS-�EM arvw� nfrn moia � v�.s6 Povas�benlfx5vR10RTCPwEUEn-. �KMEUeo.nPMe+s��o��nFevrfx.tPabM . >Tl�artn�rp�trHme�Opnlem.nlpeY�Y�bEMNM4yeEow� �. TELSECF9IYIX.SLSPEPVffiEOWENET1�itlpt8 � M1daF.P�har�tW�wE�afp dMPPrprYSYW. TM n�^�Y p^�^m�+�� �E ST�3C.E1�TO CPF TE A R�MYx6 BOM OR Iy TaP��bM b�c[epl�'WS�_i1 NC.S tlan��tl np�arx. �.��J� � ,E � a Nrwc�muu tlJ nwn�vm�mFlnm q TmYiiv.b]S nv6nm.?m.iM1 Bv�D. Se�BOLT-Otlidown Meavrb ma���rvn m�ulecn..�en COM/N OET�R �15'MYmm PY trMm�Y bqdmulH atl N�aNb dPe 0�Ab NPw4M+ME./Mi*DMipMmMenc�mNrm T9maua iqyh:tiWM1mVrNGneaaMhene6 - SpxiMaibnP011 ' r v r k r .r M1 TNSGeTbNMMbYcvMMalym4YFd�r�rubo . . aNJA6�InP.�.uticul�pffMIWMIn�urF�TeresraWC� r r � o i �r �� !IelORdsL�Ymlhib�W]YaPb^btlo�N 5W4arE �a�ac�w�w�d.�R�.aa y�+aaf �mocrr 4TEIM�TIYE�MEC�fT��i�RCTpI S�e,tr�3 ��bsw'�L Edis rranrY b IaMbk fs odn&s abw�m!i 57D.PGN-200.00 �+�(4��54 ��� P'J3[1C M'GRKS I CATCH BASIN TYPE'1 �� �.p�-�.� � I STD.Pf�N-202.Op 14O' Sl'D.PUN-20Ct.00 DEPARI'YENT 7'J3LIC 70RI6 CATGN BASIN TYPE 2 PL`HIJC FOR45 CATCH BASIN INSTALLATION I(ARCH 2O0B �CFAP.'YEVT GEPART4fh"T � � � �U FAP.':NE.VF:S FRAME AND GRATE V^i'.�-ki-'D-'9 Yf�?CF:2��g ` _' INSTALLATION DETAIL 4'.'+P.CH 2O�8 � L 15'(TYP)SfE N07L 7 i. /_� 3'OG.VEIER 91Q07N i NOClr CUNPS EKNLY �. B.tRS EIX/ALLY SPACED PIACFD SEE O£7M BELON , (�"O.0 YAX.) � * * FRAVE A FOUNO SC(/O COl£R ��M���E��m � A L J A YARXED�ORAfN'W/LOLKPIG Bq.75 Of OPENfNC S1ZfJ FGR � 100 YR f20W=5.5D' , A70NOE Y�lH7CxAa'CE FCCE55 _ � f w BY MELOWG 1 CROSSdARS TO i P wS W.S 19597 � 1£RP.G!BMS AS SHO'.�N. RIM�1197.LYJ 19550 naVGE uWER ENoS M1H ftANGEs/ ✓iutr�CVSC M1 fFwvE/LRA7E fd7 BOCTS AND PRGNDf LOCKPiG 18'I CUREl P1PE SECOHDARYNJI£i.PRO'r!YJE 11Cb1AN�5M(FAD[OCK)G4 ��w�F 9'1KK ���gg� IfR11CAL BIRS N lRAUF [OW£R fND. �'W" �S LOCA7f S7EP5 DlRECRY HE10W. �ET D£yGN W.S�19550 O 1 OG(ORIFR fLOW PLAN N£W � pp£SUPPORTS ArWROI�fDABYELDf�SCE SEf N07E b ACSO TH£SfPARATf 2• OV£RFLOW STRUC7URE �'D4l SM007H ROVND BARS 78�I RISER `N SIfONN W FiGlIRE 11I.0 L0:5ER S1EFL BAM7 j'X I'WDf MELOED EWALLY SPACED. FQ41Im TO fl1 W GR04E BARS SilAl1 BE NELGEO TO �18'O lMET P[K u�ca,a,sEe 2,.�E UPPER R LOifER B.4WS � FR�P� JAILHOUSE 6t9NDOW DETA/L NOIE] �21 BANDS EY£MY SPAllO SEE NOIF 1) lE-�9�.71 . �� - IF��88..73 UPPER SIEQ .\� ORb10E M251� N�5 ���.X,. REUOVA2LE wA7ER7KHT MOE i•-. . � CIX/PLMC OR RANCE �,.,,.,,;';�' �V"�� EYERGENCY OY£RROW v 6"£LBON �/,�;1,�'�i���1�1\ W.5 ELE✓.-�9617 � lF-}91J0 = :/;;ii� II�I�1 7!N Of£MfNLfNCY v ORIi?Cf I=7.I1" ^'2 ovranow=,sss� � PLAN 1/lEW I TI'PE 2 CB SCALE 7'�2'-0' y 57ANDARD � ' 45' CALVAN/ZEO 1.3 x D/A. � STEPS Li4 7'Y/ MM/. �� � SNQ77N UDOER 18'INLFI%PE iB'p/ttfT PlPf NQ]�,5• L£A71CAL BARS . CB. R15ER /N4£RT��9B.J5 WltF7�188.15 S£CI70N A-A PfR PLANS- -PER PUNS 7.USE A u/MUUY OF.1 SI'pAUE1ER hPF TAO G7GI&151X „�� ?.OURE7 CAPAGT/: )00-iR D£Y£LLWED P£AK fkOM � �NO�pPFD y I8Y fJW fiSER S 4£TAL PMTS CLWROS/ON R£S/STANT. NON-GAIVAMZfD PAR7S y,�,y n i0 GB.RfYR � PREFERREQ GALVMf2ED PWE PAR75 TO NAYF ASPHALT IRfA/LfNT �-` �' 7'SFC11p!Q�PWE A 7TAGIED BY 7. PlA7E MfZO£D TO£IBOiY DETAfL HOOK CLAMP s�+c.eR c�r�w/eavma rrao Faa e.�src�m ativn ro uLow Reuov.0 �.�RA4E AND GADLIE7P OR SiEPS OFFSET SR wn�o�.�r��s srEe�n Clf.WOUT ORAW(ROD BfNT AS I A CYEANOU7 GA7E IS NSfBLE fRCW TOP. Na�r� irca'o ica�trrnu�ALICAWfNT M/ y y� ��������w/�.��� a a�ue-oowrv sv�cr�s c�ur cf arscR um ccuxour cn�c. ELBOW RESTRICTOR DETAIL � 1.DIM£N90N5 ARf FOR ILLUS7RA7IpV ON 5t"INANE7ER CH FOR 06FfREN7 p'MIEIER CB5 AD.US�70 NAINTAIN f5' COY£R)SE£KCRS DMG 53 q4�fKf SNnO7H fGGE S.ff uFTAt OVTLET PiPE CdyVECJS 70 CfMENT CGwCRE7f'PiPE ti,�5 ANGL£pJ"YER7MA!"BARS AND 7'O.0 WXNrUu SPACWG OF BARS ARq/ND LOMfR 57FEL HAND. ��y WItfT P/PF TO HAY£Su�M O.A£OUAL TO CONCREiE PNE I.D. 2 YfTAL PARiS 4W5T BE CGRR0570N RE515TAN7,�STffL BMS MUSI BE CALVANlZEO I CE55 1/�' 3. Ro5 DC&PK BARPofR IS AL50 RfCOUNEYDEJ fOR US£pJ 7liE MIET IO ROAGWAY CRO55-GA4£RTS IMTH l9bl 6.GRONO£A7 LEASI ONE J'X.090 GAUGE SUPPlMT BRACKE7 E POTEN7/AL FOR OFdR/5 GYXG£C7lON(EXCEPT pV 71PE 7 SIREAYS) , EO'/ ANCMORED i0 CdJCR£7L WALL(NAMYUY 3�F£RbGIL SPACitiG) �. 7H/5 Df8R15 BARR.�E.4 6 fQP USE WISDE G�ROAO R/GHt-OF-WAY QMLY. FA7 OEB�S CAGfS WT'N/H ROAO F/GHT-0.�-WAY,SEE ORA'I,eNG 1-018 KCRS 7.L:!_A7E ELBOM RES7RMTQR(5)AS A'ELESSSRY TO PRONOE ✓.'A'WUN CLEARAn'fF AS Sf!ONN - BlROCAGE EMER6ENCY OVERFLOW CON7ROL S7RUCTURE s NIS A'iS 9 \�a.�„aC, s a�`f ' c ��� z 1 p7Y COYYFNIS DA7ED JANUARY f0.2013 1lP 01.28.13 HAJ " � �y D.R.STRONG �� ^_«� L��-a , SADDLEBROOK y>>-�+-�z o v 2 u,� „P �.ts.t7 u�� �tis NoreD ��"= CI Y GF � C812 Wu'k' De BelweYdl q � C�������E� 3 PLAN R1ANfF 1 YAJ p{.1&1J YAJ �� � "g �° °ig �s�, � ~ D � � �s��„R„t„� �.,..� x �'.` R E N TO f� STORM DRAINAGE DETAILS � ",n � 4 PLAN Q7ANCE 2 �tP p{.Z9.1 MAJ ,,,�.a a 1-800-424-5555 �,•�`� .�� ��„�.,�q,.,��»��, ��� �� °"�uu F�y,���9�B���d��9������� K�o-;s �e,� o,+ Uh3tiealkider�and Lxatbn Center �10NAL� Ot�te?l9un Fr2[cllnlMxf 2 � (D,Ml�D,�FlWA) w�w.Owory,mw �.v. �<E'.SIJIJ BY GA'E AFPR - sc�`�cc' ' � �� �� 14�17 A-NNNNAA � BayFilter Sizing Details � ADS Representative: Kell Kokesh Date: 5/2/2013 Site Informatian Pro'ect Name Saddlebrook Cit Seattle State WA Draina e Area 5.397 acres Im ervious Area 2.857 acres Pervious Area 2.54 acres %Im ervious 53% Upstream Detention System Peak release rate from detention 0.432 cfs Treatment release rate from detention 0.075 cfs S stem Confi uration Offline Detention retreatment credit 60% WA DOE Approval General Use Desi nation Yes A enc re uired%removal 80% Filter System Filtration Brand Ba Filter Cartrid e Hei ht 28 in Cartrid e Filter Area 43 sf Maximum Cartrid e Flow Rate 0.7 gpm/sf 5 ecific Flow Rate 30 gpm Determine Critical Sizing Value Number of Cartridges Usin Flow Rate 2 SUMMARY Treatment Flow Rate 0.075 cfs Cartrid e Flow Rate 30 gpm Number of Cartrid es 2 SECTION V CONVEYANCE SYSTEM ANALYSIS AND DESIGN Per Core Requirement #4 of the KCSWDM, the conveyance system must be analyzed and designed for existing tributary and developed onsite runoff from the proposed project. Pipe systems shall be designed to convey the 100-year design storm. The Rational Method was used to calculate the Q-Ratio for each pipe node. A conveyance system consisting primarily of pipes and catch basins has been designed for Saddlebrook Div. I and Div. II. Onsite runoff will be collected by the multiple catch basins. Pipes are typically twelve- and eighteen-inch diameter LCPE material. The pipes will have a minimum slope of 0.87%. The pond primary overflow riser is designed to convey the 100-year peak storm (design storm), based on the KCRTS 15-minute time series for developed, undetained conditions on site. This is calculated at 4.65 cfs. The results of the 15-minute KCRTS time series and KCBW Calculations are included in this Section. DEVELOPED 15-MINUTE TIME SERIES Modeling input Land cover Entire � Site Till forest(ac) 0.000 Till Grass (ac) 2.540 Wetland (ac) 0.000 Impervious (ac) 2.857 Scale Factor: 1.00 Time Step: 15-Min Data Type: Reduced Project location: Seatac Total Area: 5.397 Table 5 Developed 15-Min KCRTS Modeling Input O 2013 D. R.STRONG Consulting Engineers Inc. 30 Saddlebrook Div. II Technical Information Report Renton,Washington Modeling results � Developed 15-Min Fiow Frequency Ar.a-_ys�s Time Series File:l5-min-sea.�sf I Project Location:Sea-Tac , ---Annual Peak Flow Rates--- -----Flc�a Frequency Analysis------- ' Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS} (CFS) Period 1.36 6 8/27/O1 18:00 4.65 1 100.00 0. 990 1.01 8 1/05/02 15:00 3.13 2 25.00 0.960 3.13 2 12/08/02 17: 15 1.96 3 10.00 0.900 1.10 7 8/23/04 14:30 1.93 4 5.00 0.800 1. 96 4 11/17/04 5:00 1. 69 5 3.00 0.667 1. 69 5 10/27/05 10:45 1.36 6 2.00 0.500 1. 93 3 10/25/06 22:45 1.10 7 1.30 0.231 4 . 65 1 1/09/08 6:30 1.01 8 1.10 0.091 Ccmputed Peaks 4.15 50.00 0.980 i O 2013 D. R.STRONG Consulting Engineers Inc. 31 Saddlebrook Div. II Technical Information Report Renton,Washington BACKWATER ANALYSIS Storm Water Runoff Variables: A= Total of Subasin and Tributary Areas C= Runoff Coefficient(the anticipated proportion of rainfall volume that runs off the area)see 2009 KCSWM Table 3.2.1A CC= Composite Runoff Coefficient CC= S(Cn*An)/ATotal Tc= Time of Concentration(Typically 6.3 minutes which is the minimum value used in calculations) R= design return frequency iR= Unit peak rainfall intensity factor iR= (aR)(Tc)^(-bR) aR,bR= coefficients from'09 KCSWM Table 3.2.1.B used to adjust the equation for the design storm IR= Peak rainfall intensity factor for a storm of return frequency'R' IR= PR'iR PR= total precipitation(inches)for the 24-hour storm event for the given frequency. See Issopluvial Maps in 2009 KCSWM Figures 3.2.1.A-D QR= peak flow(cfs)for a storm of return frequency'R' QR= CC*iR*A The Q-Ratio describes the ratio of the tributary flow to the main upstream flow. R= 10D -year storm aR= 2.61 bR= 0.63 PR=�:�rc�s,+�'1 } 4 inches .��__ Conveyance System Variables: d= pipe diameter I n= Manning's Number 1= length of pipe - — - - - --- -- v 2013 D. R. STRONG Consulting Engineers Inc 32 Saddlebrook Div. II Technical Information Report Renton,Washington Pipe Structures Subasins& A A C CC Tc iR IR QR SQR Q- d Material n I Slope invcrt invert over- Q V Bend CD Tributaries subasin Ratio in out flow Full Full Dia elev. Flow Flow FROM CB To CB sf Ac Ac Min. cfs cfs in ft % ft ft ft cis fps CB#4 TO INLET 1 4 4 3 4 589 0.01 0.90 6.3 0.82 3.27 0.04 0.04 0.00 12 N-12 0.012 36 1.46 498.50 497.98 501.50 4.68 5.95 0 2 RUN 1033 39482 0.91 0.63 3 3 2 3 36336 D.83 0.61 3 3 2 3 75818 1.74 0.62 6.3 0.82 3.27 3.54 3.58 88.91 12 N-12 0.012 222 0.87 497.98 496.05 501.22 3.61 4.60 0.2 2 I RUN 102-2 21239 0.49 0.58 2 2 1 2 30748 0.71 0.57 2 2 1 2 51987 1.19 0.58 6.3 0.82 3.27 2.25 5.83 0.63 18 N-12 0.012 299 1.10 495.55 492.27 505.93 11.95 6.76 0.2 4 RUN 101-1 1006 0.02 0.90 RUN 703-1 81331 1.87 0.59 1 1 INLET 1 1 5477 0.13 0.90 1 1 INLET 1 1 87814 2.02 0.61 6.3 0.82 3.27 4.06 9.89 0.70 18 N-12 0.012 63 6.25 492.27 486.35 499.73 28.52 16.14 124.59 4 CB#703 TO CB#1 703 703 702 703 36095 0.83 0.51 6.3 0.82 3.27 1.38 1.38 0.00 12 N-12 0.012 77 3.88 502.61 499.63 507.61 7.62 9.70 0 2 702 702 701 702 4210 0.10 0.90 6.3 0.82 3.27 0.28 1.66 0.21 12 N-12 0.012 122 3.51 499.63 495.35 502.63 7.25 9.23 88.23 2 701 701 7 701 4217 0.10 0.90 6.3 0.82 3.27 0.29 1.95 0.17 12 N-12 0.012 23 1.00 495.35 495.12 498.50 3.87 4.92 18.74 2 7 7 5 7 735 0.02 0.90 6.3 0.82 3.27 0.05 2.00 0.03 12 N-12 0.012 31 2.28 495.12 494.42 498.12 5.84 7.44 44.11 2 5 5 1 5 36074 0.83 0.60 6.3 0.82 3.27 1.62 3.62 0.81 12 N-12 0.012 25 6.73 494.42 492.77 499.42 10.04 12.78 57.44 2 81331 1.87 0.59 CB#101 TO CB#1 101 101 1 101 1006 0.02 0.90 6.3 0.82 3.27 0.07 0.07 0.00 12 N-12 0.012 21 0.98 492.98 492.77 497.86 3.83 4.88 0 2 CB#102 TO CB#2 102 102 2 102 21239 0.49 0.58 6.3 0.82 327 0.93 0.93 0.00 12 N-12 0.012 24 20.05 500.93 496.05 505.93 17.33 22.06 0 2 i CB#'103 TO CB#3 103 103 3 103 394�2 0.91 D.63 6.3 0.82 3.27 1.86 1.88 0.00 12 N-12 0.012 24 0.99 49822 497.98 50122 3.II4 4.89 0 2 c�)2013 D. R. STRONG Consulting Engineers Inc. 33 Saddlebrook Div. II Technical Information Report Renton,Washington --� BACKWATER ANALYSIS MAP ' O 2013 D. R.STRONG Consulting Engineers Inc. 34 Saddlebrook Div. II Technicai Information Report Renton,Washington ', � �' w 1 I W I c�'� �, "' � .� W o � W c� c� � N , ' Oti � ° `��, Q ' LOT703 � � � � � � � i 32,622 S.F. "� Z W Y � � � o c°� 2 # � �� � � ^ , , � � � i i W ROAD 702 u � -I— — — — — _ i � � � � 4,21 D S.F. F\ � RO D 703 — � � w � 3,� �F--- _ I � . i �_; � � I I ;" � ii ; ■ � j , � � ' ROAD 701 I` � � I 4,217 S.F. LOT 5 Z i 30,538 S.F. LOT 102 ; ' y I 18,801 SF. 29�92 S.F. � Q i � I e Q i - Y � ' �- - - - - � ,: •� — - - - - - , . ' " � _ — --T ; � � __ -- -- � -- 5 50AD 5�_ _-.-��_ � -�t� _ � __s .�_�1��.� _ .. _ —' — — — . � �__�� — - - -� ROAD 7 ROAD 102 -- -- _.._ _ _ ;;- I � � ' 735 S.F. 2, . . �__�ROAD_103�. - - - - - % Q v� � -- - �_ ROAD � NE 1ST ST 9,9 . . - - - ' � � 'W -.�_ �—_ _ -—�x-=�- -m_ ROAD 2 -- . . . _. - -- ROAD 3 - ROAD 101 �' _ _ -- __ - - _ _ _ _ 2.43T S. . � =�- y`� �--�- , � . . � - O 2 917 S.F. �E f � __ __ -- __ _ _� � _-.. � � � - - - - --� - - - - - — ROAD 4 m � I, � � '�. 589 S.F. � Q � I O Q � I, LOT 2 ' Q m � 28,311 S.F. LOT 3 � � y I29,539 S.F. � i �� , i � I, r Q I '.� � /� `Y/ , ; � i i (I, Q -� ' � III NORTH I DRAFTcD BY.� YLp GRAPHIC SCALE G£SfCN£D BY. YLP O 3O V O 9O PROJECT ENGIN£ER: MAJ � � OATE: 04.30.13 �. PR0.AECT NO.: 13030 ' 1 INCH = 60 FT. GRAW/NG: � R:�2G12�,.ri'�12040�31DrawC-cs�Base\39V✓72G40.dwg 5/3/2C7..' 3:55:lE A.4! FDT I, COPIRIGHT Q 2012, D.R. STRONG CO��SULTIN3 ENG!�VEERS �,VC. SHEET.� � OF � j BACKWATER ANALYSIS RESULTS BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:CB#4 TO INLET l .bwp Surcharge condition at internediate junctions Tailwater Elevation:494.51 feet Discharge Range:0.985 to 9.89 Step of 0.9�5 [c�s] Overflow Elevation:501.5 feet Weir:NONE Upstream Velocity:0. feet/sec PI2E NO. 1: 62 LF - 18��cP @ 6.250 oUrLET: 488.35 IULET: 492.27 INTYP: 5 JUNC N0. 1: OVERFLOW-EL: 499.73 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.70 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI �********************�*�*�*�**�**********************************************�,� 0.99 2.26 499.53 * 0.012 0.38 0.20 6.16 6.16 2.25 2.26 0.46 1.97 2.29 494.56 * 0.012 0.53 0.27 6.16 6.16 2.26 2.29 0.6° 2.95 2.36 494.63 * 0.012 0.66 0.33 6.16 6.16 2.28 2.36 0.8�� 3.94 2.45 494.72 * 0.012 0.76 0.38 6.16 6.16 2.32 2.45 1.G° 4.93 2.57 494.84 * 0.012 0.86 0.43 6.16 6.16 2.36 2.57 1.2c 5.91 2.72 494.99 * 0.012 0.94 0.47 6.16 6.16 2.41 2.72 1.4� 6.90 2.89 495.16 * 0.012 1.02 0.51 6.16 6.16 2.47 2.89 l.0'4 7.88 3.09 495.36 * 0.012 1.09 0.54 6.16 6.16 2.54 3.09 1.83 8.87 3.31 495.58 * 0.012 1.16 0.58 6.16 6.16 2.62 3.31 2.OF 9.85 3.56 495.83 * 0.012 1.22 0.61 6.16 6.16 2.71 3.56 2.32 10.84 3.84 496.11 * 0.012 1.27 0.65 6.16 6.16 2.81 3.84 2.61 PIPE NO. 2: 299 LF - 18"CP @ 1.10$ OUTLET: 492.27 INLET: 495.55 INTYP: 5 JUNC N0. 2: OVERFLOW-EL: 505.93 BEND: 0 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.63 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HW_T ************************+�*************************x*****+**�****************�� 0.58 0.37 495.92 * 0.012 0.29 0.23 2.26 2.26 0.29 ***** 0.3; 1.16 0.54 496.09 * 0.012 0.41 0.32 2.29 2.29 0.41 ***** 0.54 1.74 0.66 496.21 * 0.012 0.50 0.39 2.36 2.36 0.50 ***** 0.65 2.32 0.77 496.32 * 0.012 0.58 0.45 2.45 2.45 0.58 ***** 0.7? 2.90 0.87 496.42 * 0.012 0.65 0.51 2.57 2.57 0.65 ***** 0.8? 3.49 0.95 496.50 * 0.012 0.72 0.56 2.72 2.72 0.72 ***** 0.95 4.07 1.03 496.58 * 0.012 0.78 0.61 2.89 2.89 0.78 ***** 1.C3 4.65 1.10 496.65 * 0.012 0.83 0.66 3.09 3.09 0.83 ***** 1.10 5.23 1.17 496.72 * 0.012 0.89 0.70 3.31 3.31 0.89 ***** 1.1? 5.81 1.32 496.87 * 0.012 0.94 0.74 3.56 3.56 1.08 1.32 1.24 6.39 1.53 497.08 * 0.012 0.98 0.79 3.84 3.84 1.44 1.53 1.30 PIPE NO. 3: 221 LF - 12"CP @ 0.87$ OUTLET: 496.05 INLET: 497.98 INTYP: 5 JUNC NO. 3: OVERFLOW-EL: 501.22 BEND: 0 DEG DIA/WIDTH: 2.0 Q-RATI0:88.91 Q(CFS) HW(FT) HW ELEV. * N-rAC DC DN TW DO DE HWO HWI *���*******************************************************�******************� 0.36 0.33 498.31 * 0.012 0.25 0.22 0.00 0.22 0.25 ***** 0.3� 0.71 0.49 498.47 * 0.012 0.36 0.31 0.04 0.31 0.36 ***** O.�y 1.07 0.61 498.59 * 0.012 0.44 0.38 0.16 0.38 0.44 ***** 0.61 1.43 0.73 498.71 * 0.a12 0.51 0.44 0.27 0.44 0.51 ***** 0.73 1.78 0.85 498.83 * 0.012 0.57 0.50 0.37 0.50 0.57 ***** 0.8� 2.14 0. 96 498.94 * 0.012 0.63 0.56 0.45 0.56 0.63 ***** 0.9,� 2.50 1.07 499.05 * 0.012 0.68 0.62 0.53 0.62 0.68 ***** 1.07 2.85 1.19 499.17 * 0.012 0.73 0.68 0.60 0.68 0.73 ***** 1.1° 3.21 1.33 499.31 * 0.012 0.77 0.74 0.67 0.74 0.77 ***** 1.33 3.57 1.49 499.47 * 0.012 0.81 0.82 0.82 0.82 0.82 1.44 1.49 3.92 1.97 499.95 * 0.012 0.85 1.00 1.03 1.03 1.39 1.97 1.65 O 2013 D. R.STRONG Consulting Engineers Inc. 35 Saddlebrook Div. II Technical Information Report Renton,Washington PIPE NO. 4: 35 LF - 12"CP @ 1.46% OUILET: 497.98 INL�T: 498.50 INiYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ***************�**************************************************************� 0.00 0.04 498.54 * 0.012 0.03 0.03 0.33 0.33 0.03 0.04 O.u3 0.01 0.06 498.56 * 0.012 0.04 0.09 0.49 0.49 0.05 0.06 0.04 0.01 0.10 498.60 * 0.012 0.05 0.04 0.61 0.61 0.10 0.10 0.0� 0.02 0.22 498.72 * 0.012 0.06 0.05 0.73 0.73 0.22 0.22 O.Oo 0.02 0.33 498.83 * 0.012 0.06 0.05 0.85 0.85 0.33 0.33 0.07 0.02 0.45 498.95 * 0.012 0.07 0.06 0.96 0.96 0.45 0.45 0.08 0.03 0.56 499.06 * 0.012 0.07 0.06 1.07 1.07 0.56 0.56 0.08 0.03 0.68 499.18 * 0.012 0.08 0.06 1.19 1.19 0.68 0.68 0.09 0.04 0.82 499.32 * 0.012 0.08 0.07 1.33 1.33 0.82 0.82 0.10 0.04 0.97 499.47 * 0.012 0.09 0.07 1.49 1.49 0.97 0.97 0.10 0.04 1.46 499.96 * 0.012 0.09 0.07 1.97 1.97 1.46 1.46 0.11 BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:CB#703 TO CB#l .bwp Surcharge condition at intermediate junctic:s Tailwater Elevation:495.84 feet Discharge Range:1.38 to 3.62 Srep o� C.�_: ;�f.s- Overflow Elevation:507.61 feet Weir:NONE Upstream Velocity:0. feet/sec PIPE N0. l: 24 LF - 12"CP @ 6.73� CII�L�:: 4y�.17 I:dL�i: 4y=.42 I2diYP: 5 JUNC NO. 1: OVERFLOW-EL: 499.42 BEND: 57 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.81 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ***************************�****************x***********+�********************� 1.38 1.53 495.95 * 0.012 0.50 0.26 3.07 3.07 1.46 1.53 0.69 1.60 1.56 495.98 * 0.012 0.54 0.28 3.07 3.07 1.46 1.56 0.7� 1.83 1.60 496.02 * 0.012 0.58 0.29 3.07 3.07 1.47 1.60 0.83 2.05 1.65 496.07 * 0.012 0.62 0.31 3.07 3.07 1.49 1.65 0.9_ 2.28 1.70 496.12 * 0.012 0.65 0.33 3.07 3.07 1.51 1.70 0.98 2.50 1.76 496.18 * 0.012 0.68 0.35 3.07 3.07 1.52 1.76 1.0� 2.72 1.83 496.25 * 0.012 0.71 0.36 3.07 3.07 1.54 1.83 1.12 2.95 1.90 496.32 * 0.012 0.74 0.38 3.07 3.07 1.56 1.90 1.20 3.17 1.97 496.39 * 0.012 0.77 0.39 3.07 3.07 1.59 1.97 1.2: 3.40 2.05 496.47 * 0.012 0.79 0.41 3.07 3.07 1.61 2.05 1.3� 3.62 2.14 496.56 * 0.012 0.82 0.42 3.07 3.07 1.64 2.14 1.4° PIPE NO. 2: 30 LF - 12"CP @ 2.28s OUTLET: 494.42 INLET: 495.12 INTYP: � JUNC N0. 2: OVERFLOW-EL: 498.12 BEND: 44 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.03 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI *�********�****************+�*****************************�*�****************�_� 0.76 0.87 495.99 * 0.012 0.37 0.25 1.53 1.53 0.85 0.87 0.49 0.89 0.90 496.02 * 0.012 0.40 0.27 1.56 1.56 0.88 0.90 0.53 1.01 0.96 496.08 * 0.012 0.43 0.29 1.60 1.60 0.93 0.96 0.�7 1.13 1.01 496.13 * 0.012 0.45 0.30 1.65 1.65 0.98 1.01 0.61 1.26 1.08 496.20 * 0.012 0.48 0.32 1.70 1.70 1.04 1.08 0.6� 1.38 1.15 496.27 * 0.012 0.50 0.34 1.76 1.76 1.10 1.15 0.68 1.50 1.23 496.35 * 0.012 0.53 0.35 1.83 1.83 1.17 1.23 0.72 1.63 1.31 496.93 * 0.012 0.55 0.37 1.90 1.90 1.25 1.31 0.7� 1.75 1.41 496.53 * 0.012 0.57 0.38 1.97 1.97 1.33 1.41 0.7� 1.88 1.51 496.63 * 0.012 0.59 �0.40 2.05 2.05 1.42 1.51 0. �� 2.00 1.61 490.73 * 0.012 0. 61 0.41 2.14 2.14 1.52 1.61 0.85 �2013 D.R.STRONG Consulting Engineers Inc. 36 Saddlebrook Div. II Technical Information Report Renton,Washington PIPE �O. 3: 23 LF - '_2"C? @ 1.00% OUTLEi: 495.12 INLEi: 49�.35 INTYP: 5 JUNC NO. 3: OVERFLOW-EL: 498.50 BEND: 18 DEG DIA/WIDTH: 2.0 Q-RATIO: 0. 17 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI *x*x�*********���**�*+*�********��*******************�************�*****�*****� 0.74 0.68 496.03 * 0.012 0.37 0.30 0.87 0.87 0.64 0.68 O.S9 0.86 0.72 496.07 * 0.012 0.39 0.33 0.90 0.90 0.68 0.72 0.53 0.98 0.78 496.13 * 0.012 0.42 0.35 0.96 0.96 0.73 0.78 0.5? l.11 0.84 496.19 * 0.012 0.45 0.37 1.01 1.01 0.79 0.84 0.6"_ 1.23 0.92 496.27 * 0.012 0.47 0.39 1.08 1.08 0.87 0.92 0.6� 1.35 0.99 496.34 * 0.012 0.50 0.41 1.15 1.15 0.94 0.99 0.6� 1.47 1.08 496.43 * 0.012 0.52 0.93 1.23 1.23 1.03 1.08 0.72 1.59 1.18 496.53 * 0.012 0.54 0.45 1.31 1.31 1.12 1.18 0.75 1.71 1.29 496.64 * 0.012 0.56 0.47 1.41 1.41 1.22 1.29 0.78 i "_.83 1.41 490.76 * 0.012 0.58 0.49 1.51 1.51 1.33 1.41 0.81 1.95 1.53 496.88 * 0.012 0.60 0.51 1.61 1.61 1.49 1.53 0.85 FIF� NO. 4: 121 LF - 12"CP @ 3.510 OUTLET: 495.35 INLET: 499.63 INTYP: 5 I JJP1C NO. 4: OVERFLOW-EL: 502.63 BEND: 88 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.21 Q(CFS) HW(FT) HW ELEV. * N-rAC DC DN TW DO DE HWO HWI ' t�,rxxxx****x***********�******x**********************�************************* .. C. 63 0.44 500.07 * 0.012 0.34 0.21 0.68 0.68 0.34 ***** 0.44 C.74 0.49 500.12 * 0.012 0.36 0.22 0.72 0.72 0.36 ***** 0.49 C.84 0.53 500.16 * 0.012 0.39 0.24 0.78 0.78 0.39 ***** 0.53 0,94 0.56 500.19 * 0.012 0.41 0.25 0.84 0.84 0.41 ***** 0.56 "-.05 0.60 500.23 * 0.012 0.44 0.26 0.92 0.92 0.44 ***** 0.60 1.15 0.64 500.27 * 0.012 0.46 0.27 0.99 0.99 0.46 ***** 0.64 1.25 0.67 500.30 * 0.012 0.48 0.29 1.08 1.08 0.48 ***** 0.67 ' 1.36 0.71 500.34 * 0.012 0.50 0.30 1.18 1.18 0.50 ***** 0.71 1.46 0.75 500.38 * 0.012 0.52 0.31 1.29 1.29 0.52 ***** 0.75 1.56 0.78 500.41 * 0.012 0.54 0.32 1.41 1.41 0.54 ***** 0.78 1.66 0.82 500.45 * 0.012 0.55 0.33 1.53 1.53 0.55 ***** 0.82 PIPE N0. 