14. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN
SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
15. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER
RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE
WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO
REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
Gi 2 W Do" Delero You Dip
811
umm" - IN a -m
WWWatwN
CQNSULTING ENGINEERS LLC
33400 M Avenue Soueh I• I♦ I S I
Sure 205
Federal Way, WA 98003 PINWIL UW 0" =04113
www.Owncmi.com E%IFAErr c+20 297-a
ELL.�..UIB (980) M-�
Ci�rii Enei�:w" L W Swwying Lawn p
P
unic werl a I mem"Im"em I L A F 0. Acct"
ESM JOB #1670-003-013
•• 7
C/.S
STRUCTURAL NOTES
1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY.
PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A
SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
2. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT-OF-WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
AS -BUILT
REVISION
ESM 101/05/161 1 SURVEYED:
DESIGNED:
Lm
DRAW
CJR
CHECKED:
SCALE:
NTS
ONE INCH
AT FULL SCALE
IF NOT ONE RICH
SCALE ACCORONIGLY
MULCH STANDARDS AND GUIDELINES
EROSION
1.
2.
CONTROL NOTES
BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTMTY OCCURS, APRE- CONSTRUCTION
MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS
PRESCRIBED ON THE PLAN(S) SWILL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING
IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE
SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARMIG LIMITS SHALL BE
CONDITIONS
�,
2.
FOR WET SEASON CONSTRUCTION
ANY CONSTRUCTION THAT WILL RESULT IN DISTURBED AREAS ON OR WITHIN A
CRITICAL AREA OR ASSOCIATED BUFFER, SHALL BE SUBJECT TO THE "CRITICAL AREA
RESTRICTIONS" CONTAINED IN THE ESC STANDARDS. THESE PROVISIONS INCLUDE
PHASING THE PROJECT WHENEVER POSSIBLE SO THAT CONSTRUCTION IN THESE
AREAS IS LIMITED TO THE DRY SEASON.
DURING CONSTRUCTION, ESC PLANS SHALL BE REVISED AS NECESSARY BY THE ESC
STRAW
AIR-DRIED; FREE FROM
2"-3" THICK; 2-3
PERMITTED. THE CLEARING LIMITS SWILL BE MAINTAINED BY THE APPLIGWT/ESC
mO
SUPERVISOR OR AS DIRECTED BY THE CITY TO ADDRESS CHANGING SITE
BALES PER 1000 SF OR
WITH ADEQUATE THICKNESS. HAIR -APPLICATION
SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
AND COARSE MATERIAL
CONDITIONS, UNEXPECTED STORM EVENTS, OR NON-COMPLIANCE WITH THE ESC
GENERALLY REQUIRES GREATER THICKNESS THAN
w
00
N
PERFORMANCE CRITERIA IN SECTION D.4.1 (P. D-69). IF NON-COMPLIANCE WITH
W
3.
STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
AVOID WIND BLOW. THE THICKNESS OF STRAW
THE ESC PERFORMANCE CRITERIA OCCURS, THE PLAN MUST BE UPDATED WITHIN 48
U
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
HOURS (FAILURE TO DO SO COULD RESULT INA "STOP WORK" ORDER AS
CONJUNCTION WITH SEEDING.
WOOD FIBER
NO GROWTH INHIBITING
DETERMINED BY THE CITY INSPECTOR) OF INSPECTIONS OR INVESTIGATIONS.
SHALL BE APPLIED WITH HYDROw1ULCHER. SHALL
CELLULOSE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN MID TRACK OUT TO ROAD
PER 1000 SF OR
NOT BE USED WITHOUT SEED AND TACKIFIER
J
RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
UNLESS THE APPLICATION RATE IS AT LEAST
IMPLEMENTATION OF THE ONSITE CHANGES MUST OCCUR WITHIN 5 DAYS.
4.
ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND
3.
ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR BASIS AS
FIBERS CAN BE EFFECTIVE AT LOWER
IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT
PRESCRIBED IN THE MAINTENANCE REQUIREMENTS FOR EACH BMP AND IN THIS
APPLICATION RATES AND WITHOUT SEED OR
TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT
SECTION. THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST WEEKLY DURING
W
NO VISIBLE WATER OR
PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED INA
MORE EFFECTIVE CONTROL CAN BE OBTAINED BY
THE WET SEASON, AND WITHIN 24 HOURS OF SIGNIFICANT STORMS. IN GENERAL, A
W
APPROX. 100 TONS
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS
SIGNIFICANT STORM IS ONE WITH MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR
PER ACRE (APPROX.