5: 76 LF - 12"CP @ 3.88$ OUTLET: 499.63 INLET: 502.61 INTYP: 5 4(C�S) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI k**********�******************�****************+*******�*******************�*** G.53 0.40 503.01 * 0.012 0.31 0.18 0.44 0.44 0.31 ***** 0.40 G.61 0.43 503.04 * 0.012 0.33 0.20 0.99 0.49 0.33 ***** 0.43 G.70 0.46 503.07 * 0.012 0.35 0.21 0.53 0.53 0.35 ***** 0.46 G.78 0.50 503.11 * 0.012 0.37 0.22 0.56 0.56 0.37 ***** 0.50 ��.87 0.53 503.14 * 0.012 0.40 0.23 0.60 0.60 0.40 ***** 0.53 �.95 0.56 503.17 * 0.012 0.41 0.24 0.64 0.64 0.41 ***** 0.56 1.04 0.59 503.20 * 0.012 0.43 0.25 0.67 0.67 0.43 ***** 0.59 1.12 0.62 503.23 * 0.012 0.45 0.26 0.71 0.71 0.45 ***** 0.62 ', 1.21 0.65 503.26 * 0.012 0.47 0.27 0.75 0.75 0.47 ***** 0.65 1.29 0.68 503.29 * 0.012 0.49 0.28 0.78 0.78 0.49 ***** 0.68 �.38 0.70 503.31 * 0.012 0.50 0.29 0.82 0.82 0.50 ***** 0.70 �2013 D. R. STRONG Consulting Engineers Inc. 37 Saddlebrook Div. II , Technical Information Report Renton,Washington BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:CB#101 TO CB#l .bwp Surcnarge condition at intermediate junctions Tailwater Elevation:495.84 ieet Discharge Range:0.07 to 0.07 Step of 0.07 [cfsj Overflow Elevation:497.86 feet Weir:NONE � Upstream Velocity:0. feet/sec PIPE NO. 1: 21 LF - 12"CP @ 0.98� CCi_�'�': -�2.77 I�dL�T: =92.98 _I•I1`�P: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HTn�I ***��*�***********�*�***************�***x***x�*************x***********�*x*�*** 0.07 2.87 495.85 * 0.012 0.11 0.10 3.07 3.07 2.87 2.87 0.14 BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:CB#102 TO CB#2 .bwp Surcharge condition at intermediate junctions Tail�aater Elevation:496.87 feet Discharge Range:0.93 to 0.93 Ste� of 0.93 [cfs] Overflow Elevation:505.93 fee� Weir:NONE Upstream Velocity:0. feet/sec _ rI�E NO. l: 24 LF - 12"CP @ 20.05°s 0[JTLET: 496.C5 I'dLEi: SC�G.93 iidTY�: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ****x******��*******�***�****x*�*�*******x�*******************�***************x 0.93 0.97 50'_.40 * 0.012 0.41 0.?6 0.82 0.82 0.4= ***** C.47 BACKWATER COMPUTER PROGRAM FOR PIPES � Pipe data from file:CB#103 TO CB#3 .bwp Surcharge condition at intermediate junctions Tailwater Elevation:499.47 feet Discharge Range:1.88 to 1.B8 St�U of =.88 [cis] Overflow Elevation:501.22 fee� Weir:NONE Upstream Velocity:0. feet/sec PIPE N0. 1: 24 Lr - 12"CP @ 0.99� OUTLET: 497.98 I`dLEi: �98.22 =tdl'YP: � Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HGdI **�*�*��*******x+*�**x***x*�**�*x*�xx*****�*****�xx**x****��x*xx***�*x*xxx�*�xx -. E� "-.44 49�.65 t 0.0"2 0.�'? O.�C 1. �9 "-.4° 1.3_ 1.44 0.88 O 2013 D.R.STRONG Consulting Engineers Inc. 38 Saddlebrook Div. 11 Technical Information Report Renton,Washington I � - --, SECTION VI � SPECIAL REPORTS AND STUDIES I The following report and studies have been provided with this submittal. 1. Geotechnical Engineering Study— Earth Solutions NW, LLC, August 21, 2012 2. Saddlebrook Phase II — Earth Solutions NW, LLC, May 15, 2013 ii 3. Tree Inspection Report— Greenforest, Inc., May 1, 2013 I O 2013 D. R.STRONG Consulting Engineers Inc. 39 Saddlebrook Div. II Technical Information Report Renton,Washington , � SECTION VII OTHER PERMITS, VARIANCES AND ADJUSTMENTS ' Approved Drainage Adjustment 2012-03 (Attached) Approved ADS BayFilter Adjustment 2012-04 (Attached) ii s 2013 D. R.STRONG Consulting Engineers Inc. 40 Saddlebrook Div. II Technical Information Report Renton,Washington PUBLIC WORKS DEPARTMENT � ^c��rof�O� .�;_: �� a�`�: . IVI E M O R A N D U M . . DATE: August 16, 2012 TO: Arneta Henninger, Plan Revie�ver FROM: ���—Rnn Straka,Surface Water Utility Supervisor, x7248 STAFF CONTACT: Hebe Bernardo,Surface Water Utility Engineer,x7264 SUBIECT: Sac�dlebrook PIat Adjustment 2012-Q3 The City of Renton Surface Water Utility has completed review of the adjustment . request for the Saddlebrook P(at in accordance with �ty adopted 2009 King County Surface Water Design Manual (KCSWDM) anci City Amendments to the 2009 KCSWDM. Our review of the information leads us to understand that the applicant's engineering is � requesting an adjustment frorr� the 2009 King County Surface Water Design Manual to � core requirement#1 (section 1.2.1), Qischarge at the Natural Location. Our review of � the information provided by the applicant engineer on August 13, 2012, provides the � following findings: p� � 1. The proposed project has not cornpleted the process preliminary plat approval � or SEPA review. L j 2. The site is {ocated in two existing parcefs (3664500Z60 and 3664540261) with a total area of 4.36 acers. Parcels are situated a#op a ridge and discharges runoff into two subbasins. Tributary Drainage Area (TDA)�West is approximately 1.78 acres and discharges ta 156th Avenue SE while TDA East is comprisec{ of the remaining 2.58 acres and discharges to 158th Avenue SE. The discharge elevation of TDA West is approximately six feet lower than that of TDA East. These two flowpaths converge at a point approximately 3,000 feet downstream of TDA West and 4,900 feet downstream of TDA East at the corner of 156th Avenue SE and SE 144th Street (convergence point). 3. The proposal is to collect much of the runoff from the project site (4.36 acres) and direct it to a single combined detention and water quality facility located in the west portion of the site. The allowed release would then discharge through an existing conveyance system into the right-of-way of 156th Avenue SE where it continues to go south and canverges with TDA East.in SE 144th Street. 1an I(lian ' Page 2 of 4 August i6,2012 ' 4. No downstream analysis has been campleted and submitted to the City for review. However, a pr�liminaryfield recognizance ofthe downstream drainage � system was completed bythe applicant and applicant's engineer. Findings were � discussed in the adjustment letter. Preliminary analysis demonstrafed that the downstream path from TDA WeSt is mostly comprised of a constructed conveyance system from the�site to the convergence point. This conveyan.ce system is made up of grass and rock-lined ditches as wel( as culverts, pipes, and catch basins. • 5. King County drainage complaints in the area were reviewed and the basin draining to the conveyance system was determined using King County iMAP. This resource review revealed an overall basin size of approximately 73.5 acres and no relevant drainage complaints in the last 15 years downstream of the Site. 6. To analyze the impact of the discharge rate, the King County Runoff Time Series Software was used to examine.the overall site in a forested condition, � TDA West's existing conditian, and the 73.5 acre basin in a forested condition as well as a full build-out condition (undetained, �based on KCSWDM Table � 3.2.2.0 for 4.0 DU/GA, 42% impervious). TDA West (in its existing condition} generates approximately 0.29 cfs of runoff for the 100-year return interval. The total site, when analyzed for the forested condition, will generate approximately 0.35 cfs of runoff for the 100-year return interval. The existing canveyance system downstream of the proposed plat would receive a net increase in runofF of 0.06 cfs,which is less than 0.1 cfs. The total drainage basin currently generates 5.93 cfs and 23.59 cfs, for forested and build-out conditions assuming no flow control, respectivefy. Based on these understandings,findings, and per section 1.2.1 of the 2009 Surface I', Water Design Manual as amended by the City,the adjustment to allow the diversion of �� runoff to a single combined stormwater flovv control and water quafity treatment facility lil drainingto SE 156th Avenue is approved with the following conditions: ', 1. A level flne downstream analysis in accordance with section 1.2.1 of the 20D9 KCSWDM a5 amended by the City shall be submitted to the City for review. Based on this analysis, the City may require the completion of a downstream analysis and/or impro�ements to the downstream system. H:\File Sys\SWP-Suriace Water Projects\SWP-27-Sur;ace Water Projects{CI?)\27-3129 Renton Stormwater Ma nu al\ADJ USTMENTS\2012\2012-3 5a ddlebrook.doc\H Bah Jan Illian Page 3 of 4 . August 16,2012 2. The proposed combined detention and water quality treatment facility to be constructed on the northwest corner of the site shall be designed as a level 3 flow control for the entire site in using the two basins as the existing (forested) site conditions. The stormwater facility shalf be designed in accordance with � section 1.2.3 ofthe 2009 KCSWDM. � 3. Surface water discharge from the west basin is required to follow its existing drainage course. 4. Water quality treatment in accordance with�section 1.2.8 of the 2009 KCSWDM shall be provided for all targeted surfaces prior to discharging from the site. The water quality facility shall be sized based on the entire proposed subdivision draining to the facility including any required frontage improvements. 5. The refease rate from the detention facility will be based on afl of the tributary area being directed to the faciiity. 6. The volume of the stormwater detention facility shall be based on all flows directed to the facifity at full development under current zoning. The detention volume shall be sized using Level 3 Flood Problem Flow Control Standards in the 2009 KCSWDM. The pre-developed condition runoff rates for the sizing of the facility shall be based on the entire site using forested as pre-developed s�te conditions. The TIR shall include all required documentation detailed in chapter 2 of the 2009 KCSWDM for the sizing of the facility. 7. Additionaf storm drainage requirements identified by the City of Renton as part of the SEPA review process or preliminary plat approval may apply to this project. Please note that the approval of this adjustment does nof relieve the � applicant from other conditions that may be stipulated in future city, state, or federal permits/requirements. � Motes to applicant: 1. All lots within the Saddlebrook Plat are required to provide flotv control SMPs in accordance with figure C.1.3.A of the 2009 KCSWDM. Flow control BMP credits in accordance with section 1.2.3 ofthe 2005 KCSWDM may be used to reduce the size ofthe required flow control facility. The feasibilityto implement full dispersion BMPs and full infiltration BMPs shall be verified first. If � implementation of full dispersion BMPs and full infiltration BMPS are not feasible alternatives,then any of the BMPs listed in figure C.1.3.A shall be provided. The selected f{ow control BMP to be implemented on each lot shall be shown on the co.nstruction plans. Drainage calculations for the sizing of the . � proposecJ BMPs to be constructed on each lot shall be included in the TIR. II H:\Fle Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3129 Renton Stormwater Manual\ADJUSTMENTS\2012\2012-3 Saddlebrook.doc\HBah Jan Illian Page 4 of 4 August 16,Z012 Construction of the proposed flow control BMPs may be differed for construction on the lot at time of building permit. It�you have any questions about this adjustment, please contacE Hebe Bernardo or me. Attachmens cc: Lys Hornsby,P.E.,Utility Systems Director � Kayren Kittrick,Development Engineering Supervisor i Vanessa Dolbee,Planner File H:\File Sys\5WP-Surface Water Projects\SVJP-27-Surr`ace VJater Projecs(QP)\27-31Z9 Renton 5tormwater Nlanua(\ADJUSTMENTS\2012\2012-3 Saddlebrook.doc\HBah QUBLIC WORKS DEPARTMENT D o c�yof .,,.,� I ���0� ���' i M E � M O R A IV D U M � DATE: October 31, 2012 . TO: . Arneta Henninger, Plan Reviewer FROM: ��2 Ron Straka, Surface Water Utility Supervisor,x7248 STAFF CONTACT: Hebe C. Bernardo, Surface Water Utility Engineer,x7248 SUBJECT: Saddlebrook Plat—ADS BayFilterTM Adjustment 2012-04 The City of Renton Surface Water Utiiity has completed re�iew of the adjustment request from DR Strong Consultant Engineer for the Saddlebrook Plat in accordance with City adopted 2009 King County�Surface Water Design Manual (KCSWDM}and Ciiy Amendments to the 2009 KCSWDM. Our review of the infiormation leads us to understand that the applicant's engineering is requesting an adjustment from the 2009 King County Surface Water Design Manual.to core requirement#8),Water Quality. Our review of the information provided by the applicant engineer on October 16,2012, prbvides the following�ndings: 1. The proposed project has not completed the process preliminary plat approval orSEPA review. . 2. The site is located in two existing parcels(3664500260 and 3664500261)with a toial area oT4.36 ac�es. P�rcei� arN si��ia�e� atop a riclge a��d uischarges iun�ff i��o �wo � sub-basins. An adjustment to Core Requirement#1, Discharge at the Natural Location was approved in December 11,2012 allowing the project to collect much of the runoff from i5e projEci site(4.36 acres) and direct it to a single combi�ed �etent�o� and water . quality facility located in the v�Jest portion oi the site. The adjustmeni requesi pioposes io use i ie BayF'tlierT"^ Sys�em for Easic Water Quality � treatment. The L1/ashington Stat�Dzpartment of Ecolog�r has approved the BayFilterT"'System � for General Use Level Designa�ion for Basic Water Quality treatment. � Based on the information provided in the adjustment request;the BayFifterTM'System for Basic . Water Quality Treatment is approved with the following conditions: � � 1. The water quality design fl�v�shall be as follows,whichever is applicable: a. Downstream of flow control facility:The full 2-year pre-developed al(owable rate release rate from the ilow contro)facility. � � Ms.Henninger Page2of3 October 31,2012 2. The Storm Filter system shall be sized as described in the BayFilterTM'Technica!and � . Design Monual,and the designer shall select the result yielding the larger number of cartridges. . 3. Pre-settling shall be provided per Section 6.5.1 of the 2009 KCSWDM, General Requirements fior Media Filtration Facilities. 4. BayFrlter'"systems shall be installed in such a manner that the flows exceeding the design flow rates are bypassed around the Ba�lter Water Quality treatment facility. An ' external bypass to handle flow exceeding the facility design shall be provided. , 5. The following maximum flow rates per cartridge system is limited to the following: a. BayFilter Cartridge(BFC) Cartridge maximum flow rate of 0.7 gpm/sf. i. 30 gpm (0.067 cfs) per cartridge (43 sf filter area). ii. 26 inches in diameter and approximately 28.75 inches tall. 6. Media combinations forthe BayFilterTM'cartridges are limited to Silica Sand, Perlite, - Zeolite, and Activated Alumina. All filters are limited to the 19"vertical component to the spiral filter lay2rs. 7. Vaults used for tne BayFilterTM'System shall conforrn to the "Materials"and "Structural Stability" requirements specified in Section 5.33 of the 2009 KCWDM for detention vaults. 8. The BayFiltern'"system must be installed in an area that is accessible to maintenance equipment. The maintenance of a BayFilterT"'system requires a vacuum truck as well as the removal and replacement of the fiiter cartridges. i he manhole covers, and/or . access hatches of the BayFilterTM'System must be placed in locations ihat can be easily reached br s�.:ch a v�hicl�. 9. Access Requirements: � a. Access consistent with City confined entry policy must be provided by either � removab(e panels or other City approved accesses to allow for removal and I"��^,��cem�nt ef the Ba;�Filter c?rtri�a?S.�!rrro��?d 2ccess details for the Storm Filte!'System ma��be �,sed as eX2�?'?��e and zre ava�lablP in Reference Section 7C of the 2009 KCSWDM_ � b. Removable panels, if used, shali be at grade, have stainless steel lifting eyes, and weigh no more than 5 tens per pane!. � � c. Access io ihe in�low and �u��et cells�ust aiso be �ravi�ed. .�. �ZG�`���Z.r.C2S5!S ��^yL':Tp�::��'1pC!VG�UIL�P{pf�t QXreP�S a IE?L. e. Structures and access covers shafi be designed Tor HS20 traitic loading. f. Removable panel access for vault s�al! not be located within the street pavement section. . 1�J. i:�s�(IGtion of a �ayFilter'`"'syst�rn sha11 falio;ni ihe manu�ac�urer's r�comm��ded h!"OC2�I,f�S. H:\Fi;e Sy;\SVJ?-Suracz L'vatei Projects\SWP-27-Surface 4Jaier Frojec`s(CiFj\27-3123 Renio�Sterm�vaier f�^�rt;al���C•JUST�9EN?S�ZOy_2;?nl?1}c�r�chmp4 Pf�t-ho��ilt2f.rlpr\[-!na� Ms.Henninger . ' � Page 3 of 3 October3l,2012 • . 11. The Bay Filter'"'system shall be inspected every six(6) months during the 2-year maintenance defect bond period following completion of construction and plat � recording..The owner is responsible for the maintenance of the Bay FilterTM'system � during the 2-year defect bod period. The City will maintain the facility afterthe two year maintenance and defect bond period expires. � 12. When BayFilter exhibits flows below design levels,the system should be inspected and maintained as soon as practical. Replacing a BayFilter cartridge should be considered at or above the level of the 4"collector pipes to the manifold. Maintenance procedures can be found in the BayFilter System Technical and Design Manual. The maintenance process comprises the removal and replacement of each BayFilter cartridge and the cleaning af the vault or manhole with a vacuum truck. 13. This is a conceptual approval for using the BayFilter for Basic Water Quality Treatment. Further analysis and design calculations shall be included in the TIR for final approval. . 14. The approval of this adjustment to use the Bay�ilter System for the Saddlebrook Plat does not authorize the use of the BayFilter System on future projects without prior approval from the City of Renton. 15.- The BayFifter system shall be installed in accordance with the approved drawings and shall not be located within City right-of-way or easements. Please note that the approval of this adjustment does not relieve the applicant from other city, � state, or�ederal requirements. If you have any questions about this adjustment, please contact Hebe C. Bernardo or me. Attachments � cc: Lys Hornsby,P.E.,Utiiiry Systems Director Kayren Kittrick,Development Engineering Supervisor Richzrd Marshz!,Surface W=ter and 1A�ater Maintenance Manager Vanessa Dolbee,Planner File N:\File Sys\54"J?-Sufac2 Wat2r Projects\SWP-�7-Surface bVater Projeds(C1P)\27-3124 Rentan Stcrmwater � Manual�ADJUSTMENTS\2012\2012-4 Sattlebrook Plat-hayfilter.doc\HEah SECTION VIII ESC PLAN ANALYSIS AND DESIGN (PART A) The Erosion and Sedimentation Control Design will meet the nine minimum requirements: 1. Clearing Limits - Areas to remain undisturbed shall be delineated with a high visibility plastic fence prior to any site clearing or grading. 2. Cover Measures - Site disturbed areas shall be covered with mulch and seeded, as appropriate, for temporary or permanent measures. 3. Perimeter Protection - Perimeter protection shall consist of a silt fence down slope of any disturbed areas or stockpiles. 4. Traffic Area Stabilization - A stabilized construction entrance will be located at the point of ingress/egress. 5. Sediment Retention — The proposed detention pond will be used as a sediment pond. 6. Surface Water Control - Surface water control will be provided by interceptor swales. 7. Dewatering Control — Not Applicable to this Site. 8. Dust Control - Dust control shall be provided by spraying exposed soils with water until wet. This is required when exposed soils are dry to the point that wind transport is possible which would impact roadways, drainage ways, surface waters, or neighboring residences. 9. Flow Control — Flow control will be provided by the detention pond. SWPPS PLAN DESIGN (PART B) Construction activities that could contribute pollutants to surface and storm water include the following, with applicable BMP's listed for each item: 1. Storage and use of chemicals: Utilize source control, and soil erosion and sedimentation control practices, such as using only recommended amounts of chemical materials applied in the proper manner; neutralizing concrete wash water, and disposing of excess concrete material only in areas prepared for concrete placement, or return to batch plant; disposing of wash-up waters from water-based paints in sanitary sewer; disposing of wastes from oil-based paints, solvents, thinners, and mineral spirits only through a licensed waste management firm, or treatment, storage, and disposal (TSD) facility. 2. Material delivery and storage: Locate temporary storage areas away from vehicular traffic, near the construction entrance, and away from storm drains. Material Safety Data Sheets (MSDS) should be supplied for all materials stored, and chemicals kept in their original labeled containers. Maintenance, fueling, and repair of heavy equipment and vehicles shall be conducted using spill O 2013 D.R.STRONG Consulting Engineers Inc. 41 Saddlebrook Div. II Technical Information Report Renton,Washington prevention and control measures. Contaminated surfaces shall be cleaned immediately following any spill incident. Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other potentially hazardous materials. 3. Building demolition: Protect stormwater drainage system from sediment-laden runoff and loose particles. To the extent possible, use dikes, berms, or other methods to protect overland discharge paths from runoff. Street gutter, sidewalks, driveways, and other paved surFaces in the immediate area of demolition must be swept daily to collect and properly dispose of loose debris and garbage. Spray the minimum amount of water to help control windblown fine particles such as concrete, dust, and paint chips. Avoid excessive spraying so that runoff from the site does not occur, yet dust control is achieved. Oils must never be used for dust control. 4. Sawcutting: Slurry and cuttings shall be vacuumed during the activity to prevent migration offsite and must not remain on permanent concrete or asphalt paving overnight. Collected slurry and cuttings shall be disposed of in a manner that does not violate ground water or surface water quality standards. The complete CSWPPP can be found in Appendix D of this report. O 2013 D.R.STRONG Consulting Engineers Inc. 42 Saddlebrook Div. II I� Technical Information Report Renton,Washington , SECTION IX BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT 1. Bond Quantity Worksheet— attached in Appendix B 2. Facility Summary— attached. 3. Declaration of Covenant—will be provided prior to final engineering approval. O 2013 D.R.STRONG Consulting Engineers Inc. 43 Saddlebrook Div. II Technical Information Report Renton,Washington STORMWATER FACILITY SUMMARY SHEET Development Saddlebrook Div. I and Div. II Date Auqust 7, 2013 I Location 13422 156th Avenue SE, Renton, Washinqton ENGINEER DEVELOPER Name Maher A. Joudi, P.E. Name ' ' ; Firm D. R. STRONG Consulting Firm: ACH Homes, LLC En ineers, Inc. Address 620 7 Avenue Address 9675 SE 36 Street, # 105 Kirkland, WA 98033 Mercer Island, WA 98040 Phone 425 827-3063 Phone 206 588-1147 Developed Site: 5.54 acres Number of lots Seventeen (Total for Div. I and Div. II) Number of detention facilities on site: Number of infiltration facilities on site: 1 pond ponds vaults vaults tanks tanks Flow control provided in regional facility (give location) No flow control required Exemption number Downstream Draina e Basins Immediate Major Basin Basin Lower Cedar River Cedar River Number & type of water quality facilities on site: biofiltration swale (regular/wet/ or continuous inflow?) sand filter (basic or large?) sand filter, linear (basic or large?) 1 BayFilter 1 detention pond sand filter vault (basic or large?) combined detention/wetvault stormwater wetland compost filter wetpond (basic or large?) filter strip wetvault 34 flow dispersion pre-settling pond farm management plan flow-splitter catchbasin O 2013 D.R. STRONG Consulting Engineers Inc. 44 Saddlebrook Div. II Technical Information Report Renton,Washington landscape management plan oil/water separator (baffle or coalescing plate?) catch basin inserts: Manufacturer pre-settling structure: Manufacturer DESIGN INFORMATION INDIVIDUAL BASIN _ East Water Quality design flow Water Quality treated volume Drainage basin(s) 2 Onsite area (inlcudes frontage) 5.54 ac. , Offsite area 0 ' Type of Storage Facility Pond Live Storage Volume (required) 62,868 Predev Runoff Rate 2-year 0.154 10-year 0.268 100-year 0.447 Developed Runoff Rate 2-year 0.083 (Including Bypass Rate) 10-year 0.228 100-year 0.444 Type of Restrictor Fro -Tee Size of orifice/restriction No. 1 1.11 No. 2 2.14 No. 3 2.54 No. 4 N/A �:�2013 D. R.STRONG Consulting Engineers Inc. 45 Saddlebrook Div. II Technical Information Report Renton,Washington — SECTION X 'I OPERATIONS AND MAINTENANCE MANUAL '� See Appendix C for excerpts from the 2009 King County Surface Water Design Manual � with regard to Operations and Maintenance. , O 2013 D. R. STRONG Consulting Engineers Inc. 46 Saddlebrook Div. II I Technical Information Report Renton,Washington �i APPENDICES O 2013 D.R.STRONG Consulting Engineers Inc. 47 Saddlebrook Div. II Technical Information Report Renton,Washington APPENDIX "A" LEGAL DESCRIPTION THE SOUTH 130 FEET OF LOT 5 IN BLOCK 2 OF JANETT'S RENTON BOULEVARD TRACTS, ACCORDING TO PLAT RECORDED IN VOLUME 17 OF PLATS AT , PAGE(S) 60, IN KING COUNTY, WASHINGTON; EXCEPT THE EAST 290 FEET I THEREOF. ' �2013 D. R.STRONG Consulting Engineers Inc. 48 Saddlebrook Div. II Technical Information Report Renton,Washington APPENDIX "B" BOND QUANTITY WORKSHEET � O 2013 D.R.STRONG Consulting Engineers Inc. 49 Saddlebrook Div. II Technical Information Report Renton,Washington � Web date: 12/02/2008 Site Improvement Bond Quantity Worksheet � King County Department of Development & Environmental Services 900 Oakesdale Avenue Southwest Renton, Washington 98057-5212 For alternate formats, ca11206-296-6600. 206-296-6600 TTY 206-296-7217 Project Name: Saddlebrook I I Date: 7-Aug-13 Location: Rentoll Project No.: Activity No.: Note: All prices include labor, equipment, materials, overhead and Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. yes X no If yes, Forest Practice Permit Number: (RCW 76.09) Page 1 of 9 Unit prices updated: 02/12/02 Version: 11/26/2008 Bond Quantity Worksheet13030.x1sx Report Date: 8/7/2013 s : _ . 1 Site Improvement Bond Quantity Worksheet Webdate: '2,°2,2°°8 n't #of Ui Reference# Price Unit Quantity Applications Cost EROSION/SEDIMENT CONTROL Number Backfill &compaction-embankment ESC-1 $ 5.62 CY Check dams,4" minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each 3 1 203 Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY Ditchin ESC-4 $ 8.08 CY 35.55555556 1 287 Excavation-bulk ESC-5 $ 1.50 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 387 1 534 Fence,Tempora (NGPE) ESC-7 $ 1.38 LF 1004 1 1386 Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY 797.6666667 1 471 Jute Mesh ESC-9 SWDM 5.4.2.2 $ 1.45 SY Mulch, by hand, straw, 3"deep ESC-10 SWDM 5.4.2.1 $ 2.01 SY 797.6666667 Mulch, by machine, straw, 2"deep ESC-11 SWDM 5.4.2.1 $ 0.53 SY Pipin ,tempora , CPP,6" ESC-12 $ 10.70 LF Pi ing,temporary, CPP, 8" ESC-13 $ 16.10 LF Piping,temporary, CPP, 12" ESC-14 $ 20.70 LF 34 1 704 Plastic coverin ,6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY 51.85185185 1 119 Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 39.08 CY Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each 1 1 2929 Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 1,949.38 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 17.91 LF Sed.trap, 5'high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF 131 1 8979 Seeding, by hand ESC-22 SWDM 5.4.2.4 $ 0.51 SY Sodding, 1"deep, level ground ESC-23 SWDM 5.4.2.5 $ 6.03 SY Sodding, 1"deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY TESC Supervisor ESC-25 $ 74.75 HR 20 1 1495 Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR 2 1 196 WRITE-IN-ITEMS **** (see paqe 9) ! Each ESC SUBTOTAL: $ 17,301.00 30%CONTINGENCY&MOBILIZATION: $ 5,190.30 ESC TOTAL: $ 22,491.30 COLUMN: A Page 2 of 9 Unit prices updated: 02/12/02 Version: 11/26/2008 Bond Quantity Worksheet13030.x1sx Report Date: 8/7/2013 Site Improvement Bond Quantity Worksheet Webdate 12/02/2008 Existing Future Public Private Quantity Completed Right-of-Way Right of Way Improvements (Bond Reduction)" &Draina e Facilities Quant. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost GENERALITEMS No. Backfill&Compaction-embankment GI-1 $ 5.62 CY 208 1,168.96 Backfill&Compaclion-trench GI-2 $ 8.53 CY 5 42.65 30 255.90 Clear/Remove Brush,b hand GI-3 $ 0.36 SY Clearin /Grubbin /Tree Removal GI-4 $ 8,876.16 Acre 0.04 355.05 0.494 4,384.82 Excavation-bulk GI-5 $ 1.50 CY 211 316.50 Excavation-Trench GI-6 $ 4.06 CY 5 20.30 30 121.80 Fencin ,cedar,6'hi h GI-7 $ 18.55 LF Fencin ,chain link,vin I coated, 6'hi h GI-8 $ 13.44 LF Fencin ,chain link, ate,vin I coated, 2 GI-9 $ 1,271.81 Each Fencin ,split rail,3'hi h GI-10 $ 12.12 LF Fill&com act-common barrow GI-11 $ 22.57 CY Fill&com act- ravel base GI-12 $ 25.48 CY Fill&com act-screened to soil GI-13 $ 37.85 CY I Gabion, 12"deep,stone filled mesh GI-14 $ 54.31 SY � Gabion, 18"deep,stone filled mesh GI-15 $ 74.85 SY Gabion,36"deep,stone filled mesh GI-16 $ 132.48 SY Grading,fine,b hand GI-17 $ 2.02 SY Grading,fine,with grader GI-18 $ 0.95 SY Monuments,3'lon GI-19 $ 135.13 Each Sensitive Areas Si n GI-20 $ 2.88 Each Sodding, 1"deep,slo ed ground GI-21 $ 7.46 SY Surve in ,line& rade GI-22 $ 788.26 Da 1 788.26 Surve ing,lot location/lines GI-23 $ 1,556.64 Acre 1 1,556.64 Traffic control crew(2 fla ers) GI-24 $ 85.18 HR 6 511.08 Trail,4"chipped wood GI-25 $ 7.59 SY Trail,4"crushed cinder GI-26 $ 8.33 SY Trail,4"top course GI-27 $ 8.19 SY Wall,retainin ,concrete GI-28 $ 44.16 SF Wall,rockery GI-29 $ 9.49 SF Page 3 of 9 SUBTOTAL 929.08 8,592.88 Unit prices updated: 02/12/02 'KCC 27A authorizes only one bond reduction. Ve�SIOn: 11/26/08 Dond Quantity V`Jorksheet13030.x1sx Report Date: 8/7/2013 Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008 Existing Future Public Private Bond Reduction* Right-of-way Right of Way Improvements 8 Drainage Facilities Quant. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost ROADIMPROVEMENT No. AC Grindin ,4'wide machine<1000s RI-1 $ 28.00 SY AC Grindin ,4'wide machine 1000-200 RI-2 $ 15.00 SY AC Grinding,4'wide machine>2000s RI-3 $ 7.00 SY AC Removal/Dis osal/Re air RI-4 $ 67.50 SY 261.778 17,670.00 Barricade,t e I RI-5 $ 30.03 LF Barricade,t e III Permanent) RI-6 $ 45.05 LF Curb&Gutter,rolled RI-7 $ 17.00 LF Curb&Gutter,vertical RI-8 $ 12.50 LF 132 1,650.00 Curb and Gutter,demolition and dis osa RI-9 $ 18.00 LF Curb,extruded asphalt RI-10 $ 5.50 LF � Curb,extruded concrete RI-11 $ 7.00 LF Sawcut,as halt,3"de th RI-12 $ 1.85 LF 430 795.50 � Sawcut,concrete,per 1"depth RI-13 $ 1.69 LF I, Sealant,as halt RI-14 $ 1.25 LF 430 537.50 Shoulder,AC, see AC road unit price) RI-15 $ - SY Shoulder,gravel,4"thick RI-16 $ 15.00 SY Sidewalk,4"thick RI-17 $ 35.00 SY 835 29,225.00 Sidewalk,4"thick,demolition and dis os RI-18 $ 29.50 SY Sidewalk,5"thick RI-19 $ 38.50 SY Sidewalk,5"thick,demolition and dis os RI-20 $ 37.50 SY Si n,handica RI-21 $ 85.28 Each Striping,per stall RI-22 $ 5.82 Each Striping,thermoplastic,(for crosswalk) RI-23 $ 2.38 SF Striping,4"reflectorized line RI-24 $ 0.25 LF Page 4 of 9 SUBTOTAL 49,878.00 Unit prices updated: 02/12/02 'KCC 27A authorizes only one bond reduction. VerSion: 11/26/08 Bond Quantity Worksheet13030.x1sx Report Date: 8/7/2013 Site Improvement Bond Quantity Worksheet Webdate 12/02/2008 Existing Future Public Private Bond Reduction' Right-of-way Right of Way Improvements &Drainage Facilities Quant. Unit Price Unit Quant. Cost Quant Cost QuanL Cost Complete Cost ROAD SURFACING (4"Rock=2.5 base&1.5"top course) For'93 KCRS(G.5"Rock=5"base&1.5"top course) For KCRS'93,(additional 2.5"base)add RS-1 $ 3.60 SY AC Overla , 1.5"AC RS-2 $ 11.25 SY AC Overla ,2"AC RS-3 $ 15.00 SY AC Road,2",4"rock,First 2500 SY RS-4 $ 21.00 SY 281.556 5,912.67 AC Road,2",4"rock,Qt .over 2500SY RS-5 $ 19.00 SY AC Road,3",4"rock,First 2500 SY RS-6 $ 23.30 SY AC Road,3",4"rock,Qt .over 2500 SY RS-7 $ 21.00 SY AC Road,5",First 2500 SY RS-8 $ 27.60 SY 498.111 13,747.87 AC Road,5",Qt .Over 2500 SY RS-9 $ 25.00 SY AC Road,6",First 2500 SY RS-1 $ 33.10 SY AC Road,6",Qt .Over 2500 SY RS-11 $ 30.00 SY Asphalt Treated Base,4"thick RS-1 $ 20.00 SY Gravel Road,4"rock,First 2500 SY RS-1 $ 15.00 SY Gravel Road,4"rock,Qt .over 2500 SY RS-14 $ 8.50 SY PCC Road,5",no base,over 2500 SY RS-1 $ 27.00 SY PCC Road, 6",no base,over 2500 SY RS-1 $ 25.50 SY Thickened Edge RS-1 i $ 8.60 LF Page 5 of 9 SUBTOTAL 5,912.67 13,747.87 I Unit prices updated: 02/12/02 'KCC 27A authorizes only one bond reduction. VerSiOn: 11/26/08 Bond Quantity VVorksheet13030.x1sx Report Date: 8/7/2013 Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008 Existing Future Public Private Bond Reduction" Right-of-way Right of Way Improvements 8 Drainage Facilities Quant. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost DRAI NAGE (CPP=Cor�ugated PIBStiC Pipe,N12 or Equivalent) For Culvert rices, Average of 4'cover was assumed.Assume perforated PVC is same price as solid pipe. Access Road, R/D D-1 $ 21.00 SY Bollards-fixed D-2 $ 240.74 Each Bollards-removable D-3 $ 452.34 Each " CBs include frame and lid) CBT el D-4 $ 1,257.64 Each 1 1,257.64 1 1,257.64 CB T e IL D-5 $ 1,433.59 Each CB T e II,48"diameter D-6 $ 2,033.57 Each for additional de th over 4' D-7 $ 436.52 FT CB T pe II,54"diameter D-8 $ 2,192.54 Each for additional depth over 4' D-9 $ 486.53 FT CB T pe II,60"diameter D-10 $ 2,351.52 Each for additionat de th over 4' D-11 $ 536.54 FT CB T pe II,72"diameter D-12 $ 3,212.64 Each for additional depth over 4' D-13 $ 692.21 FT Throu h-curb Inlet Framework(Add) D-14 $ 366.09 Each Cleanout,PVC,4" D-15 $ 130.55 Each Cleanout, PVC,6" D-16 $ 174.90 Each Cleanout, PVC,8" D-17 $ 224.19 Each Cuivert,PVC,4" D-18 $ 8.64 LF Culvert,PVC,6" D-19 $ 12.60 LF Culvert,PVC, 8" D-20 $ 13.33 LF Culvert,PVC, 12" D-21 $ 21.77 LF Culvert,CMP,8" D-22 $ 17.25 LF Culvert,CMP, 12" D-23 $ 26.45 LF Culvert,CMP, 15" D-24 $ 32.73 LF Culvert,CMP, 18" D-25 $ 37.74 LF Culvert,CMP,24" D-26 $ 53.33 LF Culvert,CMP,30" D-27 $ 71.45 LF Culvert,CMP,36" D-28 $ 112.11 LF Culvert,CMP,48" D-29 $ 140.83 LF Culvert,CMP,60" D-30 $ 235.45 LF Culvert,CMP,72" D-31 $ 302.58 LF Page 6 of 9 SUBTOTAL 1,257.64 1,257.64 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. VerSion: 11/26/08 Bond Quantity Worksheet13030.x1sx Report Date: 8/7/2013 Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008 Existing Future Public Private Bond Reduction" I� Right-of-way Right of Way Improvcments DRAINAGE CONTINUED &Drainage Facilities Quant. , No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Completc Cost Culvert,Concrete,8" D-32 $ 21.02 LF Culvert,Concrete, 12" D-33 $ 30.05 LF Culvert,Concrete, 15" D-34 $ 37.34 LF Culvert,Concrete, 18" D-35 $ 44.51 LF Culvert,Concrete,24" D-36 $ 61.07 LF Culvert,Concrete,30" D-37 $ 104.18 LF Culvert,Concrete,36" D-38 $ 137.63 LF Culvert,Concrete,42" D-39 $ 158.42 LF Culvert,Concrete,48" D-40 $ 175.94 LF Culvert,CPP,6" D-41 $ 10.70 LF 195 2086.5 Culvert,CPP,8" D-42 $ 16.10 LF Culvert,CPP, 12" D-43 $ 20.70 LF 14 289.8 63 1304.1 Culvert,CPP, 15" D-44 $ 23.00 LF Culvert,CPP, 18" D-45 $ 27.60 LF Culvert,CPP,24" D-46 $ 36.80 LF Culvert,CPP,30" D-47 $ 48.30 LF Culvert,CPP,36" D-48 $ 55.20 LF Ditchin D-49 $ 8.08 CY Flow Dispersal Trench (1,436 base+) D-50 $ 25.99 LF French Drain 3'de th D-51 $ 22.60 LF Geote�ile,laid in trench, ol pro lene D-52 $ 2.40 SY Infiltration pond testing D-53 $ 74.75 HR Mid-tank Access Riser,48"dia, 6'dee D-54 $ 1,605.40 Each Pond Overflow Spillwa D-55 $ 14.01 SY Restrictor/Oil Separator, 12" D-56 $ 1,045.19 Each Restrictor/Oil Separator, 15" D-57 $ 1,095.56 Each Restrictor/Oil Separator, 18" D-58 $ 1,146.16 Each Riprap,placed D-59 $ 39.08 CY Tank End Reducer(36"diameter) D-60 $ 1,000.50 Each Trash Rack, 12" D-61 $ 211.97 Each Trash Rack, 15" D-62 $ 237.27 Each Trash Rack, 18" D-63 $ 268.89 Each Trash Rack,21" D-64 $ 306.84 Each Page 7 of 9 SUBTOTAL 289.8 3390.6 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Ve�SiOn: 11/26/08 Bond Quantity Worksheet13030.x1sx Report Date: 8/7/2013 Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008 Existing Future Public Private Bond Reduction' '� Right-of-way Right of Way Improvements &Drainage Facilities Quant. ! Unit Price Unit Quant. Price Quant. Cost Quant. Cost Complete Cost PARKING LOT SURFACING N o. 2"AC,2"top course rock&4"borrow PL-1 $ 21.00 SY 2"AC, 1.5" to course 8�2.5"base cour PL-2 $ 28.00 SY 4"select borrow PL-3 $ 4.55 SY 1.5"top course rock&2.5"base course PL-4 $ 11.41 SY UTILITY POLES 8� STREET LIGHTING Utili ole relocation costs must be accompanied by Franchise Utility's Cost Statement Utilit Pole s Relocation UP-1 $ 10,000.00 Street Li ht Poles w/Luminaires UP-2 $ 3,000.00 Each WRITE-IN-ITEMS (Such as detention/water ualit vaults. No. WI-1 Each WI-2 Each WI-3 Each WI-4 LF WI-5 FT WI-6 WI-7 WI-8 WI-9 wi-�o SUBTOTAL SUBTOTAL(SUM ALL PAGES): 58,267.18 26,988.99 30%CONTINGENCY&MOBILIZATION: 17,480.15 8,096.70 GRANDTOTAL: 75,747.34 35,085.69 COLUMN: B C D E Page 8 of 9 _ Unit prices updated: 02/12/02 'KCC 27A authorizes only one bond reduction. VefSlon: 11/26/08 Bond Quantity Worksheet13030.x1sx Report Date: 8/7/2013 � -- ---- _ _ � Site Improvement Bond Quantity Worksheet Webdate: 12/02/2008 Original bond computations prepared by: Name: Maher A. Joudi Date: 7-Aug-13 PE Registration Number: 45232 Tel.#: (425) 827-3063 Firm Name: DR STRONG Consulting Engineers, Inc. adaress: 620 7th Avenue Kirkland, WA 98033 Project No: ROAD IMPROVEMENTS&DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND" PUBLIC ROAD&DRAINAGE AMOUNT BOND'AMOUNT MAINTENANCE/DEFECT BOND' REQUIRED AT RECORDING OR Stabilization/Erosion Sediment Control (ESC) (A) $ 22,491.3 TEMPORARY OCCUPANCY"' Existing Right-of-Way Improvements (B) $ 75,747.3 Future Public Right of Way&Drainage Facilities (C) $ - Private Improvements (D) $ 35,085.7 Calculated Quantity Completed (E). $ - Total Right-of Way and/or Site Restoration Bond*/'`"` (A+B) $ 98,238.6 (First$7,500 of bond*shall be cash.) Performance Bond*Amount (A+g+C+D) = TOTAL (� $ 133,324.3 T x 0.30 $ 39,997.3 OR Minimum bond'amount is 2 . Reduced Performance Bond*Total'"** (T-E) $ 133,324.3 Use larger o Tx30/o or(T-E (g+C)x Maintenance/Defect Bond*Total 0.25= $ 18,936.8 NAME OF PERSON PREPARING BOND*REDUCTION: Date: "NOTE: The word"bond"as used in this document means a financial guarantee acceptable to King County. '*NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work,both on-and off-site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged,some estimated costs for restoration needs to be reflected in this amount. The 30%contingency and mobilization costs are computed in this quantity. ***NOTE: Per KCC 27A,total bond amounts remaining after reduction shall not be less than 30%of the original amount(T)or as revised by major design changes. REQUIRED BOND"AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES Page 9 of 9 Unit prices updated: 02/12/02 Check out the DDES Web site at www.kinqcountv.qov/permits Version: 11/26/08 Bond Quantity Worksheet13030.x1sx Report Date: 8/7/2013 APPENDIX "C" OPERATIONS AND MAINTENACE MANUAL I I' �I �_`, „ O 2013 D. R.STRONG Consulting Engineers Inc. 50 Saddlebrook Div. II Technical Information Report Renton,Washington APPENDIX A MAIN"TENANCE REQUIREMENTS FLOW CONTROL,CONVEYANCE,AND��VQ FACILITIES N0. 1 -DETENTION PONDS Maintenance Defect or Probiem Conditions When Maintenance Is Needed Results Expected When Component Maintenance Is Performed Site Trash and debris Any frash and debris which exceed 1 cubic foot Trash and debris cleared from site. per 1,000 square feet(this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a height. height no greater than 6 inches. Top or Side Slopes Rodent holes Any evidence of rodent holes if facility is acting Rodents removed or destroyed and of Dam,Berm or as a dam or berm,or any evidence of water dam or berm repaired. Embankment piping through dam or berm via rodent holes. Tree growth Tree growth threatens integrity of slopes,does Trees do not hinder facility not allow maintenance access,or interferes with performance or maintenance maintenance activity. If trees are not a threat or activities. not interfering with access or maintenance,they do nat need to be removed. Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate of damage is still present or where there is erosion control measures. If erosion potential for continued erosion. Any erosion is occurring on compacted slope,a observed on a compacted slope. licensed civil engineer should be consulted to resolve source of erosion. Settlement Any part of a dam,berm or embankment that has Top or side slope restored to design settled 4 inches lower than the design elevation. dimensions. If settlement is significant,a licensed civil engineer should be consulted to determine the cause of the settlement. Storage Area Sediment Accumulated sediment that exceeds 10%of the Sediment cleaned out to designed accumulation designed pond depth. pond shape and depth;pond reseeded if necessary to control erosion. Liner damaged Liner is visible or pond does not hold water as Liner repaired or replaced. (If Applicable) designed. InletlOutlet Pipe. Sediment Sediment filling 20%or more of the pipe. Inleboutlet pipes clear of sediment. accumulation Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes. pipes(includes floatables and non-floatables). Damaged Cracks wider than%rinch at the joint of the No cracks more than'/-inch wide at inleVoutlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe. at the joints of the inlet/outlet pipes. Emergency Tree growth Tree growth impedes flow or threatens stability of Trees removed. Overflow/Spil Iway spilhvay. Rock missing Only one layer of rock exists above native soil in Spiliway restored to design area five square feet or larger or any exposure of standards. native soil on the spillway. 1i9i2009 2009 Surface Water Design Manual—�ppendix A A-2 APPENDIX A MAINTENANCE REQUIRE�NTS FOR FLOW CONTROL,CONVEYANCE,AND�'VQ FACILITIES NO.4-CONTROL STRUCTUREIFLOW RESTRICTOR Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Structure Trash and debris Trash or debris of more than%cubic foot which No Trash or debris blocking or is located immediately in front of the structure potentially blocking entrance to opening or is blocking capacity of the structure by structure. more than 10%. Trash or debris in the structure that exceeds'/3 No trash or debris in the structure. the depth from the bottom of basin to invert the lowest pipe into or out of the basin. Deposits of garbage exceeding 1 cubic foot in No condition present which would volume. attract or support the breeding of insects or rodents. Sediment Sediment exceeds 60%of the depth from the Sump of structure contains no bottom of the structure to the invert of the lowest sediment. pipe into or out of the structure or the bottom of the FROP-T section or is within 6 inches of the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section. Damage to frame Corner of frame extends more than'/+inch past Frame is even with curb. and/or top slab curb face into the street(If applicable). Top slab has holes larger than 2 square inches or Top siab is free of holes and cracks. cracks wider than%inch. Frame not sitting flush on top slab,i.e., Frame is sitting flush on top slab. separation of more than'/+inch of the frame from the top slab. Cracks in walis or Cracks wider than%:inch and longer than 3 feet, Structure is sealed and structurally bottom any evidence of soil particles entering structure sound. through cracks,or maintenance person judges that structure is unsound. Cracks wider than'h inch and longer than 1 foot No cracks more than'/,inch wide at at the joint of any inlet/outlet pipe or any evidence the joint of inlet/outlet pipe. of soil particles entering structure through cracks. SettlemenU Structure has settled more than 1 inch or has Basin replaced or repaired to design misalignment rotated more than 2 inches out of alignment. standards. Damaged pipe joints Cracks wider than Yrinch at the joint of the No cracks more than'/<-inch wide at inletJoutlet pipes or any evidence of soil entering the joint of inleUoutlet pipes. the structure at the joint of the inlet/outlet pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oii film. Ladder rungs missing Ladder is unsafe due to missing rungs, Ladder meets design standards and or unsafe misalignment, rust,cracks,or sharp edges. allows maintenance person safe access. FROP-T Section Damage T section is not securely attached to structure T section securely attached to wall wall and outlet pipe structure should support at and outlet pipe. least 1,000 Ibs of up or down pressure. Structure is not in upright position(allow up to Structure in correct position. 10%from plumb). Connections to outlet pipe are not watertight or Connections to outlet pipe are water show signs of deteriorated grout. tight;structure repaired or replaced and works as designed. Any holes—other than designed holes—in the Structure has no holes other than structure. designed holes. Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate. 2009 Surface Water Design Manual–Appendix A 1/9/2009 A-7 APPE\DIX A n7ALNTENANCE REQtiIREA1LNTS PLOW CONTROL,CONVEY�NCE,IIND\�'Q FACILITIES NO. 4-CONTROL STRUCTURE/FLOW RESTRICTOR Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Cleanout gate is not watertight. Gate is watertight and works as designed. Gate cannot be moved up and down by one Gate moves up and down easily and maintenance person. is watertight. Chain/rod leading to gate is missing or damaged. Chain is in place and works as designed. Orifice Plate Damaged or missing Control device is not working properly due to Plate is in piace and works as missing,out of place,or bent orifice plate. designed. Obstructions Any trash,debris,sediment,or vegetation Plate is free of all obstructions and blocking the plate. �vorks as designed. Overflow Pipe Obstructions Any trash or debris blocking(or having the Pipe is free of all obstructions and potential of blocking)the overtlow pipe. works as designed. Deformed or damaged Lip of overflow pipe is bent or deformed. O�erflow pipe does not allow lip overflow at an elevation lower than design Inlet/Outlet Pipe Sediment Sediment filling 20%or more of the pipe. InleUoutlet pipes clear of sediment. accumulation Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes. pipes(includes floatables and non-floatables). Damaged Cracks wider than%rinch at the joint of the No cracks more than%-inch wide at inleVoutlet pipes or any evidence of soil entering the joint of the inleUoutlet pipe. at the joints of the inletloutlet pipes. Metal Grates Unsafe grate opening Grate with opening wider than'/e inch. Grate opening meets design (If Applicable) standards. Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris. of grate surface. footnote to guidelines for disposal Damaged or missing Grate missing or broken member(s)of the grate. Grate is in place and meets design standards. Manhole CovedLid Cover/lid not in place Covedlid is missing or only partially in place. Cover/lid protects opening to Any open structure requires urgent structure. maintenance. Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools. Not Working maintenance person with proper tools.Boits cannot be seated. Self-locking cover/lid does not work. Cover/lid difficult to One maintenance person cannot remove Cover/lid can be remo�ed and Remove covedlid after applying 80 Ibs.of lift. reinstalled by one maintenance person. 1/9/2009 2009 Surface Water Design Manual—Appendix A Ii A-8 I APPENDIX A MAI�ITENANCE REQUIREMENTS FOR FLOVV CONTROL,CONVEYANCE,AND WQ FACILITIES NO. 5-CATCH BASINS AND MANHOLES Maintenance Defect or Problem Condition When iVlaintenance is Needed Results Expected When Component Maintenance is Performed Structure Sediment Sediment exceeds 60%of the depth from the Sump of catch basin contains no bottom of the catch basin to the invert of the sediment. lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Trash and debris Trash or debris of more than%:cubic foot which No Trash or debris blocking or is located immediately in front of the catch basin potentially blocking entrance to opening or is blocking capacity of the catch basin catch basin. by more than 10%. Trash or debris in the catch basin that exceeds No trash or debris in the catch basin. '/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. Dead animals or vegetation that could generate No dead animals or vegetation odors that could cause complaints or dangerous present within catch basin. gases(e.g., methane). Deposits of garbage exceeding 1 cubic foot in No condition present which would volume. attract or support the breeding of insects or rodents. Damage to frame Comer of frame extends more than'/.inch past Frame is even with curb. and/or top slab curb face into the street(If applicable). Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks. cracks wider than%.inch. Frame not sitting flush on top slab,i.e., Frame is sitting flush on top slab. separation of more than'/.inch of the frame from the top slab. Cracks in walls or Cracks wider than%:inch and longer than 3 feet, Catch basin is sealed and bottom any evidence of soil particles entering catch structurally sound. basin through cracks,or maintenance person judges that catch basin is unsound. Cracks wider than%inch and longer than 1 foot No cracks more than'/a inch wide at at the joint of any inlet/outlet pipe or any evidence the joint of inleUoutiet pipe. of soil paiticles entering catch basin through cracks. SettlemenU Catch basin has settied more than 1 inch or has Basin replaced or repaired to design misalignment rotated more than 2 inches out of alignment. standards. Damaged pipe joints Cracks wider than%rinch at the joint of the No cracks more than%-inch wide at inlet/outlet pipes or any evidence of soil entering the joint of inleVoutlet pipes. the catch basin at the joint of the inleUoutlet pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil,gasoline,concrete slurries or paint. according to applicabie regulations. Source control BMPs irnplemented if appropriate. No contaminants present other than a surface oil film. Inlet/Outlet Pipe Sediment Sediment filling 20%or more of the pipe. Inlet/outlet pipes clear of sediment. accumulation Trash and debris Trash and debris accumulated in inletloutlet No trash or debris in pipes. pipes(includes floatables and non-floatables}. Damaged Cracks wider than'/rinch at the joint of the No cracks more than%-inch wide at inleUoutlet pipes or any evidence of soil entering the joint of the inleUoutlet pipe. at the joints of the inlet/outlet pipes. 2009 Surface���ater Design Manual—AppendLx A li9/2009 A-9 APPENDIX A MATNTENANCE REQUIltEMENTS FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES ' NO. 5-CATCH BASINS AND MANHOLES Maintenance Defect or Problem Condition When Maintenance is Needed Resulks Expected When Component Maintenance is PerFormed Metal Grates Unsafe grate opening Grate with opening wider than'/e inch. Grate opening meets design (Catch Basins) standards. Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris. I of grate surface. footnofe to guidelines for disposal , Damaged or missing Grafe missing or broken member(s)of the grate. Grate is in place and meets design Any open structure requires urgent standards. maintenance. Manhole CovedLid Cover/lid not in place Cover/lid is missing or only partially in place. Co�er/lid protects opening to Any open structure requires urgent structure. maintenance. � Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools_ Not Working maintenance person with proper tools.Bolts cannot be seated. Self-locking cover/lid does not work. Covedlid difficult to One maintenance person cannot remove Cover/lid can be removed and Remove cover/lid after applying 80 Ibs.of lift. reinstalled by one maintenance person. 1/9,'2009 2009 Surface�'�'ater Design I�lanual—�ppendix A A-10 IAPPE'<VDIX A \�'�INTENANCE REQliIREI��fENTS FOR FLOW CONTROL,CONVEY�\TCE,r1I��VVQ F�CILITIES NO. 6-CONVEYANCE PIPES AND DITCHES ' Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Pipes Sediment&debris Accumulated sediment or debris that exceeds Water flows freely through pipes. accumulation 20%of the diameter of the pipe. Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes. water through pipes. Contaminants and Any evidence of contaminants or poilution such Materials removed and disposed of pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants ' present other than a surface oil film. Damage to protective Protective coating is damaged;rust or corrosion Pipe repaired or replaced. coating or corrosion is weakening the structural integrity of any part of pipe. Damaged Any dent that decreases the cross section area of Pipe repaired or replaced. pipe by more than 20%or is determined to have weakened structural integrity of the pipe. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from square feet of ditch and slopes. ditches. Sediment Accumulated sediment that exceeds 20%of the Ditch cleaned/flushed of all sediment accumulation design depth. and debris so that it matches design. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger of noxious vegetation where County personnel or the public might normaily be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Vegetation Vegetation that reduces free movement of water Water flows freely through ditches. through ditches. Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding. slopes Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards. place or missing(If area 5 square feet or more,any exposed native Applicable) soil. 2009 Surface Water Design�fanual—Appendix A 1i9i2009 A-11 IAPPENDIX A NIAINTENANCE REQUIREMENTS FLOVJ CONTROL,CONVEYA��ICE,AND WQ FACILITIES ' NO. 7- DEBRIS BARRIERS (E.G., TRASH RACKS) Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed. ' Site Trash and debris Trash or debris plugging more than 20%of the Barrier clear to receive capacity flow. area of the barrier. Sediment Sediment accumulation of greater than 20%of Barrier clear to receive capacity flow. ' accumulation the area of the barrier Sfructure Cracked broken or Structure which bars attached to is damaged- Structure barrier attached to is loose pipe is loose or cracked or concrete structure is sound. cracked,broken of loose. ' Bars Bar spacing Bar spacing exceeds 6 inches. Bars have at most 6 inche spacing. Damaged or missing Bars are bent out of shape more than 3 inches. Bars in place with no bends more bars than 3/<inch. ' Bars are missing or entire barrier missing. Bars in place according to design. Bars are loose and rust is causing 50% Repair or replace barrier to design deterioration to any part of barrier. standards. � ' lr`9/2009 2009 Surface Water Design Manual—Appendix A A-12 IAPPENDIX A I�4AINTENANCE REQUIREM�„I�TTS FLO�V CONTROL,CONVEYANCE,AI�TD WQ FACILITIES INO. 9-FENCING Maintenance Defect or Problem Conditions When Maintenance is Needed Resufts Ezpected When Component Maintenance is Performed ' Site Erosion or holes Erosion or holes more than 4 inches high and 12- No access under the fence. under fence 18 inches wide permitting access through an opening under a fence. ' Wood Posts,Boards Missing or damaged Missing or broken boards,post out of plumb by No gaps on fence due to missing or and Cross Members parts more than 6 inches or cross members broken broken boards,post plumb to within 1%2 inches,cross members sound. Weakened by rotting Any part showing structural deterioration due to All parts of fence are structurally ' or insects rotting or insect damage sound. Damaged or failed Concrete or metal attachments deteriorated or Post foundation capable of post foundation unabie to support posts. supporting posts even in strong ' wind. Metal Posts,Raiis Damaged parts Post out of plumb more than 6 inches. Post plumb to within 1%inches. and Fabric Top rails bent more than 6 inches. Top rail free of bends greater than ' 1 inch. Any part of fence(including post,top rails,and Fence is aligned and meets design fabric)more than 1 foot out of design alignment. standards. Missing or loose tension wire. Tension wire in place and holding ' fabric. Deteriorated paint or Part or parts that have a rusting or scaling Structurally adequate posts or parts protective coating condition that has affected structural adequacy. with a uniform protective coating. I ' Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50%of diameter ball could fit through. grid size. � � 1/9/2009 20�9 Surface�'��ater Desian 1�4anual—Appendix� A-14 � � APPEivDIX A MAINTENAIvCE REQUIItEb•fE�ITS FOR FLOW CONTROL,COi�IVEY.A��10E,r�ND WQ FACILITIES I N0. 10-GATES/BOLLARDS/ACCESS BARRIERS Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Perfortned ' Chain Link Fencing Damaged or missing Missing gate. Gates in place. Gate members Broken or missing hinges such that gate cannot Hinges intact and lubed.Gate is be easily opened and closed by a maintenance working freely. ' person. Gate is out of plumb more than 6 inches and Gate is aligned and vertical. more than 1 foot out of design alignment. � Missing stretcher bar,stretcher bands,and ties. Stretcher bar,bands,and ties in place. Locking mechanism Locking device missing,no-functioning or does Locking mechanism prevents does not lock gate not link to all parts. opening of gate. ' Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50%of diameter ball could fit through. grid size. Bar Gate Damaged or missing Cross bar does not swing open or closed,is Cross bar swings fully open and ' cross bar missing or is bent to where it does not prevent closed and prevents vehicle access. vehicle access. Locking mechanism Locking device missing,no-functioning or does Locking mechanism prevents does not lock gate not link to all parts. opening of gate. � Support post Support post does not hold cross bar up. Cross bar held up preventing vehicle damaged access into facility. Bollards Damaged or missing Bollard broken,missing,does not fit into support No access for motorized vehicles to ' hole or hinge broken or missing. get into facility. I Does not lock Locking assembly or lock missing or cannot be No access for motorized�ehicles to attached to lock bollard in place. get into facility. , � Boulders Dislodged Boulders not located to prevent motorized vehicie No access for motorized vehicles to access. get into facility. Circumvented Motorized vehicles going around or between No access for motorized vehicles to boulders. get into facility. � 2009 Surface�'�'ater Design Manual—Appendix A L`9/2009 A-1� � APPENDIX A MAINTENANCE REQUIREA�NTS FLO��CONTROL,CONVEYANCE,AIvD WQ FACILITTES � NO. 11 -GROUNDS (LANDSCAPIIVG) Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed ' Site Trash or litter Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site. per 1,Q00 square feet(this is about equal to the amount of frash it would take to fill up one standard size office garbage can). In general, � there should be no visual evidence of dumping. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable � public. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of ' poilution as oil,gasoline,concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. ' Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a height. height no greater than 6 inches. Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility. potential to fall and cause property damage or � threaten human life. A hazard tree identified by a qualified arborist must be removed as soon as possible. ' Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5% ' broken which affect more than 25°/a of the total of total foliage with split or broken foliage of the tree or shrub. limbs. Trees or shrubs that have been blown down or No blown down vegetation or knocked over. knocked over vegetation. Trees or shrubs free of injury. Trees or shrubs which are not adequately Tree or shrub in place and supported or are leaning over,causing exposure adequately supported;dead or � of the roots. diseased trees removed. I�—i i �'�- j , L_! 