MULCH FOR PROTECTING FINAL. GRADES UNTIL
COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION,
PURCHASED FROM
LESS. THE CITY MAY REQUIRE THAT A WRITTEN RECORD OF THESE REVIEWS BE KEPT
mi
MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL
ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 48 HOURS.
>-
WASTE HANDLING
SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
AMENDMENT. SOURCES FOR COMPOST ARE
PERMIT.
AVAILABLE FROM THE KING COUNTY COMMISSION
5.
THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
(206) 296-4439.
CHIPPED SITE
INTENDED TO BE MMl1AlUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
WET SEASON PROVISIONS
THIS IS A COST-EFFECTIVE WAY TO DISPOSE OF
VEGETATION
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
THICKNESS
DEBRIS FROM CLEARING AND GRUBBING, AND IT
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
ELIMINATES THE PROBLEMS ASSOCIATED WITH
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
NOTE: THE FOLLOWING MEASURES ARE REQUIRED FOR CONSTRUCTION DURING THE WET
DURING THE COURSE OF CONSTRUCTION, R SWILL BE THE OBLIGATION AND
SEASON (OCTOBER 1 -APRIL 30) IN ADDITION TO THE STANDARD TESC MEASURES.
ITS TENDENCY TO BE TRANSPORTED BY RUNOFF.
RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
1.
THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT COVER
IT IS NOT RECOMMENDED WITHIN 200 FEET OF
CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE
MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN
MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND
SHORTLY AFTER MULCH, THE DECOMPOSITION OF
(SECTION D.3.2).
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
IMPORTANT TO GRASS ESTABLISHMENT.
2.
STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED
6.
APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT
FOR MORE THAN 12 HOURS (SECTION D.3.2).
CONSTITUTE AN APPROVAL OF STORM DRA04AGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
3.
COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED
ON SITE (SECTION D.3.2).
7.
ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
4.
ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED
DISTURBED FOR T1N0 DAYS DURING THE WET SEASON (OCTOBER 1ST TROUGH MARCH
WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON (SECTION D.3.2.5).
30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30)
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G.,
5.
MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS (SECTION D.3.2.1).
SEEDING, MULCHING, PLASTIC COVERING, ETC.).
6.
FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF
8.
WET SEASON SEASONAL EROSION AND SEDMAENT CONTROL REQUIREMENTS APPLY TO ALL
DISTURBANCE MUST BE STOCKPILED ON SITE (SECTION D.3.3.1).
CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
7.
CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
UNLESS THE SITE IS UNDERLAIN BY COARSE-GRAINED SOIL (SECTION D.3.4.2).
9.
COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE
8.
SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR
WATER DESIGN MANUAL.
THE SPECIFIED DESIGN FLOW (SECTION D.3.5).
10.
ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SWELL BE
9.
SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS
ADDRESSED WITHIN SEVEN (7) DAYS.
ANTICIPATED FOR THE SPECIFIED DESIGN FLOW (SECTION D.3.6).
10.
PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONSTRUCTION
11.
THE ESC FACILITIES ON INACTIVE SITES SWILL BE INSPECTED AND MAINTAINED A MINIMUM
ACTIVITY NEAR THE SURFACE WATERS (SECTION D.5.3).
OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
11.
ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE
12.
AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE
SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND
WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
FILTER SYSTEMS, OR HOLDING TANKS.
PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER
� 2,
THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY
INTO THE DOWNSTREAM SYSTEM.
(SECTION D.5.4).
13.
DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT
DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN
12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
14. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN
SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
15. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER
RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE
WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO
REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
Gi 2 W Do" Delero You Dip
811
umm" - IN a -m
WWWatwN
CQNSULTING ENGINEERS LLC
33400 M Avenue Soueh I• I♦ I S I
Sure 205
Federal Way, WA 98003 PINWIL UW 0" =04113
www.Owncmi.com E%IFAErr c+20 297-a
ELL.�..UIB (980) M-�
Ci�rii Enei�:w" L W Swwying Lawn p
P
unic werl a I mem"Im"em I L A F 0. Acct"
ESM JOB #1670-003-013
•• 7
C/.S
STRUCTURAL NOTES
1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY.
PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A
SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
2. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT-OF-WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
AS -BUILT
REVISION
ESM 101/05/161 1 SURVEYED:
DESIGNED:
Lm
DRAW
CJR
CHECKED:
SCALE:
NTS
ONE INCH
AT FULL SCALE
IF NOT ONE RICH
SCALE ACCORONIGLY
MULCH STANDARDS AND GUIDELINES
MULCH
MATERIAL
CK ALrrY
STANDARDS
APPLICATION
RATES
REMARKS
STRAW
AIR-DRIED; FREE FROM
2"-3" THICK; 2-3
COST-EFFECTIVE PROTECTION WHEN APPLIED
mO
UNDESIRABLE SEED
BALES PER 1000 SF OR
WITH ADEQUATE THICKNESS. HAIR -APPLICATION
O
AND COARSE MATERIAL
2-3 TONS PER ACRE
GENERALLY REQUIRES GREATER THICKNESS THAN
w
00
N
BLOWN STRAW. STRAW SHOULD BE CRIMPED TO
m
m
AVOID WIND BLOW. THE THICKNESS OF STRAW
cn
M
MAY BE REDUCED BY HALF WHEN USED IN
CONJUNCTION WITH SEEDING.
WOOD FIBER
NO GROWTH INHIBITING
APPROX. 25-30 LBS
SHALL BE APPLIED WITH HYDROw1ULCHER. SHALL
CELLULOSE
FACTORS
PER 1000 SF OR
NOT BE USED WITHOUT SEED AND TACKIFIER
1000-1500 LBS PER
UNLESS THE APPLICATION RATE IS AT LEAST
ACRE
DOUBLED. SOME WOOD FIBER WITH VERY LONG
FIBERS CAN BE EFFECTIVE AT LOWER
APPLICATION RATES AND WITHOUT SEED OR
TACKIFIER.
COMPOST
NO VISIBLE WATER OR
2" THICK MIN.;
MORE EFFECTIVE CONTROL CAN BE OBTAINED BY
DUST DURA
APPROX. 100 TONS
INCREASING THICKNESS TO Y. EXCELLENT
HANDLING. MUST BE
PER ACRE (APPROX.
MULCH FOR PROTECTING FINAL. GRADES UNTIL
PURCHASED FROM
800 LBS PER YARD)
LANDSCAPING BECAUSE IT CAN BE DIRECTLY
SUPPLIER WITH SOLID
SEEDED OR TILLED INTO SOIL AS AN
WASTE HANDLING
AMENDMENT. SOURCES FOR COMPOST ARE
PERMIT.
AVAILABLE FROM THE KING COUNTY COMMISSION
FOR MARKETING RECYCLABLE MATERIALS AT
(206) 296-4439.
CHIPPED SITE
AVERAGE SIZE SHALL
2" MINIMUM
THIS IS A COST-EFFECTIVE WAY TO DISPOSE OF
VEGETATION
BE SEVERAL INCHES.
THICKNESS
DEBRIS FROM CLEARING AND GRUBBING, AND IT
ELIMINATES THE PROBLEMS ASSOCIATED WITH
BURNING. GENERALLY, IT SHOULD NOT BE USED
ON SLOPES ABOVE APPROX. 106 BECAUSE OF
ITS TENDENCY TO BE TRANSPORTED BY RUNOFF.
IT IS NOT RECOMMENDED WITHIN 200 FEET OF
SURFACE WATERS. IF SEEDING IS EXPECTED
SHORTLY AFTER MULCH, THE DECOMPOSITION OF
THE CHIPPED VEGETATION MAY TIE UP NUTRIENTS
IMPORTANT TO GRASS ESTABLISHMENT.
Wiff cAL: ~ 1 m
HORIMML• NAD , 993/, M l
DATUM
R- 316231
RECORD DRAWING
!,� CITY OF
+R RENTON
Planning/Building/Public Works Dept.
CHECKED FOR COMPLIANCE TO CITY STANDARDS
RYLEE'S PLACE
GRADING & T.E.S.C. NOTES
A$: R376231
01/05/201
RAGE:
NO:
GR -02
slur. 6 X22
o�
OM1l
D
i �m
z�
mO
r
I m.
LTI
al
R) z
m
o
b
v
a
z
0
z
c
3
tom
n
00
00
z•
D
�rn
0
0
tTlN
�
zi
mO
yr
c
Ul �
O
ic
01
Nz
o M
w
00
N
m
m
m
O
cn
M
o�
OM1l
D
i �m
z�
mO
r
I m.
LTI
al
R) z
m
o
b
v
a
z
0
z
c
3
tom
n
00
00
10=3
0
0
tTlN
1
yr
caCD�
CD
w � ►-d
O
A., �
1
o M
w
00
N
00
00
r♦
CD
cn
M