1/9/2009 2009 Surface Water Design Manual—Appendix A A-16 I APPENDIX A MAINTENAI�TCE REQUIltEMENTS FOR FLO�V CONTROL,CONV"LYA.�ICE;:�D«�Q 1=.�CILITIES I � N0. 12-ACCESS ROADS Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Perfortned � Site Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Roadway drivable by maintenance square feet(i.e.,trash and debris would fill up vehicles. one standards size garbage can). � Debris which could damage vehicle tires or Roadway drivable by maintenance prohibit use of road. vehicles. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations_ � Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Blocked roadway Any obstruction which reduces clearance above Roadway overhead clear to 14 feet � road surface to less than 14 feet. high. Any obstruction restricting the access to a 10-to At least 12-foot of width on access 12 foot width for a distance of more than 12 feet road. or any point restricting access to less than a 10 ' foot width. Road Surface Erosion,settlement, Any surFace defect which hinders or prevents Road drivable by maintenance potholes,soft spots, maintenance access. vehicles. � ruts Vegetation on road Trees or other vegetation prevent access to Maintenance vehicles can access surface facility by maintenance vehicles. facility. � Shoulders and Erosion Erosion within 1 foot of the roadway more than 8 Shoulder free of erosion and Ditches inches wide and 6 inches deep. matching the surrounding road. Weeds and brush Weeds and brush exceed 18 inches in height or Weeds and brush cut to 2 inches in hinder maintenance access. height or cleared in such a way as to allow maintenance access. Modular Grid Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of Pavement pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if � appropriate. No contaminants I present other than a surtace oil film. ; Damaged or missing Access surface compacted because of broken on Access road surface restored so missing modular block. road infiltrates_ 2009 Surface Water Design Manual—Appendix A 1/9/2009 A-17 APPEI�,'DIX:� 1�1.�TE�;:1I`CE REQUIRE1�fENTS FLO��J CONTROL,CO�IVEYAVCE,�1ND��%Q FACILITIES I NO. 20-SAND FILTER V�4ULT I�I Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When � Component Maintenance is Performed ! Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from I facility site. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable ' public. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil,gasoline,concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants , present other than a surface oil film. ', Grass/groundcover Grass or groundcover exceeds 18 iriches in Grass or groundcover mowed to a I! height. height no greater than 6 inches. I Pre-Treatment Sediment Sediment accumulation exceeds the depth of the Sediment storage contains no Chamber accumulation sediment zone plus 6 inches. sediment. Sand Filter Media Sediment Sediment depth exceeds%z-inch on sand filter Sand filter freely drains at normal accumulation media. rate. ' Trash and debris Trash and debris accumulated in vault(floatables No trash or debris in vauft. and non-floatables). Plugging Drawdown of water through the sand fiRer media, Sand filter media drawdown rate is takes longer than 24 hours,andJor flow through normal. , the overflow pipes occurs frequ2ntly. A sieve � analysis of>4%-100 or>2%-200 requires replacing sand filter media. Short circuiting Seepage or flow occurs along the vault walls and Sand filter media section re-laid and corners. Sand eroding near inflow area. compacted along perimeter of vault Cleanout wyes are not watertight. to form a semi-seal. Erosion protection added to dissipate force , of incoming flow and curtail erosion. � Vault Structure Damaged to walls, Cracks wider than Y=-inch,any evidence of soil Vault replaced or repaired to provide frame,bottom and/or entering the structure through cracks or qualified complete sealing of the structure. top slab. inspection personnel determines that the vauit is not structuralty sound. I Ventilation Ventilation area blocked or plugged. No reduction of ventilation area exists. Underdrains and SedimenUdebris Underdrains or clean-outs partially plugged,filled Underdrains and ciean-outs free of Cleanouts with sediment and/or debris or not watertight. sediment and debris and sealed. InIeUOutlet Pipe Sediment Sediment filling 20%or more of the pipe. Inlet/outlet pipes ciear of sediment. accumulation Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes. pipes(inciudes floatables and non-floatables). Damaged Cracks wider than'/rinch at the joint of the No cracks more than%4-inch wide at inleUoutlet pipes or any evidence of soil entering the joint of the inleUoutlet pipe. at the joints of the inleUoutlet pipes. 1/9/2009 2009 Surface 1'�'ater Design 1-fanual—Appendix A A-23 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLO��'CONTROL,C0�1VEY��ICE,�D��'Q FACILITIES NO. 20-SAND FILTER VAULT Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Access Manhole CoverAid not in place Covedlid is missing or only partially in place. Manhole access covered. Any open manhole requires immediate maintenance. Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools. not working maintenance person with proper tools.Bolts cannot be seated. Self-locking covedlid does not work. Cover/lid difficult to One maintenance erson cannot remove P Cover/lid can be removed and remove cover/lid after applying 80 Ibs of lift. reinstalled by one maintenance person. Ladder rungs unsafe Missing rungs, misalignment,rust,or cracks. Ladder meets design standards. Allows maintenance person safe access. Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it doors/plate to open opened/removed using normal equipment. can opened as designed. Gaps,doesn't cover Large access doors not flat and/or access Doors close flat and covers access completely opening not completely covered. opening completely. Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings su�cient to lift or rusted or plate. remove door or plate. 3009 Surface�T��ater Design A�1anua1—Appendix A � I r'9i2009 a-29 APPENDIX A MAINTENAIvCE REQUIItEMENTS FOR FLOW CONTROL,CONVEYANCE,AND WQ FACILITIES NO. 24-CATCH BASIN INSERT Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Media lnsert �sible Oil Visible oil sheen passing through media Media inset replaced. Insert does not fit Flow gets into catch basin without going through All flow goes through media. catch basin property media. Filter media plugged Filter media plugged. Flow through filter media is normal. Oil absorbent media Media oii saturated. Oil absorbent media replaced. saturated Water saturated Catch basin insert is saturated with water,which inseR replaced. no longer has the capacity to absorb. Service life exceeded Regular interval replacement due to typical Media replaced at manufacturer's average life of inedia insert product,typically one recommended interval. month. Seasonal When storms occur and during the wet season. Remove,clean and replace or install maintenance new insert after major storms, monthly during the wet season or at manufacturer's recommended interval. II ,I � . � � ,` , i I . I' , I j 2009 Surface Water Design Manual—Appendix A 1/9/2009 A-35 I APPENDIX "D" CSWPPP ' I O 2013 D.R.STRONG Consulting Engineers Inc. 51 Saddlebrook Div. II Technical Information Report Renton,Washington STORMWATER POLLUTION PREVENTION PLAN For I SADDLEBROOK DIV. II Prepared For Northwest Regional Office 3190 160th Avenue SE Bellevue, WA 98008-5452 425-649-7000 Owner Developer Operator/Contractor ACH Homes, LLC ACH Homes, LLC Maher A. Joudi, P.E. 9675 SE 36th Street Suite 105 9675 SE 36th Street Suite 105 620 7th Avenue Mercer Island, Washington Mercer Island, Washington Kirkland, Washington 98033 98040 98040 Project Site Location 13422 156th Avenue SE, Renton, Washington Certified Erosion and Sediment Control Lead Justin Lagers 253.405.5587 SWPPP Prepared By D.R. Strong Consulting Engineers, Inc. 620 7th Avenue Kirkland, Washington 98033 Maher A. Joudi, P.E., Senior Project Engineer SWPPP Preparation Date �� August 7, 2013 '' Approximate Project Construction Dates �' Start Date: August 2013 End Date: December 2013 C 2013 D.R.STRONG Consulting Engineers Inc. i STORMWATER POLLUTION PREVENTION PLAN TABLE OF CONTENTS �' 1.0 INTRODUCTION.......................................................................................................1 I 2.0 SITE DESCRIPTION .................................................................................................3 i 2.1 Existing Conditions............................................................................................3 I 2.2 Proposed Construction Activities.......................................................................3 I 3.0 CONSTRUCTION STORMWATER BMPS ...............................................................5 I 3.1 The 12 BMP Elements ......................................................................................5 3.1.1 Element#1 — Mark Clearing Limits ............................................................5 3.1.2 Element#2 — Establish Construction Access.............................................5 � 3.1.3 Element#3 — Control Flow Rates...............................................................6 3.1.4 Element#4 — Install Sediment Controls .....................................................6 3.1.5 Element #5 — Stabilize Soils.......................................................................7 3.1.6 Element#6 — Protect Slopes......................................................................8 � 3.1.7 Element#7 — Protect Drain Inlets...............................................................9 3.1.8 Element#8 — Stabilize Channels and Outlets............................................9 3.1.9 Element#9 — Control Pollutants............................................................... 10 3.1.10 Element#10 — Control Dewatering .......................................................... 11 3.1.11 Element #11 — Maintain BMPs................................................................. 11 3.1.12 Element #12 — Manage the Project.......................................................... 11 3.2 Site Specific BMPs.......................................................................................... 13 3.3 Additional Advanced BMPs............................................................................. 13 , 4.0 CONSTRUCTION PHASING AND BMP IMPLEMENTATION................................14 ' 5.0 POLLUTION PREVENTION TEAM.........................................................................15 5.1 Roles and Responsibilities .............................................................................. 15 I 5.2 Team Members............................................................................................... 15 6.0 SITE INSPECTIONS AND MONITORING ..............................................................16 I 6.1 Site Inspection................................................................................................. 16 6.1.1 Site Inspection Frequency........................................................................ 16 ,I 6.1.2 Site Inspection Documentation................................................................. 16 � 6.2 Stormwater Quality Monitoring........................................................................ 17 6.2.1 Turbidity Sampling......................................................................................... 17 �� 6.2.2 pH Sampling.................................................................................................. 17 6.2.3 Temperature Monitoring........................................................................... 18 'I 7.0 REPORTING AND RECORDKEEPING..................................................................19 7.1 Recordkeeping ................................................................................................ 19 I� 7.1.1 Site Log Book........................................................................................... 19 � 7.1.2 Records Retention ................................................................................... 19 ;s 2013 D. R.STRONG Consulting Engineers Inc. Page i of ii Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 I � 7.1.3 Access to Plans and Records .................................................................. 19 7.1.4 Updating the SWPPP............................................................................... 19 7.2 Reporting.........................................................................................................20 7.2.1 Discharge Monitoring Reports..................................................................20 7.2.2 Notification of Noncompliance..................................................................20 7.2.3 PermitApplication and Changes..............................................................20 Appendices AppendixA— Site Plans................................................................................................21 Appendix B — Construction BMPs..................................................................................22 Appendix C —Alternative BMPs.....................................................................................23 Appendix D — General Permit........................................................................................24 Appendix E — Site Inspection Forms (And Site Log)......................................................25 Appendix F — Engineering Calculations.........................................................................32 Appendix A Site Plans • Vicinity map (with all discharge points) • Site plan with TESC measures Appendix B Construction BMPs • Possibly reference in BMPs, but likely it will be a consolidated list so that the applicant can photocopy from the list from the SWMM. Appendix C Alternative Construction BMP list • List of BMPs not selected, but can be referenced if needed in each of the 12 elements Appendix D General Permit Appendix E Site Log and Inspection Forms Appendix F Engineering Calculations • Flows, ponds, etc... O 2013 D. R.STRONG Consulting Engineers Inc. Page ii of ii Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan 1 .0 INTRODUCTION This Stormwater Pollution Prevention Plan (SWPPP) has been prepared as part of the NPDES stormwater permit requirements for the Saddlebrook Div. II residential project located in Renton, Washington. The site is located at 13422 156th Avenue SE, Renton, Washington. The proposed development consists of the construction of 3 single-family dwelling units, frontage improvements, and landscaping on 0.89 acres. Construction activities will include, grading, roadway construction, utility installation and home construction. The purpose of this SWPPP is to describe the proposed construction activities and all temporary and permanent erosion and sediment control (TESC) measures, pollution prevention measures, inspection/monitoring activities, and recordkeeping that will be implemented during the proposed construction project. The objectives of the SWPPP are to: 1. Implement Best Management Practices (BMPs) to prevent erosion and sedimentation, and to identify, reduce, eliminate or prevent stormwater contamination and water pollution from construction activity. 2. Prevent violations of surface water quality, ground water quality, or sediment management standards. 3. Prevent, during the construction phase, adverse water quality impacts including impacts on beneficial uses of the receiving water by controlling peak flow rates and volumes of stormwater runoff at the Permittee's outfalls and downstream of the outfalls. This SWPPP was prepared using the Ecology SWPPP Template downloaded from the Ecology website on July 2, 2005. This SWPPP was prepared based on the requirements set forth in the Construction Stormwater General Permit, Stormwater Management Manual for Western Washington (SWMMWW 2005) and in the Stormwater Management Manual for Eastern Washington (SWMMEW 2004). The report is divided into seven main sections with several appendices that include stormwater related reference materials. The topics presented in the each of the main sections are: • Section 1 — INTRODUCTION. This section provides a summary description of the project, and the organization of the SWPPP document. • Section 2 — SITE DESCRIPTION. This section provides a detailed description of the existing site conditions, proposed construction activities, and calculated stormwater flow rates for existing conditions and post— construction conditions. • Section 3 — CONSTRUCTION BMPs. This section provides a detailed description of the BMPs to be implemented based on the 12 required elements of the SWPPP (SWMMEW 2004). • Section 4 — CONSTRUCTION PHASING AND BMP IMPLEMENTATION. This section provides a description of the timing of the BMP implementation in relation to the project schedule. O 2013 D.R.STRONG Consulting Engineers Inc. Page 1 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 �- Stormwater Pollution Prevention Plan i i ' • Section 5 — POLLUTION PREVENTION TEAM. This section identifies the appropriate contact names (emergency and non-emergency), monitoring personnel, and the onsite temporary erosion and sedimentation control inspector • Section 6 — INSPECTION AND MONITORING. This section provides a description of the inspection and monitoring requirements such as the parameters of concern to be monitored, sample locations, sample frequencies, and sampling methods for all stormwater discharge locations from the site. - • Section 7 — RECORDKEEPING. This section describes the requirements for documentation of the BMP implementation, site inspections, monitoring results, and changes to the implementation of certain BMPs due to site factors experienced during construction. Supporting documentation and standard forms are provided in the following Appendices: Appendix A— Site plans Appendix B — Construction BMPs Appendix C —Alternative Construction BMP list Appendix D — General Permit Appendix E — Site Log and Inspection Forms Appendix F — Engineering Calculations �s 2013 D.R.STRONG Consulting Engineers Inc. Page 2 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan 2.0 SITE DESCRIPTION 2.1 Existing Conditions Total existing Site area is approximately 38,715 s.f. (0.89 ac). Total proposed Project area is 41,095 s.f. (0.94 ac) which includes 2,380 s.f. (0.05 ac) for the right-of-way frontage improvements on 156th Avenue SE. The existing parcel (366450-0250) is currently developed with a single-family home, covered patio and a gravel driveway. The remainder of the Site is lawn, landscaping, and scattered trees. The 0.89 acre parcel contains a single natural discharge point near the southwest corner of the Site. The Site sheet flows towards the southwest corner of the Site and into the right-of-way. From there, it is collected into the conveyance system within 156t" Avenue and is conveyed south. For the purpose of hydrologic calculations, the entire Site is modeled as till forest. 2.2 Proposed Construction Activities The applicant has gained approval to subdivide 0.89 acres into three single-family residential lots (Project), with lot sizes ranging from approximately 10,169 to 10,983 s.f. All existing improvements will be demolished or removed during plat construction. The proposed impervious surface area will include a new shared driveway tract with 16 feet of pavement. Impervious surFace are will also include offsite half-street improvements along 156th Avenue SE. The proposed shared driveway improvements total approximately 4,411 s.f. The three single-family residences and their driveways combined will create approximately 10,875 s.f. of impervious area (reduced from maximum allowable, see next paragraph for details). Post-developed impervious areas including driveways, roofs, and site frontage improvements total approximately 17,666 s.f. (includes Bypass area). The remainder of the Project will be modeled as till grass totaling approximately 23,429 s.f. Per the 2009 King County Surface Water Design Manual (Manual), Appendix C, each lot within a new subdivision is required to mitigate for impervious surface area equal to 10% of the lot area. Per Figure C.1.3.A, Flow Control BMP Flowchart, the Project will utilize Basic Dispersion with the use of splash blocks. Two splash blocks mitigating a total of 1,400 s.f. of impervious area, will be installed with each residence. This shall , mitigate for 12.75% to 13.77% of impervious area for each lot. Also, each lot will be restricted to an area less than 4,000 s.f. (see table below). Additionally, use of Basic Dispersion allows for a 50% flow control BMP sizing credit which was used in detention facility calculations. See table below for lot area, restricted impervious area per lot, and percent impervious mitigated per lot. ROOF AREA ROUTED TO RESTRICTED IMPERVIOUS TOTAL AREA PERCENT IMPERVIOUS I� LOT NO. LOT AREA(S.F.) SPLASH BLOCK(S.F.) AREA PER LOT MITIGATED MITIGATED 1 10169 1400 3505 1895 18.64 2 10983 1400 3485 1915 17.44 I 3 10877 1400 3885 1515 13.93 �! C 2013 D.R.STRONG Consulting Engineers Inc. Page 3 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan All surface water runoff from impervious surFaces will be collected and conveyed to a storm detention pond located within Tract "A of Saddlebrook Div. I. From there, the water runoff will be conveyed through a BayFilter vault before entering the existing conveyance system within 156th Avenue SE. The following summarizes details regarding site areas: • Total site developable area: 0.89 acres • Percent impervious area before construction: 7.4 % , • Percent impervious area after construction: 45.7 % • Disturbed area during construction: 0.94 acres • Disturbed area that is characterized as impervious (i.e., access roads, staging, parking): 0.13 acres '�, � TDA • 2-year stormwater runoff peak flow prior to construction (existing): 0.029 cfs • 10-year stormwater runoff peak flow prior to construction �-�xisting): 0.047 cfs • 2-year stormwater runoff peak flow during construction: 0.214 cfs , • 10-year stormwater runoff peak flow during construction: 0.338 cfs II � • 2-year stormwater runoff peak flow after construction: 0.083 cfs (Combined detention facility with Saddlebrook Div. I) • 10-year stormwater runoff peak flow after construction: 0.228 cfs (Combined detention facility with Saddlebrook Div. I) � All stormwater flow calculations are provided in Appendix F. � O 2013 D.R.STRONG Consulting Engineers Inc. Page 4 of 33 � Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan 3.0 CONSTRUCTION STORMWATER BMPS 3.1 The 12 BMP Elements I 3.1.1 Element#1 — Mark Clearing Limits ', To protect adjacent properties and to reduce the area of soil exposed to construction, I�, the limits of construction will be clearly marked before land-disturbing activities begin. ', Trees that are to be preserved, as well as all sensitive areas and their buffers, shall be '�� clearly delineated, both in the field and on the plans. In general, natural vegetation and ', native topsoil shall be retained in an undisturbed state to the maximum extent possible. I The BMPs relevant to marking the clearing limits that will be applied for this project , include: • High Visibility Plastic or Metal Fence (BMP C103) The plastic fence will be placed around the perimeter of the developable area of the Site. BMP will be implemented at the start of construction. Alternate BMPs for marking clearing limits are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater I permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. 3.1.2 Element#2 — Establish Construction Access Construction access or activities occurring on unpaved areas shall be minimized, yet where necessary, access points shall be stabilized to minimize the tracking of sediment onto public roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent sediment from entering state waters. All wash wastewater shall be controlled on site. The specific BMPs related to establishing construction access that will be used on this project include: • Stabilized Construction Entrance (BMP C105) • Construction RoadlParking Area Stabilization (BMP C107) ' A Stabilized Construction Entrance will be placed at the intersection of, the proposed ' road, "Road A" and 156th Avenue SE. This BMP will be implemented at the start of construction. Construction Road and Parking Area Stabilization will occur along the road into the site and in staging areas where parking of equipment will occur. This will occur as the �, project goes along. I Alternate construction access BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective �2013 D.R.STRONG Consulting Engineers Inc. Page 5 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. 3.1.3 Element#3 — Control Flow Rates In order to protect the properties and waterways downstream of the project site, stormwater discharges from the site will be controlled. The specific BMPs for flow control that shall be used on this project include: • Sediment Trap A sediment trap will be installed in Lot 1. Alternate flow control BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. The project site is located west of the Cascade Mountain Crest. As such, the project must comply with Minimum Requirement 7 (Ecology 2005). In general, discharge rates of stormwater from the site will be controlled where increases in impervious area or soil compaction during construction could lead to downstream erosion, or where necessary to meet local agency stormwater discharge requirements (e.g. discharge to combined sewer systems). 3.1.4 Element#4 — Install Sediment Controls All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal BMP before leaving the construction site or prior to being discharged to an infiltration facility. The specific BMPs to be used for controlling sediment on this project include: • Silt Fence (BMP C233) • Storm Drain Inlet Protection (BMP C220) • Interceptor Swale (BMP C200) • Sediment Trap Silt fence will be installed around the perimeter of the Site in areas where runoff could sheet-flow offsite. This BMP will be installed at the start of construction. Storm Drain Inlet Protection will be installed on all newly constructed catch basins throughout the site as well as the existing catch basins in 156t" Avenue SE. The O 2013 D.R.STRONG Consulting Engineers Inc. Page 6 of 33 I' Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan existing catch basin protection will be installed at the start of construction, and protection for the newly constructed catch basins will occur as they are installed. The interceptor swales will be installed during site grading. The sediment trap will be installed and used for sedimentation at the commencement of construction. Alternate sediment control BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. In addition, sediment will be removed from paved areas in and adjacent to construction work areas manually or using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires away from the site and to minimize washoff of sediments from adjacent streets in runoff. Whenever possible, sediment laden water shall be discharged into onsite, relatively level, vegetated areas (BMP C240 paragraph 5, page 4-102). In some cases, sediment discharge in concentrated runoff can be controlled using permanent stormwater BMPs (e.g., infiltration swales, ponds, trenches). Sediment loads can limit the effectiveness of some permanent stormwater BMPs, such as those used for infiltration or biofiltration; however, those BMPs designed to remove solids by settling (wet ponds or detention ponds) can be used during the construction phase. When permanent stormwater BMPs will be used to control sediment discharge during construction, the structure will be protected from excessive sedimentation with adequate erosion and sediment control BMPs. Any accumulated sediment shall be removed after construction is complete and the permanent stormwater BMP will be restabilized with vegetation per applicable design requirements once the remainder of the site has been stabilized. The following BMPs will be implemented as end-of-pipe sediment controls as required to meet permitted turbidity limits in the site discharge(s). Prior to the implementation of these technologies, sediment sources and erosion control and soil stabilization BMP efforts will be maximized to reduce the need for end-of-pipe sedimentation controls. • Construction Stormwater Filtration (BMP C251} • Construction Stormwater Chemical Treatment (BMP C 250) (implemented only with prior written approval from Ecology). 3.1.5 Element#5 — Stabilize Soils Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent erosion throughout the life of the project. The specific BMPs for soil stabilization that shall be used on this project include: O 2013 D.R.STRONG Consulting Engineers Inc. Page 7 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 Stormwater Pollution Prevention Plan • Temporary and Permanent Seeding (BMP C120) • Plastic Covering (BMP C123) • Dust Control (BMP C140) Permanent Seeding will occur as grading is completed. All stabilized sections will be seeded and �egetated. Plastic Covering will occur throughout the site as deemed necessary by the contractor and CESCL. Dust Control will occur throughout the site as deemed necessary by the contractor and CESCL. Alternate soil stabilization BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. The project site is located west of the Cascade Mountain Crest. As such, no soils shall remain exposed and unworked for more than 7 days during the dry season (May 1 to September 30) and 2 days during the wet season (October 1 to April 30). Regardless of the time of year, all soils shall be stabilized at the end of the shift before a holiday or weekend if needed based on weather forecasts. i , In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, protected with sediment trapping measures, and where possible, be located away from storm drain inlets, waterways, and drainage channels. 3.1.6 Element#6 — Protect Slopes All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes erosion. The following specific BMPs will be used to protect slopes for this project: • Temporary and Permanent Seeding (BMP C120) • Check Dams (BMP C207) ; Permanent Seeding will occur throughout the site as slopes are stabilized. ' Checks Dams will be installed every 50' as shown on the plan. jAlternate slope protection BMPs are included in Appendix C as a quick reference tool ' for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General I ' NPDES Permit (Appendix D}. To avoid potential erosion and sediment control issues ` that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly I O 2013 D.R.STRONG Consulting Engineers Inc. Page 8 of 33 i - Stormwater Pollution Pre�ention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. 3.1.7 Element#7 — Protect Drain Inlets All storm drain inlets and culverts made operable during construction shall be protected to prevent unfiltered or untreated water from entering the drainage conveyance system. However, the first priority is to keep all access roads clean of sediment and keep street wash water separate from entering storm drains until treatment can be provided. Storm Drain Inlet Protection (BMP C220) will be implemented for all drainage inlets and culverts that could potentially be impacted by sediment-laden runoff on and near the project site. The following inlet protection measures will be applied on this project: Drop Inlet Protection • Catch Basin Filter There is one existing catch basin which will require a filter within 156t" Avenue SE. If the BMP options listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D), or if no BMPs are listed above but deemed necessary during construction, the Certified Erosion and Sediment Control Lead shall implement one or more of the alternative BMP inlet protection options listed in Appendix C. 3.1.8 Element#8 — Stabilize Channels and Outlets Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural drainage point, efforts will be taken to prevent downstream erosion. The specific BMPs for channel and outlet stabilization that shall be used on this project include: • No BMPs implemented The project will not discharge to any outlets or channels; therefore no BMP's are required. Alternate channel and outlet stabilization BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. The project site is located west of the Cascade Mountain Crest. As such, all temporary on-site conveyance channels shall be designed, constructed, and stabilized to prevent erosion from the expected peak 10 minute velocity of flow from a Type 1A, 10-year, 24- hour recurrence interval storm for the developed condition. Alternatively, the 10-year, 1- hour peak flow rate indicated by an approved continuous runoff simulation model, increased by a factor of 1.6, shall be used. Stabilization, including armoring material, �2013 D. R.STRONG Consulting Engineers Inc. Page 9 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 Stormwater Pollution Prevention Plan adequate to prevent erosion of outlets, adjacent streambanks, slopes, and downstream reaches shall be provided at the outlets of all conveyance systems. 3.1.9 Element#9 — Control Pollutants All pollutants, including waste materials and demolition debris, that occur onsite shall be handled and disposed of in a manner that does not cause contamination of stormwater. Good housekeeping and preventative measures will be taken to ensure that the site will be kept clean, well-organized, and free of debris. If required, BMPs to be implemented to control specific sources of pollutants are discussed below. Vehicles, construction equipment, andlor petroleum product storage/dispensing: • All vehicles, equipment, and petroleum product storage/dispensing areas will be inspected regularly to detect any leaks or spills, and to identify maintenance needs to prevent leaks or spills. • On-site fueling tanks and petroleum product storage containers shall include secondary containment. • Spill prevention measures, such as drip pans, will be used when conducting maintenance and repair of vehicles or equipment. • In order to perForm emergency repairs on site, temporary plastic will be placed beneath and, if raining, over the vehicle. • Contaminated surfaces shall be cleaned immediately following any discharge or spill incident. Demolition: • Dust released from demolished sidewalks, buildings, or structures will be controlled using Dust Control measures (BMP C140). • Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or debris will be protected using Storm Drain Inlet Protection (BMP C220 as described above for Element 7). • Process water and slurry resulting from sawcutting and surfacing operations will be prevented from entering the waters of the State by implementing Sawcutting and Surfacing Pollution Prevention measures (BMP C152). Concrete and grout: • Process water and slurry resulting from concrete work will be prevented from entering the waters of the State by implementing Concrete Handling measures (BMP C151). Sanitary wastewater: • Portable sanitation facilities will be firmly secured, regularly maintained, and emptied when necessary. Solid Waste: O 2013 D. R.STRONG Consulting Engineers Inc. Page 10 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 � Stormwater Poilution Prevention Plan • Solid waste will be stored in secure, clearly marked containers. Other: • Other BMPs will be administered as necessary to address any additional pollutant sources on site. The facility does not require a Spill Prevention, Control, and Countermeasure (SPCC) Plan under the Federal regulations of the Clean Water Act (CWA). 3.1.10 Element#10 — Control Dewatering '� There will be no dewatering as part of this construction project. �! 3.1.11 Element#11 — Maintain BMPs All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. Maintenance and repair shall be conducted in accordance with each particular BMPs specifications (attached). Visual monitoring of the BMPs will be conducted at least once every calendar week and within 24 hours of any stormwater or non-stormwater discharge from the site. If the site becomes inactive, and is temporarily stabilized, the inspection frequency will be reduced to once every month. All temporary erosion and sediment control BMPs shall be removed within 30 days after the final site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs or vegetation shall be permanently stabilized. 3.1.12 Element#12 — Manage the Project Erosion and sediment control BMPs for this project have been designed based on the following principles: • Design the project to fit the existing topography, soils, and drainage patterns. • Emphasize erosion control rather than sediment control. • Minimize the extent and duration of the area exposed. • Keep runoff velocities low. • Retain sediment on site. • Thoroughly monitor site and maintain all ESC measures. • Schedule major earthwork during the dry season. In addition, project management will incorporate the key components listed below: (West Response) As this project site is located west of the Cascade Mountain Crest, the project will be managed according to the following key project components: Phasing of Construction �2013 D. R.STRONG Consulting Engineers Inc. Page 11 of 33 Stormwater Pollution Prevention Plan Saddlebrook Di�. II August 7,2013 Stormwater Pollution Prevention Plan ' _ • The construction project is being phased to the e�ent practicable in order to prevent soil erosion, and, to the maximum extent possible, the transport I � ', of sediment from the site during construction. • Revegetation of exposed areas and maintenance of that vegetation shall - be an integral part of the clearing activities during each phase of construction, per the Scheduling BMP (C 162). Seasonal Work Limitations • From October 1 through April 30, clearing, grading, and other soil disturbing activities shall only be permitted if shown to the satisfaction of the local permitting authority that silt-laden runoff will be prevented from leaving the site through a combination of the following: o Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and o Limitations on activities and the extent of disturbed areas; and o Proposed erosion and sediment control measures. • Based on the information provided and/or local weather conditions, the local permitting authority may expand or restrict the seasonal limitation on site disturbance. • The following activities are exempt from the seasonal clearing and grading limitations: o Routine maintenance and necessary repair of erosion and sediment control BMPs; o Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil; and o Activities where there is 100 percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. Coordination with Utilities and Other Jurisdictions • Care has been taken to coordinate with utilities, other construction projects, and the local jurisdiction in preparing this SWPPP and scheduling the construction work. Inspection and Monitoring • All BMPs shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. Site inspections shall be conducted by a person who is knowledgeable in the principles and practices of erosion and sediment control. This person has the necessary skills to: O 2013 D.R.STRONG Consulting Engineers Inc. Page 12 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div.II August 7,2013 Stormwater Pollution Prevention Plan o Assess the site conditions and construction activities that could impact the quality of stormwater, and o Assess the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. • A Certified Erosion and Sediment Control Lead shall be on-site or on-call at all times. • Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP are inadequate, due to the actual discharge of or potential to I discharge a significant amount of any pollutant, appropriate BMPs or ' design changes shall be implemented as soon as possible. li Maintaining an Updated Construction SWPPP ! • This SWPPP shall be retained on-site or within reasonable access to the site. • The SWPPP shall be modified whenever there is a change in the design, construction, operation, or maintenance at the construction site that has, or could have, a significant effect on the discharge of pollutants to waters of the state. • The SWPPP shall be modified if, during inspections or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater discharges from the site. The SWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be completed within seven (7) days following the inspection. If the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. 3.2 Site Specific BMPs Site specific BMPs are shown on the TESC Plan Sheets and Details in Appendix A. These site specific plan sheets will be updated annually. 3.3 Additional Advanced BMPs None Proposed �2013 D.R.STRONG Consulting Engineers Inc. Page 13 of 33 ' Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan ii 4.0 CONSTRUCTION PHASING AND BMP IMPLEMENTATION The BMP implementation schedule will be driven by the construction schedule. The I following provides a sequential list of the proposed construction schedule milestones and the corresponding BMP implementation schedule. The list contains key milestones such as wet season construction. The BMP implementation schedule listed below is keyed to proposed phases of the construction project, and reflects differences in BMP installations and inspections that relate to wet season construction. The project site is located west of the Cascade Mountain Crest. As such, the dry season is considered to be from May 1 to September 30 and the wet season is considered to be from October 1 to April 30. • Estimate of Construction start date: 9/2/2013 • Estimate of Construction finish date: 10/1/2013 • Mobilize equipment on site: 9/2/2013 • Mobilize and store all ESC and soil stabilization products: 9/3/2013 - 9/6/2013 • Install ESC measures: 9/3/2013 - 9/10/2013 • Install stabilized construction entrance: 9/3/2013 • Begin clearing and grubbing: 9/11/2013 — 9/18/2013 • Demolish existing buildings: 9/11/2013 — 9/18/2013 • Begin Site Grading: 9/20/2013 • Begin implementing soil stabilization and . sediment control BMPs throughout the site: 9/19/2013 • End Site Grading: 10/18/2013 • Begin Utility Construction: 10/21/2013 • End Utility Construction: 11/25/2013 • Begin Paving and Sidewalk Installation: 12/2/2013 • Permanent erosion control measures (hydroseeding): 12/10/2013 • End Paving and Sidewalk Installation: 12/13/2013 • Final landscaping and planting begins: 12/14/2013 ' O 2013 D.R.STRONG Consulting Engineers Inc. Page 14 of 33 ' Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 I i Stormwater Pollution Prevention Plan � � 5.0 POLLUTION PREVENTION TEAM 5.1 Roles and Responsibilities The pollution prevention team consists of personnel responsible for implementation of the SWPPP, including the following: • Certified Erosion and Sediment Control Lead (CESCL) — primary contractor contact, responsible for site inspections (BMPs, visual monitoring, sampling, etc.); to be called upon in case of failure of any ESC measures. • Resident Engineer — For projects with engineered structures only (sediment ponds/traps, sand filters, etc.): site representative for the owner that is the project's supervising engineer responsible for inspections and ` issuing instructions and drawings to the contractor's site supervisor or ; representative • Emergency Ecology Contact — individual to be contacted at Ecology in case of emergency • Emergency Owner Contact — individual that is the site owner or re resentative of the site owner p to be contacted in the case of an emergency. • Non-Emergency Ecology Contact — individual that is the site owner or representative of the site owner than can be contacted if required. • Monitoring Personnel — personnel responsible for conducting water quality monitoring; for most sites this person is also the Certified Erosion and Sediment Control Lead. 5.2 Team Members Names and contact information for those identified as members of the pollution prevention team are provided in the following table. Title Name(s) Phone Number Certified Erosion and Sediment Control Justin Lagers 253.405.5587 Lead(CESCL) Resident Engineer MaherA.Joudi 425.827.3063 Emergency Ecology Contact NW Regional Office 425.649.7000 Emergency Owner Contact Justin Lagers 253.405.5587 Non-Emergency Ecology Contact Ken Waldo 425.649.7279 Monitoring Personnel TBD O 2013 D. R.STRONG Consulting Engineers Inc. Page 15 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 Stormwater Poliution Prevention Plan 6.0 SITE INSPECTIONS AND MONITORING Monitoring includes visual inspection, monitoring for water quality parameters of concern, and documentation of the inspection and monitoring findings in a site log book. A site log book will be maintained for all on-site construction activities and will include: • A record of the implementation of the SWPPP and other permit requirements; • Site inspections; and, • Stormwater quality monitoring. For convenience, the inspection form and water quality monitoring forms included in this SWPPP include the required information for the site log book. This SWPPP may function as the site log book if desired, or the forms may be separated and included in a separate site log book. However, if separated, the site log book but must be maintained on-site or within reasonable access to the site and be made available upon request to Ecology or the local jurisdiction. 6.1 Site Inspection All BMPs will be inspected, maintained, and repaired as needed to assure continued performance of their intended function. The inspector will be a Certified Erosion and � Sediment Control Lead (CESCL) per BMP C160. The name and contact information for the CESCL is provided in Section 5 of this SWPPP. Site inspection will occur in all areas disturbed by construction activities and at all stormwater discharge points. Stormwater will be examined for the presence of suspended sediment, turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be documented in the site log book or forms provided in this document. All new BMPs or design changes will be documented in the SWPPP as soon as possible. 6.1.1 Site Inspection Frequency Site inspections will be conducted at least once a week and within 24 hours following any discharge from the site. For sites with temporary stabilization measures, the site inspection frequency can be reduced to once every month. 6.1.2 Site Inspection Documentation The site inspector will record each site inspection using the site log inspection forms provided in Appendix E. The site inspection log forms may be separated from this SWPPP document, but will be maintained on-site or within reasonable access to the site and be made available upon request to Ecology or the local jurisdiction. �2013 D.R.STRONG Consulting Engineers Inc. Page 16 of 33 I' Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 II Stormwater Pollution Prevention Plan 6.2 Stormwater Quality Monitoring The Site will discharge into an existing storm drainage system. Before project discharge leaves the Site, it enters a detention pond which outlets into a BayFilter vault before entering the existing conveyance system located within 156th Avenue SE. This will be sufficient in accommodating water quality requirements. Testing at the outlet will still occur as necessary. 6.2.1 Turbidity Sampling Sampling and monitoring will be conducted during the entire construction phase of the project. Samples will be collected daily at the downstream catch basin for both the pond and vault. If there is no flow in this catch basin, the attempt to sample will be recorded in the site log book and reported to Ecology in the monthly Discharge Monitoring Report (DMR) as "No Discharge". Samples will be analyzed for turbidity using the EPA 180.1 analytical method. The key benchmark turbidity value is 25 nephelometric turbidity units (NTU) for the downstream receiving water body. If the 25 NTU benchmark is exceeded in any sample collected from the tested catch basins, the following steps will be conducted: 1. Ensure all BMPs specified in this SWPPP are installed and functioning as intended. 2. Assess whether additional BMPs should be implemented, and document modified BMPs in the SWPPP as necessary. 3. Sample discharge daily until the discharge is 25 NTU or lower. If the turbidity exceeds 250 NTU at any time, the following steps will be conducted: 1. Notify Ecology by phone within 24 hours of analysis (see Section 5.0 of this SWPPP for contact information). 2. Continue sampling daily until the discharge is 25 NTU or lower Initiate additional treatment BMPs such as off-site treatment, infiltration, filtration and , chemical treatment within 24 hours, and implement those additional treatment ' BMPs as soon as possible, but within a minimum of 7 days. 3. Describe inspection results and remedial actions taken in the site log book and in monthly discharge monitoring reports as described in Section 7.0 of this SWPPP. 6.2.2 pH Sampling Sampling and monitoring for pH will occur during the phase of construction when concrete pouring will be conducted until fully cured (3 weeks from last pour) and discharges are documented to be below pH 8.5. Samples will be collected weekly at the sedimentation pond prior to discharge to surf'ace water. Samples will be analyzed for pH using a calibrated pH meter and recorded in the site log book. The key benchmark pH value for stormwater is a maximum of 8.5. If a pH greater than 8.5 is measured in the sedimentation trap/pond(s) that has the potential to discharge to surFace water, the following steps will be conducted: C�2013 D. R.STRONG Consulting Engineers Inc. Page 17 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan 1. Prevent (detain) all discharges from leaving the site and entering surFace waters or storm drains if the pH is greater than 8.5 2. Implement CO2 sparging or dry ice treatment in accordance with Ecology BMP C252. Describe inspection results and remedial actions that are taken in the site log book and in monthly discharge monitoring reports as described in Section 7.0 of this SWPPP. 6.2.3 Temperature Monitoring No temperature monitoring is required for this construction site. i ' � _� O 2013 D.R.STRONG Consulting Engineers Inc. Page 18 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 _----- �I Stormwater Pollution Prevention Plan ' 7.0 REPORTING AND RECORDKEEPING 7.1 Recordkeeping 7.1.1 Site Log Book A site log book will be maintained for all on-site construction activities and will include: • A record of the implementation of the SWPPP and other permit requirements; • Site inspections; and, • Stormwater quality monitoring. j For convenience, the inspection form and water quality monitoring forms included in this SWPPP include the required information for the site log book. 7.1.2 Records Retention Records of all monitoring information (site log book, inspection reports/checklists, etc.), this Stormwater Pollution Prevention Plan, and any other documentation of compliance with permit requirements will be retained during the life of the construction project and for a minimum of three years following the termination of permit coverage in accordance with permit condition SS.C. 7.1.3 Access to Plans and Records The SWPPP, General Permit, Notice of Authorization letter, and Site Log Book will be retained on site or within reasonable access to the site and will be made immediately available upon request to Ecology or the local jurisdiction. A copy of this SWPPP will be provided to Ecology within 14 days of receipt of a written request for the SWPPR from Ecology. Any other information requested by Ecology will be submitted within a reasonable time. A copy of the SWPPP or access to the SWPPP will be provided to the public when requested in writing in accordance with permit condition S5.G. , 7.1.4 Updating the SWPPP , In accordance with Conditions S3, S4.B, and S9.B.3 of the General Permit, this SWPPP 'i will be modified if the SWPPP is ineffective in eliminating or significantly minimizing j pollutants in stormwater discharges from the site or there has been a change in design, ' construction, operation, or maintenance at the site that has a significant effect on the discharge, or potential for discharge, of pollutants to the waters of the State. The I SWPPP will be modified within seven days of determination based on inspection(s) that additional or modified BMPs are necessary to correct problems identified, and an updated timeline for BMP implementation will be prepared. ;�2013 D. R.STRONG Consulting Engineers Inc. Page 19 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 Stormwater Pollution Prevention Plan 7.2 Reporting 7.2.1 Discharge Monitoring Reports Water quality sampling results will be submitted to Ecology monthly on Discharge Monitoring Report (DMR) forms in accordance with permit condition SS.B. If there was no discharge during a given monitoring period, the form will be submitted with the words "no discharge" entered in place of the monitoring results. If a benchmark was exceeded, a brief summary of inspection results and remedial actions taken will be included. If sampling could not be performed during a monitoring period, a DMR will be submitted with an explanation of why sampling could not be perFormed. 7.2.2 Notification of Noncompliance If any of the terms and conditions of the permit are not met, and it causes a threat to human health or the environment, the following steps will be taken in accordance with permit section SS.F: 1. Ecology will be immediately notified of the failure to comply. 2. Immediate action will be taken to control the noncompliance issue and to correct the problem. If applicable, sampling and analysis of any noncompliance will be repeated immediately and the results submitted to Ecology within five (5) days of becoming aware of the violation. 3. A detailed written report describing the noncompliance will be submitted to Ecology within five (5) days, unless requested earlier by Ecology. Any time turbidity sampling indicates turbidity is 250 nephelometric turbidity units (NTU) or greater or water transparency is 6 centimeters or less, the Ecology regional office will be notified by phone within 24 hours of analysis as required by permit condition S5.A (see Section 5.0 of this SWPPP for contact information). In accordance with permit condition S4.F.6.b, the Ecology regional office will be notified if chemical treatment other than CO2 sparging is planned for adjustment of high pH water (see Section 5.0 of this SWPPP for contact information). 7.2.3 Permit Application and Changes In accordance with permit condition S2.A, a complete application form will be submitted to Ecology and the appropriate local jurisdiction (if applicable) to be covered by the General Permit. O 2013 D. R.STRONG Consulting Engineers Inc. Page 20 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 Stormwater Pollution Prevention Plan APPENDIX A - SITE PLANS 4 � �. ''I ;i j . �i �` O 2013 D.R.STRONG ConsuRing Engineers Inc. Page 21 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 � ( � � I i NE 1/4 SECTlON 14, TOWNSHlP 23 N, RANGE 5 E, W.M.. j ' � SADDLEBRDOKDIV. ll : W � � I � - . .. Q- � � ._�_ I � = I _ _ � , . � � _ _ � . __ _ _ _ . , � _ _ __ W - _ � � , � , _ a , � z . _ __ ___ ___ __ _ _ . , , � _ , . . ___ _ _ � , , _ __ � - �-. _ _ w o . .� . . . , . - - __ __ � � o � �,soe . _ _ . _ _ _ .__ _ . _ _ - T . '__ , . ' :. . __. _._ "__ - __ . .. _ y �/ �. � I -'_ ., i _ .. ... .... .. _..-'__ - ' _ .�_ � �\ .- � '..: � '.. _ ._... . `� � ��- _����,_ � � . . .. . . . __. . � .: .-:. . .. � � I. I.: :._.\ ... _ _ ._-_ .,. �,- ' m '� � � � - w � ...IT //.. J fX�SPNG HEALWALL TO _ EX!57LVC�ENC£TO . C- � �i Q 2E REkGVEO . ."- �.. 6£REAIOVED . Q / � fX(SRNG WAiER SERV,Cf ��� • � �� .i,. Q :O BE R£LOCATED ANO .I - - L� � - � r^.EUSEO I Spb, � _/1_ , _� O � i-_ . . � Rf � � � �`. � . � __ / . ._- ) "_ �-:I..... _ � �. . , y�.,. __;___�...___ "'. . :,� ' ' ,�� TE.VPORARY SED!M£NT TRA? ' �Q7�_, CDNSTRUCT%ON STAL7!!G R.4EA�^\� Ek1S7/AG EX7RUDED CJ.4B � SEE CALCUL4Tl.^A05 TMS SHEE ,1LL LON57RJC7lON MAiE.4lALS ��� TO BE RfLOY£0 ' - I I � ANO G/W!DS TO H '�.S�OPFJ I � ; :". .� __. . ., �� • 3-i � � `, I HHfRE ATRAttETUlES�PR£AY I . � . _�. ��Jy(,'� � p �'- ;_. . `CY- LL . �J - . ��. �. � . � 4�BERN � � SMALL BE-LklEQ N17H PLASTL I ...-,-'.-- .. � . ' ' ' , .-v- - :�j I AND RIP frM PR.'OR 70 ANY I !��. � - - ,� '� � ACnNTY. . XI A R.r K'AY 3oy . i�. `_ . / �` ._. _�� - _ TOBEREUOVED - \\ .. ---------' ✓ -. .. O, s� � ` I ."'�...��... � ,. � _ __ � : _, I . ..__ ,._,.-.. � "_' � ' .� I ... �..; " �� � ...'�`� ov � - �al0 _ � � '" I ...� � - � o���._ � _' - - _ ., . , . o .:.� ; , ; �� . . . _ . ' ,; , ,' . . I ' I' _ N8 44 1B"� 8.5 's .. -.. -, ; ., - . _ f ---.-. _..._ _ ;a',." . , - :: ;,.� f: �, .._. _,-..,_� . .._..._ .. . . .... . � '. �_q �._'"'''_ ._ ' .__'_ ....._ _-".__ ;_�_ "... . .. ' �� '., {� � ' __.. :..: ... __ I .�`.�� o'�� _.., -- .. .... .i-i -� �_ _���-\ � O� � t � . _ - - � I� ��� I� �. , . .. -.... :.... . . .. .: NOTES CONSTRIICTION SEQUENCE.• TESC LEGEND 7. AD.�1POA'/L ERGSIO.Y CONIROL NEASIR£5 AI�Y BE REOUIP,ED AS C£E71ED 1. SGrEGUtE AND Hp:�A PFf-CO.A'SPi'uCTO.Y Cp4FERENCF M11H 7hE GTY 9TE - COrt'SiRJL^fJl LId175 � 11'�1dPA?ARY CUL KRT tifG:5SA.4Y BY fAR 1NSPECTOR WSPECTOR. � 1. .L'1 PY51'F fX1571NG INPROIENfN75 TO BE R£u04ED. 1H1$W:1UOf5 ALL ONS7E 2. fLAG OR ffNC£CLARkJG LW I5. fENCES 3. Po5T SGN WITH M:SAfE AhD PHOh'£NL1!BER O�TFSC SUPERVISOR Y REINfORCEO SICT FENCE �- ��PR07fCRPV FfNL£ ' 4. RELGCAIE EX 117iL171£S,�COOP,DINA'f k1TH SIIRVEYqP. � � 5. G4ADE AND lNSTACL CONS'RUCTON ENTilANCE. O REYOL£EXI57WG STRf:CIL'r?E �� 6. DENOi15H/REYOVf EJC fM.�ROI�£ilEN75 INTHIN LYEARWC LIW75 FXCEPT AS SHONPA �' SEDIMENT TRAP SIZING SUMA�fARY.• � LYSTACL PfRIAIEIER PRO�C�iON(REMF�X'CED 5¢T FENCESJ. STABILIZfD CQNSTRf/CT10N ENTRANCE � 7RE£TO Bf RENOVTJ P1E Ti7AP WAS SIZED U9.YG THF REOIXk£MENTS STA7ED AV APP£NDIX O OF THF 2P09 8. ��N DE7EN71pJ POND LO)JS7RUCRCN. I KWC COUh'TY S'JRfALE WA7ER OESIGN MANVAL WfL�CH REOUIRCS I,A40 SF.Of 9. PISTJLL CB�AND VTllIZ:TO COLL£CT RU.'J0.F FROIA ACCESS ROAD. PUMP ! 4 " SURFRCf ARG PER CFS G'F LNFLON;OFVECOPEJ 1-YEAR 570R1I, 15-MNd 71NE STfPS RUNOFF 70 DETETiGY POND FS-HOLttJ. � CYECK OJY � � ]0.GRADE ANJ/h5TAlC INiERC£PTOR$WfLfS Yd71 CHFCK DANS ^. �� OUST CONTROL " CA7:J1MfA'T AREA�0.943 AC 11. UAA'TAM E.40510N CONiROL llEASUP.fS IN ACLORDANCE WTH C17Y SiqNDh4D5 AA'D � A,O p 7 H �I .� ?-YEAR PEAK FLOW RA7F........._....... 0.2/9 CFS NANJFACTt/RERS FECOa[N.NCATiONS y� �V R - R£�?(N,4ID SL'RFACE AR£A._................. 445 SF. 12. RELOCA7E ERGS'Of!C(1."l7.4QL AEASURES OR MSTAlL NfNYEA5URF5 50 Th'AT AS YULCHING.MA77INC,R COl/POST B[ANA'ETS 0 � PR�NDED SLFFACE A4£A._................. I,077 SF. 97E CONOIT.ONS CY.ANG£, THE ER09Q^J AND SEDINr7JT CQV7RIX 6 ACWAK M O GRAPHICSCALE o ACCO.ROANCE WI7H 7r!E L77Y5 r5C Adl,•t'NUY REG'i.'RfNFNTS.VAlA7 A!AY Ef �ET PRO7fCT10N D 10 20 40 UT1LIZf0 FOR 5£G1A!£N7 Q�NTR01.GYCE C011PLf1E(PLl1C VAUL i OLitE7 AAID � pFRAIANENT SEEDWC AND PI.RNIM/G `1 G15PGSE OF 5£011(ENT CADEN NA7�R M A NF,Y,YER APPR04ED BY?lf CI1Y CF efN7aN). � 1 INCH=20 FT. 13.LOVER ALL ARfAS Ti!AT'N.±L B£LYJRY.RXEO FOR NORE 7NAN SE4fN DAYS DURU1� STREET SNEEPWG&VACV(/NLNC - THE ORY SfASCuY p?IMO DAYS DUPI1lG TiiE WE7 SEASON W17H 57,4A N, M{�OD fIBER MULGN, CCMPOST,PLA571L SHfE71NG,GR FW!✓ALENi. •••-�l- INIfRCf?TOR SY/ALE 14.S7A&1/2E ALL ARfAS Rf/�T RcALN FfIfJ.G7ADE NITFMN SEVfN DA'/$. 15. SE£D GR SGD AYY AREAS TO REYA!N UNNORKED fOR UOkf 7NAN 30 OAYS RECOMMENDED FOR APPOVAL ]b. UPON CQVPLE7/0W OF 7H£PROJECT,ALL dSRIRBED AREAS NUST BE STAd217E0 AhD BNPS REM04E0!f APPROPP.lA7E BY: D8Y8: 77.AOA'T,^AJAL EROSION CON7RQL MEASL47E5 NAY BE REOUIREO AS DEENEO NfCE55A.RY 6Y G7Y QF RE,V70N LNSPECTOP.. BY: �a�e: - BY: Date: - BY: Date: A�.�oG �.e�o sv...ot _ Y����-�.-.�... D.R.STRONG ,�� �as r,o,m .°^^ �,��° , SADDLEBROOK DIV. II ��oe.oe.,s CITY OF �. CONSULTING ENG/NEERS ���''� R E N TC I�: CeA 2 Working Days Be`we Yau D"g � 811 g� 1;a, j1� � � �3��S� ��_`w" � u�1uu� � CLEARING AND TESC PLAN .,K.� U6Tdiea UndergowW Lxetion Cenix ��s� � �������Mwam33 "'-� � Plcr.n�ng/B�ilairg/P�btic J.'or'<; De?t. CS ous.��sasv Fizzenarz3 - 5 ��14 OD.IATND.OR,WAJ $/a�;eL� 'JQ 4EV JCN BY �A E .4P?R4 0%`� s�,.«<..Fy.�. A - NNNNAA '__ I NE 1 4 SECTION 14 WNSHIP 23 N RANGE 5 E W.M.. ! / , TO , , � = SADDLEBRDOKDIV. lI ' � �`- �-r .�,�..��� � ; �� 1 � � r�. � � � � _ i � i � �.�� - � f��.-n /������:� I I � .��� � a.,ti.�ff,�.�o.,.. �.�.,�o�, � ,,�,a��, ��!��'� t � o.Emvnemsa I -{ -�I- ` � �Ii_ :�i -� ' '-,.� n-a.r . .sff.x..o �_ su..v , ��..pT_I.-r-� z� ��� _ _I�.M,...,.��ao.��T � ' wem.v I �'� � ,�� � ..�� � � � ,� , �� ��.s.����E.��.s�E�K_„ ' Q - R.�..E..�=� '�� � ���r.� z > ��ce��.. _�_� ��om�o.�=E � �,, _ � � o �� ,,: ..��r=Rv���. _ _ _ _ a�r.v � L o r�, .r....�_-f ���-�$,�. ,E��,�. �'�ro�,� _ o �,�� _��.,��.�,�. �,u.�.�.� oE,�,.�mn.�.r�,='oE _ s clFcwTnx � .x Fa�ae�aFtow. .l. �SOi�i�v�yLaEnST�.II£D�ENTiILV��LBE:FJ,YMG�Cavc7q..JCiIOHsrtE0.N01Mt�e_s,'GON 21. S�PES�F�Poq11wV2-,:!✓'.Vi'nv�caeT�p�'1CF_E�OF�EF A'I_TItaIEF.51OE0EY�YBECANST»JC^DCALL0.S9t '� � AwcaTEmMIEaRaW �Tw+ou.alhFuiVIR.#SYSIdlDASEw/.eR-IiNUtP(eO �� � �R.E T. '�..aa'aa2._ _ _ ,FNGtNEFATD6fELiNB �... w cevcxu.o�rs�uuirox�[Flu�wxs , e � . _ - 22 CG��SLRU �VERiEwOftARlS�:�LE55�LLBE4pMQp. '., J i -u lNE iAx avA OFlHcu6MiM.1La3f5MBPK5PEfF1GnIXluBIBE uE _ -.-'J - ; YNxiB1ANCE5TnNOA1m5 ' Q [ESIGN4NOI.YSiPWiIJNSFECFIGTlua4 = pON0�1£0.LViLYREfW15f:MMRWG HpLLBE ll. ACMiY Gr+wi1�=REVAIREON.kDM�V 32 �FAI]IIIY ', ''V.Wab0.FaEOtFJClCSTrvESA'/�FS_ / �F1�0.� Q � .1. FORPHtEMANFM�ROPOS.Iq.^.d�6NLTsu65�TEO�(.'iFvpE�.�a��^ESTnBIJU.TIONNURB#I�AE�STIIT'c11RPEGC�1.tAY I nrunniePmurverieuseovau.•ansau�s�ricce�isiroraaevernr�,smweNrvnouae.�Hcrw�aaoo�.o '^ 2 PAVE�xGS.Cv:18EN5�LEU0.5NELESV�RYTOPF3lqCl�iPu:-lc'O'r+E00rv5in�^'�a e¢owrvuiuun�.a � . V/ y - ao�ypos� t1 FWHR caFA?OSSIBLETyEEHIWJlGESHALLBELOHSRUCTmOxAFRM.COu�AC!E05:.'CGRAOETWSGVSlES:ANiMLL� �"-�"�'B1T . .) _ � 315�q�q MC¢PEEF=£C1iiEnE55'JFiMEP�OaNORmUC_iXCNEEaF�RMAHIEW�NCE. FE�. aI�Na5ECu1�IVAma!_.i11uT5TA3luZE5i1�:FrN£Hpp0=31qfNLOYIY(A1ExTOBYPw55VtlnmEfA1INET1F5dT __ _ __ " _ __ _ _ 'ws ' _ G ThENFiSu' '1 I�PT1E uou[iaicv� iurour�cEsruawm - _ �"'�wTMEciMExsia�cuTMe mE�E.+�.riErr.asre , cav��oror.sco�urmmav -_ owieorvr.x . wm�� � . .. cwamuu�«iu.�n.._..v.u�. � . cn,so.....sn�.�cEna�axAsrmoiHe`.'�w.;""� _ .��.iiesm�r. �. _�.nemo.u+vcawu.etam�auammmn.m.�.a:...m . w neiµs�Eiv.cirEra�rc-sas�4�o txesme=is.• . . a=<��onri� � _ Fi�Efii[TF.�s rye�i[naEl .ur�nw[rou.z.sc�ci5.a_-u�L�v.v.rz9wte[�a��v. . . .•N�WOUYEroROPDWAY�5110.LL9ERFI��K�DInIE'.Y. 2 it�mGOs+�Fs�aYYM���or�i�/r�m�fimaAvnA .£ ._'n��IDiCCPuiaO_iw.F'FIC. 'i+_S-ESxTPC.1'e�'��imnuiHEWnS.x_Cii[M1En'Ift.JiC_y�l��vG9�tlLeE . , R 11ekN+l+pu�melahwmie�lafeeu^or,am¢�a:gti¢MCNrmu!Y � 57D.PLAN-214.00 1 rr�r..iw.�n...o�e�..nse..absw�-ra.�an�.aiR � PUH':.IC TOZKS SILT FENGE . D�PARTb(ENi MARCH 2:Od i� PJB=1C FJA4S STABILIZED SID.PIAN-215.10 � �. S19.PLAlI�-218.30 � SfD.P1dN-21710 _p Pl3L1C FORHS GATGH BASIT7 FILTER a� pllHllC/lORKS INTERCEPTOR SWALE � �?�j D=PAiTA1PJT GONSTRUCTION ENTRAPICE � ➢EPR.7fl1EVT � �'-7C DEPARTY�"f 11ARC'�20U9 SIrtRCH 2O0B LIp.FCH 2CDd � � � "'"""'��"°""�'�' EROSlON CONTROL NOTFS & SPEGFICATIONS 7REE PROTECIION MEASURES � �� T 7. APPROVAC OF TNIS EROSION AND SOINENI CGYIRCL(ESC)PLAN DOFS N0T CQV577NTE AN MF'ROVAL GF PERNANEN7 RQ10 OR ORAMAGE LG.Y57RUCiiGN 5T0.4AGE PRp;IBlitD: TYE APPVCANT MAY NOi F2L,ENCAYATF,STACK OX S70R£AA'Y EOWPNENT.p5PO5f OF ANY lIA7ERlAlS SUPPlIfS Q?(LVIDS,OP£RATF ANY � ��Q,�� I DESlGN(£.G,92E AND LOCA7,'ON Cf ROAOS,PIPES,RE57RlCi0RS�RINEL$RE7£N710N FACttl11E5,UP.Ll7lE$E7G), EPf.'IPNENT,INSTALL INPERNOVS SURfAC£5 Oh C04PPCT TNf EAR7H W ANY WAY K?THW IIiE AftEA OEFlNEO BY 7Hf D.4iP LW£Q"ANY 1REE TO BE RE7NNED. � �V--'L>' ����C X I 2 7HE'WPLEMFMA7ION Of IHFSE ESC P[ANS AND TNE CON57RUCl/pJ,NAMJ7FNANCF,RfPLAfFAIENT,ANO IIPGRADING Of 7HESE ESC FAClL11E5 6- FENCEO PROTFCTON AREA R£OUlR£D: 7iE APPLlCANT SHACL ERECT AND MA.N7A/N 9X(00T(6)HIGH CHA/N LINK TMPORP.RY CQV57RUCRW fENqNG AROUND 7HE L.4iP tINES OF d �`1� G�Q 1 15 7NE RES'QN9B211Y GF TIfE APPCICANT/ESC SUPERw50R UN7R ALL CONSTrtUCTION/S APPROVfD. f.L[RETAINfD TREf$GR AiAVG IYfE P£PHIEiER 0.�A 57AND OF R£7AdJFD 7REES F(ACARDS SHAiL BE PUCED ON�NGNG EI�£RY f]F7Y FE£T(50)WOICATINC TH£NGRD$ MO � 7R£SPASSING-PR07FCTf0 IREES'OR Q4 EAM 51Uf OF 7Xf FENCMG!F LE55 R!AN f]FJY F£E7(50).SITE ACCCSS i0 INGINDL'ALLY PP07fCTED iR£ES OR CRpJPS Of 7REE5$HALL S THE BWNOARIES OF 7HE LYEARlNG UY17S SHOWN dJ TH6 PLAN SHALL BE Ci£ARLY fUGGED BY A CbNTM/UQIS[ENCIN OF'SURI�EY 7APf(GR BE FENCED AND SlGNEO.IND/VlDUAL ]Rf£5 SHALL BF FENCEO ON FOUR(4)5'�CFS M ADDIIIINJ, TNF APPLCANT SHALL PkOV/DE SUPERYI9QY HNEAT_YER Eqfk'MEN7 OR 7RUIX5 ARE . s� FENCING,!f P.EOU/R£O)PRKM TO CpJSlRVCT10N. DUR/NC 7NE CONSTRUC7/ON PEAIOD,/JO Ol51UR@ANCE BEYOIJD ME CLfAPoNC L61�75 SHALL Bf IIOVJJC NEAR 7REES PERMTTED. RIE CLEARfNG L'MlTS SY.A�L BE llAINTA/NF0 BY TFfE MP(lCANT/ESC SU?ERNSOR�OR THE OiIRATIGN OF CQVS7RUCTIClY. PROTFCnON fROl1 GRAD£CHANGES!F IHE LRADE LEYEL ADJOIMING 70 A TRF£TO 8E RETAGVFD IS TO BE RAl5E0, THE APPLMA/JT SF44LL CONSiRUCJ A ORY ROCK WALL OR ROCK f. iHF£SC fACICIT7E5 SHOWN ON R115 PLAN MVST BE CON57RUClED PRNA7 TO OR/N CON.NNC7ION YSM A.LL CLEAP•MG AND 6!'AD1NC 50 AS 70 �LL ARWNO 7NE 7REf. 7HE OlAKE7ER Of IHIS WACL OR NELL YUST BE EIX/AL 70 7HE TR£E5 P41P LINE. �' � r, fNSURf INAT THE TRA/.SPORT OF SEDINfN7 TO SURfACE W.17ER$ORF/NAG£SKTEY$ANO AD.IACEN7 PR�ERTrES/5 M/NMl7£D. C IMPERVIOUS SURfAC£S PRQ+I!&7f0 YATNlN RiE ORIP LINf: 1X£APPLICAN7 NAY 0.�OT IA�'SiALL lNPERNWS SURFAC£MA7fR41L N9/H/N TNE AREA DEFA'ED BY TH£DR/P LlNf OF ANY 5 THf£SC fAGL/Tl£5 SHGMN QV RfiS P2AN ARE THE WN/YUN REOfAR£71dENT5 FOR ANAUPAIEO SITE COhD/710NS OUR/NG 7HE CONSTRUCTION TREE TO BE RETA/NED. PERI00. 7HfSE£SC fACWAES SHALL B£UPGRAOED AS AiEEDfO FQR UfrEXP£CTE'D SiOR.V ElEN75 AND.IlOD61E0 TO ACCOUN7 FQP CHANpNC 5/7E � _ � ` ���A��E���� COhD1TlONS(EC,A001710NAL S'.VP PNlP$FELOCATION OF W7CHES ANO SKT FENCE$ETG). e. Rf5TR1C770N5 ON GRFp'NC W7TNP/TH£ORiP LlNES OF RETAM'ED 7REE5.� 7Hf G2AOf LfbFL AROL'NO ANY TRfE TO BF RfTAYlFD MAY NOT BE LON'ERED N11NNY THE GRfA7FR Of ME -I I.-��I + i GOLLONfNG AR£AS(!)AiF AREA D£FPIED BY IHE OAN L!N£6�h/E 7RE£,Cu4(/l)A1J AREA AFOU.MD THE 7REE EOUAL TO ON£AND QNE-HALF FEE7(i-7/7 J LV LlAf1E7ER FOR FACH ' �'�.I=I I I��I�I,I''.I I � 6. THF£SC fAGt17/f5 SHA[L BE MSPECIEO DA2Y BY THE MP[IGNT/FSC SUPERNSOR AND YA/NTAINEO TO ENSUPE CQVTMMIED PROPER 01�£INLH OF 7REE CALlPER. RfE REV]EW1NG GFFIOAL LAY REOUlR£A LARt{R 7RfE PROffCiION ZOh'E BASEO OIJ 7REE 9ZE,SPEpE$SQ'C,OR D7HER LONDlTIONS -I I I=I I' I f7/NC110h'ING ItR1T7£N RfCORDS SrfALL 6E XEPT OF SYfEKLY R�WS OF M££SC(AC¢111E5 DYIRWG JNE MET SEASON(CL7. 1 TO APR2 30)AND ����I I�,I��-I I V OF bON771GY R£✓!EWS DUR.WC THE DAY SEASON IuAY 7 TO SEPT.30). L NULCH UYFR REIXJIR£D:A:1 Ar.fAS N17N/N 7HE R£WlRfO FENLYNG SHA1L 6f COVfRflJ C0117LETFLY hVD£VENLY IN7H A MN;1.fUN L1�R1REE lNCHfS(3 J Oi BAkK MULCH PRIOR 70 ' i Y- _ INSTPllAPCAf OF INE P1707EC7Ib£FENpNG.fXQ'PTONS YAY BE APPROl�EO BY TFif P.£V)£N1NC GFFILUL If 7HE IAULCif 1kL AC'hF5£LY AfFECT P.401ECTED GRO�JND COKR W_AN75. -������� i��. . - �I 1=��I 7. FNY APEAS OF EXPOS£0 SO/L5�INCLUDING ROADWAY FUHANKMENTS, 7HAT N1LL NO7 BE 06TUP.8ED FOR TN17 DAYS CJP,JNC R1£Wf7 SfASLW 9 yq,pJppnyC AEO!/IRED DURINC CONS7RUCTIOM R1E APPUCANT SHALL R£TA/N A PROfESSiONAL ARBO.R;ST OP.OiHER G'✓AL�r;fO PROFFSSlOA'AL TO P.4'J4E BR<NM�S A4'D R007$ =�'�I,=„I_I= pg SfL£N DAY$DURMG THE ORY SFASON SHALL 6E LbME0lA7E[Y STABIL2f0 Mf1N 7HE APPR04ED£SC AlEMOOS(EG,SEEDIh'f�,MULpiI,YG PLASTIC COYERM'Cy ETC.). fER7M17E,AND WAiER AS APPROPRIAIf FOR ANY 7RfE5 ANO GRO!/ND C04£R NHIGY ARE TD BE RETAINEO. fl ANY AR£A NEEDA'C ESC NEASURES NOT R£OUfR.MlGlMMfDIA1E A7TENTbN SNiL'i EE ADDRESSEO NIR1/N F/FTE'EN(ISJ OAYS � 9. 1NE ESC FAL/UIIES ON WAC7/VE 5l7f5 SHALL BF/NSPEC7ED AND LUINTA.'NED A 14%IUL'M OF CNCE A MLWRi OR NfMIN FORTY-EIGHT(S8J . ccnortpwoFus¢ HOURS FOCLONVJG A STORM EL£NT. '� . aoMpsrv�ae=�•.-usmru+oma.�=onvsGRi4�s �O. AT NO TG(E$HAlL NCRE TiIAN OIJE 1 FOOT Q�SfA'1(EN7 E£ALLOKO TO ACCUAIIlLA1E YAiNIN A GTCH BAS/N. ACL CATCH BAS7N5 AIJD 12. TC O�FVEVFI'vOFFIN'9tCFFTFDFRWuuqsi�'xa�w�2=.t5MC.ubTHE91[TO0.xOnmasR'[q�'xG_PON�. �� �. - CQYYEYANCE CINES SHA[L BE CLEANED PRfOR 70 PANNG TN£CLEA4/NC OPfRAT10N SHALL N07 FLUSN 5£O/AIENT-LAOEN WAlER MTO THE ' naixreu..rvcesr..xw.nvs �Ot4N5TR£FY SY57fl( I z.i. •:SmM+En'ic_Fcs:norvoFv-atETW�HcscEFrvf,�aiE_a=_uo�£nsorxnrr-ecn<wvEisr�srw.Eomrrsc.ic�au �I auC�cpnv. il. STABICIZED CONS7RVCTlLN ENTRAh'CFS AND ROADS SHALL Bf ASTALLED AT THE HEGINNLNG 0.�LLW57RUCPON/ND 11AIN7AlNED�OR 7H£ ' ��� ��uso�ceuF-��w=�r��=�ssrv�uae�ararze�Eoariw�ee��s�oxovr�smnueeanas�-s�oua:�:cu:=e.��vcr CUAATION OF 7i!E PROF_CT. ADDIP,OVUL bEASURf�SUpI AS Wl�SH PPOS MAY Bf REW/RED TO ENSURE THAT f.li PALED ARfAS ARf X£P7 I ..-. ..- Er+,'r5ic�c�eurv:�.Er_ CLEAN FOP IN£DURA7/ON Q�THE PRQ�ECT. I 12 ANY PERMANfNT fLOW CQNIFOL�AC217Y USED AS A 7ENPQRARY SETRINC BASfN SHALL BE NOD/FlED MiTH THE NEC£SSARY FROS101/CONT?OL I NEASURES AND SHALL PRONDE ADEOUATE STO.RAGE GPAG7Y. IF THE fACICITY IS 70 FUNC710N UL70.IATQY AS AN INFM I.PA110N SYSTCM, 7HE A'OTES. �� 7[MPORARY FAbLlTY!lUST 8E GRADEO 50 7HA7 11iE BOTlOY ANO$ICES ARE A7 LEA57 THREE FEF7 ABOVF 7HE FWAL GI7ADE Of ME PERYANEN7 ).E-FT.HIGH TfNPORARY CHA/N LINK F£NCE SNALL BE I = FACIL/TY. PLACED AT IH£DRIPLluE CE�TH£TR£E TO B£SAV£D. FfNCE � I - 11 YMfRF STRAW 1/VLCH fOR TEAIPORARY EROSION CQY7ROL 6 REplH7E0,IT SHALL B£APPLIED AT A M/:GVUTA 7HICKNESS Of 7 TO 3 MCHES. �F�CON.LE7ELY fNdRC�E TN£7R£E(5). INSiA(L FENCE I _ PG575 L'9NG Pi£R BLOCYS OhiY. AVpD C.R;NNC P0575 OR 19. PRIOft TO THE BEGA"JN(NG OF Tr/E WET SEASON OCT. 1,ALL DISTURBED AP.fAS SHAl1 BE RENEN£D 7�IQ[TIPfY NMCH GVES CAN BE 5£EDEO S7AKE5 MTO AUJ0.4 ROGTS C J 2 FOR RO0T5 OKR 1-fN OIA. 7NAT AP.F OALfAGED OURING IN FREPA.4AA:1N fOR THE N4N7£R RA/NS DlSRlR9fD AREAS SMALC BF SEEDED WIIhPN(AYE W£EK OF 11fE dEG414WIJG OF THE lSET SEASON. A CpN57RUC710N,NAKE A CLEAN,STRAIGrl7 CUT TO R£MOVE 6'�;�y SiCE7CN YAP OF THOSE AREAS TO B£SffOED ANO 7}/OSf AREAS 70 R£4�IN UNCOVFRED 57fALL BE SUB�MTIED TO IfIE OJES/MSPECTOR. 7HE THF OANAGEO POFnOAI. ALL EXP'JSfO ROOTS SHALL 8E ODES WSPFCTOR CAN Rf0U1Rf SEEDING OF ADDITIO.NAL AREAS/N MOER TO PROIECT SURFACE NA7ER$AOJACENT PROP£RIIES Q4 ORA/NAGE TEAIPOP.ARICY COV£RED M17H DAMP BURLAP TO PREVENT I fAC1UDE5 GRri.4G AND SHALL BE COVER£D N1TH 50/1 AS$DON AS I RECOMMENDED FOR APPOVAL FCS578LE � - 3. WORK fNR1M PRGTEC7fON F£NCE$lIALL EE OOh'E BY: Date: 1lANUA(LY. NO STOCXPNNG OF NArRUL$ IFHICUUR S1D.PIAN-217.40 TRAFF7C OR STORAGF Ll�EOUMN£NT OR MF.CHDJERY SHALL BY: Date: PUBLIC tt��I(S CHECK OAMS SPAGING AND p[A.LLOWfD NfTMN THE UN/I OF THE FENGNG. - ����� DEPA.RI'MENP CROSSSECTIOPIS BY: Date: �� 1L.P.CH 2:Od - TREE PROTECAON DETAIL c.qrvcm:c o.e coc�nox BY: Date: APPRO'+EO BY ARBORIST tti 4QR: Jp uiS oF ��.jdJ ��y CONSUL�NGENG/NEERS s,s �ns Noreo �' a'�°` �� CI ;Y ��F SADDLEBROOK DIV. II �oa.oa.is _ Ca9 2 Workhg Deys Betare Yw Dig �F ~ x D � � �f� ��s � ax�wmzs ruw,�rrs s��s � R E�l TO P� TESC NOTES AND DETAILS 811 �' @' .�� 0 I --' lMi7diesUndergrandLocatlonCeMer '�' Rr.� .G�� ��������1� "` � .*`�us=�c 1 ��M Flci�ire 3u��d�� Pu'clic 'Ncr{:s �.e� O�,ur.FD,oR,WA7 �`c'oY„L£�' o�zs.ez7.so&'iv�a.e�7.aaza � .., .1z��, � �� F, C6 ` N0. REVSID:J Bl' CATE .q?�R ""� - � ' � 6 "-.14 A -NNNNAA APPENDIX B - CONSTRUCTION BMPS High Visibility Plastic or Metal Fence (BMP C103) Stabilized Construction Entrance (BMP C105) Construction Road/Parking Area Stabilization (BMP C107) Temporary and Permanent Seeding (BMP C120) Plastic Covering (BMP C123) Dust Control (BMP C140) Materials on Hand (BMP C150) Interceptor Swale (BMP C200) Check Dams (BMP C207) Storm Drain Inlet Protection (BMP C220) - Silt Fence (BMP C233) Sediment Trap _ O 2013 D. R. STRONG Consulting Engineers Inc. Page 22 of 33 Storm�vater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 Stormwater Pollution Prevention Plan � APPENDIX C - ALTERNATIVE BMPS The following includes a list of possible alternative BMPs for each of the 12 elements not described in the main SWPPP text. This list can be referenced in the event a BMP for a specific element is not functioning as designed and an alternative BMP needs to be implemented. None Proposed s 2013 D.R. STRONG Consulting Engineers Inc. Page 23 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 APPENDIX D - GENERAL PERMIT O 2013 D.R.STRONG Consulting Engineers Inc. Page 24 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2�13 APPENDIX E - SITE INSPECTION FORMS (AND SITE LOG) �, The results of each inspection shall be summarized in an inspection report or checklist II',, that is entered into or attached to the site log book. It is suggested that the inspection !, report or checklist be included in this appendix to keep monitoring and inspection ' information in one document, but this is optional. However, it is mandatory that this �, SWPPP and the site inspection forms be kept onsite at all times during construction, ' and that inspections be perFormed and documented as outlined below. At a minimum, each inspection report or checklist shall include: a. Inspection date/times b. Weather information: general conditions during inspection, approximate amount of precipitation since the last inspection, and approximate amount of precipitation within the last 24 hours. c. A summary or list of all BMPs that have been implemented, including observations of all erosion/sediment control structures or practices. d. The following shall be noted: i. locations of BMPs inspected, ii. locations of BMPs that need maintenance, iii. the reason maintenance is needed, iv. locations of BMPs that failed to operate as designed or intended, and v. locations where additional or different BMPs are needed, and the reason(s) why e. A description of stormwater discharged from the site. The presence of suspended sediment, turbid water, discoloration, and/or oil sheen shall be noted, as applicable. f. A description of any water quality monitoring perFormed during inspection, and the results of that monitoring. g. General comments and notes, including a brief description of any BMP repairs, maintenance or installations made as a result of the inspection. h. A statement that, in the judgment of the person conducting the site inspection, the site is either in compliance or out of compliance with the terms and conditions of the SWPPP and the NPDES permit. If the site inspection indicates that the site is out of compliance, the inspection report shall include a summary of the remedial actions required to bring the site back into compliance, as well as a schedule of implementation. ' i. Name, title, and signature of person conducting the site inspection; and '�, the following statement: "I certify under penalty of law that this report is '' true, accurate, and complete, to the best of my knowledge and belief'. ��2013 D. R.STRONG Consulting Engineers Inc. Page 25 of 33 ', Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7, 2013 'I When the site inspection indicates that the site is not in compliance with any terms and conditions of the NPDES permit, the Permittee shall take immediate action(s) to: stop, contain, and clean up the unauthorized discharges, or otherwise stop the noncompliance; correct the problem(s); implement appropriate Best Management Practices (BMPs), and/or conduct maintenance of existing BMPs; and achieve compliance with all applicable standards and permit conditions. In addition, if the noncompliance causes a threat to human health or the environment, the Permittee shall comply with the Noncompliance Notification requirements in Special Condition S5.F of the permit. ; , �_� � �--. �_! , � f O 2013 D.R.STRONG Consulting Engineers Inc. Page 26 of 33 ' Stormwater Pollution Prevention Plan Saddlebrook Div.II August 7,2013 SITE INSPECTION FORM General Information Project Name: Inspector Name: Title: CESCL# : Date: Time: Inspection Type: ❑ After a rain event ❑ Weekly ❑ Turbidity/transparency benchmark exceedance � Other Weather Precipitation Since last inspection In last 24 hours Description of General Site Conditions: Inspection of BMPs Element 9: Mark Clearing Limits BM P: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action i BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action Element 2: Establish Constructron Access BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action ; BM P: � Inspected Functioning Location Y N Y N NIP Problem/Corrective Action Element 3: Contro!Flow Rates BMP: Location Inspected Functioning Problem/Corrective Action Y N Y N NIP - �2013 D. R. STRONG Consulting Engineers Inc. Page 27 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 BMP: Inspected Functioning ' Location Y N Y N NIP Problem/Corrective Action ' Element 4: Instal!Sediment Controls BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Location �nspected Functioning Problem/Corrective Action Y N Y N NIP i_ BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action � i BMP: - Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Inspected Functioning - Location Y N Y N NIP Problem/Corrective Action Element 5: Stabrlize Soils BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BM P: III Inspected Functioning Location Y N Y N NIP Problem/Corrective Action O 2013 D. R.STRONG Consulting Engineers Inc. Page 28 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div.II August 7, 2013 � BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Location Inspected Functioning Problem/Corrective Action Y N Y N NIP Element 6: Profect Slopes BMP: _ - Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Inspected Functioning Location Y N Y N NIP ProblemlCorrective Action Element 7: Protect Drain lnlets BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action � BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action � :,2013 D. R. STRONG Consulting Engineers Inc. Page 29 of 33 Storm�vater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 � Element 8: Sfabilize Channels and Outlets BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Inspected Functioning Location Y N Y N NIP ProblemlCorrective Action Element 9: Contro!Pollutants BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action BMP: Inspected Functioning Location Y N Y N NIP Problem/Corrective Action E/ement 90: Control Dewafering BMP: Inspected Functioning ' Location Y N Y N NIP Problem/Corrective Action I BM P: Location InspYct N YunNionNIP Problem/Corrective Action :�2013 D. R.STRONG Consufting Engineers Inc. Page 30 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013 BMP: Inspected Functioning Location Y N Y N NIP ProblemlCorrective Action Stormwater Discharges From the Site Observed? problemlCorrective Action Y �N Location Turbidity Discoloration Sheen Location Turbidity Discoloration Sheen Water Quality Monitoring Was any water quality monitoring conducted? o Yes ❑ No If water quality monitoring was conducted, record results here: If water quality monitoring indicated turbidity 250 NTU or greater; or transparency 6 cm or less, was Ecology notified by phone within 24 hrs? ❑ Yes ❑ No If Ecology was notified, indicate the date, time, contact name and phone number below: Date: Time: Contact Name: Phone#: General Comments and Notes Include BMP repairs, maintenance, or installations made as a result of the inspection. Were Photos Taken? ❑ Yes ❑ No If photos taken, describe photos below: O 2013 D.R.STRONG Consulting Engineers Inc. Page 31 of 33 Stormwater Pollution Prevention Plan Saddiebrook Div. II August 7,2013 APPENDIX F - ENGINEERING CALCULATIONS G 2013 D. R. STRONG Consulting Engineers Inc. Page 32 of 33 Stormwater Pollution Prevention P�an Saddlebrook Div. II August 7, 2013 SEDIMENT TRAP SIZING Modeling Input � �Eand Use Summary �Area� ? i, Till Forest O.OD acres� I Till Pasture� 0.00 acres Till Grass 0.49 acres Outwash Forest� 0.00 acres Outwash Pasture 0.00 acres i Outwash Grass� 0.00 acres� Wetlandl 0.00 acres Imperviousl 0.45 acres Total� 0.94 acresl Scale Fador: 1.00 15-Min Reduced Edit Flow Paths I • - Time Series: dev » Compute Time Series I Modify User Input I � Fle for computed Time Series[.TSFj Modeling Results Flow Frequency Analysis Time Series File:dev.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) {CFS) Period 0.214 6 8/27/O1 18:00 0.779 1 100.00 0.990 -- 0.164 8 1/05/02 15:00 0.513 2 25.00 0.960 0.513 2 12/08/02 17:15 0.338 3 10. 00 0.900 0. 172 7 8/23/04 14:30 0.306 4 5.00 0.800 0.338 3 11/17/04 5:00 0.271 5 3.00 0.667 0.271 5 10/27/05 10:45 0.214 6 2.00 0.500 0. 306 4 10/25/06 22:45 0. 172 7 1.30 0.231 0.779 1 1/09/08 6:30 0. 164 8 1. 10 0.091 Computed Peaks 0.690 50.00 0.980 The sediment trap requires 2,080 s.f. of surface area per cfs of inlow; developed 2-year storm, 15-minute time steps. Required SurFace Area = 2,080 x .214 = 445 s.f. Provided Surface Area = 1,077 s.f. O 2013 D.R.STRONG Consulting Engineers Inc. Page 33 of 33 Stormwater Pollution Prevention Plan Saddlebrook Div. II August 7,2013